# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-05-16 01:57:31 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO2 (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "USDA Forest Service Forestry Sciences Laboratory" # without whom these measurements would not be possible. # # URL: http://climate.usfs.msu.edu/FACE/physiology.html # # The 447-m tall WLEF-TV transmitter tower in northern Wisconsin # became the second site for the tall tower program in October, # 1994. This tower is owned by the State of Wisconsin Educational # Communications Board. A large program has evolved around our # measurements at the WLEF tower, involving a number of university # and federal research institutions. The goals are to assess the # carbon budget of the forests in the region (the Chequamegon # National Forest), and to examine the influence of forest/atmosphere # CO2 exchange on CO2 mixing ratios within and above the atmospheric # boundary layer over the continent. This program is known as # the Chequamegon Ecosystem-Atmosphere Study (ChEAS). The ChEAS # project is also a part of the AmeriFlux program. Scientists # from Caltech and NASA JPL began making total column CO2 measurements # at the base of the WLEF tower in 2004 by FTIR spectroscopy. # These measurements are part of the validation effort for NASA's # Orbiting Carbon Observatory to be launched in 2008. Partners: # Penn State University (Ken Davis) , University of Wisconsin # (Ankur Desai), USDA Forest Service Northern Research Station(Ron # Teclaw and Dan Baumann). # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag LEF 2010 11 01 00 14 55 45.9451 -90.2732 472.000 396.0 392.240 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 19 55 45.9451 -90.2732 472.000 30.0 392.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 24 55 45.9451 -90.2732 472.000 122.0 392.173 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 29 55 45.9451 -90.2732 472.000 396.0 392.184 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 34 55 45.9451 -90.2732 472.000 30.0 392.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 39 55 45.9451 -90.2732 472.000 122.0 392.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 44 55 45.9451 -90.2732 472.000 396.0 392.195 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 45 25 45.9451 -90.2732 472.000 396.0 392.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 45 55 45.9451 -90.2732 472.000 396.0 392.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 46 25 45.9451 -90.2732 472.000 396.0 392.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 46 55 45.9451 -90.2732 472.000 396.0 392.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 47 25 45.9451 -90.2732 472.000 396.0 392.171 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 47 55 45.9451 -90.2732 472.000 396.0 392.164 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 48 25 45.9451 -90.2732 472.000 396.0 392.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 48 55 45.9451 -90.2732 472.000 396.0 392.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 49 25 45.9451 -90.2732 472.000 396.0 392.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 49 55 45.9451 -90.2732 472.000 396.0 392.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 54 55 45.9451 -90.2732 472.000 30.0 392.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 00 59 55 45.9451 -90.2732 472.000 122.0 392.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 04 55 45.9451 -90.2732 472.000 396.0 392.106 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 09 55 45.9451 -90.2732 472.000 30.0 393.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 14 55 45.9451 -90.2732 472.000 122.0 393.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 19 55 45.9451 -90.2732 472.000 396.0 392.076 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 20 25 45.9451 -90.2732 472.000 396.0 392.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 20 55 45.9451 -90.2732 472.000 396.0 392.101 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 21 25 45.9451 -90.2732 472.000 396.0 392.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 21 55 45.9451 -90.2732 472.000 396.0 392.061 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 22 25 45.9451 -90.2732 472.000 396.0 392.067 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 22 55 45.9451 -90.2732 472.000 396.0 392.073 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 23 25 45.9451 -90.2732 472.000 396.0 392.077 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 23 55 45.9451 -90.2732 472.000 396.0 392.068 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 24 25 45.9451 -90.2732 472.000 396.0 392.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 24 55 45.9451 -90.2732 472.000 396.0 392.047 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 29 55 45.9451 -90.2732 472.000 30.0 394.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 34 55 45.9451 -90.2732 472.000 122.0 393.126 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 39 55 45.9451 -90.2732 472.000 396.0 392.064 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 44 55 45.9451 -90.2732 472.000 30.0 393.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 49 55 45.9451 -90.2732 472.000 122.0 392.983 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 01 54 55 45.9451 -90.2732 472.000 396.0 392.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 04 55 45.9451 -90.2732 472.000 30.0 393.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 09 55 45.9451 -90.2732 472.000 122.0 392.244 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 14 55 45.9451 -90.2732 472.000 396.0 392.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 19 55 45.9451 -90.2732 472.000 30.0 393.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 24 55 45.9451 -90.2732 472.000 122.0 392.379 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 29 55 45.9451 -90.2732 472.000 396.0 391.968 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 30 25 45.9451 -90.2732 472.000 396.0 391.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 30 55 45.9451 -90.2732 472.000 396.0 392.000 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 31 25 45.9451 -90.2732 472.000 396.0 392.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 31 55 45.9451 -90.2732 472.000 396.0 392.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 32 25 45.9451 -90.2732 472.000 396.0 392.152 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 32 55 45.9451 -90.2732 472.000 396.0 392.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 33 25 45.9451 -90.2732 472.000 396.0 392.007 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 33 55 45.9451 -90.2732 472.000 396.0 391.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 34 25 45.9451 -90.2732 472.000 396.0 392.202 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 34 55 45.9451 -90.2732 472.000 396.0 392.248 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 39 55 45.9451 -90.2732 472.000 30.0 393.920 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 44 55 45.9451 -90.2732 472.000 122.0 392.943 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 49 55 45.9451 -90.2732 472.000 396.0 392.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 54 55 45.9451 -90.2732 472.000 30.0 394.662 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 01 02 59 55 45.9451 -90.2732 472.000 122.0 392.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 04 55 45.9451 -90.2732 472.000 396.0 392.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 05 25 45.9451 -90.2732 472.000 396.0 392.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 05 55 45.9451 -90.2732 472.000 396.0 392.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 06 25 45.9451 -90.2732 472.000 396.0 392.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 06 55 45.9451 -90.2732 472.000 396.0 392.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 07 25 45.9451 -90.2732 472.000 396.0 392.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 07 55 45.9451 -90.2732 472.000 396.0 392.332 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 08 25 45.9451 -90.2732 472.000 396.0 392.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 08 55 45.9451 -90.2732 472.000 396.0 392.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 09 25 45.9451 -90.2732 472.000 396.0 392.388 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 09 55 45.9451 -90.2732 472.000 396.0 392.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 14 55 45.9451 -90.2732 472.000 30.0 394.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 19 55 45.9451 -90.2732 472.000 122.0 392.746 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 24 55 45.9451 -90.2732 472.000 396.0 392.397 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 29 55 45.9451 -90.2732 472.000 30.0 394.992 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 34 55 45.9451 -90.2732 472.000 122.0 392.379 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 39 55 45.9451 -90.2732 472.000 396.0 392.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 40 25 45.9451 -90.2732 472.000 396.0 392.491 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 40 55 45.9451 -90.2732 472.000 396.0 392.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 41 25 45.9451 -90.2732 472.000 396.0 392.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 41 55 45.9451 -90.2732 472.000 396.0 392.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 42 25 45.9451 -90.2732 472.000 396.0 392.521 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 42 55 45.9451 -90.2732 472.000 396.0 392.603 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 43 25 45.9451 -90.2732 472.000 396.0 392.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 43 55 45.9451 -90.2732 472.000 396.0 392.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 44 25 45.9451 -90.2732 472.000 396.0 392.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 44 55 45.9451 -90.2732 472.000 396.0 392.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 49 55 45.9451 -90.2732 472.000 30.0 395.868 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 54 55 45.9451 -90.2732 472.000 122.0 392.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 03 59 55 45.9451 -90.2732 472.000 396.0 392.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 04 55 45.9451 -90.2732 472.000 30.0 396.181 0.660 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 09 55 45.9451 -90.2732 472.000 122.0 392.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 14 55 45.9451 -90.2732 472.000 396.0 392.827 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 24 55 45.9451 -90.2732 472.000 30.0 395.746 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 29 55 45.9451 -90.2732 472.000 122.0 391.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 34 55 45.9451 -90.2732 472.000 396.0 392.702 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 39 55 45.9451 -90.2732 472.000 30.0 397.542 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 44 55 45.9451 -90.2732 472.000 122.0 391.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 49 55 45.9451 -90.2732 472.000 396.0 392.900 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 50 25 45.9451 -90.2732 472.000 396.0 392.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 50 55 45.9451 -90.2732 472.000 396.0 392.903 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 51 25 45.9451 -90.2732 472.000 396.0 393.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 51 55 45.9451 -90.2732 472.000 396.0 393.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 52 25 45.9451 -90.2732 472.000 396.0 393.055 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 52 55 45.9451 -90.2732 472.000 396.0 393.072 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 53 25 45.9451 -90.2732 472.000 396.0 393.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 53 55 45.9451 -90.2732 472.000 396.0 393.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 54 25 45.9451 -90.2732 472.000 396.0 393.062 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 04 54 55 45.9451 -90.2732 472.000 396.0 393.064 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 04 55 45.9451 -90.2732 472.000 30.0 396.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 09 55 45.9451 -90.2732 472.000 122.0 391.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 14 55 45.9451 -90.2732 472.000 396.0 392.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 19 55 45.9451 -90.2732 472.000 30.0 396.440 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 24 55 45.9451 -90.2732 472.000 122.0 391.983 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 29 55 45.9451 -90.2732 472.000 396.0 392.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 30 25 45.9451 -90.2732 472.000 396.0 392.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 30 55 45.9451 -90.2732 472.000 396.0 392.474 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 31 25 45.9451 -90.2732 472.000 396.0 392.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 31 55 45.9451 -90.2732 472.000 396.0 392.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 32 25 45.9451 -90.2732 472.000 396.0 392.391 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 32 55 45.9451 -90.2732 472.000 396.0 392.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 33 25 45.9451 -90.2732 472.000 396.0 392.341 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 33 55 45.9451 -90.2732 472.000 396.0 392.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 34 25 45.9451 -90.2732 472.000 396.0 392.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 34 55 45.9451 -90.2732 472.000 396.0 392.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 39 55 45.9451 -90.2732 472.000 30.0 395.832 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 44 55 45.9451 -90.2732 472.000 122.0 391.997 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 49 55 45.9451 -90.2732 472.000 396.0 393.239 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 54 55 45.9451 -90.2732 472.000 30.0 396.182 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 05 59 55 45.9451 -90.2732 472.000 122.0 392.198 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 04 55 45.9451 -90.2732 472.000 396.0 392.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 14 55 45.9451 -90.2732 472.000 30.0 396.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 19 55 45.9451 -90.2732 472.000 122.0 392.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 24 55 45.9451 -90.2732 472.000 396.0 392.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 29 55 45.9451 -90.2732 472.000 30.0 396.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 34 55 45.9451 -90.2732 472.000 122.0 392.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 39 55 45.9451 -90.2732 472.000 396.0 392.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 40 25 45.9451 -90.2732 472.000 396.0 392.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 40 55 45.9451 -90.2732 472.000 396.0 392.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 41 25 45.9451 -90.2732 472.000 396.0 392.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 41 55 45.9451 -90.2732 472.000 396.0 392.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 42 25 45.9451 -90.2732 472.000 396.0 392.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 42 55 45.9451 -90.2732 472.000 396.0 392.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 43 25 45.9451 -90.2732 472.000 396.0 392.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 43 55 45.9451 -90.2732 472.000 396.0 392.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 44 25 45.9451 -90.2732 472.000 396.0 392.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 44 55 45.9451 -90.2732 472.000 396.0 392.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 49 55 45.9451 -90.2732 472.000 30.0 397.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 54 55 45.9451 -90.2732 472.000 122.0 392.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 06 59 55 45.9451 -90.2732 472.000 396.0 392.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 04 55 45.9451 -90.2732 472.000 30.0 397.809 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 09 55 45.9451 -90.2732 472.000 122.0 392.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 14 55 45.9451 -90.2732 472.000 396.0 392.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 15 25 45.9451 -90.2732 472.000 396.0 392.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 15 55 45.9451 -90.2732 472.000 396.0 392.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 16 25 45.9451 -90.2732 472.000 396.0 392.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 16 55 45.9451 -90.2732 472.000 396.0 392.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 17 25 45.9451 -90.2732 472.000 396.0 392.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 17 55 45.9451 -90.2732 472.000 396.0 392.693 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 18 25 45.9451 -90.2732 472.000 396.0 392.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 18 55 45.9451 -90.2732 472.000 396.0 392.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 19 25 45.9451 -90.2732 472.000 396.0 392.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 19 55 45.9451 -90.2732 472.000 396.0 392.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 24 55 45.9451 -90.2732 472.000 30.0 396.955 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 29 55 45.9451 -90.2732 472.000 122.0 392.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 34 55 45.9451 -90.2732 472.000 396.0 392.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 39 55 45.9451 -90.2732 472.000 30.0 396.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 44 55 45.9451 -90.2732 472.000 122.0 392.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 49 55 45.9451 -90.2732 472.000 396.0 392.372 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 07 59 55 45.9451 -90.2732 472.000 30.0 397.458 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 04 55 45.9451 -90.2732 472.000 122.0 392.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 09 55 45.9451 -90.2732 472.000 396.0 392.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 14 55 45.9451 -90.2732 472.000 30.0 398.559 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 19 55 45.9451 -90.2732 472.000 122.0 392.390 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 24 55 45.9451 -90.2732 472.000 396.0 392.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 25 25 45.9451 -90.2732 472.000 396.0 392.122 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 25 55 45.9451 -90.2732 472.000 396.0 392.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 26 25 45.9451 -90.2732 472.000 396.0 392.190 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 26 55 45.9451 -90.2732 472.000 396.0 392.234 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 27 25 45.9451 -90.2732 472.000 396.0 392.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 27 55 45.9451 -90.2732 472.000 396.0 392.245 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 28 25 45.9451 -90.2732 472.000 396.0 392.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 28 55 45.9451 -90.2732 472.000 396.0 392.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 29 25 45.9451 -90.2732 472.000 396.0 392.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 29 55 45.9451 -90.2732 472.000 396.0 392.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 34 55 45.9451 -90.2732 472.000 30.0 399.531 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 39 55 45.9451 -90.2732 472.000 122.0 392.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 44 55 45.9451 -90.2732 472.000 396.0 392.467 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 49 55 45.9451 -90.2732 472.000 30.0 399.900 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 54 55 45.9451 -90.2732 472.000 122.0 392.529 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 08 59 55 45.9451 -90.2732 472.000 396.0 392.224 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 00 25 45.9451 -90.2732 472.000 396.0 392.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 00 55 45.9451 -90.2732 472.000 396.0 392.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 01 25 45.9451 -90.2732 472.000 396.0 392.257 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 01 55 45.9451 -90.2732 472.000 396.0 392.248 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 02 25 45.9451 -90.2732 472.000 396.0 392.237 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 02 55 45.9451 -90.2732 472.000 396.0 392.228 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 03 25 45.9451 -90.2732 472.000 396.0 392.251 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 03 55 45.9451 -90.2732 472.000 396.0 392.269 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 04 25 45.9451 -90.2732 472.000 396.0 392.264 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 04 55 45.9451 -90.2732 472.000 396.0 392.282 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 09 55 45.9451 -90.2732 472.000 30.0 399.409 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 14 55 45.9451 -90.2732 472.000 122.0 392.314 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 19 55 45.9451 -90.2732 472.000 396.0 392.225 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 24 55 45.9451 -90.2732 472.000 30.0 400.812 0.590 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 29 55 45.9451 -90.2732 472.000 122.0 392.349 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 34 55 45.9451 -90.2732 472.000 396.0 392.022 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 35 25 45.9451 -90.2732 472.000 396.0 392.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 35 55 45.9451 -90.2732 472.000 396.0 392.047 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 36 25 45.9451 -90.2732 472.000 396.0 392.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 36 55 45.9451 -90.2732 472.000 396.0 392.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 37 25 45.9451 -90.2732 472.000 396.0 392.124 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 37 55 45.9451 -90.2732 472.000 396.0 392.148 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 38 25 45.9451 -90.2732 472.000 396.0 392.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 38 55 45.9451 -90.2732 472.000 396.0 392.099 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 39 25 45.9451 -90.2732 472.000 396.0 392.106 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 39 55 45.9451 -90.2732 472.000 396.0 392.093 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 44 55 45.9451 -90.2732 472.000 30.0 402.596 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 49 55 45.9451 -90.2732 472.000 122.0 392.191 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 54 55 45.9451 -90.2732 472.000 396.0 391.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 09 59 55 45.9451 -90.2732 472.000 30.0 402.857 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 04 55 45.9451 -90.2732 472.000 122.0 392.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 09 55 45.9451 -90.2732 472.000 396.0 391.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 19 55 45.9451 -90.2732 472.000 30.0 401.734 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 24 55 45.9451 -90.2732 472.000 122.0 392.648 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 29 55 45.9451 -90.2732 472.000 396.0 391.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 34 55 45.9451 -90.2732 472.000 30.0 400.296 1.130 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 39 55 45.9451 -90.2732 472.000 122.0 392.649 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 44 55 45.9451 -90.2732 472.000 396.0 391.967 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 54 55 45.9451 -90.2732 472.000 30.0 401.573 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 10 59 55 45.9451 -90.2732 472.000 122.0 392.622 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 04 55 45.9451 -90.2732 472.000 396.0 391.908 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 09 55 45.9451 -90.2732 472.000 30.0 400.968 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 14 55 45.9451 -90.2732 472.000 122.0 392.559 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 19 55 45.9451 -90.2732 472.000 396.0 391.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 20 25 45.9451 -90.2732 472.000 396.0 391.810 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 20 55 45.9451 -90.2732 472.000 396.0 391.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 21 25 45.9451 -90.2732 472.000 396.0 391.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 21 55 45.9451 -90.2732 472.000 396.0 391.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 22 25 45.9451 -90.2732 472.000 396.0 391.830 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 22 55 45.9451 -90.2732 472.000 396.0 391.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 23 25 45.9451 -90.2732 472.000 396.0 391.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 23 55 45.9451 -90.2732 472.000 396.0 391.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 24 25 45.9451 -90.2732 472.000 396.0 391.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 24 55 45.9451 -90.2732 472.000 396.0 391.850 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 29 55 45.9451 -90.2732 472.000 30.0 399.718 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 34 55 45.9451 -90.2732 472.000 122.0 392.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 39 55 45.9451 -90.2732 472.000 396.0 391.859 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 44 55 45.9451 -90.2732 472.000 30.0 399.915 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 01 11 49 55 45.9451 -90.2732 472.000 122.0 392.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 14 55 45.9451 -90.2732 472.000 396.0 391.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 19 55 45.9451 -90.2732 472.000 30.0 398.178 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 24 55 45.9451 -90.2732 472.000 122.0 392.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 29 55 45.9451 -90.2732 472.000 396.0 391.646 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 34 55 45.9451 -90.2732 472.000 30.0 398.409 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 39 55 45.9451 -90.2732 472.000 122.0 392.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 44 55 45.9451 -90.2732 472.000 396.0 391.681 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 45 25 45.9451 -90.2732 472.000 396.0 391.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 45 55 45.9451 -90.2732 472.000 396.0 391.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 46 25 45.9451 -90.2732 472.000 396.0 391.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 46 55 45.9451 -90.2732 472.000 396.0 391.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 47 25 45.9451 -90.2732 472.000 396.0 391.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 47 55 45.9451 -90.2732 472.000 396.0 391.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 48 25 45.9451 -90.2732 472.000 396.0 391.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 48 55 45.9451 -90.2732 472.000 396.0 391.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 49 25 45.9451 -90.2732 472.000 396.0 391.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 49 55 45.9451 -90.2732 472.000 396.0 391.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 54 55 45.9451 -90.2732 472.000 30.0 399.418 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 01 12 59 55 45.9451 -90.2732 472.000 122.0 392.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 04 55 45.9451 -90.2732 472.000 396.0 391.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 09 55 45.9451 -90.2732 472.000 30.0 398.572 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 14 55 45.9451 -90.2732 472.000 122.0 392.362 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 19 55 45.9451 -90.2732 472.000 396.0 391.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 20 25 45.9451 -90.2732 472.000 396.0 391.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 20 55 45.9451 -90.2732 472.000 396.0 391.808 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 21 25 45.9451 -90.2732 472.000 396.0 391.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 21 55 45.9451 -90.2732 472.000 396.0 391.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 22 25 45.9451 -90.2732 472.000 396.0 391.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 22 55 45.9451 -90.2732 472.000 396.0 391.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 23 25 45.9451 -90.2732 472.000 396.0 391.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 23 55 45.9451 -90.2732 472.000 396.0 391.928 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 24 25 45.9451 -90.2732 472.000 396.0 392.019 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 24 55 45.9451 -90.2732 472.000 396.0 391.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 29 55 45.9451 -90.2732 472.000 30.0 399.209 1.040 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 34 55 45.9451 -90.2732 472.000 122.0 392.042 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 39 55 45.9451 -90.2732 472.000 396.0 391.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 44 55 45.9451 -90.2732 472.000 30.0 399.131 1.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 49 55 45.9451 -90.2732 472.000 122.0 392.248 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 13 54 55 45.9451 -90.2732 472.000 396.0 392.261 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 04 55 45.9451 -90.2732 472.000 30.0 401.555 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 09 55 45.9451 -90.2732 472.000 122.0 392.072 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 14 55 45.9451 -90.2732 472.000 396.0 392.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 19 55 45.9451 -90.2732 472.000 30.0 404.009 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 24 55 45.9451 -90.2732 472.000 122.0 391.898 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 29 55 45.9451 -90.2732 472.000 396.0 392.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 30 25 45.9451 -90.2732 472.000 396.0 392.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 30 55 45.9451 -90.2732 472.000 396.0 392.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 31 25 45.9451 -90.2732 472.000 396.0 392.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 31 55 45.9451 -90.2732 472.000 396.0 392.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 32 25 45.9451 -90.2732 472.000 396.0 392.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 32 55 45.9451 -90.2732 472.000 396.0 392.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 33 25 45.9451 -90.2732 472.000 396.0 392.762 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 33 55 45.9451 -90.2732 472.000 396.0 392.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 34 25 45.9451 -90.2732 472.000 396.0 392.753 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 34 55 45.9451 -90.2732 472.000 396.0 392.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 39 55 45.9451 -90.2732 472.000 30.0 408.199 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 44 55 45.9451 -90.2732 472.000 122.0 392.174 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 49 55 45.9451 -90.2732 472.000 396.0 392.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 54 55 45.9451 -90.2732 472.000 30.0 410.436 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 01 14 59 55 45.9451 -90.2732 472.000 122.0 391.968 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 04 55 45.9451 -90.2732 472.000 396.0 392.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 05 25 45.9451 -90.2732 472.000 396.0 392.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 05 55 45.9451 -90.2732 472.000 396.0 392.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 06 25 45.9451 -90.2732 472.000 396.0 392.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 06 55 45.9451 -90.2732 472.000 396.0 392.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 07 25 45.9451 -90.2732 472.000 396.0 392.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 07 55 45.9451 -90.2732 472.000 396.0 392.561 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 08 25 45.9451 -90.2732 472.000 396.0 392.587 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 08 55 45.9451 -90.2732 472.000 396.0 392.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 09 25 45.9451 -90.2732 472.000 396.0 392.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 09 55 45.9451 -90.2732 472.000 396.0 392.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 14 55 45.9451 -90.2732 472.000 30.0 407.304 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 19 55 45.9451 -90.2732 472.000 122.0 392.093 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 24 55 45.9451 -90.2732 472.000 396.0 392.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 29 55 45.9451 -90.2732 472.000 30.0 403.884 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 34 55 45.9451 -90.2732 472.000 122.0 394.221 0.880 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 39 55 45.9451 -90.2732 472.000 396.0 392.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 40 25 45.9451 -90.2732 472.000 396.0 392.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 40 55 45.9451 -90.2732 472.000 396.0 392.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 41 25 45.9451 -90.2732 472.000 396.0 392.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 41 55 45.9451 -90.2732 472.000 396.0 392.492 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 42 25 45.9451 -90.2732 472.000 396.0 392.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 42 55 45.9451 -90.2732 472.000 396.0 392.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 43 25 45.9451 -90.2732 472.000 396.0 392.418 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 43 55 45.9451 -90.2732 472.000 396.0 392.429 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 44 25 45.9451 -90.2732 472.000 396.0 392.458 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 44 55 45.9451 -90.2732 472.000 396.0 392.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 49 55 45.9451 -90.2732 472.000 30.0 402.392 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 54 55 45.9451 -90.2732 472.000 122.0 402.144 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 01 15 59 55 45.9451 -90.2732 472.000 396.0 392.317 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 04 55 45.9451 -90.2732 472.000 30.0 399.257 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 09 55 45.9451 -90.2732 472.000 122.0 397.643 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 14 55 45.9451 -90.2732 472.000 396.0 392.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 24 55 45.9451 -90.2732 472.000 30.0 397.060 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 29 55 45.9451 -90.2732 472.000 122.0 396.244 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 34 55 45.9451 -90.2732 472.000 396.0 392.916 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 39 55 45.9451 -90.2732 472.000 30.0 394.630 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 44 55 45.9451 -90.2732 472.000 122.0 394.325 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 49 55 45.9451 -90.2732 472.000 396.0 393.681 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 50 25 45.9451 -90.2732 472.000 396.0 394.183 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 50 55 45.9451 -90.2732 472.000 396.0 394.110 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 51 25 45.9451 -90.2732 472.000 396.0 393.428 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 51 55 45.9451 -90.2732 472.000 396.0 393.922 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 52 25 45.9451 -90.2732 472.000 396.0 394.289 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 52 55 45.9451 -90.2732 472.000 396.0 394.322 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 53 25 45.9451 -90.2732 472.000 396.0 394.389 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 53 55 45.9451 -90.2732 472.000 396.0 394.648 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 54 25 45.9451 -90.2732 472.000 396.0 394.705 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 01 16 54 55 45.9451 -90.2732 472.000 396.0 393.491 0.510 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 04 55 45.9451 -90.2732 472.000 30.0 393.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 09 55 45.9451 -90.2732 472.000 122.0 393.704 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 14 55 45.9451 -90.2732 472.000 396.0 394.323 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 19 55 45.9451 -90.2732 472.000 30.0 394.298 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 24 55 45.9451 -90.2732 472.000 122.0 394.386 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 29 55 45.9451 -90.2732 472.000 396.0 394.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 30 25 45.9451 -90.2732 472.000 396.0 394.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 30 55 45.9451 -90.2732 472.000 396.0 394.196 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 31 25 45.9451 -90.2732 472.000 396.0 394.116 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 31 55 45.9451 -90.2732 472.000 396.0 393.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 32 25 45.9451 -90.2732 472.000 396.0 393.762 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 32 55 45.9451 -90.2732 472.000 396.0 393.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 33 25 45.9451 -90.2732 472.000 396.0 393.841 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 33 55 45.9451 -90.2732 472.000 396.0 394.110 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 34 25 45.9451 -90.2732 472.000 396.0 394.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 34 55 45.9451 -90.2732 472.000 396.0 394.048 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 39 55 45.9451 -90.2732 472.000 30.0 394.117 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 44 55 45.9451 -90.2732 472.000 122.0 393.706 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 49 55 45.9451 -90.2732 472.000 396.0 393.870 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 54 55 45.9451 -90.2732 472.000 30.0 393.692 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 17 59 55 45.9451 -90.2732 472.000 122.0 393.432 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 04 55 45.9451 -90.2732 472.000 396.0 393.378 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 14 55 45.9451 -90.2732 472.000 30.0 393.223 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 19 55 45.9451 -90.2732 472.000 122.0 393.501 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 24 55 45.9451 -90.2732 472.000 396.0 393.522 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 29 55 45.9451 -90.2732 472.000 30.0 393.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 34 55 45.9451 -90.2732 472.000 122.0 393.282 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 39 55 45.9451 -90.2732 472.000 396.0 393.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 40 25 45.9451 -90.2732 472.000 396.0 393.403 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 40 55 45.9451 -90.2732 472.000 396.0 393.433 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 41 25 45.9451 -90.2732 472.000 396.0 393.355 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 41 55 45.9451 -90.2732 472.000 396.0 393.305 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 42 25 45.9451 -90.2732 472.000 396.0 393.331 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 42 55 45.9451 -90.2732 472.000 396.0 393.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 43 25 45.9451 -90.2732 472.000 396.0 393.374 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 43 55 45.9451 -90.2732 472.000 396.0 393.350 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 44 25 45.9451 -90.2732 472.000 396.0 393.370 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 44 55 45.9451 -90.2732 472.000 396.0 393.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 49 55 45.9451 -90.2732 472.000 30.0 393.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 54 55 45.9451 -90.2732 472.000 122.0 393.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 18 59 55 45.9451 -90.2732 472.000 396.0 393.379 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 04 55 45.9451 -90.2732 472.000 30.0 392.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 09 55 45.9451 -90.2732 472.000 122.0 392.882 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 14 55 45.9451 -90.2732 472.000 396.0 392.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 15 25 45.9451 -90.2732 472.000 396.0 392.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 15 55 45.9451 -90.2732 472.000 396.0 392.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 16 25 45.9451 -90.2732 472.000 396.0 392.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 16 55 45.9451 -90.2732 472.000 396.0 392.789 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 17 25 45.9451 -90.2732 472.000 396.0 392.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 17 55 45.9451 -90.2732 472.000 396.0 392.767 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 18 25 45.9451 -90.2732 472.000 396.0 392.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 18 55 45.9451 -90.2732 472.000 396.0 392.846 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 19 25 45.9451 -90.2732 472.000 396.0 392.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 19 55 45.9451 -90.2732 472.000 396.0 392.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 24 55 45.9451 -90.2732 472.000 30.0 392.593 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 29 55 45.9451 -90.2732 472.000 122.0 392.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 34 55 45.9451 -90.2732 472.000 396.0 392.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 39 55 45.9451 -90.2732 472.000 30.0 392.707 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 44 55 45.9451 -90.2732 472.000 122.0 392.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 49 55 45.9451 -90.2732 472.000 396.0 393.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 19 59 55 45.9451 -90.2732 472.000 30.0 392.796 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 04 55 45.9451 -90.2732 472.000 122.0 393.075 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 09 55 45.9451 -90.2732 472.000 396.0 393.085 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 14 55 45.9451 -90.2732 472.000 30.0 392.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 19 55 45.9451 -90.2732 472.000 122.0 392.798 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 24 55 45.9451 -90.2732 472.000 396.0 393.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 25 25 45.9451 -90.2732 472.000 396.0 393.042 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 25 55 45.9451 -90.2732 472.000 396.0 393.037 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 26 25 45.9451 -90.2732 472.000 396.0 393.058 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 26 55 45.9451 -90.2732 472.000 396.0 393.093 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 27 25 45.9451 -90.2732 472.000 396.0 393.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 27 55 45.9451 -90.2732 472.000 396.0 393.085 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 28 25 45.9451 -90.2732 472.000 396.0 393.061 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 28 55 45.9451 -90.2732 472.000 396.0 393.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 29 25 45.9451 -90.2732 472.000 396.0 393.023 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 29 55 45.9451 -90.2732 472.000 396.0 393.004 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 34 55 45.9451 -90.2732 472.000 30.0 393.135 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 39 55 45.9451 -90.2732 472.000 122.0 393.120 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 44 55 45.9451 -90.2732 472.000 396.0 393.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 49 55 45.9451 -90.2732 472.000 30.0 392.904 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 54 55 45.9451 -90.2732 472.000 122.0 392.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 20 59 55 45.9451 -90.2732 472.000 396.0 392.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 00 25 45.9451 -90.2732 472.000 396.0 392.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 00 55 45.9451 -90.2732 472.000 396.0 392.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 01 25 45.9451 -90.2732 472.000 396.0 392.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 01 55 45.9451 -90.2732 472.000 396.0 392.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 02 25 45.9451 -90.2732 472.000 396.0 392.910 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 02 55 45.9451 -90.2732 472.000 396.0 392.921 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 03 25 45.9451 -90.2732 472.000 396.0 392.933 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 03 55 45.9451 -90.2732 472.000 396.0 392.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 04 25 45.9451 -90.2732 472.000 396.0 392.941 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 04 55 45.9451 -90.2732 472.000 396.0 392.942 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 09 55 45.9451 -90.2732 472.000 30.0 392.630 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 14 55 45.9451 -90.2732 472.000 122.0 392.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 19 55 45.9451 -90.2732 472.000 396.0 392.656 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 24 55 45.9451 -90.2732 472.000 30.0 392.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 29 55 45.9451 -90.2732 472.000 122.0 392.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 34 55 45.9451 -90.2732 472.000 396.0 392.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 35 25 45.9451 -90.2732 472.000 396.0 392.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 35 55 45.9451 -90.2732 472.000 396.0 392.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 36 25 45.9451 -90.2732 472.000 396.0 392.800 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 36 55 45.9451 -90.2732 472.000 396.0 392.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 37 25 45.9451 -90.2732 472.000 396.0 392.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 37 55 45.9451 -90.2732 472.000 396.0 392.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 38 25 45.9451 -90.2732 472.000 396.0 392.729 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 38 55 45.9451 -90.2732 472.000 396.0 392.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 39 25 45.9451 -90.2732 472.000 396.0 392.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 39 55 45.9451 -90.2732 472.000 396.0 392.800 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 44 55 45.9451 -90.2732 472.000 30.0 392.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 49 55 45.9451 -90.2732 472.000 122.0 392.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 54 55 45.9451 -90.2732 472.000 396.0 392.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 21 59 55 45.9451 -90.2732 472.000 30.0 392.895 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 04 55 45.9451 -90.2732 472.000 122.0 393.088 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 09 55 45.9451 -90.2732 472.000 396.0 393.035 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 19 55 45.9451 -90.2732 472.000 30.0 393.115 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 24 55 45.9451 -90.2732 472.000 122.0 393.163 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 29 55 45.9451 -90.2732 472.000 396.0 393.220 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 34 55 45.9451 -90.2732 472.000 30.0 393.012 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 39 55 45.9451 -90.2732 472.000 122.0 393.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 44 55 45.9451 -90.2732 472.000 396.0 393.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 54 55 45.9451 -90.2732 472.000 30.0 393.260 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 22 59 55 45.9451 -90.2732 472.000 122.0 393.151 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 04 55 45.9451 -90.2732 472.000 396.0 393.202 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 09 55 45.9451 -90.2732 472.000 30.0 393.133 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 14 55 45.9451 -90.2732 472.000 122.0 393.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 19 55 45.9451 -90.2732 472.000 396.0 393.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 20 25 45.9451 -90.2732 472.000 396.0 393.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 20 55 45.9451 -90.2732 472.000 396.0 393.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 21 25 45.9451 -90.2732 472.000 396.0 393.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 21 55 45.9451 -90.2732 472.000 396.0 393.456 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 22 25 45.9451 -90.2732 472.000 396.0 393.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 22 55 45.9451 -90.2732 472.000 396.0 393.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 23 25 45.9451 -90.2732 472.000 396.0 393.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 23 55 45.9451 -90.2732 472.000 396.0 393.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 24 25 45.9451 -90.2732 472.000 396.0 393.469 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 24 55 45.9451 -90.2732 472.000 396.0 393.455 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 29 55 45.9451 -90.2732 472.000 30.0 393.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 34 55 45.9451 -90.2732 472.000 122.0 393.489 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 39 55 45.9451 -90.2732 472.000 396.0 393.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 44 55 45.9451 -90.2732 472.000 30.0 393.464 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 01 23 49 55 45.9451 -90.2732 472.000 122.0 393.810 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 14 55 45.9451 -90.2732 472.000 396.0 394.744 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 19 55 45.9451 -90.2732 472.000 30.0 393.865 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 24 55 45.9451 -90.2732 472.000 122.0 394.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 29 55 45.9451 -90.2732 472.000 396.0 394.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 34 55 45.9451 -90.2732 472.000 30.0 393.781 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 39 55 45.9451 -90.2732 472.000 122.0 394.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 44 55 45.9451 -90.2732 472.000 396.0 394.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 45 25 45.9451 -90.2732 472.000 396.0 394.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 45 55 45.9451 -90.2732 472.000 396.0 394.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 46 25 45.9451 -90.2732 472.000 396.0 394.657 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 46 55 45.9451 -90.2732 472.000 396.0 394.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 47 25 45.9451 -90.2732 472.000 396.0 394.590 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 47 55 45.9451 -90.2732 472.000 396.0 394.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 48 25 45.9451 -90.2732 472.000 396.0 394.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 48 55 45.9451 -90.2732 472.000 396.0 394.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 49 25 45.9451 -90.2732 472.000 396.0 394.617 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 49 55 45.9451 -90.2732 472.000 396.0 394.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 54 55 45.9451 -90.2732 472.000 30.0 393.895 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 00 59 55 45.9451 -90.2732 472.000 122.0 394.210 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 04 55 45.9451 -90.2732 472.000 396.0 394.063 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 09 55 45.9451 -90.2732 472.000 30.0 394.388 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 14 55 45.9451 -90.2732 472.000 122.0 394.471 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 19 55 45.9451 -90.2732 472.000 396.0 394.042 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 20 25 45.9451 -90.2732 472.000 396.0 394.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 20 55 45.9451 -90.2732 472.000 396.0 394.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 21 25 45.9451 -90.2732 472.000 396.0 394.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 21 55 45.9451 -90.2732 472.000 396.0 394.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 22 25 45.9451 -90.2732 472.000 396.0 394.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 22 55 45.9451 -90.2732 472.000 396.0 394.112 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 23 25 45.9451 -90.2732 472.000 396.0 394.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 23 55 45.9451 -90.2732 472.000 396.0 394.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 24 25 45.9451 -90.2732 472.000 396.0 394.137 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 24 55 45.9451 -90.2732 472.000 396.0 394.149 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 29 55 45.9451 -90.2732 472.000 30.0 394.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 34 55 45.9451 -90.2732 472.000 122.0 394.972 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 39 55 45.9451 -90.2732 472.000 396.0 394.273 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 44 55 45.9451 -90.2732 472.000 30.0 394.936 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 49 55 45.9451 -90.2732 472.000 122.0 394.892 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 01 54 55 45.9451 -90.2732 472.000 396.0 394.550 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 04 55 45.9451 -90.2732 472.000 30.0 395.579 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 09 55 45.9451 -90.2732 472.000 122.0 393.994 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 14 55 45.9451 -90.2732 472.000 396.0 394.319 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 19 55 45.9451 -90.2732 472.000 30.0 395.509 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 24 55 45.9451 -90.2732 472.000 122.0 394.095 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 29 55 45.9451 -90.2732 472.000 396.0 394.222 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 30 25 45.9451 -90.2732 472.000 396.0 394.170 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 30 55 45.9451 -90.2732 472.000 396.0 394.180 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 31 25 45.9451 -90.2732 472.000 396.0 394.197 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 31 55 45.9451 -90.2732 472.000 396.0 394.238 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 32 25 45.9451 -90.2732 472.000 396.0 394.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 32 55 45.9451 -90.2732 472.000 396.0 394.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 33 25 45.9451 -90.2732 472.000 396.0 394.251 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 33 55 45.9451 -90.2732 472.000 396.0 394.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 34 25 45.9451 -90.2732 472.000 396.0 394.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 34 55 45.9451 -90.2732 472.000 396.0 394.245 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 39 55 45.9451 -90.2732 472.000 30.0 395.888 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 44 55 45.9451 -90.2732 472.000 122.0 393.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 49 55 45.9451 -90.2732 472.000 396.0 393.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 54 55 45.9451 -90.2732 472.000 30.0 396.331 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 02 59 55 45.9451 -90.2732 472.000 122.0 394.442 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 04 55 45.9451 -90.2732 472.000 396.0 394.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 05 25 45.9451 -90.2732 472.000 396.0 394.471 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 05 55 45.9451 -90.2732 472.000 396.0 394.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 06 25 45.9451 -90.2732 472.000 396.0 394.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 06 55 45.9451 -90.2732 472.000 396.0 394.470 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 07 25 45.9451 -90.2732 472.000 396.0 394.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 07 55 45.9451 -90.2732 472.000 396.0 394.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 08 25 45.9451 -90.2732 472.000 396.0 394.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 08 55 45.9451 -90.2732 472.000 396.0 394.410 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 09 25 45.9451 -90.2732 472.000 396.0 394.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 09 55 45.9451 -90.2732 472.000 396.0 394.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 14 55 45.9451 -90.2732 472.000 30.0 396.590 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 19 55 45.9451 -90.2732 472.000 122.0 394.808 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 24 55 45.9451 -90.2732 472.000 396.0 394.248 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 29 55 45.9451 -90.2732 472.000 30.0 396.199 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 34 55 45.9451 -90.2732 472.000 122.0 395.094 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 39 55 45.9451 -90.2732 472.000 396.0 394.271 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 40 25 45.9451 -90.2732 472.000 396.0 394.305 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 40 55 45.9451 -90.2732 472.000 396.0 394.258 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 41 25 45.9451 -90.2732 472.000 396.0 394.191 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 41 55 45.9451 -90.2732 472.000 396.0 394.189 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 42 25 45.9451 -90.2732 472.000 396.0 394.201 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 42 55 45.9451 -90.2732 472.000 396.0 394.204 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 43 25 45.9451 -90.2732 472.000 396.0 394.221 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 43 55 45.9451 -90.2732 472.000 396.0 394.243 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 44 25 45.9451 -90.2732 472.000 396.0 394.229 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 44 55 45.9451 -90.2732 472.000 396.0 394.237 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 49 55 45.9451 -90.2732 472.000 30.0 395.984 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 54 55 45.9451 -90.2732 472.000 122.0 394.429 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 03 59 55 45.9451 -90.2732 472.000 396.0 393.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 04 55 45.9451 -90.2732 472.000 30.0 395.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 09 55 45.9451 -90.2732 472.000 122.0 394.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 14 55 45.9451 -90.2732 472.000 396.0 394.391 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 24 55 45.9451 -90.2732 472.000 30.0 396.610 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 29 55 45.9451 -90.2732 472.000 122.0 394.364 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 34 55 45.9451 -90.2732 472.000 396.0 394.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 39 55 45.9451 -90.2732 472.000 30.0 396.530 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 44 55 45.9451 -90.2732 472.000 122.0 394.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 49 55 45.9451 -90.2732 472.000 396.0 394.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 50 25 45.9451 -90.2732 472.000 396.0 394.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 50 55 45.9451 -90.2732 472.000 396.0 394.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 51 25 45.9451 -90.2732 472.000 396.0 394.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 51 55 45.9451 -90.2732 472.000 396.0 394.341 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 52 25 45.9451 -90.2732 472.000 396.0 394.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 52 55 45.9451 -90.2732 472.000 396.0 394.355 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 53 25 45.9451 -90.2732 472.000 396.0 394.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 53 55 45.9451 -90.2732 472.000 396.0 394.369 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 54 25 45.9451 -90.2732 472.000 396.0 394.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 04 54 55 45.9451 -90.2732 472.000 396.0 394.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 04 55 45.9451 -90.2732 472.000 30.0 396.702 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 09 55 45.9451 -90.2732 472.000 122.0 394.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 14 55 45.9451 -90.2732 472.000 396.0 394.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 19 55 45.9451 -90.2732 472.000 30.0 396.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 24 55 45.9451 -90.2732 472.000 122.0 394.441 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 29 55 45.9451 -90.2732 472.000 396.0 393.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 30 25 45.9451 -90.2732 472.000 396.0 393.328 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 30 55 45.9451 -90.2732 472.000 396.0 393.352 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 31 25 45.9451 -90.2732 472.000 396.0 393.354 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 31 55 45.9451 -90.2732 472.000 396.0 393.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 32 25 45.9451 -90.2732 472.000 396.0 393.377 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 32 55 45.9451 -90.2732 472.000 396.0 393.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 33 25 45.9451 -90.2732 472.000 396.0 393.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 33 55 45.9451 -90.2732 472.000 396.0 393.317 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 34 25 45.9451 -90.2732 472.000 396.0 393.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 34 55 45.9451 -90.2732 472.000 396.0 393.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 39 55 45.9451 -90.2732 472.000 30.0 396.721 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 44 55 45.9451 -90.2732 472.000 122.0 394.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 49 55 45.9451 -90.2732 472.000 396.0 394.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 54 55 45.9451 -90.2732 472.000 30.0 397.009 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 02 05 59 55 45.9451 -90.2732 472.000 122.0 394.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 04 55 45.9451 -90.2732 472.000 396.0 394.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 14 55 45.9451 -90.2732 472.000 30.0 398.517 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 19 55 45.9451 -90.2732 472.000 122.0 394.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 24 55 45.9451 -90.2732 472.000 396.0 394.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 29 55 45.9451 -90.2732 472.000 30.0 398.519 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 34 55 45.9451 -90.2732 472.000 122.0 393.634 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 39 55 45.9451 -90.2732 472.000 396.0 393.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 40 25 45.9451 -90.2732 472.000 396.0 393.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 40 55 45.9451 -90.2732 472.000 396.0 393.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 41 25 45.9451 -90.2732 472.000 396.0 393.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 41 55 45.9451 -90.2732 472.000 396.0 393.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 42 25 45.9451 -90.2732 472.000 396.0 393.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 42 55 45.9451 -90.2732 472.000 396.0 393.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 43 25 45.9451 -90.2732 472.000 396.0 393.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 43 55 45.9451 -90.2732 472.000 396.0 393.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 44 25 45.9451 -90.2732 472.000 396.0 393.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 44 55 45.9451 -90.2732 472.000 396.0 393.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 49 55 45.9451 -90.2732 472.000 30.0 399.916 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 54 55 45.9451 -90.2732 472.000 122.0 393.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 06 59 55 45.9451 -90.2732 472.000 396.0 394.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 04 55 45.9451 -90.2732 472.000 30.0 399.821 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 09 55 45.9451 -90.2732 472.000 122.0 393.812 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 14 55 45.9451 -90.2732 472.000 396.0 393.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 15 25 45.9451 -90.2732 472.000 396.0 393.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 15 55 45.9451 -90.2732 472.000 396.0 393.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 16 25 45.9451 -90.2732 472.000 396.0 393.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 16 55 45.9451 -90.2732 472.000 396.0 393.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 17 25 45.9451 -90.2732 472.000 396.0 393.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 17 55 45.9451 -90.2732 472.000 396.0 393.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 18 25 45.9451 -90.2732 472.000 396.0 393.714 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 18 55 45.9451 -90.2732 472.000 396.0 393.752 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 19 25 45.9451 -90.2732 472.000 396.0 393.841 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 19 55 45.9451 -90.2732 472.000 396.0 393.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 24 55 45.9451 -90.2732 472.000 30.0 403.539 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 29 55 45.9451 -90.2732 472.000 122.0 394.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 34 55 45.9451 -90.2732 472.000 396.0 394.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 39 55 45.9451 -90.2732 472.000 30.0 402.036 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 44 55 45.9451 -90.2732 472.000 122.0 394.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 49 55 45.9451 -90.2732 472.000 396.0 394.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 07 59 55 45.9451 -90.2732 472.000 30.0 403.885 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 04 55 45.9451 -90.2732 472.000 122.0 394.468 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 09 55 45.9451 -90.2732 472.000 396.0 394.355 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 14 55 45.9451 -90.2732 472.000 30.0 402.805 0.630 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 19 55 45.9451 -90.2732 472.000 122.0 394.802 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 24 55 45.9451 -90.2732 472.000 396.0 394.542 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 25 25 45.9451 -90.2732 472.000 396.0 394.570 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 25 55 45.9451 -90.2732 472.000 396.0 394.594 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 26 25 45.9451 -90.2732 472.000 396.0 394.715 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 26 55 45.9451 -90.2732 472.000 396.0 394.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 27 25 45.9451 -90.2732 472.000 396.0 394.734 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 27 55 45.9451 -90.2732 472.000 396.0 394.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 28 25 45.9451 -90.2732 472.000 396.0 394.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 28 55 45.9451 -90.2732 472.000 396.0 394.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 29 25 45.9451 -90.2732 472.000 396.0 394.585 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 29 55 45.9451 -90.2732 472.000 396.0 394.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 34 55 45.9451 -90.2732 472.000 30.0 403.990 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 39 55 45.9451 -90.2732 472.000 122.0 394.999 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 44 55 45.9451 -90.2732 472.000 396.0 394.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 49 55 45.9451 -90.2732 472.000 30.0 402.767 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 54 55 45.9451 -90.2732 472.000 122.0 394.637 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 08 59 55 45.9451 -90.2732 472.000 396.0 394.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 00 25 45.9451 -90.2732 472.000 396.0 394.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 00 55 45.9451 -90.2732 472.000 396.0 394.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 01 25 45.9451 -90.2732 472.000 396.0 394.891 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 01 55 45.9451 -90.2732 472.000 396.0 394.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 02 25 45.9451 -90.2732 472.000 396.0 394.931 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 02 55 45.9451 -90.2732 472.000 396.0 394.964 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 03 25 45.9451 -90.2732 472.000 396.0 394.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 03 55 45.9451 -90.2732 472.000 396.0 394.944 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 04 25 45.9451 -90.2732 472.000 396.0 394.877 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 04 55 45.9451 -90.2732 472.000 396.0 394.842 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 09 55 45.9451 -90.2732 472.000 30.0 403.169 0.590 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 14 55 45.9451 -90.2732 472.000 122.0 394.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 19 55 45.9451 -90.2732 472.000 396.0 394.978 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 24 55 45.9451 -90.2732 472.000 30.0 405.056 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 29 55 45.9451 -90.2732 472.000 122.0 394.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 34 55 45.9451 -90.2732 472.000 396.0 394.704 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 35 25 45.9451 -90.2732 472.000 396.0 394.721 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 35 55 45.9451 -90.2732 472.000 396.0 394.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 36 25 45.9451 -90.2732 472.000 396.0 394.755 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 36 55 45.9451 -90.2732 472.000 396.0 394.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 37 25 45.9451 -90.2732 472.000 396.0 394.904 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 37 55 45.9451 -90.2732 472.000 396.0 394.905 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 38 25 45.9451 -90.2732 472.000 396.0 394.943 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 38 55 45.9451 -90.2732 472.000 396.0 395.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 39 25 45.9451 -90.2732 472.000 396.0 395.072 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 39 55 45.9451 -90.2732 472.000 396.0 395.071 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 44 55 45.9451 -90.2732 472.000 30.0 404.523 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 49 55 45.9451 -90.2732 472.000 122.0 394.515 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 54 55 45.9451 -90.2732 472.000 396.0 395.127 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 02 09 59 55 45.9451 -90.2732 472.000 30.0 405.174 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 04 55 45.9451 -90.2732 472.000 122.0 394.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 09 55 45.9451 -90.2732 472.000 396.0 395.148 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 19 55 45.9451 -90.2732 472.000 30.0 404.635 0.930 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 24 55 45.9451 -90.2732 472.000 122.0 394.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 29 55 45.9451 -90.2732 472.000 396.0 395.077 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 34 55 45.9451 -90.2732 472.000 30.0 404.932 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 39 55 45.9451 -90.2732 472.000 122.0 394.748 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 44 55 45.9451 -90.2732 472.000 396.0 394.854 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 54 55 45.9451 -90.2732 472.000 30.0 405.498 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 02 10 59 55 45.9451 -90.2732 472.000 122.0 395.334 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 04 55 45.9451 -90.2732 472.000 396.0 394.615 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 09 55 45.9451 -90.2732 472.000 30.0 405.416 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 14 55 45.9451 -90.2732 472.000 122.0 395.343 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 19 55 45.9451 -90.2732 472.000 396.0 393.273 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 20 25 45.9451 -90.2732 472.000 396.0 393.268 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 20 55 45.9451 -90.2732 472.000 396.0 393.301 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 21 25 45.9451 -90.2732 472.000 396.0 393.303 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 21 55 45.9451 -90.2732 472.000 396.0 393.300 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 22 25 45.9451 -90.2732 472.000 396.0 393.257 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 22 55 45.9451 -90.2732 472.000 396.0 393.231 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 23 25 45.9451 -90.2732 472.000 396.0 393.304 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 23 55 45.9451 -90.2732 472.000 396.0 393.415 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 24 25 45.9451 -90.2732 472.000 396.0 393.486 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 24 55 45.9451 -90.2732 472.000 396.0 393.455 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 29 55 45.9451 -90.2732 472.000 30.0 405.706 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 34 55 45.9451 -90.2732 472.000 122.0 395.042 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 39 55 45.9451 -90.2732 472.000 396.0 394.197 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 44 55 45.9451 -90.2732 472.000 30.0 405.687 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 02 11 49 55 45.9451 -90.2732 472.000 122.0 395.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 14 55 45.9451 -90.2732 472.000 396.0 395.895 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 19 55 45.9451 -90.2732 472.000 30.0 405.648 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 24 55 45.9451 -90.2732 472.000 122.0 395.289 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 29 55 45.9451 -90.2732 472.000 396.0 395.572 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 34 55 45.9451 -90.2732 472.000 30.0 405.945 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 39 55 45.9451 -90.2732 472.000 122.0 394.747 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 44 55 45.9451 -90.2732 472.000 396.0 396.156 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 45 25 45.9451 -90.2732 472.000 396.0 396.349 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 45 55 45.9451 -90.2732 472.000 396.0 396.000 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 46 25 45.9451 -90.2732 472.000 396.0 395.882 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 46 55 45.9451 -90.2732 472.000 396.0 395.892 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 47 25 45.9451 -90.2732 472.000 396.0 395.807 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 47 55 45.9451 -90.2732 472.000 396.0 396.475 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 48 25 45.9451 -90.2732 472.000 396.0 396.331 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 48 55 45.9451 -90.2732 472.000 396.0 396.510 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 49 25 45.9451 -90.2732 472.000 396.0 396.157 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 49 55 45.9451 -90.2732 472.000 396.0 396.415 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 54 55 45.9451 -90.2732 472.000 30.0 405.556 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 12 59 55 45.9451 -90.2732 472.000 122.0 395.923 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 04 55 45.9451 -90.2732 472.000 396.0 395.682 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 09 55 45.9451 -90.2732 472.000 30.0 405.318 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 14 55 45.9451 -90.2732 472.000 122.0 394.562 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 19 55 45.9451 -90.2732 472.000 396.0 394.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 20 25 45.9451 -90.2732 472.000 396.0 394.381 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 20 55 45.9451 -90.2732 472.000 396.0 394.365 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 21 25 45.9451 -90.2732 472.000 396.0 394.349 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 21 55 45.9451 -90.2732 472.000 396.0 394.270 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 22 25 45.9451 -90.2732 472.000 396.0 394.287 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 22 55 45.9451 -90.2732 472.000 396.0 394.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 23 25 45.9451 -90.2732 472.000 396.0 394.383 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 23 55 45.9451 -90.2732 472.000 396.0 394.532 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 24 25 45.9451 -90.2732 472.000 396.0 394.625 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 24 55 45.9451 -90.2732 472.000 396.0 394.779 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 29 55 45.9451 -90.2732 472.000 30.0 405.231 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 34 55 45.9451 -90.2732 472.000 122.0 394.381 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 39 55 45.9451 -90.2732 472.000 396.0 394.656 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 44 55 45.9451 -90.2732 472.000 30.0 404.036 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 49 55 45.9451 -90.2732 472.000 122.0 394.630 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 13 54 55 45.9451 -90.2732 472.000 396.0 395.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 04 55 45.9451 -90.2732 472.000 30.0 403.392 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 09 55 45.9451 -90.2732 472.000 122.0 394.127 0.540 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 14 55 45.9451 -90.2732 472.000 396.0 395.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 19 55 45.9451 -90.2732 472.000 30.0 404.085 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 24 55 45.9451 -90.2732 472.000 122.0 396.614 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 29 55 45.9451 -90.2732 472.000 396.0 395.122 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 30 25 45.9451 -90.2732 472.000 396.0 395.080 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 30 55 45.9451 -90.2732 472.000 396.0 395.096 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 31 25 45.9451 -90.2732 472.000 396.0 395.094 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 31 55 45.9451 -90.2732 472.000 396.0 395.141 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 32 25 45.9451 -90.2732 472.000 396.0 395.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 32 55 45.9451 -90.2732 472.000 396.0 395.185 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 33 25 45.9451 -90.2732 472.000 396.0 395.218 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 33 55 45.9451 -90.2732 472.000 396.0 395.242 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 34 25 45.9451 -90.2732 472.000 396.0 395.221 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 34 55 45.9451 -90.2732 472.000 396.0 395.215 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 39 55 45.9451 -90.2732 472.000 30.0 402.578 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 44 55 45.9451 -90.2732 472.000 122.0 400.073 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 49 55 45.9451 -90.2732 472.000 396.0 395.273 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 54 55 45.9451 -90.2732 472.000 30.0 401.477 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 14 59 55 45.9451 -90.2732 472.000 122.0 400.654 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 04 55 45.9451 -90.2732 472.000 396.0 395.356 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 05 25 45.9451 -90.2732 472.000 396.0 395.383 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 05 55 45.9451 -90.2732 472.000 396.0 395.348 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 06 25 45.9451 -90.2732 472.000 396.0 395.345 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 06 55 45.9451 -90.2732 472.000 396.0 395.317 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 07 25 45.9451 -90.2732 472.000 396.0 395.449 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 07 55 45.9451 -90.2732 472.000 396.0 395.616 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 08 25 45.9451 -90.2732 472.000 396.0 395.851 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 08 55 45.9451 -90.2732 472.000 396.0 396.013 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 09 25 45.9451 -90.2732 472.000 396.0 396.105 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 09 55 45.9451 -90.2732 472.000 396.0 396.062 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 14 55 45.9451 -90.2732 472.000 30.0 400.499 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 19 55 45.9451 -90.2732 472.000 122.0 399.499 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 24 55 45.9451 -90.2732 472.000 396.0 395.283 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 29 55 45.9451 -90.2732 472.000 30.0 398.811 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 34 55 45.9451 -90.2732 472.000 122.0 397.976 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 39 55 45.9451 -90.2732 472.000 396.0 393.952 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 40 25 45.9451 -90.2732 472.000 396.0 395.019 0.450 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 40 55 45.9451 -90.2732 472.000 396.0 395.944 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 41 25 45.9451 -90.2732 472.000 396.0 395.828 0.470 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 41 55 45.9451 -90.2732 472.000 396.0 394.955 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 42 25 45.9451 -90.2732 472.000 396.0 394.148 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 42 55 45.9451 -90.2732 472.000 396.0 395.306 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 43 25 45.9451 -90.2732 472.000 396.0 395.265 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 43 55 45.9451 -90.2732 472.000 396.0 395.964 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 44 25 45.9451 -90.2732 472.000 396.0 394.326 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 44 55 45.9451 -90.2732 472.000 396.0 394.692 0.810 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 49 55 45.9451 -90.2732 472.000 30.0 396.899 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 54 55 45.9451 -90.2732 472.000 122.0 396.857 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 15 59 55 45.9451 -90.2732 472.000 396.0 395.891 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 04 55 45.9451 -90.2732 472.000 30.0 396.784 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 09 55 45.9451 -90.2732 472.000 122.0 396.841 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 14 55 45.9451 -90.2732 472.000 396.0 396.149 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 24 55 45.9451 -90.2732 472.000 30.0 396.179 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 29 55 45.9451 -90.2732 472.000 122.0 396.251 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 34 55 45.9451 -90.2732 472.000 396.0 396.417 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 39 55 45.9451 -90.2732 472.000 30.0 396.006 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 44 55 45.9451 -90.2732 472.000 122.0 396.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 49 55 45.9451 -90.2732 472.000 396.0 395.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 50 25 45.9451 -90.2732 472.000 396.0 395.411 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 50 55 45.9451 -90.2732 472.000 396.0 395.787 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 51 25 45.9451 -90.2732 472.000 396.0 395.986 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 51 55 45.9451 -90.2732 472.000 396.0 396.096 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 52 25 45.9451 -90.2732 472.000 396.0 395.775 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 52 55 45.9451 -90.2732 472.000 396.0 395.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 53 25 45.9451 -90.2732 472.000 396.0 395.941 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 53 55 45.9451 -90.2732 472.000 396.0 396.022 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 54 25 45.9451 -90.2732 472.000 396.0 396.055 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 16 54 55 45.9451 -90.2732 472.000 396.0 396.186 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 04 55 45.9451 -90.2732 472.000 30.0 396.154 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 09 55 45.9451 -90.2732 472.000 122.0 396.228 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 14 55 45.9451 -90.2732 472.000 396.0 396.188 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 19 55 45.9451 -90.2732 472.000 30.0 396.017 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 24 55 45.9451 -90.2732 472.000 122.0 396.027 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 29 55 45.9451 -90.2732 472.000 396.0 396.718 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 30 25 45.9451 -90.2732 472.000 396.0 396.406 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 30 55 45.9451 -90.2732 472.000 396.0 396.521 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 31 25 45.9451 -90.2732 472.000 396.0 396.397 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 31 55 45.9451 -90.2732 472.000 396.0 396.121 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 32 25 45.9451 -90.2732 472.000 396.0 395.695 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 32 55 45.9451 -90.2732 472.000 396.0 396.178 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 33 25 45.9451 -90.2732 472.000 396.0 396.280 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 33 55 45.9451 -90.2732 472.000 396.0 396.067 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 34 25 45.9451 -90.2732 472.000 396.0 395.720 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 34 55 45.9451 -90.2732 472.000 396.0 395.722 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 39 55 45.9451 -90.2732 472.000 30.0 396.260 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 44 55 45.9451 -90.2732 472.000 122.0 396.263 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 49 55 45.9451 -90.2732 472.000 396.0 396.563 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 54 55 45.9451 -90.2732 472.000 30.0 396.552 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 17 59 55 45.9451 -90.2732 472.000 122.0 396.942 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 04 55 45.9451 -90.2732 472.000 396.0 396.840 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 14 55 45.9451 -90.2732 472.000 30.0 396.851 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 19 55 45.9451 -90.2732 472.000 122.0 397.026 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 24 55 45.9451 -90.2732 472.000 396.0 397.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 29 55 45.9451 -90.2732 472.000 30.0 397.332 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 34 55 45.9451 -90.2732 472.000 122.0 397.366 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 39 55 45.9451 -90.2732 472.000 396.0 397.472 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 40 25 45.9451 -90.2732 472.000 396.0 397.365 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 40 55 45.9451 -90.2732 472.000 396.0 397.198 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 41 25 45.9451 -90.2732 472.000 396.0 397.179 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 41 55 45.9451 -90.2732 472.000 396.0 397.283 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 42 25 45.9451 -90.2732 472.000 396.0 397.257 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 42 55 45.9451 -90.2732 472.000 396.0 397.205 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 43 25 45.9451 -90.2732 472.000 396.0 397.043 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 43 55 45.9451 -90.2732 472.000 396.0 396.936 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 44 25 45.9451 -90.2732 472.000 396.0 396.928 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 44 55 45.9451 -90.2732 472.000 396.0 397.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 49 55 45.9451 -90.2732 472.000 30.0 396.686 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 54 55 45.9451 -90.2732 472.000 122.0 396.537 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 18 59 55 45.9451 -90.2732 472.000 396.0 396.547 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 04 55 45.9451 -90.2732 472.000 30.0 396.049 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 09 55 45.9451 -90.2732 472.000 122.0 396.357 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 14 55 45.9451 -90.2732 472.000 396.0 396.370 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 15 25 45.9451 -90.2732 472.000 396.0 396.357 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 15 55 45.9451 -90.2732 472.000 396.0 396.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 16 25 45.9451 -90.2732 472.000 396.0 396.309 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 16 55 45.9451 -90.2732 472.000 396.0 396.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 17 25 45.9451 -90.2732 472.000 396.0 396.259 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 17 55 45.9451 -90.2732 472.000 396.0 396.224 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 18 25 45.9451 -90.2732 472.000 396.0 396.228 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 18 55 45.9451 -90.2732 472.000 396.0 396.249 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 19 25 45.9451 -90.2732 472.000 396.0 396.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 19 55 45.9451 -90.2732 472.000 396.0 396.204 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 24 55 45.9451 -90.2732 472.000 30.0 395.953 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 29 55 45.9451 -90.2732 472.000 122.0 396.179 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 34 55 45.9451 -90.2732 472.000 396.0 396.145 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 39 55 45.9451 -90.2732 472.000 30.0 396.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 44 55 45.9451 -90.2732 472.000 122.0 396.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 49 55 45.9451 -90.2732 472.000 396.0 396.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 19 59 55 45.9451 -90.2732 472.000 30.0 396.339 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 04 55 45.9451 -90.2732 472.000 122.0 396.357 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 09 55 45.9451 -90.2732 472.000 396.0 396.289 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 14 55 45.9451 -90.2732 472.000 30.0 396.314 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 19 55 45.9451 -90.2732 472.000 122.0 396.319 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 24 55 45.9451 -90.2732 472.000 396.0 396.400 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 25 25 45.9451 -90.2732 472.000 396.0 396.443 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 25 55 45.9451 -90.2732 472.000 396.0 396.411 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 26 25 45.9451 -90.2732 472.000 396.0 396.407 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 26 55 45.9451 -90.2732 472.000 396.0 396.188 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 27 25 45.9451 -90.2732 472.000 396.0 396.197 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 27 55 45.9451 -90.2732 472.000 396.0 396.273 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 28 25 45.9451 -90.2732 472.000 396.0 396.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 28 55 45.9451 -90.2732 472.000 396.0 396.318 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 29 25 45.9451 -90.2732 472.000 396.0 396.224 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 29 55 45.9451 -90.2732 472.000 396.0 396.274 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 34 55 45.9451 -90.2732 472.000 30.0 396.217 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 39 55 45.9451 -90.2732 472.000 122.0 396.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 44 55 45.9451 -90.2732 472.000 396.0 396.065 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 49 55 45.9451 -90.2732 472.000 30.0 396.027 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 54 55 45.9451 -90.2732 472.000 122.0 396.127 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 20 59 55 45.9451 -90.2732 472.000 396.0 396.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 00 25 45.9451 -90.2732 472.000 396.0 396.003 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 00 55 45.9451 -90.2732 472.000 396.0 396.009 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 01 25 45.9451 -90.2732 472.000 396.0 395.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 01 55 45.9451 -90.2732 472.000 396.0 395.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 02 25 45.9451 -90.2732 472.000 396.0 395.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 02 55 45.9451 -90.2732 472.000 396.0 395.952 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 03 25 45.9451 -90.2732 472.000 396.0 395.946 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 03 55 45.9451 -90.2732 472.000 396.0 395.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 04 25 45.9451 -90.2732 472.000 396.0 395.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 04 55 45.9451 -90.2732 472.000 396.0 396.010 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 09 55 45.9451 -90.2732 472.000 30.0 395.945 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 14 55 45.9451 -90.2732 472.000 122.0 395.905 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 19 55 45.9451 -90.2732 472.000 396.0 395.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 24 55 45.9451 -90.2732 472.000 30.0 395.877 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 29 55 45.9451 -90.2732 472.000 122.0 395.907 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 34 55 45.9451 -90.2732 472.000 396.0 396.022 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 35 25 45.9451 -90.2732 472.000 396.0 396.007 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 35 55 45.9451 -90.2732 472.000 396.0 395.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 36 25 45.9451 -90.2732 472.000 396.0 396.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 36 55 45.9451 -90.2732 472.000 396.0 396.051 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 37 25 45.9451 -90.2732 472.000 396.0 396.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 37 55 45.9451 -90.2732 472.000 396.0 396.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 38 25 45.9451 -90.2732 472.000 396.0 396.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 38 55 45.9451 -90.2732 472.000 396.0 396.093 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 39 25 45.9451 -90.2732 472.000 396.0 396.103 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 39 55 45.9451 -90.2732 472.000 396.0 396.104 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 44 55 45.9451 -90.2732 472.000 30.0 396.116 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 49 55 45.9451 -90.2732 472.000 122.0 396.148 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 54 55 45.9451 -90.2732 472.000 396.0 395.919 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 21 59 55 45.9451 -90.2732 472.000 30.0 396.337 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 04 55 45.9451 -90.2732 472.000 122.0 396.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 09 55 45.9451 -90.2732 472.000 396.0 396.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 19 55 45.9451 -90.2732 472.000 30.0 396.456 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 24 55 45.9451 -90.2732 472.000 122.0 396.552 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 29 55 45.9451 -90.2732 472.000 396.0 396.468 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 34 55 45.9451 -90.2732 472.000 30.0 396.738 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 39 55 45.9451 -90.2732 472.000 122.0 396.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 44 55 45.9451 -90.2732 472.000 396.0 396.531 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 54 55 45.9451 -90.2732 472.000 30.0 397.088 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 22 59 55 45.9451 -90.2732 472.000 122.0 396.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 04 55 45.9451 -90.2732 472.000 396.0 396.069 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 09 55 45.9451 -90.2732 472.000 30.0 397.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 14 55 45.9451 -90.2732 472.000 122.0 396.752 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 19 55 45.9451 -90.2732 472.000 396.0 396.235 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 20 25 45.9451 -90.2732 472.000 396.0 396.216 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 20 55 45.9451 -90.2732 472.000 396.0 396.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 21 25 45.9451 -90.2732 472.000 396.0 396.201 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 21 55 45.9451 -90.2732 472.000 396.0 396.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 22 25 45.9451 -90.2732 472.000 396.0 396.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 22 55 45.9451 -90.2732 472.000 396.0 396.187 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 23 25 45.9451 -90.2732 472.000 396.0 396.190 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 23 55 45.9451 -90.2732 472.000 396.0 396.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 24 25 45.9451 -90.2732 472.000 396.0 396.093 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 24 55 45.9451 -90.2732 472.000 396.0 396.125 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 29 55 45.9451 -90.2732 472.000 30.0 397.389 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 34 55 45.9451 -90.2732 472.000 122.0 397.214 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 39 55 45.9451 -90.2732 472.000 396.0 396.327 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 44 55 45.9451 -90.2732 472.000 30.0 397.898 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 02 23 49 55 45.9451 -90.2732 472.000 122.0 397.167 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 14 55 45.9451 -90.2732 472.000 396.0 397.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 19 55 45.9451 -90.2732 472.000 30.0 398.864 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 24 55 45.9451 -90.2732 472.000 122.0 398.270 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 29 55 45.9451 -90.2732 472.000 396.0 397.500 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 34 55 45.9451 -90.2732 472.000 30.0 399.001 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 39 55 45.9451 -90.2732 472.000 122.0 398.703 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 44 55 45.9451 -90.2732 472.000 396.0 398.011 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 45 25 45.9451 -90.2732 472.000 396.0 397.996 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 45 55 45.9451 -90.2732 472.000 396.0 397.961 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 46 25 45.9451 -90.2732 472.000 396.0 397.945 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 46 55 45.9451 -90.2732 472.000 396.0 398.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 47 25 45.9451 -90.2732 472.000 396.0 398.033 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 47 55 45.9451 -90.2732 472.000 396.0 398.023 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 48 25 45.9451 -90.2732 472.000 396.0 398.140 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 48 55 45.9451 -90.2732 472.000 396.0 398.090 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 49 25 45.9451 -90.2732 472.000 396.0 398.343 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 49 55 45.9451 -90.2732 472.000 396.0 398.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 54 55 45.9451 -90.2732 472.000 30.0 399.527 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 00 59 55 45.9451 -90.2732 472.000 122.0 398.860 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 04 55 45.9451 -90.2732 472.000 396.0 398.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 09 55 45.9451 -90.2732 472.000 30.0 399.835 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 14 55 45.9451 -90.2732 472.000 122.0 399.443 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 19 55 45.9451 -90.2732 472.000 396.0 398.602 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 20 25 45.9451 -90.2732 472.000 396.0 398.755 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 20 55 45.9451 -90.2732 472.000 396.0 398.641 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 21 25 45.9451 -90.2732 472.000 396.0 398.508 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 21 55 45.9451 -90.2732 472.000 396.0 398.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 22 25 45.9451 -90.2732 472.000 396.0 398.598 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 22 55 45.9451 -90.2732 472.000 396.0 398.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 23 25 45.9451 -90.2732 472.000 396.0 398.547 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 23 55 45.9451 -90.2732 472.000 396.0 398.482 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 24 25 45.9451 -90.2732 472.000 396.0 398.371 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 24 55 45.9451 -90.2732 472.000 396.0 398.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 29 55 45.9451 -90.2732 472.000 30.0 399.907 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 34 55 45.9451 -90.2732 472.000 122.0 399.554 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 39 55 45.9451 -90.2732 472.000 396.0 398.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 44 55 45.9451 -90.2732 472.000 30.0 400.394 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 49 55 45.9451 -90.2732 472.000 122.0 399.934 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 01 54 55 45.9451 -90.2732 472.000 396.0 400.374 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 04 55 45.9451 -90.2732 472.000 30.0 400.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 09 55 45.9451 -90.2732 472.000 122.0 400.284 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 14 55 45.9451 -90.2732 472.000 396.0 400.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 19 55 45.9451 -90.2732 472.000 30.0 400.842 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 24 55 45.9451 -90.2732 472.000 122.0 400.416 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 29 55 45.9451 -90.2732 472.000 396.0 400.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 30 25 45.9451 -90.2732 472.000 396.0 400.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 30 55 45.9451 -90.2732 472.000 396.0 400.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 31 25 45.9451 -90.2732 472.000 396.0 400.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 31 55 45.9451 -90.2732 472.000 396.0 400.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 32 25 45.9451 -90.2732 472.000 396.0 400.428 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 32 55 45.9451 -90.2732 472.000 396.0 400.473 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 33 25 45.9451 -90.2732 472.000 396.0 400.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 33 55 45.9451 -90.2732 472.000 396.0 400.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 34 25 45.9451 -90.2732 472.000 396.0 400.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 34 55 45.9451 -90.2732 472.000 396.0 400.541 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 39 55 45.9451 -90.2732 472.000 30.0 400.897 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 44 55 45.9451 -90.2732 472.000 122.0 400.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 49 55 45.9451 -90.2732 472.000 396.0 401.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 54 55 45.9451 -90.2732 472.000 30.0 401.197 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 02 59 55 45.9451 -90.2732 472.000 122.0 401.247 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 04 55 45.9451 -90.2732 472.000 396.0 401.180 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 05 25 45.9451 -90.2732 472.000 396.0 401.241 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 05 55 45.9451 -90.2732 472.000 396.0 401.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 06 25 45.9451 -90.2732 472.000 396.0 401.234 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 06 55 45.9451 -90.2732 472.000 396.0 401.365 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 07 25 45.9451 -90.2732 472.000 396.0 401.323 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 07 55 45.9451 -90.2732 472.000 396.0 401.319 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 08 25 45.9451 -90.2732 472.000 396.0 401.378 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 08 55 45.9451 -90.2732 472.000 396.0 401.465 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 09 25 45.9451 -90.2732 472.000 396.0 401.349 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 09 55 45.9451 -90.2732 472.000 396.0 401.510 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 14 55 45.9451 -90.2732 472.000 30.0 401.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 19 55 45.9451 -90.2732 472.000 122.0 401.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 24 55 45.9451 -90.2732 472.000 396.0 401.751 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 29 55 45.9451 -90.2732 472.000 30.0 402.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 34 55 45.9451 -90.2732 472.000 122.0 402.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 39 55 45.9451 -90.2732 472.000 396.0 401.270 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 40 25 45.9451 -90.2732 472.000 396.0 400.919 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 40 55 45.9451 -90.2732 472.000 396.0 401.003 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 41 25 45.9451 -90.2732 472.000 396.0 400.738 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 41 55 45.9451 -90.2732 472.000 396.0 400.814 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 42 25 45.9451 -90.2732 472.000 396.0 401.007 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 42 55 45.9451 -90.2732 472.000 396.0 400.763 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 43 25 45.9451 -90.2732 472.000 396.0 400.828 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 43 55 45.9451 -90.2732 472.000 396.0 400.760 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 44 25 45.9451 -90.2732 472.000 396.0 400.881 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 44 55 45.9451 -90.2732 472.000 396.0 400.826 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 49 55 45.9451 -90.2732 472.000 30.0 402.669 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 54 55 45.9451 -90.2732 472.000 122.0 402.272 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 03 59 55 45.9451 -90.2732 472.000 396.0 400.784 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 04 55 45.9451 -90.2732 472.000 30.0 402.825 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 09 55 45.9451 -90.2732 472.000 122.0 402.280 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 14 55 45.9451 -90.2732 472.000 396.0 401.218 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 24 55 45.9451 -90.2732 472.000 30.0 402.946 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 29 55 45.9451 -90.2732 472.000 122.0 402.578 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 34 55 45.9451 -90.2732 472.000 396.0 400.906 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 39 55 45.9451 -90.2732 472.000 30.0 402.803 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 44 55 45.9451 -90.2732 472.000 122.0 402.430 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 49 55 45.9451 -90.2732 472.000 396.0 399.438 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 50 25 45.9451 -90.2732 472.000 396.0 399.129 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 50 55 45.9451 -90.2732 472.000 396.0 398.581 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 51 25 45.9451 -90.2732 472.000 396.0 398.654 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 51 55 45.9451 -90.2732 472.000 396.0 398.443 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 52 25 45.9451 -90.2732 472.000 396.0 398.950 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 52 55 45.9451 -90.2732 472.000 396.0 398.738 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 53 25 45.9451 -90.2732 472.000 396.0 399.610 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 53 55 45.9451 -90.2732 472.000 396.0 400.036 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 54 25 45.9451 -90.2732 472.000 396.0 399.787 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 04 54 55 45.9451 -90.2732 472.000 396.0 399.654 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 04 55 45.9451 -90.2732 472.000 30.0 402.538 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 09 55 45.9451 -90.2732 472.000 122.0 402.140 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 14 55 45.9451 -90.2732 472.000 396.0 399.921 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 19 55 45.9451 -90.2732 472.000 30.0 402.565 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 24 55 45.9451 -90.2732 472.000 122.0 401.947 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 29 55 45.9451 -90.2732 472.000 396.0 400.380 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 30 25 45.9451 -90.2732 472.000 396.0 400.204 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 30 55 45.9451 -90.2732 472.000 396.0 400.007 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 31 25 45.9451 -90.2732 472.000 396.0 399.479 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 31 55 45.9451 -90.2732 472.000 396.0 399.838 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 32 25 45.9451 -90.2732 472.000 396.0 399.837 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 32 55 45.9451 -90.2732 472.000 396.0 400.101 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 33 25 45.9451 -90.2732 472.000 396.0 400.097 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 33 55 45.9451 -90.2732 472.000 396.0 400.185 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 34 25 45.9451 -90.2732 472.000 396.0 399.954 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 34 55 45.9451 -90.2732 472.000 396.0 400.447 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 39 55 45.9451 -90.2732 472.000 30.0 402.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 44 55 45.9451 -90.2732 472.000 122.0 402.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 49 55 45.9451 -90.2732 472.000 396.0 400.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 54 55 45.9451 -90.2732 472.000 30.0 402.401 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 05 59 55 45.9451 -90.2732 472.000 122.0 401.998 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 04 55 45.9451 -90.2732 472.000 396.0 401.021 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 14 55 45.9451 -90.2732 472.000 30.0 402.328 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 19 55 45.9451 -90.2732 472.000 122.0 402.070 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 24 55 45.9451 -90.2732 472.000 396.0 401.047 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 29 55 45.9451 -90.2732 472.000 30.0 402.313 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 34 55 45.9451 -90.2732 472.000 122.0 402.043 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 39 55 45.9451 -90.2732 472.000 396.0 401.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 40 25 45.9451 -90.2732 472.000 396.0 401.319 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 40 55 45.9451 -90.2732 472.000 396.0 401.074 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 41 25 45.9451 -90.2732 472.000 396.0 401.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 41 55 45.9451 -90.2732 472.000 396.0 401.222 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 42 25 45.9451 -90.2732 472.000 396.0 401.327 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 42 55 45.9451 -90.2732 472.000 396.0 401.341 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 43 25 45.9451 -90.2732 472.000 396.0 401.372 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 43 55 45.9451 -90.2732 472.000 396.0 401.117 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 44 25 45.9451 -90.2732 472.000 396.0 401.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 44 55 45.9451 -90.2732 472.000 396.0 401.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 49 55 45.9451 -90.2732 472.000 30.0 402.338 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 54 55 45.9451 -90.2732 472.000 122.0 401.893 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 06 59 55 45.9451 -90.2732 472.000 396.0 401.025 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 04 55 45.9451 -90.2732 472.000 30.0 402.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 09 55 45.9451 -90.2732 472.000 122.0 401.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 14 55 45.9451 -90.2732 472.000 396.0 400.923 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 15 25 45.9451 -90.2732 472.000 396.0 400.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 15 55 45.9451 -90.2732 472.000 396.0 401.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 16 25 45.9451 -90.2732 472.000 396.0 401.146 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 16 55 45.9451 -90.2732 472.000 396.0 401.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 17 25 45.9451 -90.2732 472.000 396.0 401.199 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 17 55 45.9451 -90.2732 472.000 396.0 401.242 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 18 25 45.9451 -90.2732 472.000 396.0 401.356 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 18 55 45.9451 -90.2732 472.000 396.0 401.311 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 19 25 45.9451 -90.2732 472.000 396.0 401.244 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 19 55 45.9451 -90.2732 472.000 396.0 400.878 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 24 55 45.9451 -90.2732 472.000 30.0 402.077 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 29 55 45.9451 -90.2732 472.000 122.0 402.048 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 34 55 45.9451 -90.2732 472.000 396.0 401.297 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 39 55 45.9451 -90.2732 472.000 30.0 402.492 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 44 55 45.9451 -90.2732 472.000 122.0 402.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 49 55 45.9451 -90.2732 472.000 396.0 401.411 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 07 59 55 45.9451 -90.2732 472.000 30.0 402.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 04 55 45.9451 -90.2732 472.000 122.0 402.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 09 55 45.9451 -90.2732 472.000 396.0 401.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 14 55 45.9451 -90.2732 472.000 30.0 402.584 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 19 55 45.9451 -90.2732 472.000 122.0 402.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 24 55 45.9451 -90.2732 472.000 396.0 401.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 25 25 45.9451 -90.2732 472.000 396.0 401.703 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 25 55 45.9451 -90.2732 472.000 396.0 401.572 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 26 25 45.9451 -90.2732 472.000 396.0 401.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 26 55 45.9451 -90.2732 472.000 396.0 401.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 27 25 45.9451 -90.2732 472.000 396.0 401.690 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 27 55 45.9451 -90.2732 472.000 396.0 401.576 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 28 25 45.9451 -90.2732 472.000 396.0 401.585 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 28 55 45.9451 -90.2732 472.000 396.0 401.638 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 29 25 45.9451 -90.2732 472.000 396.0 401.686 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 29 55 45.9451 -90.2732 472.000 396.0 401.733 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 34 55 45.9451 -90.2732 472.000 30.0 402.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 39 55 45.9451 -90.2732 472.000 122.0 402.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 44 55 45.9451 -90.2732 472.000 396.0 401.774 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 49 55 45.9451 -90.2732 472.000 30.0 402.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 54 55 45.9451 -90.2732 472.000 122.0 402.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 08 59 55 45.9451 -90.2732 472.000 396.0 401.825 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 00 25 45.9451 -90.2732 472.000 396.0 401.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 00 55 45.9451 -90.2732 472.000 396.0 401.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 01 25 45.9451 -90.2732 472.000 396.0 401.917 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 01 55 45.9451 -90.2732 472.000 396.0 401.914 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 02 25 45.9451 -90.2732 472.000 396.0 401.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 02 55 45.9451 -90.2732 472.000 396.0 401.869 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 03 25 45.9451 -90.2732 472.000 396.0 401.860 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 03 55 45.9451 -90.2732 472.000 396.0 401.941 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 04 25 45.9451 -90.2732 472.000 396.0 401.919 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 04 55 45.9451 -90.2732 472.000 396.0 401.902 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 09 55 45.9451 -90.2732 472.000 30.0 403.279 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 14 55 45.9451 -90.2732 472.000 122.0 402.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 19 55 45.9451 -90.2732 472.000 396.0 401.125 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 24 55 45.9451 -90.2732 472.000 30.0 403.437 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 29 55 45.9451 -90.2732 472.000 122.0 403.070 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 34 55 45.9451 -90.2732 472.000 396.0 402.262 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 35 25 45.9451 -90.2732 472.000 396.0 402.317 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 35 55 45.9451 -90.2732 472.000 396.0 402.081 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 36 25 45.9451 -90.2732 472.000 396.0 401.848 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 36 55 45.9451 -90.2732 472.000 396.0 401.632 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 37 25 45.9451 -90.2732 472.000 396.0 402.167 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 37 55 45.9451 -90.2732 472.000 396.0 402.410 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 38 25 45.9451 -90.2732 472.000 396.0 402.177 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 38 55 45.9451 -90.2732 472.000 396.0 401.958 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 39 25 45.9451 -90.2732 472.000 396.0 402.129 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 39 55 45.9451 -90.2732 472.000 396.0 402.090 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 44 55 45.9451 -90.2732 472.000 30.0 403.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 49 55 45.9451 -90.2732 472.000 122.0 403.355 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 54 55 45.9451 -90.2732 472.000 396.0 402.088 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 09 59 55 45.9451 -90.2732 472.000 30.0 403.818 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 04 55 45.9451 -90.2732 472.000 122.0 403.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 09 55 45.9451 -90.2732 472.000 396.0 401.244 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 19 55 45.9451 -90.2732 472.000 30.0 404.227 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 24 55 45.9451 -90.2732 472.000 122.0 403.731 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 29 55 45.9451 -90.2732 472.000 396.0 401.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 34 55 45.9451 -90.2732 472.000 30.0 404.361 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 39 55 45.9451 -90.2732 472.000 122.0 404.045 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 44 55 45.9451 -90.2732 472.000 396.0 401.509 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 54 55 45.9451 -90.2732 472.000 30.0 404.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 10 59 55 45.9451 -90.2732 472.000 122.0 404.474 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 04 55 45.9451 -90.2732 472.000 396.0 400.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 09 55 45.9451 -90.2732 472.000 30.0 405.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 14 55 45.9451 -90.2732 472.000 122.0 404.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 19 55 45.9451 -90.2732 472.000 396.0 401.664 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 20 25 45.9451 -90.2732 472.000 396.0 400.836 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 20 55 45.9451 -90.2732 472.000 396.0 399.735 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 21 25 45.9451 -90.2732 472.000 396.0 399.419 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 21 55 45.9451 -90.2732 472.000 396.0 399.250 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 22 25 45.9451 -90.2732 472.000 396.0 399.528 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 22 55 45.9451 -90.2732 472.000 396.0 399.832 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 23 25 45.9451 -90.2732 472.000 396.0 400.587 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 23 55 45.9451 -90.2732 472.000 396.0 400.941 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 24 25 45.9451 -90.2732 472.000 396.0 401.149 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 24 55 45.9451 -90.2732 472.000 396.0 401.174 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 29 55 45.9451 -90.2732 472.000 30.0 405.646 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 34 55 45.9451 -90.2732 472.000 122.0 405.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 39 55 45.9451 -90.2732 472.000 396.0 398.392 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 44 55 45.9451 -90.2732 472.000 30.0 405.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 11 49 55 45.9451 -90.2732 472.000 122.0 406.307 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 14 55 45.9451 -90.2732 472.000 396.0 394.115 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 19 55 45.9451 -90.2732 472.000 30.0 407.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 24 55 45.9451 -90.2732 472.000 122.0 405.239 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 29 55 45.9451 -90.2732 472.000 396.0 392.266 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 34 55 45.9451 -90.2732 472.000 30.0 407.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 39 55 45.9451 -90.2732 472.000 122.0 404.435 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 44 55 45.9451 -90.2732 472.000 396.0 391.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 45 25 45.9451 -90.2732 472.000 396.0 391.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 45 55 45.9451 -90.2732 472.000 396.0 391.540 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 46 25 45.9451 -90.2732 472.000 396.0 391.498 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 46 55 45.9451 -90.2732 472.000 396.0 391.500 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 47 25 45.9451 -90.2732 472.000 396.0 391.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 47 55 45.9451 -90.2732 472.000 396.0 391.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 48 25 45.9451 -90.2732 472.000 396.0 391.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 48 55 45.9451 -90.2732 472.000 396.0 391.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 49 25 45.9451 -90.2732 472.000 396.0 391.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 49 55 45.9451 -90.2732 472.000 396.0 391.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 54 55 45.9451 -90.2732 472.000 30.0 408.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 12 59 55 45.9451 -90.2732 472.000 122.0 404.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 04 55 45.9451 -90.2732 472.000 396.0 391.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 09 55 45.9451 -90.2732 472.000 30.0 407.783 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 14 55 45.9451 -90.2732 472.000 122.0 403.985 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 19 55 45.9451 -90.2732 472.000 396.0 392.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 20 25 45.9451 -90.2732 472.000 396.0 392.272 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 20 55 45.9451 -90.2732 472.000 396.0 391.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 21 25 45.9451 -90.2732 472.000 396.0 391.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 21 55 45.9451 -90.2732 472.000 396.0 391.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 22 25 45.9451 -90.2732 472.000 396.0 391.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 22 55 45.9451 -90.2732 472.000 396.0 392.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 23 25 45.9451 -90.2732 472.000 396.0 392.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 23 55 45.9451 -90.2732 472.000 396.0 392.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 24 25 45.9451 -90.2732 472.000 396.0 392.309 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 24 55 45.9451 -90.2732 472.000 396.0 392.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 29 55 45.9451 -90.2732 472.000 30.0 407.627 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 34 55 45.9451 -90.2732 472.000 122.0 403.541 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 39 55 45.9451 -90.2732 472.000 396.0 393.071 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 44 55 45.9451 -90.2732 472.000 30.0 406.994 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 49 55 45.9451 -90.2732 472.000 122.0 403.118 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 03 13 54 55 45.9451 -90.2732 472.000 396.0 392.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 04 55 45.9451 -90.2732 472.000 30.0 406.370 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 09 55 45.9451 -90.2732 472.000 122.0 403.065 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 14 55 45.9451 -90.2732 472.000 396.0 391.995 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 19 55 45.9451 -90.2732 472.000 30.0 404.222 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 24 55 45.9451 -90.2732 472.000 122.0 402.900 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 29 55 45.9451 -90.2732 472.000 396.0 391.792 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 30 25 45.9451 -90.2732 472.000 396.0 391.826 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 30 55 45.9451 -90.2732 472.000 396.0 391.842 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 31 25 45.9451 -90.2732 472.000 396.0 391.807 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 31 55 45.9451 -90.2732 472.000 396.0 391.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 32 25 45.9451 -90.2732 472.000 396.0 391.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 32 55 45.9451 -90.2732 472.000 396.0 391.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 33 25 45.9451 -90.2732 472.000 396.0 391.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 33 55 45.9451 -90.2732 472.000 396.0 391.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 34 25 45.9451 -90.2732 472.000 396.0 391.774 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 34 55 45.9451 -90.2732 472.000 396.0 391.774 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 39 55 45.9451 -90.2732 472.000 30.0 402.197 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 44 55 45.9451 -90.2732 472.000 122.0 401.342 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 49 55 45.9451 -90.2732 472.000 396.0 392.916 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 54 55 45.9451 -90.2732 472.000 30.0 400.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 14 59 55 45.9451 -90.2732 472.000 122.0 400.320 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 04 55 45.9451 -90.2732 472.000 396.0 396.339 0.790 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 05 25 45.9451 -90.2732 472.000 396.0 394.610 0.830 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 05 55 45.9451 -90.2732 472.000 396.0 396.462 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 06 25 45.9451 -90.2732 472.000 396.0 396.051 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 06 55 45.9451 -90.2732 472.000 396.0 393.778 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 07 25 45.9451 -90.2732 472.000 396.0 393.640 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 07 55 45.9451 -90.2732 472.000 396.0 393.900 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 08 25 45.9451 -90.2732 472.000 396.0 396.207 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 08 55 45.9451 -90.2732 472.000 396.0 394.394 0.630 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 09 25 45.9451 -90.2732 472.000 396.0 396.409 0.580 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 09 55 45.9451 -90.2732 472.000 396.0 396.819 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 14 55 45.9451 -90.2732 472.000 30.0 399.734 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 19 55 45.9451 -90.2732 472.000 122.0 399.511 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 24 55 45.9451 -90.2732 472.000 396.0 397.483 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 29 55 45.9451 -90.2732 472.000 30.0 398.840 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 34 55 45.9451 -90.2732 472.000 122.0 398.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 39 55 45.9451 -90.2732 472.000 396.0 396.996 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 40 25 45.9451 -90.2732 472.000 396.0 396.111 0.640 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 40 55 45.9451 -90.2732 472.000 396.0 397.352 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 41 25 45.9451 -90.2732 472.000 396.0 397.794 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 41 55 45.9451 -90.2732 472.000 396.0 397.935 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 42 25 45.9451 -90.2732 472.000 396.0 398.093 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 42 55 45.9451 -90.2732 472.000 396.0 397.805 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 43 25 45.9451 -90.2732 472.000 396.0 397.142 0.450 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 43 55 45.9451 -90.2732 472.000 396.0 396.242 0.970 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 44 25 45.9451 -90.2732 472.000 396.0 397.214 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 44 55 45.9451 -90.2732 472.000 396.0 396.797 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 49 55 45.9451 -90.2732 472.000 30.0 398.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 54 55 45.9451 -90.2732 472.000 122.0 398.188 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 15 59 55 45.9451 -90.2732 472.000 396.0 395.669 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 04 55 45.9451 -90.2732 472.000 30.0 397.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 09 55 45.9451 -90.2732 472.000 122.0 397.777 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 14 55 45.9451 -90.2732 472.000 396.0 396.605 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 24 55 45.9451 -90.2732 472.000 30.0 397.619 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 29 55 45.9451 -90.2732 472.000 122.0 397.650 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 34 55 45.9451 -90.2732 472.000 396.0 396.632 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 39 55 45.9451 -90.2732 472.000 30.0 397.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 44 55 45.9451 -90.2732 472.000 122.0 396.992 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 49 55 45.9451 -90.2732 472.000 396.0 396.937 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 50 25 45.9451 -90.2732 472.000 396.0 396.648 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 50 55 45.9451 -90.2732 472.000 396.0 396.555 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 51 25 45.9451 -90.2732 472.000 396.0 396.498 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 51 55 45.9451 -90.2732 472.000 396.0 396.600 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 52 25 45.9451 -90.2732 472.000 396.0 396.779 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 52 55 45.9451 -90.2732 472.000 396.0 396.203 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 53 25 45.9451 -90.2732 472.000 396.0 396.248 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 53 55 45.9451 -90.2732 472.000 396.0 396.716 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 54 25 45.9451 -90.2732 472.000 396.0 396.734 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 16 54 55 45.9451 -90.2732 472.000 396.0 396.626 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 04 55 45.9451 -90.2732 472.000 30.0 396.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 09 55 45.9451 -90.2732 472.000 122.0 396.753 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 14 55 45.9451 -90.2732 472.000 396.0 396.261 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 19 55 45.9451 -90.2732 472.000 30.0 396.178 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 24 55 45.9451 -90.2732 472.000 122.0 396.136 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 29 55 45.9451 -90.2732 472.000 396.0 396.082 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 30 25 45.9451 -90.2732 472.000 396.0 396.115 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 30 55 45.9451 -90.2732 472.000 396.0 395.611 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 31 25 45.9451 -90.2732 472.000 396.0 396.041 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 31 55 45.9451 -90.2732 472.000 396.0 396.165 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 32 25 45.9451 -90.2732 472.000 396.0 396.103 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 32 55 45.9451 -90.2732 472.000 396.0 395.849 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 33 25 45.9451 -90.2732 472.000 396.0 396.144 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 33 55 45.9451 -90.2732 472.000 396.0 396.049 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 34 25 45.9451 -90.2732 472.000 396.0 396.135 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 34 55 45.9451 -90.2732 472.000 396.0 396.116 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 39 55 45.9451 -90.2732 472.000 30.0 395.830 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 44 55 45.9451 -90.2732 472.000 122.0 396.112 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 49 55 45.9451 -90.2732 472.000 396.0 395.855 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 54 55 45.9451 -90.2732 472.000 30.0 395.377 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 17 59 55 45.9451 -90.2732 472.000 122.0 394.925 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 04 55 45.9451 -90.2732 472.000 396.0 395.456 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 14 55 45.9451 -90.2732 472.000 30.0 394.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 19 55 45.9451 -90.2732 472.000 122.0 394.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 24 55 45.9451 -90.2732 472.000 396.0 394.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 29 55 45.9451 -90.2732 472.000 30.0 394.548 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 34 55 45.9451 -90.2732 472.000 122.0 394.595 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 39 55 45.9451 -90.2732 472.000 396.0 394.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 40 25 45.9451 -90.2732 472.000 396.0 394.627 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 40 55 45.9451 -90.2732 472.000 396.0 394.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 41 25 45.9451 -90.2732 472.000 396.0 394.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 41 55 45.9451 -90.2732 472.000 396.0 394.628 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 42 25 45.9451 -90.2732 472.000 396.0 394.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 42 55 45.9451 -90.2732 472.000 396.0 394.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 43 25 45.9451 -90.2732 472.000 396.0 394.606 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 43 55 45.9451 -90.2732 472.000 396.0 394.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 44 25 45.9451 -90.2732 472.000 396.0 394.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 44 55 45.9451 -90.2732 472.000 396.0 394.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 49 55 45.9451 -90.2732 472.000 30.0 394.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 54 55 45.9451 -90.2732 472.000 122.0 394.672 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 18 59 55 45.9451 -90.2732 472.000 396.0 394.816 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 04 55 45.9451 -90.2732 472.000 30.0 394.583 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 09 55 45.9451 -90.2732 472.000 122.0 394.637 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 14 55 45.9451 -90.2732 472.000 396.0 394.743 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 15 25 45.9451 -90.2732 472.000 396.0 394.645 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 15 55 45.9451 -90.2732 472.000 396.0 394.403 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 16 25 45.9451 -90.2732 472.000 396.0 394.847 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 16 55 45.9451 -90.2732 472.000 396.0 394.553 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 17 25 45.9451 -90.2732 472.000 396.0 394.270 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 17 55 45.9451 -90.2732 472.000 396.0 394.213 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 18 25 45.9451 -90.2732 472.000 396.0 394.471 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 18 55 45.9451 -90.2732 472.000 396.0 394.335 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 19 25 45.9451 -90.2732 472.000 396.0 394.687 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 19 55 45.9451 -90.2732 472.000 396.0 394.670 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 24 55 45.9451 -90.2732 472.000 30.0 394.374 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 29 55 45.9451 -90.2732 472.000 122.0 394.604 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 34 55 45.9451 -90.2732 472.000 396.0 394.634 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 39 55 45.9451 -90.2732 472.000 30.0 394.249 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 44 55 45.9451 -90.2732 472.000 122.0 394.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 49 55 45.9451 -90.2732 472.000 396.0 394.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 19 59 55 45.9451 -90.2732 472.000 30.0 394.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 04 55 45.9451 -90.2732 472.000 122.0 394.540 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 09 55 45.9451 -90.2732 472.000 396.0 394.706 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 14 55 45.9451 -90.2732 472.000 30.0 394.256 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 19 55 45.9451 -90.2732 472.000 122.0 394.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 24 55 45.9451 -90.2732 472.000 396.0 394.701 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 25 25 45.9451 -90.2732 472.000 396.0 394.699 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 25 55 45.9451 -90.2732 472.000 396.0 394.647 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 26 25 45.9451 -90.2732 472.000 396.0 394.644 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 26 55 45.9451 -90.2732 472.000 396.0 394.709 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 27 25 45.9451 -90.2732 472.000 396.0 394.702 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 27 55 45.9451 -90.2732 472.000 396.0 394.689 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 28 25 45.9451 -90.2732 472.000 396.0 394.620 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 28 55 45.9451 -90.2732 472.000 396.0 394.623 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 29 25 45.9451 -90.2732 472.000 396.0 394.781 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 29 55 45.9451 -90.2732 472.000 396.0 394.860 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 34 55 45.9451 -90.2732 472.000 30.0 394.888 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 39 55 45.9451 -90.2732 472.000 122.0 394.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 44 55 45.9451 -90.2732 472.000 396.0 394.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 49 55 45.9451 -90.2732 472.000 30.0 394.924 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 54 55 45.9451 -90.2732 472.000 122.0 394.805 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 20 59 55 45.9451 -90.2732 472.000 396.0 394.917 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 00 25 45.9451 -90.2732 472.000 396.0 394.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 00 55 45.9451 -90.2732 472.000 396.0 394.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 01 25 45.9451 -90.2732 472.000 396.0 394.845 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 01 55 45.9451 -90.2732 472.000 396.0 394.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 02 25 45.9451 -90.2732 472.000 396.0 394.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 02 55 45.9451 -90.2732 472.000 396.0 394.876 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 03 25 45.9451 -90.2732 472.000 396.0 394.612 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 03 55 45.9451 -90.2732 472.000 396.0 394.520 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 04 25 45.9451 -90.2732 472.000 396.0 394.581 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 04 55 45.9451 -90.2732 472.000 396.0 394.539 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 09 55 45.9451 -90.2732 472.000 30.0 394.969 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 14 55 45.9451 -90.2732 472.000 122.0 394.852 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 19 55 45.9451 -90.2732 472.000 396.0 394.938 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 24 55 45.9451 -90.2732 472.000 30.0 395.102 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 29 55 45.9451 -90.2732 472.000 122.0 394.888 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 34 55 45.9451 -90.2732 472.000 396.0 394.888 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 35 25 45.9451 -90.2732 472.000 396.0 394.881 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 35 55 45.9451 -90.2732 472.000 396.0 394.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 36 25 45.9451 -90.2732 472.000 396.0 394.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 36 55 45.9451 -90.2732 472.000 396.0 394.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 37 25 45.9451 -90.2732 472.000 396.0 394.896 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 37 55 45.9451 -90.2732 472.000 396.0 394.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 38 25 45.9451 -90.2732 472.000 396.0 394.906 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 38 55 45.9451 -90.2732 472.000 396.0 394.879 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 39 25 45.9451 -90.2732 472.000 396.0 394.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 39 55 45.9451 -90.2732 472.000 396.0 394.778 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 44 55 45.9451 -90.2732 472.000 30.0 395.073 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 49 55 45.9451 -90.2732 472.000 122.0 395.084 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 54 55 45.9451 -90.2732 472.000 396.0 394.732 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 21 59 55 45.9451 -90.2732 472.000 30.0 395.077 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 04 55 45.9451 -90.2732 472.000 122.0 395.129 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 09 55 45.9451 -90.2732 472.000 396.0 394.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 19 55 45.9451 -90.2732 472.000 30.0 395.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 24 55 45.9451 -90.2732 472.000 122.0 395.016 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 29 55 45.9451 -90.2732 472.000 396.0 394.746 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 34 55 45.9451 -90.2732 472.000 30.0 395.259 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 39 55 45.9451 -90.2732 472.000 122.0 394.984 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 44 55 45.9451 -90.2732 472.000 396.0 394.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 54 55 45.9451 -90.2732 472.000 30.0 395.405 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 03 22 59 55 45.9451 -90.2732 472.000 122.0 394.939 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 04 55 45.9451 -90.2732 472.000 396.0 394.845 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 09 55 45.9451 -90.2732 472.000 30.0 395.381 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 14 55 45.9451 -90.2732 472.000 122.0 395.064 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 19 55 45.9451 -90.2732 472.000 396.0 394.588 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 20 25 45.9451 -90.2732 472.000 396.0 394.537 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 20 55 45.9451 -90.2732 472.000 396.0 394.603 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 21 25 45.9451 -90.2732 472.000 396.0 394.532 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 21 55 45.9451 -90.2732 472.000 396.0 394.462 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 22 25 45.9451 -90.2732 472.000 396.0 394.430 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 22 55 45.9451 -90.2732 472.000 396.0 394.533 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 23 25 45.9451 -90.2732 472.000 396.0 394.558 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 23 55 45.9451 -90.2732 472.000 396.0 394.538 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 24 25 45.9451 -90.2732 472.000 396.0 394.580 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 24 55 45.9451 -90.2732 472.000 396.0 394.678 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 29 55 45.9451 -90.2732 472.000 30.0 395.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 34 55 45.9451 -90.2732 472.000 122.0 395.008 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 39 55 45.9451 -90.2732 472.000 396.0 394.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 44 55 45.9451 -90.2732 472.000 30.0 395.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 03 23 49 55 45.9451 -90.2732 472.000 122.0 395.139 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 14 55 45.9451 -90.2732 472.000 396.0 394.316 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 19 55 45.9451 -90.2732 472.000 30.0 395.576 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 24 55 45.9451 -90.2732 472.000 122.0 395.105 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 29 55 45.9451 -90.2732 472.000 396.0 394.426 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 34 55 45.9451 -90.2732 472.000 30.0 395.596 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 39 55 45.9451 -90.2732 472.000 122.0 395.167 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 44 55 45.9451 -90.2732 472.000 396.0 394.468 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 45 25 45.9451 -90.2732 472.000 396.0 394.518 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 45 55 45.9451 -90.2732 472.000 396.0 394.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 46 25 45.9451 -90.2732 472.000 396.0 394.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 46 55 45.9451 -90.2732 472.000 396.0 394.422 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 47 25 45.9451 -90.2732 472.000 396.0 394.348 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 47 55 45.9451 -90.2732 472.000 396.0 394.350 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 48 25 45.9451 -90.2732 472.000 396.0 394.358 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 48 55 45.9451 -90.2732 472.000 396.0 394.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 49 25 45.9451 -90.2732 472.000 396.0 394.301 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 49 55 45.9451 -90.2732 472.000 396.0 394.282 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 54 55 45.9451 -90.2732 472.000 30.0 395.661 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 00 59 55 45.9451 -90.2732 472.000 122.0 395.375 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 04 55 45.9451 -90.2732 472.000 396.0 394.493 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 09 55 45.9451 -90.2732 472.000 30.0 395.849 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 14 55 45.9451 -90.2732 472.000 122.0 395.233 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 19 55 45.9451 -90.2732 472.000 396.0 394.254 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 20 25 45.9451 -90.2732 472.000 396.0 394.221 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 20 55 45.9451 -90.2732 472.000 396.0 394.238 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 21 25 45.9451 -90.2732 472.000 396.0 394.306 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 21 55 45.9451 -90.2732 472.000 396.0 394.205 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 22 25 45.9451 -90.2732 472.000 396.0 394.053 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 22 55 45.9451 -90.2732 472.000 396.0 393.964 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 23 25 45.9451 -90.2732 472.000 396.0 394.205 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 23 55 45.9451 -90.2732 472.000 396.0 394.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 24 25 45.9451 -90.2732 472.000 396.0 394.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 24 55 45.9451 -90.2732 472.000 396.0 394.354 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 29 55 45.9451 -90.2732 472.000 30.0 395.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 34 55 45.9451 -90.2732 472.000 122.0 395.417 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 39 55 45.9451 -90.2732 472.000 396.0 394.081 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 44 55 45.9451 -90.2732 472.000 30.0 396.065 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 49 55 45.9451 -90.2732 472.000 122.0 395.174 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 01 54 55 45.9451 -90.2732 472.000 396.0 393.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 04 55 45.9451 -90.2732 472.000 30.0 396.280 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 09 55 45.9451 -90.2732 472.000 122.0 395.343 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 14 55 45.9451 -90.2732 472.000 396.0 394.063 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 19 55 45.9451 -90.2732 472.000 30.0 396.238 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 24 55 45.9451 -90.2732 472.000 122.0 395.338 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 29 55 45.9451 -90.2732 472.000 396.0 394.271 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 30 25 45.9451 -90.2732 472.000 396.0 394.270 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 30 55 45.9451 -90.2732 472.000 396.0 394.225 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 31 25 45.9451 -90.2732 472.000 396.0 394.256 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 31 55 45.9451 -90.2732 472.000 396.0 394.181 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 32 25 45.9451 -90.2732 472.000 396.0 394.288 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 32 55 45.9451 -90.2732 472.000 396.0 394.178 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 33 25 45.9451 -90.2732 472.000 396.0 394.380 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 33 55 45.9451 -90.2732 472.000 396.0 394.262 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 34 25 45.9451 -90.2732 472.000 396.0 394.259 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 34 55 45.9451 -90.2732 472.000 396.0 394.150 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 39 55 45.9451 -90.2732 472.000 30.0 396.087 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 44 55 45.9451 -90.2732 472.000 122.0 395.085 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 49 55 45.9451 -90.2732 472.000 396.0 394.217 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 54 55 45.9451 -90.2732 472.000 30.0 395.834 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 02 59 55 45.9451 -90.2732 472.000 122.0 395.024 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 04 55 45.9451 -90.2732 472.000 396.0 394.268 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 05 25 45.9451 -90.2732 472.000 396.0 394.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 05 55 45.9451 -90.2732 472.000 396.0 394.250 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 06 25 45.9451 -90.2732 472.000 396.0 394.352 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 06 55 45.9451 -90.2732 472.000 396.0 394.521 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 07 25 45.9451 -90.2732 472.000 396.0 394.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 07 55 45.9451 -90.2732 472.000 396.0 394.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 08 25 45.9451 -90.2732 472.000 396.0 394.464 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 08 55 45.9451 -90.2732 472.000 396.0 394.376 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 09 25 45.9451 -90.2732 472.000 396.0 394.395 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 09 55 45.9451 -90.2732 472.000 396.0 394.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 14 55 45.9451 -90.2732 472.000 30.0 395.477 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 19 55 45.9451 -90.2732 472.000 122.0 395.123 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 24 55 45.9451 -90.2732 472.000 396.0 394.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 29 55 45.9451 -90.2732 472.000 30.0 395.437 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 34 55 45.9451 -90.2732 472.000 122.0 395.117 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 39 55 45.9451 -90.2732 472.000 396.0 394.462 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 40 25 45.9451 -90.2732 472.000 396.0 394.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 40 55 45.9451 -90.2732 472.000 396.0 394.468 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 41 25 45.9451 -90.2732 472.000 396.0 394.404 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 41 55 45.9451 -90.2732 472.000 396.0 394.524 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 42 25 45.9451 -90.2732 472.000 396.0 394.594 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 42 55 45.9451 -90.2732 472.000 396.0 394.524 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 43 25 45.9451 -90.2732 472.000 396.0 394.495 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 43 55 45.9451 -90.2732 472.000 396.0 394.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 44 25 45.9451 -90.2732 472.000 396.0 394.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 44 55 45.9451 -90.2732 472.000 396.0 394.526 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 49 55 45.9451 -90.2732 472.000 30.0 395.327 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 54 55 45.9451 -90.2732 472.000 122.0 395.192 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 03 59 55 45.9451 -90.2732 472.000 396.0 394.568 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 04 55 45.9451 -90.2732 472.000 30.0 395.616 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 09 55 45.9451 -90.2732 472.000 122.0 395.416 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 14 55 45.9451 -90.2732 472.000 396.0 394.593 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 24 55 45.9451 -90.2732 472.000 30.0 395.916 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 29 55 45.9451 -90.2732 472.000 122.0 395.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 34 55 45.9451 -90.2732 472.000 396.0 394.482 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 39 55 45.9451 -90.2732 472.000 30.0 395.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 44 55 45.9451 -90.2732 472.000 122.0 395.726 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 49 55 45.9451 -90.2732 472.000 396.0 394.758 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 50 25 45.9451 -90.2732 472.000 396.0 394.870 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 50 55 45.9451 -90.2732 472.000 396.0 394.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 51 25 45.9451 -90.2732 472.000 396.0 394.612 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 51 55 45.9451 -90.2732 472.000 396.0 394.710 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 52 25 45.9451 -90.2732 472.000 396.0 394.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 52 55 45.9451 -90.2732 472.000 396.0 394.558 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 53 25 45.9451 -90.2732 472.000 396.0 394.601 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 53 55 45.9451 -90.2732 472.000 396.0 394.572 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 54 25 45.9451 -90.2732 472.000 396.0 394.698 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 04 54 55 45.9451 -90.2732 472.000 396.0 394.670 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 04 55 45.9451 -90.2732 472.000 30.0 396.166 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 09 55 45.9451 -90.2732 472.000 122.0 395.583 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 14 55 45.9451 -90.2732 472.000 396.0 394.303 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 19 55 45.9451 -90.2732 472.000 30.0 396.359 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 24 55 45.9451 -90.2732 472.000 122.0 395.672 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 29 55 45.9451 -90.2732 472.000 396.0 394.584 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 30 25 45.9451 -90.2732 472.000 396.0 394.574 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 30 55 45.9451 -90.2732 472.000 396.0 394.777 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 31 25 45.9451 -90.2732 472.000 396.0 394.725 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 31 55 45.9451 -90.2732 472.000 396.0 394.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 32 25 45.9451 -90.2732 472.000 396.0 394.729 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 32 55 45.9451 -90.2732 472.000 396.0 394.806 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 33 25 45.9451 -90.2732 472.000 396.0 394.597 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 33 55 45.9451 -90.2732 472.000 396.0 394.792 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 34 25 45.9451 -90.2732 472.000 396.0 394.782 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 34 55 45.9451 -90.2732 472.000 396.0 394.756 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 39 55 45.9451 -90.2732 472.000 30.0 396.264 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 44 55 45.9451 -90.2732 472.000 122.0 395.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 49 55 45.9451 -90.2732 472.000 396.0 394.751 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 54 55 45.9451 -90.2732 472.000 30.0 396.567 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 05 59 55 45.9451 -90.2732 472.000 122.0 396.030 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 04 55 45.9451 -90.2732 472.000 396.0 394.697 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 14 55 45.9451 -90.2732 472.000 30.0 396.878 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 19 55 45.9451 -90.2732 472.000 122.0 396.080 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 24 55 45.9451 -90.2732 472.000 396.0 394.946 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 29 55 45.9451 -90.2732 472.000 30.0 396.770 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 34 55 45.9451 -90.2732 472.000 122.0 396.163 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 39 55 45.9451 -90.2732 472.000 396.0 395.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 40 25 45.9451 -90.2732 472.000 396.0 394.946 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 40 55 45.9451 -90.2732 472.000 396.0 394.905 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 41 25 45.9451 -90.2732 472.000 396.0 394.986 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 41 55 45.9451 -90.2732 472.000 396.0 395.025 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 42 25 45.9451 -90.2732 472.000 396.0 395.101 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 42 55 45.9451 -90.2732 472.000 396.0 395.005 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 43 25 45.9451 -90.2732 472.000 396.0 395.031 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 43 55 45.9451 -90.2732 472.000 396.0 395.032 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 44 25 45.9451 -90.2732 472.000 396.0 395.067 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 44 55 45.9451 -90.2732 472.000 396.0 395.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 49 55 45.9451 -90.2732 472.000 30.0 396.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 54 55 45.9451 -90.2732 472.000 122.0 396.094 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 06 59 55 45.9451 -90.2732 472.000 396.0 394.455 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 04 55 45.9451 -90.2732 472.000 30.0 396.115 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 09 55 45.9451 -90.2732 472.000 122.0 395.864 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 14 55 45.9451 -90.2732 472.000 396.0 395.054 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 15 25 45.9451 -90.2732 472.000 396.0 395.015 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 15 55 45.9451 -90.2732 472.000 396.0 395.164 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 16 25 45.9451 -90.2732 472.000 396.0 395.105 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 16 55 45.9451 -90.2732 472.000 396.0 395.106 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 17 25 45.9451 -90.2732 472.000 396.0 395.179 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 17 55 45.9451 -90.2732 472.000 396.0 395.117 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 18 25 45.9451 -90.2732 472.000 396.0 395.064 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 18 55 45.9451 -90.2732 472.000 396.0 395.163 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 19 25 45.9451 -90.2732 472.000 396.0 395.408 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 19 55 45.9451 -90.2732 472.000 396.0 395.156 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 24 55 45.9451 -90.2732 472.000 30.0 396.205 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 29 55 45.9451 -90.2732 472.000 122.0 395.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 34 55 45.9451 -90.2732 472.000 396.0 394.634 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 39 55 45.9451 -90.2732 472.000 30.0 395.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 44 55 45.9451 -90.2732 472.000 122.0 395.597 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 49 55 45.9451 -90.2732 472.000 396.0 394.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 07 59 55 45.9451 -90.2732 472.000 30.0 396.080 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 04 55 45.9451 -90.2732 472.000 122.0 395.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 09 55 45.9451 -90.2732 472.000 396.0 395.249 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 14 55 45.9451 -90.2732 472.000 30.0 396.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 19 55 45.9451 -90.2732 472.000 122.0 395.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 24 55 45.9451 -90.2732 472.000 396.0 395.283 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 25 25 45.9451 -90.2732 472.000 396.0 395.235 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 25 55 45.9451 -90.2732 472.000 396.0 395.303 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 26 25 45.9451 -90.2732 472.000 396.0 395.432 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 26 55 45.9451 -90.2732 472.000 396.0 395.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 27 25 45.9451 -90.2732 472.000 396.0 395.408 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 27 55 45.9451 -90.2732 472.000 396.0 395.457 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 28 25 45.9451 -90.2732 472.000 396.0 395.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 28 55 45.9451 -90.2732 472.000 396.0 395.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 29 25 45.9451 -90.2732 472.000 396.0 395.264 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 29 55 45.9451 -90.2732 472.000 396.0 395.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 34 55 45.9451 -90.2732 472.000 30.0 396.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 39 55 45.9451 -90.2732 472.000 122.0 396.100 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 44 55 45.9451 -90.2732 472.000 396.0 395.276 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 49 55 45.9451 -90.2732 472.000 30.0 396.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 54 55 45.9451 -90.2732 472.000 122.0 396.337 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 08 59 55 45.9451 -90.2732 472.000 396.0 394.517 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 00 25 45.9451 -90.2732 472.000 396.0 394.545 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 00 55 45.9451 -90.2732 472.000 396.0 394.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 01 25 45.9451 -90.2732 472.000 396.0 394.618 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 01 55 45.9451 -90.2732 472.000 396.0 394.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 02 25 45.9451 -90.2732 472.000 396.0 394.628 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 02 55 45.9451 -90.2732 472.000 396.0 394.699 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 03 25 45.9451 -90.2732 472.000 396.0 394.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 03 55 45.9451 -90.2732 472.000 396.0 394.732 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 04 25 45.9451 -90.2732 472.000 396.0 394.691 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 04 55 45.9451 -90.2732 472.000 396.0 394.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 09 55 45.9451 -90.2732 472.000 30.0 396.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 14 55 45.9451 -90.2732 472.000 122.0 396.460 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 19 55 45.9451 -90.2732 472.000 396.0 395.337 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 24 55 45.9451 -90.2732 472.000 30.0 396.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 29 55 45.9451 -90.2732 472.000 122.0 396.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 34 55 45.9451 -90.2732 472.000 396.0 395.404 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 35 25 45.9451 -90.2732 472.000 396.0 395.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 35 55 45.9451 -90.2732 472.000 396.0 395.556 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 36 25 45.9451 -90.2732 472.000 396.0 395.553 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 36 55 45.9451 -90.2732 472.000 396.0 395.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 37 25 45.9451 -90.2732 472.000 396.0 395.557 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 37 55 45.9451 -90.2732 472.000 396.0 395.455 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 38 25 45.9451 -90.2732 472.000 396.0 395.598 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 38 55 45.9451 -90.2732 472.000 396.0 395.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 39 25 45.9451 -90.2732 472.000 396.0 395.554 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 39 55 45.9451 -90.2732 472.000 396.0 395.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 44 55 45.9451 -90.2732 472.000 30.0 397.051 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 49 55 45.9451 -90.2732 472.000 122.0 396.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 54 55 45.9451 -90.2732 472.000 396.0 395.358 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 09 59 55 45.9451 -90.2732 472.000 30.0 397.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 04 55 45.9451 -90.2732 472.000 122.0 396.570 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 09 55 45.9451 -90.2732 472.000 396.0 395.365 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 19 55 45.9451 -90.2732 472.000 30.0 396.245 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 24 55 45.9451 -90.2732 472.000 122.0 395.890 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 29 55 45.9451 -90.2732 472.000 396.0 394.709 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 34 55 45.9451 -90.2732 472.000 30.0 396.261 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 39 55 45.9451 -90.2732 472.000 122.0 396.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 44 55 45.9451 -90.2732 472.000 396.0 395.592 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 54 55 45.9451 -90.2732 472.000 30.0 396.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 10 59 55 45.9451 -90.2732 472.000 122.0 396.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 04 55 45.9451 -90.2732 472.000 396.0 394.789 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 09 55 45.9451 -90.2732 472.000 30.0 396.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 14 55 45.9451 -90.2732 472.000 122.0 396.258 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 19 55 45.9451 -90.2732 472.000 396.0 395.165 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 20 25 45.9451 -90.2732 472.000 396.0 394.496 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 20 55 45.9451 -90.2732 472.000 396.0 394.990 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 21 25 45.9451 -90.2732 472.000 396.0 395.042 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 21 55 45.9451 -90.2732 472.000 396.0 395.024 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 22 25 45.9451 -90.2732 472.000 396.0 394.862 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 22 55 45.9451 -90.2732 472.000 396.0 394.789 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 23 25 45.9451 -90.2732 472.000 396.0 394.646 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 23 55 45.9451 -90.2732 472.000 396.0 395.337 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 24 25 45.9451 -90.2732 472.000 396.0 395.691 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 24 55 45.9451 -90.2732 472.000 396.0 395.760 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 29 55 45.9451 -90.2732 472.000 30.0 396.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 34 55 45.9451 -90.2732 472.000 122.0 396.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 39 55 45.9451 -90.2732 472.000 396.0 396.338 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 44 55 45.9451 -90.2732 472.000 30.0 396.971 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 11 49 55 45.9451 -90.2732 472.000 122.0 396.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 14 55 45.9451 -90.2732 472.000 396.0 393.954 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 19 55 45.9451 -90.2732 472.000 30.0 394.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 24 55 45.9451 -90.2732 472.000 122.0 394.952 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 29 55 45.9451 -90.2732 472.000 396.0 395.676 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 34 55 45.9451 -90.2732 472.000 30.0 395.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 39 55 45.9451 -90.2732 472.000 122.0 395.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 44 55 45.9451 -90.2732 472.000 396.0 394.554 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 45 25 45.9451 -90.2732 472.000 396.0 394.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 45 55 45.9451 -90.2732 472.000 396.0 394.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 46 25 45.9451 -90.2732 472.000 396.0 394.562 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 46 55 45.9451 -90.2732 472.000 396.0 394.560 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 47 25 45.9451 -90.2732 472.000 396.0 394.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 47 55 45.9451 -90.2732 472.000 396.0 394.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 48 25 45.9451 -90.2732 472.000 396.0 394.587 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 48 55 45.9451 -90.2732 472.000 396.0 394.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 49 25 45.9451 -90.2732 472.000 396.0 394.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 49 55 45.9451 -90.2732 472.000 396.0 394.656 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 54 55 45.9451 -90.2732 472.000 30.0 395.426 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 04 12 59 55 45.9451 -90.2732 472.000 122.0 394.609 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 04 55 45.9451 -90.2732 472.000 396.0 394.514 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 09 55 45.9451 -90.2732 472.000 30.0 395.576 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 14 55 45.9451 -90.2732 472.000 122.0 394.840 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 19 55 45.9451 -90.2732 472.000 396.0 393.919 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 20 25 45.9451 -90.2732 472.000 396.0 393.810 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 20 55 45.9451 -90.2732 472.000 396.0 393.766 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 21 25 45.9451 -90.2732 472.000 396.0 393.870 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 21 55 45.9451 -90.2732 472.000 396.0 393.799 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 22 25 45.9451 -90.2732 472.000 396.0 393.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 22 55 45.9451 -90.2732 472.000 396.0 393.963 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 23 25 45.9451 -90.2732 472.000 396.0 393.923 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 23 55 45.9451 -90.2732 472.000 396.0 393.895 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 24 25 45.9451 -90.2732 472.000 396.0 393.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 24 55 45.9451 -90.2732 472.000 396.0 393.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 29 55 45.9451 -90.2732 472.000 30.0 395.273 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 34 55 45.9451 -90.2732 472.000 122.0 394.858 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 39 55 45.9451 -90.2732 472.000 396.0 394.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 44 55 45.9451 -90.2732 472.000 30.0 395.300 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 49 55 45.9451 -90.2732 472.000 122.0 394.808 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 13 54 55 45.9451 -90.2732 472.000 396.0 394.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 04 55 45.9451 -90.2732 472.000 30.0 395.199 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 09 55 45.9451 -90.2732 472.000 122.0 394.954 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 14 55 45.9451 -90.2732 472.000 396.0 394.690 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 19 55 45.9451 -90.2732 472.000 30.0 395.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 24 55 45.9451 -90.2732 472.000 122.0 395.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 29 55 45.9451 -90.2732 472.000 396.0 394.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 30 25 45.9451 -90.2732 472.000 396.0 394.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 30 55 45.9451 -90.2732 472.000 396.0 394.904 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 31 25 45.9451 -90.2732 472.000 396.0 394.764 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 31 55 45.9451 -90.2732 472.000 396.0 394.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 32 25 45.9451 -90.2732 472.000 396.0 394.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 32 55 45.9451 -90.2732 472.000 396.0 394.756 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 33 25 45.9451 -90.2732 472.000 396.0 394.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 33 55 45.9451 -90.2732 472.000 396.0 394.798 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 34 25 45.9451 -90.2732 472.000 396.0 394.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 34 55 45.9451 -90.2732 472.000 396.0 394.869 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 39 55 45.9451 -90.2732 472.000 30.0 395.158 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 44 55 45.9451 -90.2732 472.000 122.0 394.753 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 49 55 45.9451 -90.2732 472.000 396.0 394.601 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 54 55 45.9451 -90.2732 472.000 30.0 394.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 14 59 55 45.9451 -90.2732 472.000 122.0 394.879 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 04 55 45.9451 -90.2732 472.000 396.0 394.349 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 05 25 45.9451 -90.2732 472.000 396.0 394.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 05 55 45.9451 -90.2732 472.000 396.0 394.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 06 25 45.9451 -90.2732 472.000 396.0 394.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 06 55 45.9451 -90.2732 472.000 396.0 394.403 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 07 25 45.9451 -90.2732 472.000 396.0 394.509 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 07 55 45.9451 -90.2732 472.000 396.0 394.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 08 25 45.9451 -90.2732 472.000 396.0 394.513 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 08 55 45.9451 -90.2732 472.000 396.0 394.069 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 09 25 45.9451 -90.2732 472.000 396.0 394.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 09 55 45.9451 -90.2732 472.000 396.0 394.079 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 14 55 45.9451 -90.2732 472.000 30.0 394.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 19 55 45.9451 -90.2732 472.000 122.0 394.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 24 55 45.9451 -90.2732 472.000 396.0 394.112 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 29 55 45.9451 -90.2732 472.000 30.0 394.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 34 55 45.9451 -90.2732 472.000 122.0 394.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 39 55 45.9451 -90.2732 472.000 396.0 394.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 40 25 45.9451 -90.2732 472.000 396.0 394.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 40 55 45.9451 -90.2732 472.000 396.0 394.149 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 41 25 45.9451 -90.2732 472.000 396.0 394.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 41 55 45.9451 -90.2732 472.000 396.0 394.120 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 42 25 45.9451 -90.2732 472.000 396.0 394.059 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 42 55 45.9451 -90.2732 472.000 396.0 394.044 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 43 25 45.9451 -90.2732 472.000 396.0 394.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 43 55 45.9451 -90.2732 472.000 396.0 394.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 44 25 45.9451 -90.2732 472.000 396.0 393.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 44 55 45.9451 -90.2732 472.000 396.0 394.007 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 49 55 45.9451 -90.2732 472.000 30.0 393.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 54 55 45.9451 -90.2732 472.000 122.0 393.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 15 59 55 45.9451 -90.2732 472.000 396.0 393.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 04 55 45.9451 -90.2732 472.000 30.0 394.112 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 09 55 45.9451 -90.2732 472.000 122.0 394.014 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 14 55 45.9451 -90.2732 472.000 396.0 393.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 24 55 45.9451 -90.2732 472.000 30.0 393.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 29 55 45.9451 -90.2732 472.000 122.0 394.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 34 55 45.9451 -90.2732 472.000 396.0 393.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 39 55 45.9451 -90.2732 472.000 30.0 393.725 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 44 55 45.9451 -90.2732 472.000 122.0 393.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 49 55 45.9451 -90.2732 472.000 396.0 393.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 50 25 45.9451 -90.2732 472.000 396.0 393.701 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 50 55 45.9451 -90.2732 472.000 396.0 393.713 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 51 25 45.9451 -90.2732 472.000 396.0 393.659 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 51 55 45.9451 -90.2732 472.000 396.0 393.674 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 52 25 45.9451 -90.2732 472.000 396.0 393.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 52 55 45.9451 -90.2732 472.000 396.0 393.657 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 53 25 45.9451 -90.2732 472.000 396.0 393.650 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 53 55 45.9451 -90.2732 472.000 396.0 393.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 54 25 45.9451 -90.2732 472.000 396.0 393.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 16 54 55 45.9451 -90.2732 472.000 396.0 393.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 04 55 45.9451 -90.2732 472.000 30.0 393.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 09 55 45.9451 -90.2732 472.000 122.0 393.485 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 14 55 45.9451 -90.2732 472.000 396.0 393.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 19 55 45.9451 -90.2732 472.000 30.0 393.221 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 24 55 45.9451 -90.2732 472.000 122.0 393.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 29 55 45.9451 -90.2732 472.000 396.0 393.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 30 25 45.9451 -90.2732 472.000 396.0 393.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 30 55 45.9451 -90.2732 472.000 396.0 393.160 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 31 25 45.9451 -90.2732 472.000 396.0 393.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 31 55 45.9451 -90.2732 472.000 396.0 393.213 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 32 25 45.9451 -90.2732 472.000 396.0 393.110 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 32 55 45.9451 -90.2732 472.000 396.0 393.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 33 25 45.9451 -90.2732 472.000 396.0 393.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 33 55 45.9451 -90.2732 472.000 396.0 393.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 34 25 45.9451 -90.2732 472.000 396.0 393.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 34 55 45.9451 -90.2732 472.000 396.0 393.204 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 39 55 45.9451 -90.2732 472.000 30.0 392.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 44 55 45.9451 -90.2732 472.000 122.0 392.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 49 55 45.9451 -90.2732 472.000 396.0 392.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 54 55 45.9451 -90.2732 472.000 30.0 392.812 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 17 59 55 45.9451 -90.2732 472.000 122.0 392.770 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 04 55 45.9451 -90.2732 472.000 396.0 392.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 14 55 45.9451 -90.2732 472.000 30.0 392.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 19 55 45.9451 -90.2732 472.000 122.0 392.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 24 55 45.9451 -90.2732 472.000 396.0 392.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 29 55 45.9451 -90.2732 472.000 30.0 392.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 34 55 45.9451 -90.2732 472.000 122.0 392.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 39 55 45.9451 -90.2732 472.000 396.0 392.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 40 25 45.9451 -90.2732 472.000 396.0 392.653 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 40 55 45.9451 -90.2732 472.000 396.0 392.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 41 25 45.9451 -90.2732 472.000 396.0 392.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 41 55 45.9451 -90.2732 472.000 396.0 392.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 42 25 45.9451 -90.2732 472.000 396.0 392.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 42 55 45.9451 -90.2732 472.000 396.0 392.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 43 25 45.9451 -90.2732 472.000 396.0 392.659 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 43 55 45.9451 -90.2732 472.000 396.0 392.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 44 25 45.9451 -90.2732 472.000 396.0 392.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 44 55 45.9451 -90.2732 472.000 396.0 392.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 49 55 45.9451 -90.2732 472.000 30.0 392.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 54 55 45.9451 -90.2732 472.000 122.0 392.823 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 18 59 55 45.9451 -90.2732 472.000 396.0 392.840 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 04 55 45.9451 -90.2732 472.000 30.0 392.769 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 09 55 45.9451 -90.2732 472.000 122.0 393.053 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 14 55 45.9451 -90.2732 472.000 396.0 393.130 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 15 25 45.9451 -90.2732 472.000 396.0 393.138 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 15 55 45.9451 -90.2732 472.000 396.0 393.129 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 16 25 45.9451 -90.2732 472.000 396.0 393.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 16 55 45.9451 -90.2732 472.000 396.0 393.168 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 17 25 45.9451 -90.2732 472.000 396.0 393.179 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 17 55 45.9451 -90.2732 472.000 396.0 393.153 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 18 25 45.9451 -90.2732 472.000 396.0 393.187 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 18 55 45.9451 -90.2732 472.000 396.0 393.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 19 25 45.9451 -90.2732 472.000 396.0 393.066 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 19 55 45.9451 -90.2732 472.000 396.0 393.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 24 55 45.9451 -90.2732 472.000 30.0 392.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 29 55 45.9451 -90.2732 472.000 122.0 393.197 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 34 55 45.9451 -90.2732 472.000 396.0 393.206 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 39 55 45.9451 -90.2732 472.000 30.0 393.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 44 55 45.9451 -90.2732 472.000 122.0 393.204 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 49 55 45.9451 -90.2732 472.000 396.0 393.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 19 59 55 45.9451 -90.2732 472.000 30.0 393.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 04 55 45.9451 -90.2732 472.000 122.0 393.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 09 55 45.9451 -90.2732 472.000 396.0 393.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 14 55 45.9451 -90.2732 472.000 30.0 392.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 19 55 45.9451 -90.2732 472.000 122.0 392.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 24 55 45.9451 -90.2732 472.000 396.0 392.996 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 25 25 45.9451 -90.2732 472.000 396.0 392.993 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 25 55 45.9451 -90.2732 472.000 396.0 392.971 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 26 25 45.9451 -90.2732 472.000 396.0 393.008 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 26 55 45.9451 -90.2732 472.000 396.0 392.932 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 27 25 45.9451 -90.2732 472.000 396.0 392.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 27 55 45.9451 -90.2732 472.000 396.0 392.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 28 25 45.9451 -90.2732 472.000 396.0 392.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 28 55 45.9451 -90.2732 472.000 396.0 392.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 29 25 45.9451 -90.2732 472.000 396.0 392.946 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 29 55 45.9451 -90.2732 472.000 396.0 392.914 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 34 55 45.9451 -90.2732 472.000 30.0 392.809 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 39 55 45.9451 -90.2732 472.000 122.0 392.767 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 44 55 45.9451 -90.2732 472.000 396.0 392.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 49 55 45.9451 -90.2732 472.000 30.0 392.838 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 54 55 45.9451 -90.2732 472.000 122.0 392.692 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 20 59 55 45.9451 -90.2732 472.000 396.0 392.537 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 00 25 45.9451 -90.2732 472.000 396.0 392.553 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 00 55 45.9451 -90.2732 472.000 396.0 392.524 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 01 25 45.9451 -90.2732 472.000 396.0 392.497 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 01 55 45.9451 -90.2732 472.000 396.0 392.546 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 02 25 45.9451 -90.2732 472.000 396.0 392.564 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 02 55 45.9451 -90.2732 472.000 396.0 392.602 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 03 25 45.9451 -90.2732 472.000 396.0 392.585 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 03 55 45.9451 -90.2732 472.000 396.0 392.572 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 04 25 45.9451 -90.2732 472.000 396.0 392.519 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 04 55 45.9451 -90.2732 472.000 396.0 392.543 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 09 55 45.9451 -90.2732 472.000 30.0 392.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 14 55 45.9451 -90.2732 472.000 122.0 392.595 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 19 55 45.9451 -90.2732 472.000 396.0 392.624 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 24 55 45.9451 -90.2732 472.000 30.0 392.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 29 55 45.9451 -90.2732 472.000 122.0 392.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 34 55 45.9451 -90.2732 472.000 396.0 392.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 35 25 45.9451 -90.2732 472.000 396.0 392.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 35 55 45.9451 -90.2732 472.000 396.0 392.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 36 25 45.9451 -90.2732 472.000 396.0 392.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 36 55 45.9451 -90.2732 472.000 396.0 392.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 37 25 45.9451 -90.2732 472.000 396.0 392.801 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 37 55 45.9451 -90.2732 472.000 396.0 392.812 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 38 25 45.9451 -90.2732 472.000 396.0 392.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 38 55 45.9451 -90.2732 472.000 396.0 392.842 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 39 25 45.9451 -90.2732 472.000 396.0 392.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 39 55 45.9451 -90.2732 472.000 396.0 392.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 44 55 45.9451 -90.2732 472.000 30.0 393.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 49 55 45.9451 -90.2732 472.000 122.0 392.979 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 54 55 45.9451 -90.2732 472.000 396.0 392.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 21 59 55 45.9451 -90.2732 472.000 30.0 393.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 04 55 45.9451 -90.2732 472.000 122.0 392.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 09 55 45.9451 -90.2732 472.000 396.0 392.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 19 55 45.9451 -90.2732 472.000 30.0 392.913 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 24 55 45.9451 -90.2732 472.000 122.0 392.778 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 29 55 45.9451 -90.2732 472.000 396.0 392.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 34 55 45.9451 -90.2732 472.000 30.0 392.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 39 55 45.9451 -90.2732 472.000 122.0 392.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 44 55 45.9451 -90.2732 472.000 396.0 392.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 54 55 45.9451 -90.2732 472.000 30.0 392.927 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 22 59 55 45.9451 -90.2732 472.000 122.0 392.635 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 04 55 45.9451 -90.2732 472.000 396.0 392.240 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 09 55 45.9451 -90.2732 472.000 30.0 392.729 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 14 55 45.9451 -90.2732 472.000 122.0 392.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 19 55 45.9451 -90.2732 472.000 396.0 392.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 20 25 45.9451 -90.2732 472.000 396.0 392.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 20 55 45.9451 -90.2732 472.000 396.0 392.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 21 25 45.9451 -90.2732 472.000 396.0 392.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 21 55 45.9451 -90.2732 472.000 396.0 392.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 22 25 45.9451 -90.2732 472.000 396.0 392.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 22 55 45.9451 -90.2732 472.000 396.0 392.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 23 25 45.9451 -90.2732 472.000 396.0 392.343 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 23 55 45.9451 -90.2732 472.000 396.0 392.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 24 25 45.9451 -90.2732 472.000 396.0 392.307 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 24 55 45.9451 -90.2732 472.000 396.0 392.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 29 55 45.9451 -90.2732 472.000 30.0 393.130 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 34 55 45.9451 -90.2732 472.000 122.0 392.738 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 39 55 45.9451 -90.2732 472.000 396.0 392.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 44 55 45.9451 -90.2732 472.000 30.0 393.156 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 04 23 49 55 45.9451 -90.2732 472.000 122.0 392.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 14 55 45.9451 -90.2732 472.000 396.0 391.898 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 19 55 45.9451 -90.2732 472.000 30.0 393.622 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 24 55 45.9451 -90.2732 472.000 122.0 392.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 29 55 45.9451 -90.2732 472.000 396.0 391.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 34 55 45.9451 -90.2732 472.000 30.0 393.528 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 39 55 45.9451 -90.2732 472.000 122.0 392.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 44 55 45.9451 -90.2732 472.000 396.0 391.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 45 25 45.9451 -90.2732 472.000 396.0 391.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 45 55 45.9451 -90.2732 472.000 396.0 391.706 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 46 25 45.9451 -90.2732 472.000 396.0 391.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 46 55 45.9451 -90.2732 472.000 396.0 391.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 47 25 45.9451 -90.2732 472.000 396.0 391.695 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 47 55 45.9451 -90.2732 472.000 396.0 391.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 48 25 45.9451 -90.2732 472.000 396.0 391.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 48 55 45.9451 -90.2732 472.000 396.0 391.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 49 25 45.9451 -90.2732 472.000 396.0 391.764 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 49 55 45.9451 -90.2732 472.000 396.0 391.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 54 55 45.9451 -90.2732 472.000 30.0 394.109 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 00 59 55 45.9451 -90.2732 472.000 122.0 392.942 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 04 55 45.9451 -90.2732 472.000 396.0 391.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 09 55 45.9451 -90.2732 472.000 30.0 393.774 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 14 55 45.9451 -90.2732 472.000 122.0 392.875 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 19 55 45.9451 -90.2732 472.000 396.0 391.534 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 20 25 45.9451 -90.2732 472.000 396.0 391.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 20 55 45.9451 -90.2732 472.000 396.0 391.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 21 25 45.9451 -90.2732 472.000 396.0 391.439 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 21 55 45.9451 -90.2732 472.000 396.0 391.508 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 22 25 45.9451 -90.2732 472.000 396.0 391.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 22 55 45.9451 -90.2732 472.000 396.0 391.545 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 23 25 45.9451 -90.2732 472.000 396.0 391.448 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 23 55 45.9451 -90.2732 472.000 396.0 391.629 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 24 25 45.9451 -90.2732 472.000 396.0 391.596 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 24 55 45.9451 -90.2732 472.000 396.0 391.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 29 55 45.9451 -90.2732 472.000 30.0 393.501 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 34 55 45.9451 -90.2732 472.000 122.0 392.641 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 39 55 45.9451 -90.2732 472.000 396.0 391.604 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 44 55 45.9451 -90.2732 472.000 30.0 393.417 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 49 55 45.9451 -90.2732 472.000 122.0 392.466 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 05 01 54 55 45.9451 -90.2732 472.000 396.0 391.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 04 55 45.9451 -90.2732 472.000 30.0 393.350 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 09 55 45.9451 -90.2732 472.000 122.0 392.572 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 14 55 45.9451 -90.2732 472.000 396.0 391.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 19 55 45.9451 -90.2732 472.000 30.0 393.474 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 24 55 45.9451 -90.2732 472.000 122.0 392.696 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 29 55 45.9451 -90.2732 472.000 396.0 391.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 30 25 45.9451 -90.2732 472.000 396.0 391.764 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 30 55 45.9451 -90.2732 472.000 396.0 391.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 31 25 45.9451 -90.2732 472.000 396.0 391.836 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 31 55 45.9451 -90.2732 472.000 396.0 391.762 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 32 25 45.9451 -90.2732 472.000 396.0 391.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 32 55 45.9451 -90.2732 472.000 396.0 391.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 33 25 45.9451 -90.2732 472.000 396.0 391.774 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 33 55 45.9451 -90.2732 472.000 396.0 391.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 34 25 45.9451 -90.2732 472.000 396.0 391.714 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 34 55 45.9451 -90.2732 472.000 396.0 391.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 39 55 45.9451 -90.2732 472.000 30.0 393.622 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 44 55 45.9451 -90.2732 472.000 122.0 392.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 49 55 45.9451 -90.2732 472.000 396.0 391.884 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 54 55 45.9451 -90.2732 472.000 30.0 393.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 02 59 55 45.9451 -90.2732 472.000 122.0 392.772 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 04 55 45.9451 -90.2732 472.000 396.0 391.999 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 05 25 45.9451 -90.2732 472.000 396.0 392.089 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 05 55 45.9451 -90.2732 472.000 396.0 392.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 06 25 45.9451 -90.2732 472.000 396.0 391.758 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 06 55 45.9451 -90.2732 472.000 396.0 391.822 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 07 25 45.9451 -90.2732 472.000 396.0 391.913 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 07 55 45.9451 -90.2732 472.000 396.0 391.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 08 25 45.9451 -90.2732 472.000 396.0 391.979 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 08 55 45.9451 -90.2732 472.000 396.0 391.917 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 09 25 45.9451 -90.2732 472.000 396.0 391.970 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 09 55 45.9451 -90.2732 472.000 396.0 392.098 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 14 55 45.9451 -90.2732 472.000 30.0 393.305 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 19 55 45.9451 -90.2732 472.000 122.0 393.003 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 24 55 45.9451 -90.2732 472.000 396.0 391.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 29 55 45.9451 -90.2732 472.000 30.0 393.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 34 55 45.9451 -90.2732 472.000 122.0 393.179 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 39 55 45.9451 -90.2732 472.000 396.0 391.872 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 40 25 45.9451 -90.2732 472.000 396.0 392.005 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 40 55 45.9451 -90.2732 472.000 396.0 392.159 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 41 25 45.9451 -90.2732 472.000 396.0 391.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 41 55 45.9451 -90.2732 472.000 396.0 391.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 42 25 45.9451 -90.2732 472.000 396.0 391.847 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 42 55 45.9451 -90.2732 472.000 396.0 391.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 43 25 45.9451 -90.2732 472.000 396.0 391.802 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 43 55 45.9451 -90.2732 472.000 396.0 391.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 44 25 45.9451 -90.2732 472.000 396.0 391.835 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 44 55 45.9451 -90.2732 472.000 396.0 391.876 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 49 55 45.9451 -90.2732 472.000 30.0 392.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 54 55 45.9451 -90.2732 472.000 122.0 392.094 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 03 59 55 45.9451 -90.2732 472.000 396.0 391.775 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 04 55 45.9451 -90.2732 472.000 30.0 391.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 09 55 45.9451 -90.2732 472.000 122.0 391.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 14 55 45.9451 -90.2732 472.000 396.0 391.904 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 24 55 45.9451 -90.2732 472.000 30.0 392.133 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 29 55 45.9451 -90.2732 472.000 122.0 392.094 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 34 55 45.9451 -90.2732 472.000 396.0 391.939 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 39 55 45.9451 -90.2732 472.000 30.0 392.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 44 55 45.9451 -90.2732 472.000 122.0 392.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 49 55 45.9451 -90.2732 472.000 396.0 391.930 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 50 25 45.9451 -90.2732 472.000 396.0 392.008 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 50 55 45.9451 -90.2732 472.000 396.0 392.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 51 25 45.9451 -90.2732 472.000 396.0 392.076 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 51 55 45.9451 -90.2732 472.000 396.0 392.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 52 25 45.9451 -90.2732 472.000 396.0 391.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 52 55 45.9451 -90.2732 472.000 396.0 391.939 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 53 25 45.9451 -90.2732 472.000 396.0 392.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 53 55 45.9451 -90.2732 472.000 396.0 392.064 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 54 25 45.9451 -90.2732 472.000 396.0 392.114 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 04 54 55 45.9451 -90.2732 472.000 396.0 392.131 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 04 55 45.9451 -90.2732 472.000 30.0 392.277 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 09 55 45.9451 -90.2732 472.000 122.0 392.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 14 55 45.9451 -90.2732 472.000 396.0 391.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 19 55 45.9451 -90.2732 472.000 30.0 392.195 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 24 55 45.9451 -90.2732 472.000 122.0 392.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 29 55 45.9451 -90.2732 472.000 396.0 392.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 30 25 45.9451 -90.2732 472.000 396.0 392.177 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 30 55 45.9451 -90.2732 472.000 396.0 392.179 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 31 25 45.9451 -90.2732 472.000 396.0 392.199 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 31 55 45.9451 -90.2732 472.000 396.0 392.217 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 32 25 45.9451 -90.2732 472.000 396.0 392.156 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 32 55 45.9451 -90.2732 472.000 396.0 392.137 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 33 25 45.9451 -90.2732 472.000 396.0 392.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 33 55 45.9451 -90.2732 472.000 396.0 392.262 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 34 25 45.9451 -90.2732 472.000 396.0 392.174 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 34 55 45.9451 -90.2732 472.000 396.0 392.148 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 39 55 45.9451 -90.2732 472.000 30.0 392.206 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 44 55 45.9451 -90.2732 472.000 122.0 392.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 49 55 45.9451 -90.2732 472.000 396.0 392.164 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 54 55 45.9451 -90.2732 472.000 30.0 392.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 05 59 55 45.9451 -90.2732 472.000 122.0 392.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 04 55 45.9451 -90.2732 472.000 396.0 392.348 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 14 55 45.9451 -90.2732 472.000 30.0 392.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 19 55 45.9451 -90.2732 472.000 122.0 392.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 24 55 45.9451 -90.2732 472.000 396.0 392.415 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 29 55 45.9451 -90.2732 472.000 30.0 392.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 34 55 45.9451 -90.2732 472.000 122.0 392.499 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 39 55 45.9451 -90.2732 472.000 396.0 392.485 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 40 25 45.9451 -90.2732 472.000 396.0 392.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 40 55 45.9451 -90.2732 472.000 396.0 392.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 41 25 45.9451 -90.2732 472.000 396.0 392.520 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 41 55 45.9451 -90.2732 472.000 396.0 392.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 42 25 45.9451 -90.2732 472.000 396.0 392.379 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 42 55 45.9451 -90.2732 472.000 396.0 392.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 43 25 45.9451 -90.2732 472.000 396.0 392.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 43 55 45.9451 -90.2732 472.000 396.0 392.425 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 44 25 45.9451 -90.2732 472.000 396.0 392.451 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 44 55 45.9451 -90.2732 472.000 396.0 392.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 49 55 45.9451 -90.2732 472.000 30.0 392.803 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 54 55 45.9451 -90.2732 472.000 122.0 392.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 06 59 55 45.9451 -90.2732 472.000 396.0 392.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 04 55 45.9451 -90.2732 472.000 30.0 392.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 09 55 45.9451 -90.2732 472.000 122.0 392.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 14 55 45.9451 -90.2732 472.000 396.0 392.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 15 25 45.9451 -90.2732 472.000 396.0 392.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 15 55 45.9451 -90.2732 472.000 396.0 392.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 16 25 45.9451 -90.2732 472.000 396.0 392.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 16 55 45.9451 -90.2732 472.000 396.0 392.834 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 17 25 45.9451 -90.2732 472.000 396.0 392.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 17 55 45.9451 -90.2732 472.000 396.0 392.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 18 25 45.9451 -90.2732 472.000 396.0 392.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 18 55 45.9451 -90.2732 472.000 396.0 392.793 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 19 25 45.9451 -90.2732 472.000 396.0 392.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 19 55 45.9451 -90.2732 472.000 396.0 392.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 24 55 45.9451 -90.2732 472.000 30.0 392.920 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 29 55 45.9451 -90.2732 472.000 122.0 392.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 34 55 45.9451 -90.2732 472.000 396.0 392.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 39 55 45.9451 -90.2732 472.000 30.0 392.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 44 55 45.9451 -90.2732 472.000 122.0 392.773 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 49 55 45.9451 -90.2732 472.000 396.0 392.673 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 07 59 55 45.9451 -90.2732 472.000 30.0 392.935 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 04 55 45.9451 -90.2732 472.000 122.0 392.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 09 55 45.9451 -90.2732 472.000 396.0 392.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 14 55 45.9451 -90.2732 472.000 30.0 393.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 19 55 45.9451 -90.2732 472.000 122.0 392.944 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 24 55 45.9451 -90.2732 472.000 396.0 392.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 25 25 45.9451 -90.2732 472.000 396.0 392.856 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 25 55 45.9451 -90.2732 472.000 396.0 392.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 26 25 45.9451 -90.2732 472.000 396.0 392.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 26 55 45.9451 -90.2732 472.000 396.0 392.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 27 25 45.9451 -90.2732 472.000 396.0 392.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 27 55 45.9451 -90.2732 472.000 396.0 392.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 28 25 45.9451 -90.2732 472.000 396.0 392.890 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 28 55 45.9451 -90.2732 472.000 396.0 392.892 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 29 25 45.9451 -90.2732 472.000 396.0 392.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 29 55 45.9451 -90.2732 472.000 396.0 392.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 34 55 45.9451 -90.2732 472.000 30.0 393.172 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 39 55 45.9451 -90.2732 472.000 122.0 393.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 44 55 45.9451 -90.2732 472.000 396.0 393.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 49 55 45.9451 -90.2732 472.000 30.0 393.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 54 55 45.9451 -90.2732 472.000 122.0 393.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 08 59 55 45.9451 -90.2732 472.000 396.0 393.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 00 25 45.9451 -90.2732 472.000 396.0 393.062 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 00 55 45.9451 -90.2732 472.000 396.0 393.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 01 25 45.9451 -90.2732 472.000 396.0 393.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 01 55 45.9451 -90.2732 472.000 396.0 393.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 02 25 45.9451 -90.2732 472.000 396.0 393.166 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 02 55 45.9451 -90.2732 472.000 396.0 393.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 03 25 45.9451 -90.2732 472.000 396.0 393.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 03 55 45.9451 -90.2732 472.000 396.0 393.171 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 04 25 45.9451 -90.2732 472.000 396.0 393.219 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 04 55 45.9451 -90.2732 472.000 396.0 393.176 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 09 55 45.9451 -90.2732 472.000 30.0 393.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 14 55 45.9451 -90.2732 472.000 122.0 393.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 19 55 45.9451 -90.2732 472.000 396.0 393.069 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 24 55 45.9451 -90.2732 472.000 30.0 393.398 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 29 55 45.9451 -90.2732 472.000 122.0 393.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 34 55 45.9451 -90.2732 472.000 396.0 393.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 35 25 45.9451 -90.2732 472.000 396.0 393.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 35 55 45.9451 -90.2732 472.000 396.0 393.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 36 25 45.9451 -90.2732 472.000 396.0 393.187 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 36 55 45.9451 -90.2732 472.000 396.0 393.168 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 37 25 45.9451 -90.2732 472.000 396.0 393.184 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 37 55 45.9451 -90.2732 472.000 396.0 393.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 38 25 45.9451 -90.2732 472.000 396.0 393.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 38 55 45.9451 -90.2732 472.000 396.0 393.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 39 25 45.9451 -90.2732 472.000 396.0 393.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 39 55 45.9451 -90.2732 472.000 396.0 393.149 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 44 55 45.9451 -90.2732 472.000 30.0 393.215 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 49 55 45.9451 -90.2732 472.000 122.0 393.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 54 55 45.9451 -90.2732 472.000 396.0 392.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 09 59 55 45.9451 -90.2732 472.000 30.0 393.143 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 04 55 45.9451 -90.2732 472.000 122.0 393.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 09 55 45.9451 -90.2732 472.000 396.0 392.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 19 55 45.9451 -90.2732 472.000 30.0 393.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 24 55 45.9451 -90.2732 472.000 122.0 393.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 29 55 45.9451 -90.2732 472.000 396.0 392.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 34 55 45.9451 -90.2732 472.000 30.0 393.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 39 55 45.9451 -90.2732 472.000 122.0 393.104 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 44 55 45.9451 -90.2732 472.000 396.0 392.644 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 54 55 45.9451 -90.2732 472.000 30.0 393.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 10 59 55 45.9451 -90.2732 472.000 122.0 393.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 04 55 45.9451 -90.2732 472.000 396.0 392.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 09 55 45.9451 -90.2732 472.000 30.0 393.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 14 55 45.9451 -90.2732 472.000 122.0 392.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 19 55 45.9451 -90.2732 472.000 396.0 392.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 20 25 45.9451 -90.2732 472.000 396.0 392.653 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 20 55 45.9451 -90.2732 472.000 396.0 392.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 21 25 45.9451 -90.2732 472.000 396.0 392.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 21 55 45.9451 -90.2732 472.000 396.0 392.731 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 22 25 45.9451 -90.2732 472.000 396.0 392.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 22 55 45.9451 -90.2732 472.000 396.0 392.699 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 23 25 45.9451 -90.2732 472.000 396.0 392.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 23 55 45.9451 -90.2732 472.000 396.0 392.732 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 24 25 45.9451 -90.2732 472.000 396.0 392.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 24 55 45.9451 -90.2732 472.000 396.0 392.746 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 29 55 45.9451 -90.2732 472.000 30.0 393.237 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 34 55 45.9451 -90.2732 472.000 122.0 392.827 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 39 55 45.9451 -90.2732 472.000 396.0 392.584 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 44 55 45.9451 -90.2732 472.000 30.0 392.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 11 49 55 45.9451 -90.2732 472.000 122.0 392.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 14 55 45.9451 -90.2732 472.000 396.0 392.699 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 19 55 45.9451 -90.2732 472.000 30.0 393.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 24 55 45.9451 -90.2732 472.000 122.0 392.941 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 29 55 45.9451 -90.2732 472.000 396.0 392.542 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 34 55 45.9451 -90.2732 472.000 30.0 393.191 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 39 55 45.9451 -90.2732 472.000 122.0 392.875 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 44 55 45.9451 -90.2732 472.000 396.0 392.381 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 45 25 45.9451 -90.2732 472.000 396.0 392.386 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 45 55 45.9451 -90.2732 472.000 396.0 392.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 46 25 45.9451 -90.2732 472.000 396.0 392.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 46 55 45.9451 -90.2732 472.000 396.0 392.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 47 25 45.9451 -90.2732 472.000 396.0 392.399 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 47 55 45.9451 -90.2732 472.000 396.0 392.400 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 48 25 45.9451 -90.2732 472.000 396.0 392.386 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 48 55 45.9451 -90.2732 472.000 396.0 392.419 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 49 25 45.9451 -90.2732 472.000 396.0 392.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 49 55 45.9451 -90.2732 472.000 396.0 392.406 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 54 55 45.9451 -90.2732 472.000 30.0 393.083 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 12 59 55 45.9451 -90.2732 472.000 122.0 392.803 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 04 55 45.9451 -90.2732 472.000 396.0 392.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 09 55 45.9451 -90.2732 472.000 30.0 393.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 14 55 45.9451 -90.2732 472.000 122.0 392.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 19 55 45.9451 -90.2732 472.000 396.0 392.391 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 20 25 45.9451 -90.2732 472.000 396.0 392.401 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 20 55 45.9451 -90.2732 472.000 396.0 392.403 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 21 25 45.9451 -90.2732 472.000 396.0 392.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 21 55 45.9451 -90.2732 472.000 396.0 392.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 22 25 45.9451 -90.2732 472.000 396.0 392.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 22 55 45.9451 -90.2732 472.000 396.0 392.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 23 25 45.9451 -90.2732 472.000 396.0 392.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 23 55 45.9451 -90.2732 472.000 396.0 392.433 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 24 25 45.9451 -90.2732 472.000 396.0 392.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 24 55 45.9451 -90.2732 472.000 396.0 392.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 29 55 45.9451 -90.2732 472.000 30.0 393.308 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 34 55 45.9451 -90.2732 472.000 122.0 392.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 39 55 45.9451 -90.2732 472.000 396.0 392.534 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 44 55 45.9451 -90.2732 472.000 30.0 393.493 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 49 55 45.9451 -90.2732 472.000 122.0 393.210 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 05 13 54 55 45.9451 -90.2732 472.000 396.0 392.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 04 55 45.9451 -90.2732 472.000 30.0 393.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 09 55 45.9451 -90.2732 472.000 122.0 393.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 14 55 45.9451 -90.2732 472.000 396.0 392.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 19 55 45.9451 -90.2732 472.000 30.0 393.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 24 55 45.9451 -90.2732 472.000 122.0 393.336 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 29 55 45.9451 -90.2732 472.000 396.0 393.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 30 25 45.9451 -90.2732 472.000 396.0 393.125 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 30 55 45.9451 -90.2732 472.000 396.0 392.947 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 31 25 45.9451 -90.2732 472.000 396.0 392.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 31 55 45.9451 -90.2732 472.000 396.0 393.067 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 32 25 45.9451 -90.2732 472.000 396.0 393.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 32 55 45.9451 -90.2732 472.000 396.0 393.174 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 33 25 45.9451 -90.2732 472.000 396.0 393.179 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 33 55 45.9451 -90.2732 472.000 396.0 393.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 34 25 45.9451 -90.2732 472.000 396.0 393.044 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 34 55 45.9451 -90.2732 472.000 396.0 392.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 39 55 45.9451 -90.2732 472.000 30.0 393.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 44 55 45.9451 -90.2732 472.000 122.0 393.089 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 49 55 45.9451 -90.2732 472.000 396.0 393.162 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 54 55 45.9451 -90.2732 472.000 30.0 393.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 14 59 55 45.9451 -90.2732 472.000 122.0 392.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 04 55 45.9451 -90.2732 472.000 396.0 393.012 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 05 25 45.9451 -90.2732 472.000 396.0 393.013 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 05 55 45.9451 -90.2732 472.000 396.0 393.027 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 06 25 45.9451 -90.2732 472.000 396.0 392.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 06 55 45.9451 -90.2732 472.000 396.0 392.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 07 25 45.9451 -90.2732 472.000 396.0 392.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 07 55 45.9451 -90.2732 472.000 396.0 392.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 08 25 45.9451 -90.2732 472.000 396.0 392.860 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 08 55 45.9451 -90.2732 472.000 396.0 392.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 09 25 45.9451 -90.2732 472.000 396.0 392.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 09 55 45.9451 -90.2732 472.000 396.0 392.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 14 55 45.9451 -90.2732 472.000 30.0 392.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 19 55 45.9451 -90.2732 472.000 122.0 392.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 24 55 45.9451 -90.2732 472.000 396.0 392.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 29 55 45.9451 -90.2732 472.000 30.0 392.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 34 55 45.9451 -90.2732 472.000 122.0 392.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 39 55 45.9451 -90.2732 472.000 396.0 392.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 40 25 45.9451 -90.2732 472.000 396.0 392.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 40 55 45.9451 -90.2732 472.000 396.0 392.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 41 25 45.9451 -90.2732 472.000 396.0 392.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 41 55 45.9451 -90.2732 472.000 396.0 392.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 42 25 45.9451 -90.2732 472.000 396.0 392.667 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 42 55 45.9451 -90.2732 472.000 396.0 392.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 43 25 45.9451 -90.2732 472.000 396.0 392.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 43 55 45.9451 -90.2732 472.000 396.0 392.637 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 44 25 45.9451 -90.2732 472.000 396.0 392.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 44 55 45.9451 -90.2732 472.000 396.0 392.632 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 49 55 45.9451 -90.2732 472.000 30.0 392.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 54 55 45.9451 -90.2732 472.000 122.0 392.637 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 15 59 55 45.9451 -90.2732 472.000 396.0 392.598 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 04 55 45.9451 -90.2732 472.000 30.0 392.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 09 55 45.9451 -90.2732 472.000 122.0 392.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 14 55 45.9451 -90.2732 472.000 396.0 392.606 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 24 55 45.9451 -90.2732 472.000 30.0 392.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 29 55 45.9451 -90.2732 472.000 122.0 392.561 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 34 55 45.9451 -90.2732 472.000 396.0 392.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 39 55 45.9451 -90.2732 472.000 30.0 392.577 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 44 55 45.9451 -90.2732 472.000 122.0 392.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 49 55 45.9451 -90.2732 472.000 396.0 392.494 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 50 25 45.9451 -90.2732 472.000 396.0 392.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 50 55 45.9451 -90.2732 472.000 396.0 392.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 51 25 45.9451 -90.2732 472.000 396.0 392.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 51 55 45.9451 -90.2732 472.000 396.0 392.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 52 25 45.9451 -90.2732 472.000 396.0 392.491 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 52 55 45.9451 -90.2732 472.000 396.0 392.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 53 25 45.9451 -90.2732 472.000 396.0 392.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 53 55 45.9451 -90.2732 472.000 396.0 392.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 54 25 45.9451 -90.2732 472.000 396.0 392.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 16 54 55 45.9451 -90.2732 472.000 396.0 392.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 04 55 45.9451 -90.2732 472.000 30.0 392.459 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 09 55 45.9451 -90.2732 472.000 122.0 392.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 14 55 45.9451 -90.2732 472.000 396.0 392.327 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 19 55 45.9451 -90.2732 472.000 30.0 392.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 24 55 45.9451 -90.2732 472.000 122.0 392.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 29 55 45.9451 -90.2732 472.000 396.0 392.394 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 30 25 45.9451 -90.2732 472.000 396.0 392.413 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 30 55 45.9451 -90.2732 472.000 396.0 392.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 31 25 45.9451 -90.2732 472.000 396.0 392.489 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 31 55 45.9451 -90.2732 472.000 396.0 392.463 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 32 25 45.9451 -90.2732 472.000 396.0 392.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 32 55 45.9451 -90.2732 472.000 396.0 392.335 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 33 25 45.9451 -90.2732 472.000 396.0 392.364 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 33 55 45.9451 -90.2732 472.000 396.0 392.347 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 34 25 45.9451 -90.2732 472.000 396.0 392.196 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 34 55 45.9451 -90.2732 472.000 396.0 392.093 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 39 55 45.9451 -90.2732 472.000 30.0 392.302 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 44 55 45.9451 -90.2732 472.000 122.0 392.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 49 55 45.9451 -90.2732 472.000 396.0 392.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 54 55 45.9451 -90.2732 472.000 30.0 392.317 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 17 59 55 45.9451 -90.2732 472.000 122.0 392.416 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 04 55 45.9451 -90.2732 472.000 396.0 392.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 14 55 45.9451 -90.2732 472.000 30.0 392.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 19 55 45.9451 -90.2732 472.000 122.0 392.399 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 24 55 45.9451 -90.2732 472.000 396.0 392.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 29 55 45.9451 -90.2732 472.000 30.0 392.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 34 55 45.9451 -90.2732 472.000 122.0 392.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 39 55 45.9451 -90.2732 472.000 396.0 392.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 40 25 45.9451 -90.2732 472.000 396.0 392.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 40 55 45.9451 -90.2732 472.000 396.0 392.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 41 25 45.9451 -90.2732 472.000 396.0 392.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 41 55 45.9451 -90.2732 472.000 396.0 392.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 42 25 45.9451 -90.2732 472.000 396.0 392.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 42 55 45.9451 -90.2732 472.000 396.0 392.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 43 25 45.9451 -90.2732 472.000 396.0 392.280 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 43 55 45.9451 -90.2732 472.000 396.0 392.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 44 25 45.9451 -90.2732 472.000 396.0 392.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 44 55 45.9451 -90.2732 472.000 396.0 392.280 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 49 55 45.9451 -90.2732 472.000 30.0 392.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 54 55 45.9451 -90.2732 472.000 122.0 392.156 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 18 59 55 45.9451 -90.2732 472.000 396.0 392.302 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 04 55 45.9451 -90.2732 472.000 30.0 392.364 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 09 55 45.9451 -90.2732 472.000 122.0 392.389 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 14 55 45.9451 -90.2732 472.000 396.0 392.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 15 25 45.9451 -90.2732 472.000 396.0 392.389 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 15 55 45.9451 -90.2732 472.000 396.0 392.400 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 16 25 45.9451 -90.2732 472.000 396.0 392.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 16 55 45.9451 -90.2732 472.000 396.0 392.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 17 25 45.9451 -90.2732 472.000 396.0 392.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 17 55 45.9451 -90.2732 472.000 396.0 392.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 18 25 45.9451 -90.2732 472.000 396.0 392.312 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 18 55 45.9451 -90.2732 472.000 396.0 392.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 19 25 45.9451 -90.2732 472.000 396.0 392.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 19 55 45.9451 -90.2732 472.000 396.0 392.407 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 24 55 45.9451 -90.2732 472.000 30.0 392.293 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 29 55 45.9451 -90.2732 472.000 122.0 392.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 34 55 45.9451 -90.2732 472.000 396.0 392.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 39 55 45.9451 -90.2732 472.000 30.0 392.203 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 44 55 45.9451 -90.2732 472.000 122.0 392.253 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 49 55 45.9451 -90.2732 472.000 396.0 392.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 19 59 55 45.9451 -90.2732 472.000 30.0 392.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 04 55 45.9451 -90.2732 472.000 122.0 392.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 09 55 45.9451 -90.2732 472.000 396.0 392.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 14 55 45.9451 -90.2732 472.000 30.0 392.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 19 55 45.9451 -90.2732 472.000 122.0 392.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 24 55 45.9451 -90.2732 472.000 396.0 392.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 25 25 45.9451 -90.2732 472.000 396.0 392.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 25 55 45.9451 -90.2732 472.000 396.0 392.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 26 25 45.9451 -90.2732 472.000 396.0 392.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 26 55 45.9451 -90.2732 472.000 396.0 392.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 27 25 45.9451 -90.2732 472.000 396.0 392.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 27 55 45.9451 -90.2732 472.000 396.0 392.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 28 25 45.9451 -90.2732 472.000 396.0 392.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 28 55 45.9451 -90.2732 472.000 396.0 392.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 29 25 45.9451 -90.2732 472.000 396.0 392.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 29 55 45.9451 -90.2732 472.000 396.0 392.113 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 34 55 45.9451 -90.2732 472.000 30.0 391.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 39 55 45.9451 -90.2732 472.000 122.0 392.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 44 55 45.9451 -90.2732 472.000 396.0 392.093 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 49 55 45.9451 -90.2732 472.000 30.0 392.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 54 55 45.9451 -90.2732 472.000 122.0 391.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 20 59 55 45.9451 -90.2732 472.000 396.0 391.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 00 25 45.9451 -90.2732 472.000 396.0 391.829 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 00 55 45.9451 -90.2732 472.000 396.0 391.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 01 25 45.9451 -90.2732 472.000 396.0 391.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 01 55 45.9451 -90.2732 472.000 396.0 391.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 02 25 45.9451 -90.2732 472.000 396.0 391.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 02 55 45.9451 -90.2732 472.000 396.0 391.906 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 03 25 45.9451 -90.2732 472.000 396.0 391.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 03 55 45.9451 -90.2732 472.000 396.0 391.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 04 25 45.9451 -90.2732 472.000 396.0 391.896 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 04 55 45.9451 -90.2732 472.000 396.0 391.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 09 55 45.9451 -90.2732 472.000 30.0 391.850 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 14 55 45.9451 -90.2732 472.000 122.0 391.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 19 55 45.9451 -90.2732 472.000 396.0 391.934 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 24 55 45.9451 -90.2732 472.000 30.0 391.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 29 55 45.9451 -90.2732 472.000 122.0 391.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 34 55 45.9451 -90.2732 472.000 396.0 391.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 35 25 45.9451 -90.2732 472.000 396.0 391.679 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 35 55 45.9451 -90.2732 472.000 396.0 391.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 36 25 45.9451 -90.2732 472.000 396.0 391.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 36 55 45.9451 -90.2732 472.000 396.0 391.604 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 37 25 45.9451 -90.2732 472.000 396.0 391.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 37 55 45.9451 -90.2732 472.000 396.0 391.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 38 25 45.9451 -90.2732 472.000 396.0 391.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 38 55 45.9451 -90.2732 472.000 396.0 391.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 39 25 45.9451 -90.2732 472.000 396.0 391.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 39 55 45.9451 -90.2732 472.000 396.0 391.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 44 55 45.9451 -90.2732 472.000 30.0 391.812 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 49 55 45.9451 -90.2732 472.000 122.0 391.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 54 55 45.9451 -90.2732 472.000 396.0 391.870 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 21 59 55 45.9451 -90.2732 472.000 30.0 391.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 04 55 45.9451 -90.2732 472.000 122.0 391.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 09 55 45.9451 -90.2732 472.000 396.0 391.740 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 19 55 45.9451 -90.2732 472.000 30.0 391.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 24 55 45.9451 -90.2732 472.000 122.0 391.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 29 55 45.9451 -90.2732 472.000 396.0 391.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 34 55 45.9451 -90.2732 472.000 30.0 391.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 39 55 45.9451 -90.2732 472.000 122.0 391.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 44 55 45.9451 -90.2732 472.000 396.0 391.794 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 54 55 45.9451 -90.2732 472.000 30.0 392.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 22 59 55 45.9451 -90.2732 472.000 122.0 391.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 04 55 45.9451 -90.2732 472.000 396.0 391.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 09 55 45.9451 -90.2732 472.000 30.0 392.055 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 14 55 45.9451 -90.2732 472.000 122.0 391.802 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 19 55 45.9451 -90.2732 472.000 396.0 391.808 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 20 25 45.9451 -90.2732 472.000 396.0 391.801 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 20 55 45.9451 -90.2732 472.000 396.0 391.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 21 25 45.9451 -90.2732 472.000 396.0 391.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 21 55 45.9451 -90.2732 472.000 396.0 391.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 22 25 45.9451 -90.2732 472.000 396.0 391.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 22 55 45.9451 -90.2732 472.000 396.0 391.789 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 23 25 45.9451 -90.2732 472.000 396.0 391.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 23 55 45.9451 -90.2732 472.000 396.0 391.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 24 25 45.9451 -90.2732 472.000 396.0 391.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 24 55 45.9451 -90.2732 472.000 396.0 391.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 29 55 45.9451 -90.2732 472.000 30.0 392.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 34 55 45.9451 -90.2732 472.000 122.0 391.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 39 55 45.9451 -90.2732 472.000 396.0 391.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 44 55 45.9451 -90.2732 472.000 30.0 392.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 05 23 49 55 45.9451 -90.2732 472.000 122.0 391.827 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 14 55 45.9451 -90.2732 472.000 396.0 391.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 19 55 45.9451 -90.2732 472.000 30.0 392.595 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 24 55 45.9451 -90.2732 472.000 122.0 391.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 29 55 45.9451 -90.2732 472.000 396.0 391.833 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 34 55 45.9451 -90.2732 472.000 30.0 393.050 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 39 55 45.9451 -90.2732 472.000 122.0 391.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 44 55 45.9451 -90.2732 472.000 396.0 391.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 45 25 45.9451 -90.2732 472.000 396.0 391.713 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 45 55 45.9451 -90.2732 472.000 396.0 391.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 46 25 45.9451 -90.2732 472.000 396.0 391.649 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 46 55 45.9451 -90.2732 472.000 396.0 391.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 47 25 45.9451 -90.2732 472.000 396.0 391.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 47 55 45.9451 -90.2732 472.000 396.0 391.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 48 25 45.9451 -90.2732 472.000 396.0 391.720 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 48 55 45.9451 -90.2732 472.000 396.0 391.767 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 49 25 45.9451 -90.2732 472.000 396.0 391.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 49 55 45.9451 -90.2732 472.000 396.0 391.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 54 55 45.9451 -90.2732 472.000 30.0 393.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 00 59 55 45.9451 -90.2732 472.000 122.0 391.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 04 55 45.9451 -90.2732 472.000 396.0 392.016 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 09 55 45.9451 -90.2732 472.000 30.0 393.763 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 14 55 45.9451 -90.2732 472.000 122.0 391.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 19 55 45.9451 -90.2732 472.000 396.0 391.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 20 25 45.9451 -90.2732 472.000 396.0 391.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 20 55 45.9451 -90.2732 472.000 396.0 391.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 21 25 45.9451 -90.2732 472.000 396.0 391.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 21 55 45.9451 -90.2732 472.000 396.0 391.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 22 25 45.9451 -90.2732 472.000 396.0 391.713 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 22 55 45.9451 -90.2732 472.000 396.0 391.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 23 25 45.9451 -90.2732 472.000 396.0 391.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 23 55 45.9451 -90.2732 472.000 396.0 391.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 24 25 45.9451 -90.2732 472.000 396.0 391.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 24 55 45.9451 -90.2732 472.000 396.0 391.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 29 55 45.9451 -90.2732 472.000 30.0 392.889 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 34 55 45.9451 -90.2732 472.000 122.0 391.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 39 55 45.9451 -90.2732 472.000 396.0 391.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 44 55 45.9451 -90.2732 472.000 30.0 392.842 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 49 55 45.9451 -90.2732 472.000 122.0 391.818 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 01 54 55 45.9451 -90.2732 472.000 396.0 391.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 04 55 45.9451 -90.2732 472.000 30.0 394.284 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 09 55 45.9451 -90.2732 472.000 122.0 391.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 14 55 45.9451 -90.2732 472.000 396.0 391.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 19 55 45.9451 -90.2732 472.000 30.0 395.121 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 24 55 45.9451 -90.2732 472.000 122.0 392.157 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 29 55 45.9451 -90.2732 472.000 396.0 391.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 30 25 45.9451 -90.2732 472.000 396.0 391.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 30 55 45.9451 -90.2732 472.000 396.0 392.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 31 25 45.9451 -90.2732 472.000 396.0 392.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 31 55 45.9451 -90.2732 472.000 396.0 392.045 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 32 25 45.9451 -90.2732 472.000 396.0 392.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 32 55 45.9451 -90.2732 472.000 396.0 392.062 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 33 25 45.9451 -90.2732 472.000 396.0 392.103 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 33 55 45.9451 -90.2732 472.000 396.0 392.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 34 25 45.9451 -90.2732 472.000 396.0 392.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 34 55 45.9451 -90.2732 472.000 396.0 392.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 39 55 45.9451 -90.2732 472.000 30.0 395.516 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 44 55 45.9451 -90.2732 472.000 122.0 391.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 49 55 45.9451 -90.2732 472.000 396.0 392.385 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 54 55 45.9451 -90.2732 472.000 30.0 396.061 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 06 02 59 55 45.9451 -90.2732 472.000 122.0 392.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 04 55 45.9451 -90.2732 472.000 396.0 392.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 05 25 45.9451 -90.2732 472.000 396.0 392.558 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 05 55 45.9451 -90.2732 472.000 396.0 392.589 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 06 25 45.9451 -90.2732 472.000 396.0 392.565 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 06 55 45.9451 -90.2732 472.000 396.0 392.564 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 07 25 45.9451 -90.2732 472.000 396.0 392.567 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 07 55 45.9451 -90.2732 472.000 396.0 392.572 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 08 25 45.9451 -90.2732 472.000 396.0 392.568 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 08 55 45.9451 -90.2732 472.000 396.0 392.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 09 25 45.9451 -90.2732 472.000 396.0 392.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 09 55 45.9451 -90.2732 472.000 396.0 392.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 14 55 45.9451 -90.2732 472.000 30.0 396.185 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 19 55 45.9451 -90.2732 472.000 122.0 392.018 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 24 55 45.9451 -90.2732 472.000 396.0 392.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 29 55 45.9451 -90.2732 472.000 30.0 398.484 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 34 55 45.9451 -90.2732 472.000 122.0 392.020 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 39 55 45.9451 -90.2732 472.000 396.0 392.760 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 40 25 45.9451 -90.2732 472.000 396.0 392.762 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 40 55 45.9451 -90.2732 472.000 396.0 392.753 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 41 25 45.9451 -90.2732 472.000 396.0 392.702 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 41 55 45.9451 -90.2732 472.000 396.0 392.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 42 25 45.9451 -90.2732 472.000 396.0 392.703 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 42 55 45.9451 -90.2732 472.000 396.0 392.808 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 43 25 45.9451 -90.2732 472.000 396.0 392.829 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 43 55 45.9451 -90.2732 472.000 396.0 392.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 44 25 45.9451 -90.2732 472.000 396.0 392.818 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 44 55 45.9451 -90.2732 472.000 396.0 392.796 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 49 55 45.9451 -90.2732 472.000 30.0 398.551 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 54 55 45.9451 -90.2732 472.000 122.0 392.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 03 59 55 45.9451 -90.2732 472.000 396.0 392.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 04 55 45.9451 -90.2732 472.000 30.0 398.757 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 09 55 45.9451 -90.2732 472.000 122.0 392.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 14 55 45.9451 -90.2732 472.000 396.0 392.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 24 55 45.9451 -90.2732 472.000 30.0 398.550 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 29 55 45.9451 -90.2732 472.000 122.0 394.308 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 34 55 45.9451 -90.2732 472.000 396.0 393.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 39 55 45.9451 -90.2732 472.000 30.0 397.989 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 44 55 45.9451 -90.2732 472.000 122.0 392.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 49 55 45.9451 -90.2732 472.000 396.0 393.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 50 25 45.9451 -90.2732 472.000 396.0 393.160 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 50 55 45.9451 -90.2732 472.000 396.0 393.174 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 51 25 45.9451 -90.2732 472.000 396.0 393.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 51 55 45.9451 -90.2732 472.000 396.0 393.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 52 25 45.9451 -90.2732 472.000 396.0 393.194 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 52 55 45.9451 -90.2732 472.000 396.0 393.146 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 53 25 45.9451 -90.2732 472.000 396.0 393.126 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 53 55 45.9451 -90.2732 472.000 396.0 393.106 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 54 25 45.9451 -90.2732 472.000 396.0 393.109 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 04 54 55 45.9451 -90.2732 472.000 396.0 393.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 04 55 45.9451 -90.2732 472.000 30.0 397.958 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 09 55 45.9451 -90.2732 472.000 122.0 393.015 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 14 55 45.9451 -90.2732 472.000 396.0 392.914 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 19 55 45.9451 -90.2732 472.000 30.0 398.274 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 24 55 45.9451 -90.2732 472.000 122.0 393.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 29 55 45.9451 -90.2732 472.000 396.0 392.699 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 30 25 45.9451 -90.2732 472.000 396.0 392.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 30 55 45.9451 -90.2732 472.000 396.0 392.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 31 25 45.9451 -90.2732 472.000 396.0 392.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 31 55 45.9451 -90.2732 472.000 396.0 392.695 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 32 25 45.9451 -90.2732 472.000 396.0 392.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 32 55 45.9451 -90.2732 472.000 396.0 392.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 33 25 45.9451 -90.2732 472.000 396.0 392.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 33 55 45.9451 -90.2732 472.000 396.0 392.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 34 25 45.9451 -90.2732 472.000 396.0 392.765 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 34 55 45.9451 -90.2732 472.000 396.0 392.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 39 55 45.9451 -90.2732 472.000 30.0 398.893 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 44 55 45.9451 -90.2732 472.000 122.0 392.789 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 49 55 45.9451 -90.2732 472.000 396.0 392.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 54 55 45.9451 -90.2732 472.000 30.0 399.475 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 06 05 59 55 45.9451 -90.2732 472.000 122.0 392.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 04 55 45.9451 -90.2732 472.000 396.0 392.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 14 55 45.9451 -90.2732 472.000 30.0 398.303 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 19 55 45.9451 -90.2732 472.000 122.0 392.148 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 24 55 45.9451 -90.2732 472.000 396.0 392.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 29 55 45.9451 -90.2732 472.000 30.0 398.663 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 34 55 45.9451 -90.2732 472.000 122.0 392.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 39 55 45.9451 -90.2732 472.000 396.0 392.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 40 25 45.9451 -90.2732 472.000 396.0 392.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 40 55 45.9451 -90.2732 472.000 396.0 392.521 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 41 25 45.9451 -90.2732 472.000 396.0 392.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 41 55 45.9451 -90.2732 472.000 396.0 392.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 42 25 45.9451 -90.2732 472.000 396.0 392.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 42 55 45.9451 -90.2732 472.000 396.0 392.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 43 25 45.9451 -90.2732 472.000 396.0 392.559 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 43 55 45.9451 -90.2732 472.000 396.0 392.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 44 25 45.9451 -90.2732 472.000 396.0 392.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 44 55 45.9451 -90.2732 472.000 396.0 392.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 49 55 45.9451 -90.2732 472.000 30.0 397.890 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 54 55 45.9451 -90.2732 472.000 122.0 392.139 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 06 59 55 45.9451 -90.2732 472.000 396.0 392.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 04 55 45.9451 -90.2732 472.000 30.0 398.302 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 09 55 45.9451 -90.2732 472.000 122.0 392.389 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 14 55 45.9451 -90.2732 472.000 396.0 392.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 15 25 45.9451 -90.2732 472.000 396.0 392.559 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 15 55 45.9451 -90.2732 472.000 396.0 392.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 16 25 45.9451 -90.2732 472.000 396.0 392.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 16 55 45.9451 -90.2732 472.000 396.0 392.577 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 17 25 45.9451 -90.2732 472.000 396.0 392.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 17 55 45.9451 -90.2732 472.000 396.0 392.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 18 25 45.9451 -90.2732 472.000 396.0 392.593 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 18 55 45.9451 -90.2732 472.000 396.0 392.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 19 25 45.9451 -90.2732 472.000 396.0 392.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 19 55 45.9451 -90.2732 472.000 396.0 392.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 24 55 45.9451 -90.2732 472.000 30.0 398.900 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 29 55 45.9451 -90.2732 472.000 122.0 393.681 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 34 55 45.9451 -90.2732 472.000 396.0 392.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 39 55 45.9451 -90.2732 472.000 30.0 398.692 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 44 55 45.9451 -90.2732 472.000 122.0 394.012 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 49 55 45.9451 -90.2732 472.000 396.0 392.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 07 59 55 45.9451 -90.2732 472.000 30.0 398.895 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 04 55 45.9451 -90.2732 472.000 122.0 394.578 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 09 55 45.9451 -90.2732 472.000 396.0 392.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 14 55 45.9451 -90.2732 472.000 30.0 398.893 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 19 55 45.9451 -90.2732 472.000 122.0 395.142 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 24 55 45.9451 -90.2732 472.000 396.0 392.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 25 25 45.9451 -90.2732 472.000 396.0 392.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 25 55 45.9451 -90.2732 472.000 396.0 392.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 26 25 45.9451 -90.2732 472.000 396.0 392.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 26 55 45.9451 -90.2732 472.000 396.0 392.711 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 27 25 45.9451 -90.2732 472.000 396.0 392.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 27 55 45.9451 -90.2732 472.000 396.0 392.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 28 25 45.9451 -90.2732 472.000 396.0 392.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 28 55 45.9451 -90.2732 472.000 396.0 392.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 29 25 45.9451 -90.2732 472.000 396.0 392.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 29 55 45.9451 -90.2732 472.000 396.0 392.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 34 55 45.9451 -90.2732 472.000 30.0 399.669 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 39 55 45.9451 -90.2732 472.000 122.0 396.568 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 44 55 45.9451 -90.2732 472.000 396.0 392.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 49 55 45.9451 -90.2732 472.000 30.0 399.368 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 54 55 45.9451 -90.2732 472.000 122.0 396.791 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 08 59 55 45.9451 -90.2732 472.000 396.0 392.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 00 25 45.9451 -90.2732 472.000 396.0 392.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 00 55 45.9451 -90.2732 472.000 396.0 392.464 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 01 25 45.9451 -90.2732 472.000 396.0 392.502 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 01 55 45.9451 -90.2732 472.000 396.0 392.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 02 25 45.9451 -90.2732 472.000 396.0 392.538 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 02 55 45.9451 -90.2732 472.000 396.0 392.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 03 25 45.9451 -90.2732 472.000 396.0 392.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 03 55 45.9451 -90.2732 472.000 396.0 392.462 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 04 25 45.9451 -90.2732 472.000 396.0 392.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 04 55 45.9451 -90.2732 472.000 396.0 392.470 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 09 55 45.9451 -90.2732 472.000 30.0 399.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 14 55 45.9451 -90.2732 472.000 122.0 397.018 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 19 55 45.9451 -90.2732 472.000 396.0 392.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 24 55 45.9451 -90.2732 472.000 30.0 399.821 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 29 55 45.9451 -90.2732 472.000 122.0 397.391 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 34 55 45.9451 -90.2732 472.000 396.0 392.314 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 35 25 45.9451 -90.2732 472.000 396.0 392.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 35 55 45.9451 -90.2732 472.000 396.0 392.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 36 25 45.9451 -90.2732 472.000 396.0 392.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 36 55 45.9451 -90.2732 472.000 396.0 392.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 37 25 45.9451 -90.2732 472.000 396.0 392.313 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 37 55 45.9451 -90.2732 472.000 396.0 392.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 38 25 45.9451 -90.2732 472.000 396.0 392.246 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 38 55 45.9451 -90.2732 472.000 396.0 392.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 39 25 45.9451 -90.2732 472.000 396.0 392.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 39 55 45.9451 -90.2732 472.000 396.0 392.213 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 44 55 45.9451 -90.2732 472.000 30.0 400.078 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 49 55 45.9451 -90.2732 472.000 122.0 396.991 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 54 55 45.9451 -90.2732 472.000 396.0 392.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 09 59 55 45.9451 -90.2732 472.000 30.0 400.233 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 04 55 45.9451 -90.2732 472.000 122.0 396.335 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 09 55 45.9451 -90.2732 472.000 396.0 392.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 19 55 45.9451 -90.2732 472.000 30.0 399.810 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 24 55 45.9451 -90.2732 472.000 122.0 396.023 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 29 55 45.9451 -90.2732 472.000 396.0 392.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 34 55 45.9451 -90.2732 472.000 30.0 399.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 39 55 45.9451 -90.2732 472.000 122.0 395.641 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 44 55 45.9451 -90.2732 472.000 396.0 393.399 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 54 55 45.9451 -90.2732 472.000 30.0 399.215 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 10 59 55 45.9451 -90.2732 472.000 122.0 395.611 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 04 55 45.9451 -90.2732 472.000 396.0 394.627 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 09 55 45.9451 -90.2732 472.000 30.0 398.645 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 14 55 45.9451 -90.2732 472.000 122.0 395.985 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 19 55 45.9451 -90.2732 472.000 396.0 395.848 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 20 25 45.9451 -90.2732 472.000 396.0 395.313 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 20 55 45.9451 -90.2732 472.000 396.0 394.573 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 21 25 45.9451 -90.2732 472.000 396.0 394.396 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 21 55 45.9451 -90.2732 472.000 396.0 394.633 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 22 25 45.9451 -90.2732 472.000 396.0 394.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 22 55 45.9451 -90.2732 472.000 396.0 394.534 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 23 25 45.9451 -90.2732 472.000 396.0 394.220 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 23 55 45.9451 -90.2732 472.000 396.0 394.124 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 24 25 45.9451 -90.2732 472.000 396.0 394.079 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 24 55 45.9451 -90.2732 472.000 396.0 393.998 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 29 55 45.9451 -90.2732 472.000 30.0 398.943 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 34 55 45.9451 -90.2732 472.000 122.0 396.020 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 39 55 45.9451 -90.2732 472.000 396.0 393.828 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 44 55 45.9451 -90.2732 472.000 30.0 398.828 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 11 49 55 45.9451 -90.2732 472.000 122.0 396.053 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 14 55 45.9451 -90.2732 472.000 396.0 391.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 19 55 45.9451 -90.2732 472.000 30.0 399.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 24 55 45.9451 -90.2732 472.000 122.0 395.848 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 29 55 45.9451 -90.2732 472.000 396.0 391.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 34 55 45.9451 -90.2732 472.000 30.0 399.214 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 39 55 45.9451 -90.2732 472.000 122.0 395.397 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 44 55 45.9451 -90.2732 472.000 396.0 391.707 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 45 25 45.9451 -90.2732 472.000 396.0 391.720 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 45 55 45.9451 -90.2732 472.000 396.0 391.710 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 46 25 45.9451 -90.2732 472.000 396.0 391.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 46 55 45.9451 -90.2732 472.000 396.0 391.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 47 25 45.9451 -90.2732 472.000 396.0 391.739 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 47 55 45.9451 -90.2732 472.000 396.0 391.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 48 25 45.9451 -90.2732 472.000 396.0 391.711 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 48 55 45.9451 -90.2732 472.000 396.0 391.732 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 49 25 45.9451 -90.2732 472.000 396.0 391.746 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 49 55 45.9451 -90.2732 472.000 396.0 391.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 54 55 45.9451 -90.2732 472.000 30.0 399.085 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 12 59 55 45.9451 -90.2732 472.000 122.0 395.803 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 04 55 45.9451 -90.2732 472.000 396.0 391.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 09 55 45.9451 -90.2732 472.000 30.0 399.490 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 14 55 45.9451 -90.2732 472.000 122.0 395.994 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 19 55 45.9451 -90.2732 472.000 396.0 391.667 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 20 25 45.9451 -90.2732 472.000 396.0 391.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 20 55 45.9451 -90.2732 472.000 396.0 391.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 21 25 45.9451 -90.2732 472.000 396.0 391.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 21 55 45.9451 -90.2732 472.000 396.0 391.653 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 22 25 45.9451 -90.2732 472.000 396.0 391.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 22 55 45.9451 -90.2732 472.000 396.0 391.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 23 25 45.9451 -90.2732 472.000 396.0 391.633 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 23 55 45.9451 -90.2732 472.000 396.0 391.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 24 25 45.9451 -90.2732 472.000 396.0 391.644 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 24 55 45.9451 -90.2732 472.000 396.0 391.633 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 29 55 45.9451 -90.2732 472.000 30.0 398.546 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 34 55 45.9451 -90.2732 472.000 122.0 396.158 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 39 55 45.9451 -90.2732 472.000 396.0 391.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 44 55 45.9451 -90.2732 472.000 30.0 397.901 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 49 55 45.9451 -90.2732 472.000 122.0 396.656 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 13 54 55 45.9451 -90.2732 472.000 396.0 391.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 04 55 45.9451 -90.2732 472.000 30.0 397.159 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 09 55 45.9451 -90.2732 472.000 122.0 396.495 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 14 55 45.9451 -90.2732 472.000 396.0 391.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 19 55 45.9451 -90.2732 472.000 30.0 396.794 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 24 55 45.9451 -90.2732 472.000 122.0 396.248 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 29 55 45.9451 -90.2732 472.000 396.0 391.850 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 30 25 45.9451 -90.2732 472.000 396.0 391.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 30 55 45.9451 -90.2732 472.000 396.0 391.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 31 25 45.9451 -90.2732 472.000 396.0 391.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 31 55 45.9451 -90.2732 472.000 396.0 391.828 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 32 25 45.9451 -90.2732 472.000 396.0 391.769 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 32 55 45.9451 -90.2732 472.000 396.0 391.778 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 33 25 45.9451 -90.2732 472.000 396.0 391.802 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 33 55 45.9451 -90.2732 472.000 396.0 391.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 34 25 45.9451 -90.2732 472.000 396.0 391.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 34 55 45.9451 -90.2732 472.000 396.0 391.738 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 39 55 45.9451 -90.2732 472.000 30.0 395.673 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 44 55 45.9451 -90.2732 472.000 122.0 395.102 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 49 55 45.9451 -90.2732 472.000 396.0 391.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 54 55 45.9451 -90.2732 472.000 30.0 395.107 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 14 59 55 45.9451 -90.2732 472.000 122.0 394.857 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 04 55 45.9451 -90.2732 472.000 396.0 392.826 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 05 25 45.9451 -90.2732 472.000 396.0 392.474 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 05 55 45.9451 -90.2732 472.000 396.0 392.573 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 06 25 45.9451 -90.2732 472.000 396.0 392.278 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 06 55 45.9451 -90.2732 472.000 396.0 392.642 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 07 25 45.9451 -90.2732 472.000 396.0 392.371 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 07 55 45.9451 -90.2732 472.000 396.0 392.554 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 08 25 45.9451 -90.2732 472.000 396.0 392.169 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 08 55 45.9451 -90.2732 472.000 396.0 392.609 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 09 25 45.9451 -90.2732 472.000 396.0 392.711 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 09 55 45.9451 -90.2732 472.000 396.0 392.494 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 14 55 45.9451 -90.2732 472.000 30.0 394.175 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 19 55 45.9451 -90.2732 472.000 122.0 393.783 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 24 55 45.9451 -90.2732 472.000 396.0 392.413 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 29 55 45.9451 -90.2732 472.000 30.0 393.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 34 55 45.9451 -90.2732 472.000 122.0 393.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 39 55 45.9451 -90.2732 472.000 396.0 393.082 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 40 25 45.9451 -90.2732 472.000 396.0 393.033 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 40 55 45.9451 -90.2732 472.000 396.0 392.990 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 41 25 45.9451 -90.2732 472.000 396.0 392.909 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 41 55 45.9451 -90.2732 472.000 396.0 393.087 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 42 25 45.9451 -90.2732 472.000 396.0 392.983 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 42 55 45.9451 -90.2732 472.000 396.0 392.944 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 43 25 45.9451 -90.2732 472.000 396.0 392.716 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 43 55 45.9451 -90.2732 472.000 396.0 392.965 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 44 25 45.9451 -90.2732 472.000 396.0 392.889 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 44 55 45.9451 -90.2732 472.000 396.0 392.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 49 55 45.9451 -90.2732 472.000 30.0 393.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 54 55 45.9451 -90.2732 472.000 122.0 393.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 15 59 55 45.9451 -90.2732 472.000 396.0 393.096 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 04 55 45.9451 -90.2732 472.000 30.0 393.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 09 55 45.9451 -90.2732 472.000 122.0 393.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 14 55 45.9451 -90.2732 472.000 396.0 392.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 24 55 45.9451 -90.2732 472.000 30.0 393.417 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 29 55 45.9451 -90.2732 472.000 122.0 393.449 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 34 55 45.9451 -90.2732 472.000 396.0 393.210 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 39 55 45.9451 -90.2732 472.000 30.0 393.256 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 44 55 45.9451 -90.2732 472.000 122.0 393.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 49 55 45.9451 -90.2732 472.000 396.0 393.434 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 50 25 45.9451 -90.2732 472.000 396.0 393.476 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 50 55 45.9451 -90.2732 472.000 396.0 393.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 51 25 45.9451 -90.2732 472.000 396.0 393.362 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 51 55 45.9451 -90.2732 472.000 396.0 393.314 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 52 25 45.9451 -90.2732 472.000 396.0 393.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 52 55 45.9451 -90.2732 472.000 396.0 393.441 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 53 25 45.9451 -90.2732 472.000 396.0 393.308 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 53 55 45.9451 -90.2732 472.000 396.0 393.306 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 54 25 45.9451 -90.2732 472.000 396.0 393.270 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 06 16 54 55 45.9451 -90.2732 472.000 396.0 393.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 04 55 45.9451 -90.2732 472.000 30.0 393.543 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 09 55 45.9451 -90.2732 472.000 122.0 393.483 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 14 55 45.9451 -90.2732 472.000 396.0 393.307 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 19 55 45.9451 -90.2732 472.000 30.0 393.382 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 24 55 45.9451 -90.2732 472.000 122.0 393.464 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 29 55 45.9451 -90.2732 472.000 396.0 393.266 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 30 25 45.9451 -90.2732 472.000 396.0 393.389 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 30 55 45.9451 -90.2732 472.000 396.0 393.373 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 31 25 45.9451 -90.2732 472.000 396.0 393.317 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 31 55 45.9451 -90.2732 472.000 396.0 393.343 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 32 25 45.9451 -90.2732 472.000 396.0 393.393 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 32 55 45.9451 -90.2732 472.000 396.0 393.388 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 33 25 45.9451 -90.2732 472.000 396.0 393.423 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 33 55 45.9451 -90.2732 472.000 396.0 393.431 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 34 25 45.9451 -90.2732 472.000 396.0 393.428 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 34 55 45.9451 -90.2732 472.000 396.0 393.453 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 39 55 45.9451 -90.2732 472.000 30.0 393.365 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 44 55 45.9451 -90.2732 472.000 122.0 393.487 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 49 55 45.9451 -90.2732 472.000 396.0 393.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 54 55 45.9451 -90.2732 472.000 30.0 393.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 17 59 55 45.9451 -90.2732 472.000 122.0 393.589 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 04 55 45.9451 -90.2732 472.000 396.0 393.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 14 55 45.9451 -90.2732 472.000 30.0 393.540 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 19 55 45.9451 -90.2732 472.000 122.0 393.743 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 24 55 45.9451 -90.2732 472.000 396.0 393.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 29 55 45.9451 -90.2732 472.000 30.0 393.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 34 55 45.9451 -90.2732 472.000 122.0 393.874 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 39 55 45.9451 -90.2732 472.000 396.0 393.884 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 40 25 45.9451 -90.2732 472.000 396.0 393.848 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 40 55 45.9451 -90.2732 472.000 396.0 393.865 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 41 25 45.9451 -90.2732 472.000 396.0 393.880 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 41 55 45.9451 -90.2732 472.000 396.0 393.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 42 25 45.9451 -90.2732 472.000 396.0 393.857 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 42 55 45.9451 -90.2732 472.000 396.0 393.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 43 25 45.9451 -90.2732 472.000 396.0 393.861 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 43 55 45.9451 -90.2732 472.000 396.0 393.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 44 25 45.9451 -90.2732 472.000 396.0 393.874 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 44 55 45.9451 -90.2732 472.000 396.0 393.843 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 49 55 45.9451 -90.2732 472.000 30.0 393.834 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 54 55 45.9451 -90.2732 472.000 122.0 393.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 18 59 55 45.9451 -90.2732 472.000 396.0 393.832 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 04 55 45.9451 -90.2732 472.000 30.0 393.653 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 09 55 45.9451 -90.2732 472.000 122.0 393.805 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 14 55 45.9451 -90.2732 472.000 396.0 393.870 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 15 25 45.9451 -90.2732 472.000 396.0 393.875 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 15 55 45.9451 -90.2732 472.000 396.0 393.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 16 25 45.9451 -90.2732 472.000 396.0 393.902 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 16 55 45.9451 -90.2732 472.000 396.0 393.888 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 17 25 45.9451 -90.2732 472.000 396.0 393.898 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 17 55 45.9451 -90.2732 472.000 396.0 393.901 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 18 25 45.9451 -90.2732 472.000 396.0 393.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 18 55 45.9451 -90.2732 472.000 396.0 393.871 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 19 25 45.9451 -90.2732 472.000 396.0 393.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 19 55 45.9451 -90.2732 472.000 396.0 393.899 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 24 55 45.9451 -90.2732 472.000 30.0 393.729 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 29 55 45.9451 -90.2732 472.000 122.0 393.734 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 34 55 45.9451 -90.2732 472.000 396.0 393.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 39 55 45.9451 -90.2732 472.000 30.0 393.639 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 44 55 45.9451 -90.2732 472.000 122.0 393.635 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 49 55 45.9451 -90.2732 472.000 396.0 393.628 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 19 59 55 45.9451 -90.2732 472.000 30.0 393.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 04 55 45.9451 -90.2732 472.000 122.0 393.700 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 09 55 45.9451 -90.2732 472.000 396.0 393.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 14 55 45.9451 -90.2732 472.000 30.0 393.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 19 55 45.9451 -90.2732 472.000 122.0 393.639 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 24 55 45.9451 -90.2732 472.000 396.0 393.617 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 25 25 45.9451 -90.2732 472.000 396.0 393.657 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 25 55 45.9451 -90.2732 472.000 396.0 393.638 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 26 25 45.9451 -90.2732 472.000 396.0 393.645 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 26 55 45.9451 -90.2732 472.000 396.0 393.580 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 27 25 45.9451 -90.2732 472.000 396.0 393.570 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 27 55 45.9451 -90.2732 472.000 396.0 393.639 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 28 25 45.9451 -90.2732 472.000 396.0 393.660 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 28 55 45.9451 -90.2732 472.000 396.0 393.643 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 29 25 45.9451 -90.2732 472.000 396.0 393.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 29 55 45.9451 -90.2732 472.000 396.0 393.622 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 34 55 45.9451 -90.2732 472.000 30.0 393.516 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 39 55 45.9451 -90.2732 472.000 122.0 393.630 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 44 55 45.9451 -90.2732 472.000 396.0 393.606 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 49 55 45.9451 -90.2732 472.000 30.0 393.512 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 54 55 45.9451 -90.2732 472.000 122.0 393.564 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 20 59 55 45.9451 -90.2732 472.000 396.0 393.509 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 00 25 45.9451 -90.2732 472.000 396.0 393.532 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 00 55 45.9451 -90.2732 472.000 396.0 393.506 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 01 25 45.9451 -90.2732 472.000 396.0 393.510 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 01 55 45.9451 -90.2732 472.000 396.0 393.534 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 02 25 45.9451 -90.2732 472.000 396.0 393.578 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 02 55 45.9451 -90.2732 472.000 396.0 393.581 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 03 25 45.9451 -90.2732 472.000 396.0 393.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 03 55 45.9451 -90.2732 472.000 396.0 393.551 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 04 25 45.9451 -90.2732 472.000 396.0 393.579 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 04 55 45.9451 -90.2732 472.000 396.0 393.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 09 55 45.9451 -90.2732 472.000 30.0 393.583 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 14 55 45.9451 -90.2732 472.000 122.0 393.595 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 19 55 45.9451 -90.2732 472.000 396.0 393.509 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 24 55 45.9451 -90.2732 472.000 30.0 393.525 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 29 55 45.9451 -90.2732 472.000 122.0 393.686 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 34 55 45.9451 -90.2732 472.000 396.0 393.579 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 35 25 45.9451 -90.2732 472.000 396.0 393.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 35 55 45.9451 -90.2732 472.000 396.0 393.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 36 25 45.9451 -90.2732 472.000 396.0 393.554 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 36 55 45.9451 -90.2732 472.000 396.0 393.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 37 25 45.9451 -90.2732 472.000 396.0 393.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 37 55 45.9451 -90.2732 472.000 396.0 393.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 38 25 45.9451 -90.2732 472.000 396.0 393.621 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 38 55 45.9451 -90.2732 472.000 396.0 393.654 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 39 25 45.9451 -90.2732 472.000 396.0 393.650 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 39 55 45.9451 -90.2732 472.000 396.0 393.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 44 55 45.9451 -90.2732 472.000 30.0 393.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 49 55 45.9451 -90.2732 472.000 122.0 393.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 54 55 45.9451 -90.2732 472.000 396.0 393.714 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 21 59 55 45.9451 -90.2732 472.000 30.0 393.694 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 04 55 45.9451 -90.2732 472.000 122.0 393.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 09 55 45.9451 -90.2732 472.000 396.0 393.703 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 19 55 45.9451 -90.2732 472.000 30.0 393.926 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 24 55 45.9451 -90.2732 472.000 122.0 393.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 29 55 45.9451 -90.2732 472.000 396.0 393.669 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 34 55 45.9451 -90.2732 472.000 30.0 393.978 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 39 55 45.9451 -90.2732 472.000 122.0 393.833 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 44 55 45.9451 -90.2732 472.000 396.0 393.706 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 54 55 45.9451 -90.2732 472.000 30.0 394.111 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 22 59 55 45.9451 -90.2732 472.000 122.0 394.030 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 04 55 45.9451 -90.2732 472.000 396.0 393.792 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 09 55 45.9451 -90.2732 472.000 30.0 394.174 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 14 55 45.9451 -90.2732 472.000 122.0 394.040 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 19 55 45.9451 -90.2732 472.000 396.0 393.897 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 20 25 45.9451 -90.2732 472.000 396.0 393.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 20 55 45.9451 -90.2732 472.000 396.0 393.891 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 21 25 45.9451 -90.2732 472.000 396.0 393.875 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 21 55 45.9451 -90.2732 472.000 396.0 393.879 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 22 25 45.9451 -90.2732 472.000 396.0 393.912 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 22 55 45.9451 -90.2732 472.000 396.0 393.916 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 23 25 45.9451 -90.2732 472.000 396.0 393.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 23 55 45.9451 -90.2732 472.000 396.0 393.885 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 24 25 45.9451 -90.2732 472.000 396.0 393.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 24 55 45.9451 -90.2732 472.000 396.0 393.877 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 29 55 45.9451 -90.2732 472.000 30.0 394.495 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 34 55 45.9451 -90.2732 472.000 122.0 394.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 39 55 45.9451 -90.2732 472.000 396.0 393.996 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 44 55 45.9451 -90.2732 472.000 30.0 394.698 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 06 23 49 55 45.9451 -90.2732 472.000 122.0 394.497 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 14 55 45.9451 -90.2732 472.000 396.0 394.008 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 19 55 45.9451 -90.2732 472.000 30.0 394.849 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 24 55 45.9451 -90.2732 472.000 122.0 394.648 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 29 55 45.9451 -90.2732 472.000 396.0 394.105 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 34 55 45.9451 -90.2732 472.000 30.0 394.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 39 55 45.9451 -90.2732 472.000 122.0 394.685 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 44 55 45.9451 -90.2732 472.000 396.0 394.148 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 45 25 45.9451 -90.2732 472.000 396.0 394.152 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 45 55 45.9451 -90.2732 472.000 396.0 394.162 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 46 25 45.9451 -90.2732 472.000 396.0 394.108 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 46 55 45.9451 -90.2732 472.000 396.0 394.128 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 47 25 45.9451 -90.2732 472.000 396.0 394.145 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 47 55 45.9451 -90.2732 472.000 396.0 394.202 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 48 25 45.9451 -90.2732 472.000 396.0 394.153 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 48 55 45.9451 -90.2732 472.000 396.0 394.123 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 49 25 45.9451 -90.2732 472.000 396.0 394.116 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 49 55 45.9451 -90.2732 472.000 396.0 394.122 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 54 55 45.9451 -90.2732 472.000 30.0 395.063 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 00 59 55 45.9451 -90.2732 472.000 122.0 394.886 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 04 55 45.9451 -90.2732 472.000 396.0 394.193 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 09 55 45.9451 -90.2732 472.000 30.0 395.268 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 14 55 45.9451 -90.2732 472.000 122.0 394.990 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 19 55 45.9451 -90.2732 472.000 396.0 394.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 20 25 45.9451 -90.2732 472.000 396.0 394.169 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 20 55 45.9451 -90.2732 472.000 396.0 394.288 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 21 25 45.9451 -90.2732 472.000 396.0 394.301 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 21 55 45.9451 -90.2732 472.000 396.0 394.296 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 22 25 45.9451 -90.2732 472.000 396.0 394.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 22 55 45.9451 -90.2732 472.000 396.0 394.388 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 23 25 45.9451 -90.2732 472.000 396.0 394.353 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 23 55 45.9451 -90.2732 472.000 396.0 394.320 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 24 25 45.9451 -90.2732 472.000 396.0 394.292 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 24 55 45.9451 -90.2732 472.000 396.0 394.320 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 29 55 45.9451 -90.2732 472.000 30.0 395.416 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 34 55 45.9451 -90.2732 472.000 122.0 395.142 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 39 55 45.9451 -90.2732 472.000 396.0 394.430 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 44 55 45.9451 -90.2732 472.000 30.0 395.595 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 49 55 45.9451 -90.2732 472.000 122.0 395.244 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 01 54 55 45.9451 -90.2732 472.000 396.0 394.390 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 04 55 45.9451 -90.2732 472.000 30.0 395.731 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 09 55 45.9451 -90.2732 472.000 122.0 395.476 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 14 55 45.9451 -90.2732 472.000 396.0 394.627 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 19 55 45.9451 -90.2732 472.000 30.0 395.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 24 55 45.9451 -90.2732 472.000 122.0 395.574 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 29 55 45.9451 -90.2732 472.000 396.0 394.838 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 30 25 45.9451 -90.2732 472.000 396.0 394.864 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 30 55 45.9451 -90.2732 472.000 396.0 394.869 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 31 25 45.9451 -90.2732 472.000 396.0 394.869 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 31 55 45.9451 -90.2732 472.000 396.0 394.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 32 25 45.9451 -90.2732 472.000 396.0 394.783 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 32 55 45.9451 -90.2732 472.000 396.0 394.782 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 33 25 45.9451 -90.2732 472.000 396.0 394.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 33 55 45.9451 -90.2732 472.000 396.0 394.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 34 25 45.9451 -90.2732 472.000 396.0 394.910 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 34 55 45.9451 -90.2732 472.000 396.0 394.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 39 55 45.9451 -90.2732 472.000 30.0 396.105 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 44 55 45.9451 -90.2732 472.000 122.0 395.842 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 49 55 45.9451 -90.2732 472.000 396.0 394.987 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 54 55 45.9451 -90.2732 472.000 30.0 396.123 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 02 59 55 45.9451 -90.2732 472.000 122.0 395.846 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 04 55 45.9451 -90.2732 472.000 396.0 395.141 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 05 25 45.9451 -90.2732 472.000 396.0 395.131 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 05 55 45.9451 -90.2732 472.000 396.0 395.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 06 25 45.9451 -90.2732 472.000 396.0 395.126 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 06 55 45.9451 -90.2732 472.000 396.0 395.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 07 25 45.9451 -90.2732 472.000 396.0 395.157 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 07 55 45.9451 -90.2732 472.000 396.0 395.170 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 08 25 45.9451 -90.2732 472.000 396.0 395.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 08 55 45.9451 -90.2732 472.000 396.0 395.170 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 09 25 45.9451 -90.2732 472.000 396.0 395.161 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 09 55 45.9451 -90.2732 472.000 396.0 395.160 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 14 55 45.9451 -90.2732 472.000 30.0 396.411 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 19 55 45.9451 -90.2732 472.000 122.0 396.057 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 24 55 45.9451 -90.2732 472.000 396.0 395.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 29 55 45.9451 -90.2732 472.000 30.0 396.504 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 34 55 45.9451 -90.2732 472.000 122.0 396.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 39 55 45.9451 -90.2732 472.000 396.0 395.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 40 25 45.9451 -90.2732 472.000 396.0 395.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 40 55 45.9451 -90.2732 472.000 396.0 395.336 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 41 25 45.9451 -90.2732 472.000 396.0 395.307 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 41 55 45.9451 -90.2732 472.000 396.0 395.317 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 42 25 45.9451 -90.2732 472.000 396.0 395.317 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 42 55 45.9451 -90.2732 472.000 396.0 395.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 43 25 45.9451 -90.2732 472.000 396.0 395.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 43 55 45.9451 -90.2732 472.000 396.0 395.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 44 25 45.9451 -90.2732 472.000 396.0 395.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 44 55 45.9451 -90.2732 472.000 396.0 395.396 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 49 55 45.9451 -90.2732 472.000 30.0 396.609 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 54 55 45.9451 -90.2732 472.000 122.0 396.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 03 59 55 45.9451 -90.2732 472.000 396.0 395.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 04 55 45.9451 -90.2732 472.000 30.0 396.702 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 09 55 45.9451 -90.2732 472.000 122.0 396.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 14 55 45.9451 -90.2732 472.000 396.0 395.570 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 24 55 45.9451 -90.2732 472.000 30.0 396.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 29 55 45.9451 -90.2732 472.000 122.0 396.647 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 34 55 45.9451 -90.2732 472.000 396.0 395.661 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 39 55 45.9451 -90.2732 472.000 30.0 396.966 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 44 55 45.9451 -90.2732 472.000 122.0 396.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 49 55 45.9451 -90.2732 472.000 396.0 395.690 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 50 25 45.9451 -90.2732 472.000 396.0 395.701 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 50 55 45.9451 -90.2732 472.000 396.0 395.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 51 25 45.9451 -90.2732 472.000 396.0 395.707 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 51 55 45.9451 -90.2732 472.000 396.0 395.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 52 25 45.9451 -90.2732 472.000 396.0 395.695 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 52 55 45.9451 -90.2732 472.000 396.0 395.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 53 25 45.9451 -90.2732 472.000 396.0 395.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 53 55 45.9451 -90.2732 472.000 396.0 395.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 54 25 45.9451 -90.2732 472.000 396.0 395.739 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 04 54 55 45.9451 -90.2732 472.000 396.0 395.717 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 04 55 45.9451 -90.2732 472.000 30.0 397.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 09 55 45.9451 -90.2732 472.000 122.0 396.807 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 14 55 45.9451 -90.2732 472.000 396.0 395.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 19 55 45.9451 -90.2732 472.000 30.0 397.212 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 24 55 45.9451 -90.2732 472.000 122.0 396.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 29 55 45.9451 -90.2732 472.000 396.0 395.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 30 25 45.9451 -90.2732 472.000 396.0 395.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 30 55 45.9451 -90.2732 472.000 396.0 395.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 31 25 45.9451 -90.2732 472.000 396.0 395.733 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 31 55 45.9451 -90.2732 472.000 396.0 395.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 32 25 45.9451 -90.2732 472.000 396.0 395.779 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 32 55 45.9451 -90.2732 472.000 396.0 395.789 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 33 25 45.9451 -90.2732 472.000 396.0 395.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 33 55 45.9451 -90.2732 472.000 396.0 395.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 34 25 45.9451 -90.2732 472.000 396.0 395.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 34 55 45.9451 -90.2732 472.000 396.0 395.706 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 39 55 45.9451 -90.2732 472.000 30.0 397.268 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 44 55 45.9451 -90.2732 472.000 122.0 396.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 49 55 45.9451 -90.2732 472.000 396.0 395.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 54 55 45.9451 -90.2732 472.000 30.0 397.526 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 05 59 55 45.9451 -90.2732 472.000 122.0 396.869 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 04 55 45.9451 -90.2732 472.000 396.0 395.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 14 55 45.9451 -90.2732 472.000 30.0 397.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 19 55 45.9451 -90.2732 472.000 122.0 397.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 24 55 45.9451 -90.2732 472.000 396.0 395.674 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 29 55 45.9451 -90.2732 472.000 30.0 398.213 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 34 55 45.9451 -90.2732 472.000 122.0 397.041 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 39 55 45.9451 -90.2732 472.000 396.0 395.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 40 25 45.9451 -90.2732 472.000 396.0 395.559 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 40 55 45.9451 -90.2732 472.000 396.0 395.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 41 25 45.9451 -90.2732 472.000 396.0 395.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 41 55 45.9451 -90.2732 472.000 396.0 395.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 42 25 45.9451 -90.2732 472.000 396.0 395.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 42 55 45.9451 -90.2732 472.000 396.0 395.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 43 25 45.9451 -90.2732 472.000 396.0 395.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 43 55 45.9451 -90.2732 472.000 396.0 395.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 44 25 45.9451 -90.2732 472.000 396.0 395.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 44 55 45.9451 -90.2732 472.000 396.0 395.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 49 55 45.9451 -90.2732 472.000 30.0 398.338 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 54 55 45.9451 -90.2732 472.000 122.0 397.137 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 06 59 55 45.9451 -90.2732 472.000 396.0 395.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 04 55 45.9451 -90.2732 472.000 30.0 398.708 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 09 55 45.9451 -90.2732 472.000 122.0 397.424 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 14 55 45.9451 -90.2732 472.000 396.0 395.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 15 25 45.9451 -90.2732 472.000 396.0 395.489 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 15 55 45.9451 -90.2732 472.000 396.0 395.485 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 16 25 45.9451 -90.2732 472.000 396.0 395.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 16 55 45.9451 -90.2732 472.000 396.0 395.510 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 17 25 45.9451 -90.2732 472.000 396.0 395.501 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 17 55 45.9451 -90.2732 472.000 396.0 395.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 18 25 45.9451 -90.2732 472.000 396.0 395.462 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 18 55 45.9451 -90.2732 472.000 396.0 395.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 19 25 45.9451 -90.2732 472.000 396.0 395.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 19 55 45.9451 -90.2732 472.000 396.0 395.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 24 55 45.9451 -90.2732 472.000 30.0 399.281 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 29 55 45.9451 -90.2732 472.000 122.0 397.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 34 55 45.9451 -90.2732 472.000 396.0 395.482 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 39 55 45.9451 -90.2732 472.000 30.0 399.430 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 44 55 45.9451 -90.2732 472.000 122.0 397.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 49 55 45.9451 -90.2732 472.000 396.0 395.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 07 59 55 45.9451 -90.2732 472.000 30.0 399.397 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 04 55 45.9451 -90.2732 472.000 122.0 397.822 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 09 55 45.9451 -90.2732 472.000 396.0 395.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 14 55 45.9451 -90.2732 472.000 30.0 399.512 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 19 55 45.9451 -90.2732 472.000 122.0 398.001 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 24 55 45.9451 -90.2732 472.000 396.0 395.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 25 25 45.9451 -90.2732 472.000 396.0 395.621 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 25 55 45.9451 -90.2732 472.000 396.0 395.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 26 25 45.9451 -90.2732 472.000 396.0 395.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 26 55 45.9451 -90.2732 472.000 396.0 395.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 27 25 45.9451 -90.2732 472.000 396.0 395.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 27 55 45.9451 -90.2732 472.000 396.0 395.667 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 28 25 45.9451 -90.2732 472.000 396.0 395.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 28 55 45.9451 -90.2732 472.000 396.0 395.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 29 25 45.9451 -90.2732 472.000 396.0 395.653 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 29 55 45.9451 -90.2732 472.000 396.0 395.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 34 55 45.9451 -90.2732 472.000 30.0 399.477 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 39 55 45.9451 -90.2732 472.000 122.0 397.942 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 44 55 45.9451 -90.2732 472.000 396.0 395.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 49 55 45.9451 -90.2732 472.000 30.0 399.499 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 54 55 45.9451 -90.2732 472.000 122.0 398.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 08 59 55 45.9451 -90.2732 472.000 396.0 395.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 00 25 45.9451 -90.2732 472.000 396.0 395.808 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 00 55 45.9451 -90.2732 472.000 396.0 395.794 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 01 25 45.9451 -90.2732 472.000 396.0 395.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 01 55 45.9451 -90.2732 472.000 396.0 395.782 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 02 25 45.9451 -90.2732 472.000 396.0 395.779 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 02 55 45.9451 -90.2732 472.000 396.0 395.763 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 03 25 45.9451 -90.2732 472.000 396.0 395.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 03 55 45.9451 -90.2732 472.000 396.0 395.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 04 25 45.9451 -90.2732 472.000 396.0 395.835 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 04 55 45.9451 -90.2732 472.000 396.0 395.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 09 55 45.9451 -90.2732 472.000 30.0 399.782 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 14 55 45.9451 -90.2732 472.000 122.0 398.176 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 19 55 45.9451 -90.2732 472.000 396.0 395.953 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 24 55 45.9451 -90.2732 472.000 30.0 399.555 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 29 55 45.9451 -90.2732 472.000 122.0 397.997 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 34 55 45.9451 -90.2732 472.000 396.0 395.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 35 25 45.9451 -90.2732 472.000 396.0 395.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 35 55 45.9451 -90.2732 472.000 396.0 395.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 36 25 45.9451 -90.2732 472.000 396.0 395.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 36 55 45.9451 -90.2732 472.000 396.0 395.992 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 37 25 45.9451 -90.2732 472.000 396.0 396.007 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 37 55 45.9451 -90.2732 472.000 396.0 396.016 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 38 25 45.9451 -90.2732 472.000 396.0 396.028 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 38 55 45.9451 -90.2732 472.000 396.0 396.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 39 25 45.9451 -90.2732 472.000 396.0 396.055 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 39 55 45.9451 -90.2732 472.000 396.0 396.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 44 55 45.9451 -90.2732 472.000 30.0 399.412 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 49 55 45.9451 -90.2732 472.000 122.0 397.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 54 55 45.9451 -90.2732 472.000 396.0 396.082 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 09 59 55 45.9451 -90.2732 472.000 30.0 399.643 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 04 55 45.9451 -90.2732 472.000 122.0 397.764 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 09 55 45.9451 -90.2732 472.000 396.0 396.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 19 55 45.9451 -90.2732 472.000 30.0 399.792 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 24 55 45.9451 -90.2732 472.000 122.0 398.122 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 29 55 45.9451 -90.2732 472.000 396.0 396.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 34 55 45.9451 -90.2732 472.000 30.0 399.705 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 39 55 45.9451 -90.2732 472.000 122.0 398.054 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 44 55 45.9451 -90.2732 472.000 396.0 396.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 54 55 45.9451 -90.2732 472.000 30.0 399.712 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 10 59 55 45.9451 -90.2732 472.000 122.0 398.242 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 04 55 45.9451 -90.2732 472.000 396.0 396.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 09 55 45.9451 -90.2732 472.000 30.0 399.744 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 14 55 45.9451 -90.2732 472.000 122.0 398.379 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 19 55 45.9451 -90.2732 472.000 396.0 396.733 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 20 25 45.9451 -90.2732 472.000 396.0 396.746 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 20 55 45.9451 -90.2732 472.000 396.0 396.738 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 21 25 45.9451 -90.2732 472.000 396.0 396.769 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 21 55 45.9451 -90.2732 472.000 396.0 396.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 22 25 45.9451 -90.2732 472.000 396.0 396.760 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 22 55 45.9451 -90.2732 472.000 396.0 396.755 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 23 25 45.9451 -90.2732 472.000 396.0 396.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 23 55 45.9451 -90.2732 472.000 396.0 396.763 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 24 25 45.9451 -90.2732 472.000 396.0 396.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 24 55 45.9451 -90.2732 472.000 396.0 396.800 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 29 55 45.9451 -90.2732 472.000 30.0 399.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 34 55 45.9451 -90.2732 472.000 122.0 398.533 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 39 55 45.9451 -90.2732 472.000 396.0 396.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 44 55 45.9451 -90.2732 472.000 30.0 399.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 11 49 55 45.9451 -90.2732 472.000 122.0 398.656 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 14 55 45.9451 -90.2732 472.000 396.0 397.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 19 55 45.9451 -90.2732 472.000 30.0 400.019 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 24 55 45.9451 -90.2732 472.000 122.0 398.885 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 29 55 45.9451 -90.2732 472.000 396.0 397.156 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 34 55 45.9451 -90.2732 472.000 30.0 400.171 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 39 55 45.9451 -90.2732 472.000 122.0 398.893 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 44 55 45.9451 -90.2732 472.000 396.0 397.240 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 45 25 45.9451 -90.2732 472.000 396.0 397.251 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 45 55 45.9451 -90.2732 472.000 396.0 397.270 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 46 25 45.9451 -90.2732 472.000 396.0 397.249 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 46 55 45.9451 -90.2732 472.000 396.0 397.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 47 25 45.9451 -90.2732 472.000 396.0 397.266 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 47 55 45.9451 -90.2732 472.000 396.0 397.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 48 25 45.9451 -90.2732 472.000 396.0 397.305 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 48 55 45.9451 -90.2732 472.000 396.0 397.316 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 49 25 45.9451 -90.2732 472.000 396.0 397.339 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 49 55 45.9451 -90.2732 472.000 396.0 397.293 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 54 55 45.9451 -90.2732 472.000 30.0 400.870 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 07 12 59 55 45.9451 -90.2732 472.000 122.0 398.751 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 04 55 45.9451 -90.2732 472.000 396.0 397.182 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 09 55 45.9451 -90.2732 472.000 30.0 400.742 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 14 55 45.9451 -90.2732 472.000 122.0 398.823 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 19 55 45.9451 -90.2732 472.000 396.0 397.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 20 25 45.9451 -90.2732 472.000 396.0 397.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 20 55 45.9451 -90.2732 472.000 396.0 397.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 21 25 45.9451 -90.2732 472.000 396.0 397.146 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 21 55 45.9451 -90.2732 472.000 396.0 397.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 22 25 45.9451 -90.2732 472.000 396.0 397.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 22 55 45.9451 -90.2732 472.000 396.0 397.211 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 23 25 45.9451 -90.2732 472.000 396.0 397.204 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 23 55 45.9451 -90.2732 472.000 396.0 397.196 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 24 25 45.9451 -90.2732 472.000 396.0 397.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 24 55 45.9451 -90.2732 472.000 396.0 397.168 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 29 55 45.9451 -90.2732 472.000 30.0 401.130 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 34 55 45.9451 -90.2732 472.000 122.0 398.580 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 39 55 45.9451 -90.2732 472.000 396.0 397.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 44 55 45.9451 -90.2732 472.000 30.0 401.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 49 55 45.9451 -90.2732 472.000 122.0 398.495 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 13 54 55 45.9451 -90.2732 472.000 396.0 396.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 04 55 45.9451 -90.2732 472.000 30.0 402.184 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 09 55 45.9451 -90.2732 472.000 122.0 399.069 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 14 55 45.9451 -90.2732 472.000 396.0 396.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 19 55 45.9451 -90.2732 472.000 30.0 402.843 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 24 55 45.9451 -90.2732 472.000 122.0 399.506 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 29 55 45.9451 -90.2732 472.000 396.0 396.633 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 30 25 45.9451 -90.2732 472.000 396.0 396.562 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 30 55 45.9451 -90.2732 472.000 396.0 396.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 31 25 45.9451 -90.2732 472.000 396.0 396.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 31 55 45.9451 -90.2732 472.000 396.0 396.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 32 25 45.9451 -90.2732 472.000 396.0 396.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 32 55 45.9451 -90.2732 472.000 396.0 396.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 33 25 45.9451 -90.2732 472.000 396.0 396.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 33 55 45.9451 -90.2732 472.000 396.0 396.603 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 34 25 45.9451 -90.2732 472.000 396.0 396.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 34 55 45.9451 -90.2732 472.000 396.0 396.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 39 55 45.9451 -90.2732 472.000 30.0 402.399 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 44 55 45.9451 -90.2732 472.000 122.0 400.888 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 49 55 45.9451 -90.2732 472.000 396.0 396.501 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 54 55 45.9451 -90.2732 472.000 30.0 401.501 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 07 14 59 55 45.9451 -90.2732 472.000 122.0 400.960 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 04 55 45.9451 -90.2732 472.000 396.0 396.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 05 25 45.9451 -90.2732 472.000 396.0 396.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 05 55 45.9451 -90.2732 472.000 396.0 396.370 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 06 25 45.9451 -90.2732 472.000 396.0 396.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 06 55 45.9451 -90.2732 472.000 396.0 396.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 07 25 45.9451 -90.2732 472.000 396.0 396.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 07 55 45.9451 -90.2732 472.000 396.0 396.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 08 25 45.9451 -90.2732 472.000 396.0 396.338 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 08 55 45.9451 -90.2732 472.000 396.0 396.388 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 09 25 45.9451 -90.2732 472.000 396.0 396.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 09 55 45.9451 -90.2732 472.000 396.0 396.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 14 55 45.9451 -90.2732 472.000 30.0 400.580 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 19 55 45.9451 -90.2732 472.000 122.0 400.271 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 24 55 45.9451 -90.2732 472.000 396.0 396.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 29 55 45.9451 -90.2732 472.000 30.0 399.610 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 34 55 45.9451 -90.2732 472.000 122.0 399.404 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 39 55 45.9451 -90.2732 472.000 396.0 396.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 40 25 45.9451 -90.2732 472.000 396.0 396.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 40 55 45.9451 -90.2732 472.000 396.0 396.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 41 25 45.9451 -90.2732 472.000 396.0 396.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 41 55 45.9451 -90.2732 472.000 396.0 396.634 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 42 25 45.9451 -90.2732 472.000 396.0 396.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 42 55 45.9451 -90.2732 472.000 396.0 396.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 43 25 45.9451 -90.2732 472.000 396.0 396.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 43 55 45.9451 -90.2732 472.000 396.0 396.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 44 25 45.9451 -90.2732 472.000 396.0 396.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 44 55 45.9451 -90.2732 472.000 396.0 396.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 49 55 45.9451 -90.2732 472.000 30.0 399.221 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 54 55 45.9451 -90.2732 472.000 122.0 399.136 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 15 59 55 45.9451 -90.2732 472.000 396.0 396.519 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 04 55 45.9451 -90.2732 472.000 30.0 399.062 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 09 55 45.9451 -90.2732 472.000 122.0 399.150 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 14 55 45.9451 -90.2732 472.000 396.0 396.319 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 24 55 45.9451 -90.2732 472.000 30.0 398.947 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 29 55 45.9451 -90.2732 472.000 122.0 398.804 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 34 55 45.9451 -90.2732 472.000 396.0 396.041 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 39 55 45.9451 -90.2732 472.000 30.0 398.829 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 44 55 45.9451 -90.2732 472.000 122.0 398.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 49 55 45.9451 -90.2732 472.000 396.0 395.833 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 50 25 45.9451 -90.2732 472.000 396.0 395.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 50 55 45.9451 -90.2732 472.000 396.0 395.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 51 25 45.9451 -90.2732 472.000 396.0 395.851 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 51 55 45.9451 -90.2732 472.000 396.0 395.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 52 25 45.9451 -90.2732 472.000 396.0 395.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 52 55 45.9451 -90.2732 472.000 396.0 395.931 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 53 25 45.9451 -90.2732 472.000 396.0 395.912 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 53 55 45.9451 -90.2732 472.000 396.0 395.784 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 54 25 45.9451 -90.2732 472.000 396.0 395.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 16 54 55 45.9451 -90.2732 472.000 396.0 395.870 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 04 55 45.9451 -90.2732 472.000 30.0 398.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 09 55 45.9451 -90.2732 472.000 122.0 398.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 14 55 45.9451 -90.2732 472.000 396.0 397.080 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 19 55 45.9451 -90.2732 472.000 30.0 398.399 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 24 55 45.9451 -90.2732 472.000 122.0 398.241 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 29 55 45.9451 -90.2732 472.000 396.0 396.535 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 30 25 45.9451 -90.2732 472.000 396.0 397.082 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 30 55 45.9451 -90.2732 472.000 396.0 396.863 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 31 25 45.9451 -90.2732 472.000 396.0 396.701 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 31 55 45.9451 -90.2732 472.000 396.0 397.239 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 32 25 45.9451 -90.2732 472.000 396.0 398.054 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 32 55 45.9451 -90.2732 472.000 396.0 396.928 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 33 25 45.9451 -90.2732 472.000 396.0 397.384 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 33 55 45.9451 -90.2732 472.000 396.0 397.672 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 34 25 45.9451 -90.2732 472.000 396.0 397.534 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 34 55 45.9451 -90.2732 472.000 396.0 398.204 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 39 55 45.9451 -90.2732 472.000 30.0 398.367 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 44 55 45.9451 -90.2732 472.000 122.0 398.248 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 49 55 45.9451 -90.2732 472.000 396.0 396.552 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 54 55 45.9451 -90.2732 472.000 30.0 398.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 17 59 55 45.9451 -90.2732 472.000 122.0 398.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 04 55 45.9451 -90.2732 472.000 396.0 397.036 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 14 55 45.9451 -90.2732 472.000 30.0 398.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 19 55 45.9451 -90.2732 472.000 122.0 398.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 24 55 45.9451 -90.2732 472.000 396.0 397.396 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 29 55 45.9451 -90.2732 472.000 30.0 398.012 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 34 55 45.9451 -90.2732 472.000 122.0 398.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 39 55 45.9451 -90.2732 472.000 396.0 397.567 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 40 25 45.9451 -90.2732 472.000 396.0 397.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 40 55 45.9451 -90.2732 472.000 396.0 397.354 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 41 25 45.9451 -90.2732 472.000 396.0 397.338 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 41 55 45.9451 -90.2732 472.000 396.0 397.452 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 42 25 45.9451 -90.2732 472.000 396.0 397.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 42 55 45.9451 -90.2732 472.000 396.0 397.767 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 43 25 45.9451 -90.2732 472.000 396.0 397.812 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 43 55 45.9451 -90.2732 472.000 396.0 397.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 44 25 45.9451 -90.2732 472.000 396.0 397.571 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 44 55 45.9451 -90.2732 472.000 396.0 397.564 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 49 55 45.9451 -90.2732 472.000 30.0 397.712 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 54 55 45.9451 -90.2732 472.000 122.0 397.656 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 18 59 55 45.9451 -90.2732 472.000 396.0 397.262 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 04 55 45.9451 -90.2732 472.000 30.0 397.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 09 55 45.9451 -90.2732 472.000 122.0 397.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 14 55 45.9451 -90.2732 472.000 396.0 397.465 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 15 25 45.9451 -90.2732 472.000 396.0 397.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 15 55 45.9451 -90.2732 472.000 396.0 397.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 16 25 45.9451 -90.2732 472.000 396.0 397.519 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 16 55 45.9451 -90.2732 472.000 396.0 397.543 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 17 25 45.9451 -90.2732 472.000 396.0 397.505 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 17 55 45.9451 -90.2732 472.000 396.0 397.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 18 25 45.9451 -90.2732 472.000 396.0 397.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 18 55 45.9451 -90.2732 472.000 396.0 397.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 19 25 45.9451 -90.2732 472.000 396.0 397.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 19 55 45.9451 -90.2732 472.000 396.0 397.360 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 24 55 45.9451 -90.2732 472.000 30.0 397.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 29 55 45.9451 -90.2732 472.000 122.0 397.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 34 55 45.9451 -90.2732 472.000 396.0 397.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 39 55 45.9451 -90.2732 472.000 30.0 397.365 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 44 55 45.9451 -90.2732 472.000 122.0 397.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 49 55 45.9451 -90.2732 472.000 396.0 397.406 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 19 59 55 45.9451 -90.2732 472.000 30.0 397.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 04 55 45.9451 -90.2732 472.000 122.0 397.235 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 09 55 45.9451 -90.2732 472.000 396.0 397.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 14 55 45.9451 -90.2732 472.000 30.0 397.188 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 19 55 45.9451 -90.2732 472.000 122.0 397.098 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 24 55 45.9451 -90.2732 472.000 396.0 397.122 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 25 25 45.9451 -90.2732 472.000 396.0 397.053 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 25 55 45.9451 -90.2732 472.000 396.0 396.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 26 25 45.9451 -90.2732 472.000 396.0 397.074 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 26 55 45.9451 -90.2732 472.000 396.0 397.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 27 25 45.9451 -90.2732 472.000 396.0 396.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 27 55 45.9451 -90.2732 472.000 396.0 397.140 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 28 25 45.9451 -90.2732 472.000 396.0 397.182 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 28 55 45.9451 -90.2732 472.000 396.0 397.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 29 25 45.9451 -90.2732 472.000 396.0 396.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 29 55 45.9451 -90.2732 472.000 396.0 397.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 34 55 45.9451 -90.2732 472.000 30.0 397.105 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 39 55 45.9451 -90.2732 472.000 122.0 397.249 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 44 55 45.9451 -90.2732 472.000 396.0 397.010 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 49 55 45.9451 -90.2732 472.000 30.0 397.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 54 55 45.9451 -90.2732 472.000 122.0 397.403 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 20 59 55 45.9451 -90.2732 472.000 396.0 397.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 00 25 45.9451 -90.2732 472.000 396.0 397.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 00 55 45.9451 -90.2732 472.000 396.0 397.268 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 01 25 45.9451 -90.2732 472.000 396.0 397.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 01 55 45.9451 -90.2732 472.000 396.0 397.230 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 02 25 45.9451 -90.2732 472.000 396.0 397.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 02 55 45.9451 -90.2732 472.000 396.0 397.165 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 03 25 45.9451 -90.2732 472.000 396.0 397.198 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 03 55 45.9451 -90.2732 472.000 396.0 397.089 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 04 25 45.9451 -90.2732 472.000 396.0 397.065 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 04 55 45.9451 -90.2732 472.000 396.0 396.982 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 09 55 45.9451 -90.2732 472.000 30.0 397.373 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 14 55 45.9451 -90.2732 472.000 122.0 397.417 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 19 55 45.9451 -90.2732 472.000 396.0 397.418 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 24 55 45.9451 -90.2732 472.000 30.0 397.491 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 29 55 45.9451 -90.2732 472.000 122.0 397.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 34 55 45.9451 -90.2732 472.000 396.0 396.750 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 35 25 45.9451 -90.2732 472.000 396.0 396.835 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 35 55 45.9451 -90.2732 472.000 396.0 396.989 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 36 25 45.9451 -90.2732 472.000 396.0 396.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 36 55 45.9451 -90.2732 472.000 396.0 396.982 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 37 25 45.9451 -90.2732 472.000 396.0 396.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 37 55 45.9451 -90.2732 472.000 396.0 397.006 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 38 25 45.9451 -90.2732 472.000 396.0 397.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 38 55 45.9451 -90.2732 472.000 396.0 397.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 39 25 45.9451 -90.2732 472.000 396.0 397.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 39 55 45.9451 -90.2732 472.000 396.0 397.336 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 44 55 45.9451 -90.2732 472.000 30.0 397.427 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 49 55 45.9451 -90.2732 472.000 122.0 397.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 54 55 45.9451 -90.2732 472.000 396.0 397.230 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 07 21 59 55 45.9451 -90.2732 472.000 30.0 397.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 04 55 45.9451 -90.2732 472.000 122.0 397.656 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 09 55 45.9451 -90.2732 472.000 396.0 397.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 19 55 45.9451 -90.2732 472.000 30.0 397.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 24 55 45.9451 -90.2732 472.000 122.0 397.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 29 55 45.9451 -90.2732 472.000 396.0 397.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 34 55 45.9451 -90.2732 472.000 30.0 397.777 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 39 55 45.9451 -90.2732 472.000 122.0 397.808 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 44 55 45.9451 -90.2732 472.000 396.0 396.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 54 55 45.9451 -90.2732 472.000 30.0 397.979 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 22 59 55 45.9451 -90.2732 472.000 122.0 397.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 04 55 45.9451 -90.2732 472.000 396.0 396.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 09 55 45.9451 -90.2732 472.000 30.0 398.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 14 55 45.9451 -90.2732 472.000 122.0 397.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 19 55 45.9451 -90.2732 472.000 396.0 397.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 20 25 45.9451 -90.2732 472.000 396.0 397.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 20 55 45.9451 -90.2732 472.000 396.0 397.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 21 25 45.9451 -90.2732 472.000 396.0 397.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 21 55 45.9451 -90.2732 472.000 396.0 397.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 22 25 45.9451 -90.2732 472.000 396.0 397.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 22 55 45.9451 -90.2732 472.000 396.0 397.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 23 25 45.9451 -90.2732 472.000 396.0 397.523 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 23 55 45.9451 -90.2732 472.000 396.0 397.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 24 25 45.9451 -90.2732 472.000 396.0 397.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 24 55 45.9451 -90.2732 472.000 396.0 397.415 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 29 55 45.9451 -90.2732 472.000 30.0 398.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 34 55 45.9451 -90.2732 472.000 122.0 397.710 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 39 55 45.9451 -90.2732 472.000 396.0 396.866 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 44 55 45.9451 -90.2732 472.000 30.0 398.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 07 23 49 55 45.9451 -90.2732 472.000 122.0 397.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 14 55 45.9451 -90.2732 472.000 396.0 397.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 19 55 45.9451 -90.2732 472.000 30.0 398.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 24 55 45.9451 -90.2732 472.000 122.0 398.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 29 55 45.9451 -90.2732 472.000 396.0 397.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 34 55 45.9451 -90.2732 472.000 30.0 398.502 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 39 55 45.9451 -90.2732 472.000 122.0 398.336 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 44 55 45.9451 -90.2732 472.000 396.0 397.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 45 25 45.9451 -90.2732 472.000 396.0 397.745 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 45 55 45.9451 -90.2732 472.000 396.0 397.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 46 25 45.9451 -90.2732 472.000 396.0 397.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 46 55 45.9451 -90.2732 472.000 396.0 397.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 47 25 45.9451 -90.2732 472.000 396.0 397.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 47 55 45.9451 -90.2732 472.000 396.0 397.706 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 48 25 45.9451 -90.2732 472.000 396.0 397.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 48 55 45.9451 -90.2732 472.000 396.0 397.618 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 49 25 45.9451 -90.2732 472.000 396.0 397.703 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 49 55 45.9451 -90.2732 472.000 396.0 397.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 54 55 45.9451 -90.2732 472.000 30.0 399.678 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 08 00 59 55 45.9451 -90.2732 472.000 122.0 398.491 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 04 55 45.9451 -90.2732 472.000 396.0 397.435 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 09 55 45.9451 -90.2732 472.000 30.0 400.088 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 14 55 45.9451 -90.2732 472.000 122.0 398.332 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 19 55 45.9451 -90.2732 472.000 396.0 397.702 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 20 25 45.9451 -90.2732 472.000 396.0 397.964 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 20 55 45.9451 -90.2732 472.000 396.0 398.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 21 25 45.9451 -90.2732 472.000 396.0 398.029 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 21 55 45.9451 -90.2732 472.000 396.0 398.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 22 25 45.9451 -90.2732 472.000 396.0 398.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 22 55 45.9451 -90.2732 472.000 396.0 398.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 23 25 45.9451 -90.2732 472.000 396.0 398.093 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 23 55 45.9451 -90.2732 472.000 396.0 398.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 24 25 45.9451 -90.2732 472.000 396.0 398.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 24 55 45.9451 -90.2732 472.000 396.0 398.076 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 29 55 45.9451 -90.2732 472.000 30.0 400.751 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 34 55 45.9451 -90.2732 472.000 122.0 398.807 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 39 55 45.9451 -90.2732 472.000 396.0 397.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 44 55 45.9451 -90.2732 472.000 30.0 401.023 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 49 55 45.9451 -90.2732 472.000 122.0 398.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 01 54 55 45.9451 -90.2732 472.000 396.0 397.114 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 04 55 45.9451 -90.2732 472.000 30.0 400.858 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 09 55 45.9451 -90.2732 472.000 122.0 398.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 14 55 45.9451 -90.2732 472.000 396.0 397.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 19 55 45.9451 -90.2732 472.000 30.0 400.777 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 24 55 45.9451 -90.2732 472.000 122.0 398.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 29 55 45.9451 -90.2732 472.000 396.0 396.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 30 25 45.9451 -90.2732 472.000 396.0 396.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 30 55 45.9451 -90.2732 472.000 396.0 396.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 31 25 45.9451 -90.2732 472.000 396.0 396.473 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 31 55 45.9451 -90.2732 472.000 396.0 396.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 32 25 45.9451 -90.2732 472.000 396.0 396.441 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 32 55 45.9451 -90.2732 472.000 396.0 396.410 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 33 25 45.9451 -90.2732 472.000 396.0 396.403 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 33 55 45.9451 -90.2732 472.000 396.0 396.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 34 25 45.9451 -90.2732 472.000 396.0 396.404 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 34 55 45.9451 -90.2732 472.000 396.0 396.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 39 55 45.9451 -90.2732 472.000 30.0 401.298 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 44 55 45.9451 -90.2732 472.000 122.0 398.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 49 55 45.9451 -90.2732 472.000 396.0 396.175 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 54 55 45.9451 -90.2732 472.000 30.0 401.355 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 02 59 55 45.9451 -90.2732 472.000 122.0 399.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 04 55 45.9451 -90.2732 472.000 396.0 396.603 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 05 25 45.9451 -90.2732 472.000 396.0 396.608 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 05 55 45.9451 -90.2732 472.000 396.0 396.542 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 06 25 45.9451 -90.2732 472.000 396.0 396.392 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 06 55 45.9451 -90.2732 472.000 396.0 396.371 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 07 25 45.9451 -90.2732 472.000 396.0 396.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 07 55 45.9451 -90.2732 472.000 396.0 396.196 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 08 25 45.9451 -90.2732 472.000 396.0 396.206 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 08 55 45.9451 -90.2732 472.000 396.0 396.108 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 09 25 45.9451 -90.2732 472.000 396.0 396.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 09 55 45.9451 -90.2732 472.000 396.0 396.095 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 14 55 45.9451 -90.2732 472.000 30.0 401.698 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 19 55 45.9451 -90.2732 472.000 122.0 400.739 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 24 55 45.9451 -90.2732 472.000 396.0 396.584 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 29 55 45.9451 -90.2732 472.000 30.0 402.413 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 34 55 45.9451 -90.2732 472.000 122.0 399.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 39 55 45.9451 -90.2732 472.000 396.0 396.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 40 25 45.9451 -90.2732 472.000 396.0 396.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 40 55 45.9451 -90.2732 472.000 396.0 396.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 41 25 45.9451 -90.2732 472.000 396.0 396.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 41 55 45.9451 -90.2732 472.000 396.0 396.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 42 25 45.9451 -90.2732 472.000 396.0 396.731 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 42 55 45.9451 -90.2732 472.000 396.0 396.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 43 25 45.9451 -90.2732 472.000 396.0 396.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 43 55 45.9451 -90.2732 472.000 396.0 396.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 44 25 45.9451 -90.2732 472.000 396.0 396.735 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 44 55 45.9451 -90.2732 472.000 396.0 396.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 49 55 45.9451 -90.2732 472.000 30.0 402.342 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 54 55 45.9451 -90.2732 472.000 122.0 399.354 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 03 59 55 45.9451 -90.2732 472.000 396.0 396.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 04 55 45.9451 -90.2732 472.000 30.0 402.078 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 09 55 45.9451 -90.2732 472.000 122.0 399.354 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 14 55 45.9451 -90.2732 472.000 396.0 396.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 24 55 45.9451 -90.2732 472.000 30.0 402.383 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 29 55 45.9451 -90.2732 472.000 122.0 399.388 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 34 55 45.9451 -90.2732 472.000 396.0 396.044 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 39 55 45.9451 -90.2732 472.000 30.0 402.201 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 44 55 45.9451 -90.2732 472.000 122.0 399.429 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 49 55 45.9451 -90.2732 472.000 396.0 396.065 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 50 25 45.9451 -90.2732 472.000 396.0 396.018 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 50 55 45.9451 -90.2732 472.000 396.0 396.394 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 51 25 45.9451 -90.2732 472.000 396.0 396.521 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 51 55 45.9451 -90.2732 472.000 396.0 396.483 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 52 25 45.9451 -90.2732 472.000 396.0 396.701 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 52 55 45.9451 -90.2732 472.000 396.0 396.373 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 53 25 45.9451 -90.2732 472.000 396.0 396.604 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 53 55 45.9451 -90.2732 472.000 396.0 396.476 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 54 25 45.9451 -90.2732 472.000 396.0 396.852 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 04 54 55 45.9451 -90.2732 472.000 396.0 396.536 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 04 55 45.9451 -90.2732 472.000 30.0 403.205 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 09 55 45.9451 -90.2732 472.000 122.0 399.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 14 55 45.9451 -90.2732 472.000 396.0 397.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 19 55 45.9451 -90.2732 472.000 30.0 404.706 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 24 55 45.9451 -90.2732 472.000 122.0 399.706 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 29 55 45.9451 -90.2732 472.000 396.0 397.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 30 25 45.9451 -90.2732 472.000 396.0 397.072 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 30 55 45.9451 -90.2732 472.000 396.0 397.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 31 25 45.9451 -90.2732 472.000 396.0 397.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 31 55 45.9451 -90.2732 472.000 396.0 397.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 32 25 45.9451 -90.2732 472.000 396.0 397.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 32 55 45.9451 -90.2732 472.000 396.0 397.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 33 25 45.9451 -90.2732 472.000 396.0 397.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 33 55 45.9451 -90.2732 472.000 396.0 397.023 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 34 25 45.9451 -90.2732 472.000 396.0 396.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 34 55 45.9451 -90.2732 472.000 396.0 397.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 39 55 45.9451 -90.2732 472.000 30.0 406.267 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 44 55 45.9451 -90.2732 472.000 122.0 400.146 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 49 55 45.9451 -90.2732 472.000 396.0 397.203 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 54 55 45.9451 -90.2732 472.000 30.0 407.110 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 05 59 55 45.9451 -90.2732 472.000 122.0 400.078 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 04 55 45.9451 -90.2732 472.000 396.0 397.830 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 14 55 45.9451 -90.2732 472.000 30.0 405.143 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 19 55 45.9451 -90.2732 472.000 122.0 400.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 24 55 45.9451 -90.2732 472.000 396.0 397.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 29 55 45.9451 -90.2732 472.000 30.0 404.942 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 34 55 45.9451 -90.2732 472.000 122.0 399.393 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 39 55 45.9451 -90.2732 472.000 396.0 397.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 40 25 45.9451 -90.2732 472.000 396.0 397.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 40 55 45.9451 -90.2732 472.000 396.0 397.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 41 25 45.9451 -90.2732 472.000 396.0 397.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 41 55 45.9451 -90.2732 472.000 396.0 397.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 42 25 45.9451 -90.2732 472.000 396.0 396.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 42 55 45.9451 -90.2732 472.000 396.0 396.992 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 43 25 45.9451 -90.2732 472.000 396.0 396.998 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 43 55 45.9451 -90.2732 472.000 396.0 396.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 44 25 45.9451 -90.2732 472.000 396.0 396.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 44 55 45.9451 -90.2732 472.000 396.0 396.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 49 55 45.9451 -90.2732 472.000 30.0 404.420 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 54 55 45.9451 -90.2732 472.000 122.0 399.368 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 06 59 55 45.9451 -90.2732 472.000 396.0 396.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 04 55 45.9451 -90.2732 472.000 30.0 404.968 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 09 55 45.9451 -90.2732 472.000 122.0 399.194 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 14 55 45.9451 -90.2732 472.000 396.0 396.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 15 25 45.9451 -90.2732 472.000 396.0 396.599 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 15 55 45.9451 -90.2732 472.000 396.0 396.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 16 25 45.9451 -90.2732 472.000 396.0 396.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 16 55 45.9451 -90.2732 472.000 396.0 396.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 17 25 45.9451 -90.2732 472.000 396.0 396.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 17 55 45.9451 -90.2732 472.000 396.0 396.587 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 18 25 45.9451 -90.2732 472.000 396.0 396.607 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 18 55 45.9451 -90.2732 472.000 396.0 396.576 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 19 25 45.9451 -90.2732 472.000 396.0 396.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 19 55 45.9451 -90.2732 472.000 396.0 396.607 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 24 55 45.9451 -90.2732 472.000 30.0 405.577 0.400 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 29 55 45.9451 -90.2732 472.000 122.0 399.107 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 34 55 45.9451 -90.2732 472.000 396.0 396.375 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 39 55 45.9451 -90.2732 472.000 30.0 406.529 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 44 55 45.9451 -90.2732 472.000 122.0 399.569 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 49 55 45.9451 -90.2732 472.000 396.0 396.095 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 07 59 55 45.9451 -90.2732 472.000 30.0 407.215 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 04 55 45.9451 -90.2732 472.000 122.0 399.515 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 09 55 45.9451 -90.2732 472.000 396.0 396.038 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 14 55 45.9451 -90.2732 472.000 30.0 407.254 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 19 55 45.9451 -90.2732 472.000 122.0 399.818 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 24 55 45.9451 -90.2732 472.000 396.0 395.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 25 25 45.9451 -90.2732 472.000 396.0 395.802 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 25 55 45.9451 -90.2732 472.000 396.0 395.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 26 25 45.9451 -90.2732 472.000 396.0 395.802 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 26 55 45.9451 -90.2732 472.000 396.0 395.856 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 27 25 45.9451 -90.2732 472.000 396.0 395.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 27 55 45.9451 -90.2732 472.000 396.0 395.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 28 25 45.9451 -90.2732 472.000 396.0 395.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 28 55 45.9451 -90.2732 472.000 396.0 395.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 29 25 45.9451 -90.2732 472.000 396.0 395.900 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 29 55 45.9451 -90.2732 472.000 396.0 395.884 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 34 55 45.9451 -90.2732 472.000 30.0 407.975 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 39 55 45.9451 -90.2732 472.000 122.0 399.319 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 44 55 45.9451 -90.2732 472.000 396.0 395.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 49 55 45.9451 -90.2732 472.000 30.0 408.201 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 54 55 45.9451 -90.2732 472.000 122.0 399.362 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 08 08 59 55 45.9451 -90.2732 472.000 396.0 395.242 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 00 25 45.9451 -90.2732 472.000 396.0 394.915 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 00 55 45.9451 -90.2732 472.000 396.0 394.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 01 25 45.9451 -90.2732 472.000 396.0 394.784 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 01 55 45.9451 -90.2732 472.000 396.0 394.820 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 02 25 45.9451 -90.2732 472.000 396.0 394.872 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 02 55 45.9451 -90.2732 472.000 396.0 394.998 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 03 25 45.9451 -90.2732 472.000 396.0 394.972 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 03 55 45.9451 -90.2732 472.000 396.0 394.936 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 04 25 45.9451 -90.2732 472.000 396.0 395.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 04 55 45.9451 -90.2732 472.000 396.0 394.892 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 09 55 45.9451 -90.2732 472.000 30.0 408.137 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 14 55 45.9451 -90.2732 472.000 122.0 398.672 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 19 55 45.9451 -90.2732 472.000 396.0 394.485 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 24 55 45.9451 -90.2732 472.000 30.0 407.500 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 29 55 45.9451 -90.2732 472.000 122.0 399.824 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 34 55 45.9451 -90.2732 472.000 396.0 394.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 35 25 45.9451 -90.2732 472.000 396.0 394.586 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 35 55 45.9451 -90.2732 472.000 396.0 394.597 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 36 25 45.9451 -90.2732 472.000 396.0 394.623 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 36 55 45.9451 -90.2732 472.000 396.0 394.549 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 37 25 45.9451 -90.2732 472.000 396.0 394.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 37 55 45.9451 -90.2732 472.000 396.0 394.568 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 38 25 45.9451 -90.2732 472.000 396.0 394.618 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 38 55 45.9451 -90.2732 472.000 396.0 394.563 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 39 25 45.9451 -90.2732 472.000 396.0 394.522 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 39 55 45.9451 -90.2732 472.000 396.0 394.634 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 44 55 45.9451 -90.2732 472.000 30.0 408.424 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 49 55 45.9451 -90.2732 472.000 122.0 400.055 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 54 55 45.9451 -90.2732 472.000 396.0 394.275 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 09 59 55 45.9451 -90.2732 472.000 30.0 409.813 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 04 55 45.9451 -90.2732 472.000 122.0 401.442 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 09 55 45.9451 -90.2732 472.000 396.0 394.693 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 19 55 45.9451 -90.2732 472.000 30.0 410.750 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 24 55 45.9451 -90.2732 472.000 122.0 402.408 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 29 55 45.9451 -90.2732 472.000 396.0 394.212 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 34 55 45.9451 -90.2732 472.000 30.0 411.165 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 39 55 45.9451 -90.2732 472.000 122.0 404.607 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 44 55 45.9451 -90.2732 472.000 396.0 394.111 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 54 55 45.9451 -90.2732 472.000 30.0 411.524 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 10 59 55 45.9451 -90.2732 472.000 122.0 405.076 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 04 55 45.9451 -90.2732 472.000 396.0 394.409 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 09 55 45.9451 -90.2732 472.000 30.0 411.262 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 14 55 45.9451 -90.2732 472.000 122.0 405.308 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 19 55 45.9451 -90.2732 472.000 396.0 394.429 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 20 25 45.9451 -90.2732 472.000 396.0 394.448 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 20 55 45.9451 -90.2732 472.000 396.0 394.469 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 21 25 45.9451 -90.2732 472.000 396.0 394.495 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 21 55 45.9451 -90.2732 472.000 396.0 394.455 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 22 25 45.9451 -90.2732 472.000 396.0 394.426 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 22 55 45.9451 -90.2732 472.000 396.0 394.378 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 23 25 45.9451 -90.2732 472.000 396.0 394.359 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 23 55 45.9451 -90.2732 472.000 396.0 394.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 24 25 45.9451 -90.2732 472.000 396.0 394.376 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 24 55 45.9451 -90.2732 472.000 396.0 394.408 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 29 55 45.9451 -90.2732 472.000 30.0 410.201 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 34 55 45.9451 -90.2732 472.000 122.0 404.997 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 39 55 45.9451 -90.2732 472.000 396.0 394.429 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 44 55 45.9451 -90.2732 472.000 30.0 409.881 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 11 49 55 45.9451 -90.2732 472.000 122.0 404.553 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 14 55 45.9451 -90.2732 472.000 396.0 394.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 19 55 45.9451 -90.2732 472.000 30.0 409.146 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 24 55 45.9451 -90.2732 472.000 122.0 404.056 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 29 55 45.9451 -90.2732 472.000 396.0 394.715 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 34 55 45.9451 -90.2732 472.000 30.0 408.855 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 39 55 45.9451 -90.2732 472.000 122.0 404.188 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 44 55 45.9451 -90.2732 472.000 396.0 394.579 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 45 25 45.9451 -90.2732 472.000 396.0 394.560 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 45 55 45.9451 -90.2732 472.000 396.0 394.532 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 46 25 45.9451 -90.2732 472.000 396.0 394.519 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 46 55 45.9451 -90.2732 472.000 396.0 394.529 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 47 25 45.9451 -90.2732 472.000 396.0 394.535 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 47 55 45.9451 -90.2732 472.000 396.0 394.533 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 48 25 45.9451 -90.2732 472.000 396.0 394.543 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 48 55 45.9451 -90.2732 472.000 396.0 394.523 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 49 25 45.9451 -90.2732 472.000 396.0 394.507 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 49 55 45.9451 -90.2732 472.000 396.0 394.500 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 54 55 45.9451 -90.2732 472.000 30.0 408.388 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 12 59 55 45.9451 -90.2732 472.000 122.0 404.339 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 04 55 45.9451 -90.2732 472.000 396.0 394.592 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 09 55 45.9451 -90.2732 472.000 30.0 407.816 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 14 55 45.9451 -90.2732 472.000 122.0 404.526 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 19 55 45.9451 -90.2732 472.000 396.0 394.555 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 20 25 45.9451 -90.2732 472.000 396.0 394.565 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 20 55 45.9451 -90.2732 472.000 396.0 394.587 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 21 25 45.9451 -90.2732 472.000 396.0 394.579 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 21 55 45.9451 -90.2732 472.000 396.0 394.525 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 22 25 45.9451 -90.2732 472.000 396.0 394.471 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 22 55 45.9451 -90.2732 472.000 396.0 394.470 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 23 25 45.9451 -90.2732 472.000 396.0 394.479 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 23 55 45.9451 -90.2732 472.000 396.0 394.507 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 24 25 45.9451 -90.2732 472.000 396.0 394.540 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 24 55 45.9451 -90.2732 472.000 396.0 394.563 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 29 55 45.9451 -90.2732 472.000 30.0 407.334 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 34 55 45.9451 -90.2732 472.000 122.0 404.737 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 39 55 45.9451 -90.2732 472.000 396.0 394.486 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 44 55 45.9451 -90.2732 472.000 30.0 407.000 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 49 55 45.9451 -90.2732 472.000 122.0 405.068 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 13 54 55 45.9451 -90.2732 472.000 396.0 394.579 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 04 55 45.9451 -90.2732 472.000 30.0 406.469 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 09 55 45.9451 -90.2732 472.000 122.0 405.246 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 14 55 45.9451 -90.2732 472.000 396.0 394.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 19 55 45.9451 -90.2732 472.000 30.0 406.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 24 55 45.9451 -90.2732 472.000 122.0 406.412 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 29 55 45.9451 -90.2732 472.000 396.0 394.077 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 30 25 45.9451 -90.2732 472.000 396.0 394.196 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 30 55 45.9451 -90.2732 472.000 396.0 394.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 31 25 45.9451 -90.2732 472.000 396.0 394.141 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 31 55 45.9451 -90.2732 472.000 396.0 394.356 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 32 25 45.9451 -90.2732 472.000 396.0 394.351 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 32 55 45.9451 -90.2732 472.000 396.0 394.551 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 33 25 45.9451 -90.2732 472.000 396.0 394.672 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 33 55 45.9451 -90.2732 472.000 396.0 394.598 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 34 25 45.9451 -90.2732 472.000 396.0 394.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 34 55 45.9451 -90.2732 472.000 396.0 394.664 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 39 55 45.9451 -90.2732 472.000 30.0 407.113 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 44 55 45.9451 -90.2732 472.000 122.0 406.396 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 49 55 45.9451 -90.2732 472.000 396.0 394.306 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 54 55 45.9451 -90.2732 472.000 30.0 406.061 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 14 59 55 45.9451 -90.2732 472.000 122.0 405.221 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 04 55 45.9451 -90.2732 472.000 396.0 394.999 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 05 25 45.9451 -90.2732 472.000 396.0 394.920 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 05 55 45.9451 -90.2732 472.000 396.0 395.070 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 06 25 45.9451 -90.2732 472.000 396.0 394.875 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 06 55 45.9451 -90.2732 472.000 396.0 394.947 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 07 25 45.9451 -90.2732 472.000 396.0 394.965 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 07 55 45.9451 -90.2732 472.000 396.0 395.079 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 08 25 45.9451 -90.2732 472.000 396.0 395.724 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 08 55 45.9451 -90.2732 472.000 396.0 395.181 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 09 25 45.9451 -90.2732 472.000 396.0 395.367 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 09 55 45.9451 -90.2732 472.000 396.0 396.126 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 14 55 45.9451 -90.2732 472.000 30.0 404.621 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 19 55 45.9451 -90.2732 472.000 122.0 404.518 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 24 55 45.9451 -90.2732 472.000 396.0 395.917 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 29 55 45.9451 -90.2732 472.000 30.0 403.858 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 34 55 45.9451 -90.2732 472.000 122.0 403.745 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 39 55 45.9451 -90.2732 472.000 396.0 396.896 0.670 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 40 25 45.9451 -90.2732 472.000 396.0 397.116 0.740 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 40 55 45.9451 -90.2732 472.000 396.0 395.820 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 41 25 45.9451 -90.2732 472.000 396.0 399.033 1.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 41 55 45.9451 -90.2732 472.000 396.0 398.186 0.900 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 42 25 45.9451 -90.2732 472.000 396.0 397.197 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 42 55 45.9451 -90.2732 472.000 396.0 396.591 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 43 25 45.9451 -90.2732 472.000 396.0 397.180 0.640 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 43 55 45.9451 -90.2732 472.000 396.0 396.795 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 44 25 45.9451 -90.2732 472.000 396.0 397.135 1.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 44 55 45.9451 -90.2732 472.000 396.0 396.676 0.820 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 49 55 45.9451 -90.2732 472.000 30.0 402.928 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 54 55 45.9451 -90.2732 472.000 122.0 402.780 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 15 59 55 45.9451 -90.2732 472.000 396.0 397.840 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 04 55 45.9451 -90.2732 472.000 30.0 401.953 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 09 55 45.9451 -90.2732 472.000 122.0 401.637 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 14 55 45.9451 -90.2732 472.000 396.0 399.270 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 24 55 45.9451 -90.2732 472.000 30.0 401.307 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 29 55 45.9451 -90.2732 472.000 122.0 401.294 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 34 55 45.9451 -90.2732 472.000 396.0 399.406 1.030 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 39 55 45.9451 -90.2732 472.000 30.0 401.238 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 44 55 45.9451 -90.2732 472.000 122.0 401.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 49 55 45.9451 -90.2732 472.000 396.0 399.248 0.450 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 50 25 45.9451 -90.2732 472.000 396.0 398.701 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 50 55 45.9451 -90.2732 472.000 396.0 398.678 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 51 25 45.9451 -90.2732 472.000 396.0 398.908 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 51 55 45.9451 -90.2732 472.000 396.0 398.461 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 52 25 45.9451 -90.2732 472.000 396.0 399.791 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 52 55 45.9451 -90.2732 472.000 396.0 399.712 0.820 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 53 25 45.9451 -90.2732 472.000 396.0 398.757 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 53 55 45.9451 -90.2732 472.000 396.0 397.853 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 54 25 45.9451 -90.2732 472.000 396.0 398.616 0.680 -999.990 -999.990 0.070 ..P LEF 2010 11 08 16 54 55 45.9451 -90.2732 472.000 396.0 398.459 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 04 55 45.9451 -90.2732 472.000 30.0 401.281 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 09 55 45.9451 -90.2732 472.000 122.0 401.238 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 14 55 45.9451 -90.2732 472.000 396.0 399.180 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 19 55 45.9451 -90.2732 472.000 30.0 400.711 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 24 55 45.9451 -90.2732 472.000 122.0 400.671 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 29 55 45.9451 -90.2732 472.000 396.0 399.573 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 30 25 45.9451 -90.2732 472.000 396.0 399.459 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 30 55 45.9451 -90.2732 472.000 396.0 399.264 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 31 25 45.9451 -90.2732 472.000 396.0 399.538 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 31 55 45.9451 -90.2732 472.000 396.0 399.612 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 32 25 45.9451 -90.2732 472.000 396.0 399.058 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 32 55 45.9451 -90.2732 472.000 396.0 399.082 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 33 25 45.9451 -90.2732 472.000 396.0 399.075 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 33 55 45.9451 -90.2732 472.000 396.0 399.025 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 34 25 45.9451 -90.2732 472.000 396.0 398.759 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 34 55 45.9451 -90.2732 472.000 396.0 398.730 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 39 55 45.9451 -90.2732 472.000 30.0 399.672 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 44 55 45.9451 -90.2732 472.000 122.0 399.696 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 49 55 45.9451 -90.2732 472.000 396.0 398.606 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 54 55 45.9451 -90.2732 472.000 30.0 399.519 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 17 59 55 45.9451 -90.2732 472.000 122.0 399.708 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 04 55 45.9451 -90.2732 472.000 396.0 398.821 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 14 55 45.9451 -90.2732 472.000 30.0 399.362 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 19 55 45.9451 -90.2732 472.000 122.0 399.648 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 24 55 45.9451 -90.2732 472.000 396.0 398.671 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 29 55 45.9451 -90.2732 472.000 30.0 399.172 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 34 55 45.9451 -90.2732 472.000 122.0 399.234 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 39 55 45.9451 -90.2732 472.000 396.0 398.921 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 40 25 45.9451 -90.2732 472.000 396.0 398.797 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 40 55 45.9451 -90.2732 472.000 396.0 398.823 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 41 25 45.9451 -90.2732 472.000 396.0 398.599 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 41 55 45.9451 -90.2732 472.000 396.0 398.678 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 42 25 45.9451 -90.2732 472.000 396.0 398.043 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 42 55 45.9451 -90.2732 472.000 396.0 397.845 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 43 25 45.9451 -90.2732 472.000 396.0 398.642 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 43 55 45.9451 -90.2732 472.000 396.0 398.748 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 44 25 45.9451 -90.2732 472.000 396.0 398.832 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 44 55 45.9451 -90.2732 472.000 396.0 398.467 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 49 55 45.9451 -90.2732 472.000 30.0 398.820 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 54 55 45.9451 -90.2732 472.000 122.0 398.855 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 18 59 55 45.9451 -90.2732 472.000 396.0 398.498 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 04 55 45.9451 -90.2732 472.000 30.0 398.504 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 09 55 45.9451 -90.2732 472.000 122.0 398.683 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 14 55 45.9451 -90.2732 472.000 396.0 398.189 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 15 25 45.9451 -90.2732 472.000 396.0 398.199 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 15 55 45.9451 -90.2732 472.000 396.0 397.982 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 16 25 45.9451 -90.2732 472.000 396.0 397.773 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 16 55 45.9451 -90.2732 472.000 396.0 398.008 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 17 25 45.9451 -90.2732 472.000 396.0 397.906 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 17 55 45.9451 -90.2732 472.000 396.0 398.184 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 18 25 45.9451 -90.2732 472.000 396.0 398.476 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 18 55 45.9451 -90.2732 472.000 396.0 398.150 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 19 25 45.9451 -90.2732 472.000 396.0 397.582 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 19 55 45.9451 -90.2732 472.000 396.0 397.876 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 24 55 45.9451 -90.2732 472.000 30.0 398.493 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 29 55 45.9451 -90.2732 472.000 122.0 398.322 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 34 55 45.9451 -90.2732 472.000 396.0 397.726 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 39 55 45.9451 -90.2732 472.000 30.0 398.112 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 44 55 45.9451 -90.2732 472.000 122.0 398.601 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 49 55 45.9451 -90.2732 472.000 396.0 397.968 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 08 19 59 55 45.9451 -90.2732 472.000 30.0 398.246 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 04 55 45.9451 -90.2732 472.000 122.0 398.179 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 09 55 45.9451 -90.2732 472.000 396.0 397.787 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 14 55 45.9451 -90.2732 472.000 30.0 397.766 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 19 55 45.9451 -90.2732 472.000 122.0 397.798 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 24 55 45.9451 -90.2732 472.000 396.0 397.594 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 25 25 45.9451 -90.2732 472.000 396.0 397.686 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 25 55 45.9451 -90.2732 472.000 396.0 397.508 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 26 25 45.9451 -90.2732 472.000 396.0 397.618 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 26 55 45.9451 -90.2732 472.000 396.0 397.634 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 27 25 45.9451 -90.2732 472.000 396.0 397.592 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 27 55 45.9451 -90.2732 472.000 396.0 397.413 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 28 25 45.9451 -90.2732 472.000 396.0 397.364 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 28 55 45.9451 -90.2732 472.000 396.0 397.283 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 29 25 45.9451 -90.2732 472.000 396.0 397.444 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 29 55 45.9451 -90.2732 472.000 396.0 397.530 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 34 55 45.9451 -90.2732 472.000 30.0 397.611 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 39 55 45.9451 -90.2732 472.000 122.0 397.628 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 44 55 45.9451 -90.2732 472.000 396.0 397.298 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 49 55 45.9451 -90.2732 472.000 30.0 397.705 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 54 55 45.9451 -90.2732 472.000 122.0 397.565 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 20 59 55 45.9451 -90.2732 472.000 396.0 397.492 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 00 25 45.9451 -90.2732 472.000 396.0 397.392 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 00 55 45.9451 -90.2732 472.000 396.0 397.421 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 01 25 45.9451 -90.2732 472.000 396.0 397.464 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 01 55 45.9451 -90.2732 472.000 396.0 397.482 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 02 25 45.9451 -90.2732 472.000 396.0 397.459 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 02 55 45.9451 -90.2732 472.000 396.0 397.459 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 03 25 45.9451 -90.2732 472.000 396.0 397.354 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 03 55 45.9451 -90.2732 472.000 396.0 397.464 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 04 25 45.9451 -90.2732 472.000 396.0 397.456 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 04 55 45.9451 -90.2732 472.000 396.0 397.416 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 09 55 45.9451 -90.2732 472.000 30.0 397.868 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 14 55 45.9451 -90.2732 472.000 122.0 397.895 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 19 55 45.9451 -90.2732 472.000 396.0 397.217 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 24 55 45.9451 -90.2732 472.000 30.0 398.183 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 29 55 45.9451 -90.2732 472.000 122.0 398.134 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 34 55 45.9451 -90.2732 472.000 396.0 397.248 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 35 25 45.9451 -90.2732 472.000 396.0 397.368 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 35 55 45.9451 -90.2732 472.000 396.0 397.311 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 36 25 45.9451 -90.2732 472.000 396.0 397.312 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 36 55 45.9451 -90.2732 472.000 396.0 397.317 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 37 25 45.9451 -90.2732 472.000 396.0 397.376 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 37 55 45.9451 -90.2732 472.000 396.0 397.462 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 38 25 45.9451 -90.2732 472.000 396.0 397.512 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 38 55 45.9451 -90.2732 472.000 396.0 397.388 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 39 25 45.9451 -90.2732 472.000 396.0 397.435 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 39 55 45.9451 -90.2732 472.000 396.0 397.511 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 44 55 45.9451 -90.2732 472.000 30.0 398.341 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 49 55 45.9451 -90.2732 472.000 122.0 398.180 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 54 55 45.9451 -90.2732 472.000 396.0 397.575 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 21 59 55 45.9451 -90.2732 472.000 30.0 398.307 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 04 55 45.9451 -90.2732 472.000 122.0 398.338 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 09 55 45.9451 -90.2732 472.000 396.0 397.709 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 19 55 45.9451 -90.2732 472.000 30.0 398.680 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 24 55 45.9451 -90.2732 472.000 122.0 398.501 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 29 55 45.9451 -90.2732 472.000 396.0 398.783 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 34 55 45.9451 -90.2732 472.000 30.0 399.083 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 39 55 45.9451 -90.2732 472.000 122.0 398.820 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 44 55 45.9451 -90.2732 472.000 396.0 399.309 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 54 55 45.9451 -90.2732 472.000 30.0 399.397 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 22 59 55 45.9451 -90.2732 472.000 122.0 399.698 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 04 55 45.9451 -90.2732 472.000 396.0 399.896 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 09 55 45.9451 -90.2732 472.000 30.0 400.599 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 14 55 45.9451 -90.2732 472.000 122.0 400.681 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 19 55 45.9451 -90.2732 472.000 396.0 400.867 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 20 25 45.9451 -90.2732 472.000 396.0 400.860 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 20 55 45.9451 -90.2732 472.000 396.0 400.770 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 21 25 45.9451 -90.2732 472.000 396.0 400.755 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 21 55 45.9451 -90.2732 472.000 396.0 400.895 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 22 25 45.9451 -90.2732 472.000 396.0 401.161 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 22 55 45.9451 -90.2732 472.000 396.0 401.095 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 23 25 45.9451 -90.2732 472.000 396.0 400.911 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 23 55 45.9451 -90.2732 472.000 396.0 400.971 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 24 25 45.9451 -90.2732 472.000 396.0 401.258 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 24 55 45.9451 -90.2732 472.000 396.0 401.215 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 29 55 45.9451 -90.2732 472.000 30.0 401.991 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 34 55 45.9451 -90.2732 472.000 122.0 401.810 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 39 55 45.9451 -90.2732 472.000 396.0 402.053 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 44 55 45.9451 -90.2732 472.000 30.0 402.530 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 08 23 49 55 45.9451 -90.2732 472.000 122.0 402.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 14 55 45.9451 -90.2732 472.000 396.0 402.221 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 19 55 45.9451 -90.2732 472.000 30.0 404.575 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 24 55 45.9451 -90.2732 472.000 122.0 404.612 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 29 55 45.9451 -90.2732 472.000 396.0 403.095 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 34 55 45.9451 -90.2732 472.000 30.0 405.703 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 39 55 45.9451 -90.2732 472.000 122.0 406.374 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 44 55 45.9451 -90.2732 472.000 396.0 402.327 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 45 25 45.9451 -90.2732 472.000 396.0 403.222 0.470 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 45 55 45.9451 -90.2732 472.000 396.0 402.489 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 46 25 45.9451 -90.2732 472.000 396.0 403.103 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 46 55 45.9451 -90.2732 472.000 396.0 403.546 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 47 25 45.9451 -90.2732 472.000 396.0 402.584 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 47 55 45.9451 -90.2732 472.000 396.0 402.826 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 48 25 45.9451 -90.2732 472.000 396.0 402.082 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 48 55 45.9451 -90.2732 472.000 396.0 401.617 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 49 25 45.9451 -90.2732 472.000 396.0 401.604 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 49 55 45.9451 -90.2732 472.000 396.0 401.230 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 54 55 45.9451 -90.2732 472.000 30.0 407.132 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 00 59 55 45.9451 -90.2732 472.000 122.0 406.524 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 04 55 45.9451 -90.2732 472.000 396.0 401.498 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 09 55 45.9451 -90.2732 472.000 30.0 406.773 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 14 55 45.9451 -90.2732 472.000 122.0 406.234 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 19 55 45.9451 -90.2732 472.000 396.0 400.920 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 20 25 45.9451 -90.2732 472.000 396.0 400.842 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 20 55 45.9451 -90.2732 472.000 396.0 400.844 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 21 25 45.9451 -90.2732 472.000 396.0 400.968 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 21 55 45.9451 -90.2732 472.000 396.0 400.879 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 22 25 45.9451 -90.2732 472.000 396.0 400.853 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 22 55 45.9451 -90.2732 472.000 396.0 400.734 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 23 25 45.9451 -90.2732 472.000 396.0 400.903 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 23 55 45.9451 -90.2732 472.000 396.0 401.068 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 24 25 45.9451 -90.2732 472.000 396.0 401.002 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 24 55 45.9451 -90.2732 472.000 396.0 400.806 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 29 55 45.9451 -90.2732 472.000 30.0 407.101 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 34 55 45.9451 -90.2732 472.000 122.0 406.415 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 39 55 45.9451 -90.2732 472.000 396.0 401.932 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 44 55 45.9451 -90.2732 472.000 30.0 407.256 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 49 55 45.9451 -90.2732 472.000 122.0 406.060 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 01 54 55 45.9451 -90.2732 472.000 396.0 402.531 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 04 55 45.9451 -90.2732 472.000 30.0 406.812 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 09 55 45.9451 -90.2732 472.000 122.0 405.969 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 14 55 45.9451 -90.2732 472.000 396.0 402.157 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 19 55 45.9451 -90.2732 472.000 30.0 406.678 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 24 55 45.9451 -90.2732 472.000 122.0 406.306 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 29 55 45.9451 -90.2732 472.000 396.0 402.000 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 30 25 45.9451 -90.2732 472.000 396.0 402.108 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 30 55 45.9451 -90.2732 472.000 396.0 402.055 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 31 25 45.9451 -90.2732 472.000 396.0 402.084 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 31 55 45.9451 -90.2732 472.000 396.0 402.154 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 32 25 45.9451 -90.2732 472.000 396.0 402.165 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 32 55 45.9451 -90.2732 472.000 396.0 402.146 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 33 25 45.9451 -90.2732 472.000 396.0 402.304 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 33 55 45.9451 -90.2732 472.000 396.0 402.387 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 34 25 45.9451 -90.2732 472.000 396.0 402.971 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 34 55 45.9451 -90.2732 472.000 396.0 403.142 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 39 55 45.9451 -90.2732 472.000 30.0 407.227 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 44 55 45.9451 -90.2732 472.000 122.0 406.841 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 49 55 45.9451 -90.2732 472.000 396.0 403.474 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 54 55 45.9451 -90.2732 472.000 30.0 407.757 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 02 59 55 45.9451 -90.2732 472.000 122.0 407.156 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 04 55 45.9451 -90.2732 472.000 396.0 403.178 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 05 25 45.9451 -90.2732 472.000 396.0 403.018 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 05 55 45.9451 -90.2732 472.000 396.0 403.006 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 06 25 45.9451 -90.2732 472.000 396.0 402.991 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 06 55 45.9451 -90.2732 472.000 396.0 402.979 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 07 25 45.9451 -90.2732 472.000 396.0 403.154 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 07 55 45.9451 -90.2732 472.000 396.0 402.935 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 08 25 45.9451 -90.2732 472.000 396.0 403.095 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 08 55 45.9451 -90.2732 472.000 396.0 403.233 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 09 25 45.9451 -90.2732 472.000 396.0 403.660 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 09 55 45.9451 -90.2732 472.000 396.0 403.691 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 14 55 45.9451 -90.2732 472.000 30.0 407.778 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 19 55 45.9451 -90.2732 472.000 122.0 407.269 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 24 55 45.9451 -90.2732 472.000 396.0 403.452 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 29 55 45.9451 -90.2732 472.000 30.0 408.146 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 34 55 45.9451 -90.2732 472.000 122.0 407.997 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 39 55 45.9451 -90.2732 472.000 396.0 403.137 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 40 25 45.9451 -90.2732 472.000 396.0 404.057 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 40 55 45.9451 -90.2732 472.000 396.0 403.720 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 41 25 45.9451 -90.2732 472.000 396.0 403.848 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 41 55 45.9451 -90.2732 472.000 396.0 403.701 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 42 25 45.9451 -90.2732 472.000 396.0 403.270 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 42 55 45.9451 -90.2732 472.000 396.0 403.414 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 43 25 45.9451 -90.2732 472.000 396.0 403.100 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 43 55 45.9451 -90.2732 472.000 396.0 403.234 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 44 25 45.9451 -90.2732 472.000 396.0 403.515 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 44 55 45.9451 -90.2732 472.000 396.0 403.233 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 49 55 45.9451 -90.2732 472.000 30.0 408.753 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 54 55 45.9451 -90.2732 472.000 122.0 408.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 03 59 55 45.9451 -90.2732 472.000 396.0 401.765 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 04 55 45.9451 -90.2732 472.000 30.0 408.823 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 09 55 45.9451 -90.2732 472.000 122.0 408.591 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 14 55 45.9451 -90.2732 472.000 396.0 401.722 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 24 55 45.9451 -90.2732 472.000 30.0 409.165 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 29 55 45.9451 -90.2732 472.000 122.0 409.083 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 34 55 45.9451 -90.2732 472.000 396.0 398.224 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 39 55 45.9451 -90.2732 472.000 30.0 409.499 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 44 55 45.9451 -90.2732 472.000 122.0 409.391 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 49 55 45.9451 -90.2732 472.000 396.0 399.034 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 50 25 45.9451 -90.2732 472.000 396.0 399.126 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 50 55 45.9451 -90.2732 472.000 396.0 399.474 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 51 25 45.9451 -90.2732 472.000 396.0 399.502 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 51 55 45.9451 -90.2732 472.000 396.0 399.421 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 52 25 45.9451 -90.2732 472.000 396.0 399.298 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 52 55 45.9451 -90.2732 472.000 396.0 399.248 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 53 25 45.9451 -90.2732 472.000 396.0 399.074 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 53 55 45.9451 -90.2732 472.000 396.0 398.826 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 54 25 45.9451 -90.2732 472.000 396.0 398.795 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 04 54 55 45.9451 -90.2732 472.000 396.0 398.869 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 04 55 45.9451 -90.2732 472.000 30.0 410.919 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 09 55 45.9451 -90.2732 472.000 122.0 410.674 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 14 55 45.9451 -90.2732 472.000 396.0 399.080 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 19 55 45.9451 -90.2732 472.000 30.0 411.832 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 24 55 45.9451 -90.2732 472.000 122.0 411.308 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 29 55 45.9451 -90.2732 472.000 396.0 398.448 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 30 25 45.9451 -90.2732 472.000 396.0 398.507 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 30 55 45.9451 -90.2732 472.000 396.0 398.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 31 25 45.9451 -90.2732 472.000 396.0 398.533 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 31 55 45.9451 -90.2732 472.000 396.0 398.596 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 32 25 45.9451 -90.2732 472.000 396.0 398.685 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 32 55 45.9451 -90.2732 472.000 396.0 398.852 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 33 25 45.9451 -90.2732 472.000 396.0 398.883 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 33 55 45.9451 -90.2732 472.000 396.0 398.759 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 34 25 45.9451 -90.2732 472.000 396.0 398.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 34 55 45.9451 -90.2732 472.000 396.0 398.667 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 39 55 45.9451 -90.2732 472.000 30.0 412.634 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 44 55 45.9451 -90.2732 472.000 122.0 411.896 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 49 55 45.9451 -90.2732 472.000 396.0 397.802 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 54 55 45.9451 -90.2732 472.000 30.0 413.099 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 05 59 55 45.9451 -90.2732 472.000 122.0 412.231 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 04 55 45.9451 -90.2732 472.000 396.0 397.568 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 14 55 45.9451 -90.2732 472.000 30.0 413.599 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 19 55 45.9451 -90.2732 472.000 122.0 412.398 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 24 55 45.9451 -90.2732 472.000 396.0 397.384 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 29 55 45.9451 -90.2732 472.000 30.0 414.024 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 34 55 45.9451 -90.2732 472.000 122.0 412.626 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 39 55 45.9451 -90.2732 472.000 396.0 397.276 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 40 25 45.9451 -90.2732 472.000 396.0 397.252 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 40 55 45.9451 -90.2732 472.000 396.0 397.276 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 41 25 45.9451 -90.2732 472.000 396.0 397.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 41 55 45.9451 -90.2732 472.000 396.0 397.279 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 42 25 45.9451 -90.2732 472.000 396.0 397.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 42 55 45.9451 -90.2732 472.000 396.0 397.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 43 25 45.9451 -90.2732 472.000 396.0 397.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 43 55 45.9451 -90.2732 472.000 396.0 397.285 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 44 25 45.9451 -90.2732 472.000 396.0 397.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 44 55 45.9451 -90.2732 472.000 396.0 397.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 49 55 45.9451 -90.2732 472.000 30.0 414.443 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 54 55 45.9451 -90.2732 472.000 122.0 412.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 06 59 55 45.9451 -90.2732 472.000 396.0 397.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 04 55 45.9451 -90.2732 472.000 30.0 414.577 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 09 55 45.9451 -90.2732 472.000 122.0 412.973 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 14 55 45.9451 -90.2732 472.000 396.0 397.370 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 15 25 45.9451 -90.2732 472.000 396.0 397.361 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 15 55 45.9451 -90.2732 472.000 396.0 397.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 16 25 45.9451 -90.2732 472.000 396.0 397.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 16 55 45.9451 -90.2732 472.000 396.0 397.335 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 17 25 45.9451 -90.2732 472.000 396.0 397.345 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 17 55 45.9451 -90.2732 472.000 396.0 397.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 18 25 45.9451 -90.2732 472.000 396.0 397.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 18 55 45.9451 -90.2732 472.000 396.0 397.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 19 25 45.9451 -90.2732 472.000 396.0 397.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 19 55 45.9451 -90.2732 472.000 396.0 397.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 24 55 45.9451 -90.2732 472.000 30.0 414.875 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 29 55 45.9451 -90.2732 472.000 122.0 412.973 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 34 55 45.9451 -90.2732 472.000 396.0 397.469 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 39 55 45.9451 -90.2732 472.000 30.0 415.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 44 55 45.9451 -90.2732 472.000 122.0 413.219 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 49 55 45.9451 -90.2732 472.000 396.0 397.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 07 59 55 45.9451 -90.2732 472.000 30.0 415.027 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 04 55 45.9451 -90.2732 472.000 122.0 413.344 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 09 55 45.9451 -90.2732 472.000 396.0 397.466 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 14 55 45.9451 -90.2732 472.000 30.0 415.077 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 19 55 45.9451 -90.2732 472.000 122.0 413.461 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 24 55 45.9451 -90.2732 472.000 396.0 397.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 25 25 45.9451 -90.2732 472.000 396.0 397.373 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 25 55 45.9451 -90.2732 472.000 396.0 397.369 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 26 25 45.9451 -90.2732 472.000 396.0 397.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 26 55 45.9451 -90.2732 472.000 396.0 397.394 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 27 25 45.9451 -90.2732 472.000 396.0 397.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 27 55 45.9451 -90.2732 472.000 396.0 397.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 28 25 45.9451 -90.2732 472.000 396.0 397.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 28 55 45.9451 -90.2732 472.000 396.0 397.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 29 25 45.9451 -90.2732 472.000 396.0 397.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 29 55 45.9451 -90.2732 472.000 396.0 397.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 34 55 45.9451 -90.2732 472.000 30.0 415.381 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 39 55 45.9451 -90.2732 472.000 122.0 414.083 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 44 55 45.9451 -90.2732 472.000 396.0 397.268 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 49 55 45.9451 -90.2732 472.000 30.0 416.092 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 54 55 45.9451 -90.2732 472.000 122.0 414.245 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 08 59 55 45.9451 -90.2732 472.000 396.0 397.762 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 00 25 45.9451 -90.2732 472.000 396.0 397.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 00 55 45.9451 -90.2732 472.000 396.0 397.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 01 25 45.9451 -90.2732 472.000 396.0 397.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 01 55 45.9451 -90.2732 472.000 396.0 397.683 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 02 25 45.9451 -90.2732 472.000 396.0 397.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 02 55 45.9451 -90.2732 472.000 396.0 397.644 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 03 25 45.9451 -90.2732 472.000 396.0 397.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 03 55 45.9451 -90.2732 472.000 396.0 397.590 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 04 25 45.9451 -90.2732 472.000 396.0 397.571 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 04 55 45.9451 -90.2732 472.000 396.0 397.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 09 55 45.9451 -90.2732 472.000 30.0 416.367 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 14 55 45.9451 -90.2732 472.000 122.0 414.096 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 19 55 45.9451 -90.2732 472.000 396.0 397.201 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 24 55 45.9451 -90.2732 472.000 30.0 416.356 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 29 55 45.9451 -90.2732 472.000 122.0 414.045 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 34 55 45.9451 -90.2732 472.000 396.0 397.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 35 25 45.9451 -90.2732 472.000 396.0 397.039 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 35 55 45.9451 -90.2732 472.000 396.0 397.025 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 36 25 45.9451 -90.2732 472.000 396.0 397.027 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 36 55 45.9451 -90.2732 472.000 396.0 397.008 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 37 25 45.9451 -90.2732 472.000 396.0 396.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 37 55 45.9451 -90.2732 472.000 396.0 396.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 38 25 45.9451 -90.2732 472.000 396.0 396.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 38 55 45.9451 -90.2732 472.000 396.0 396.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 39 25 45.9451 -90.2732 472.000 396.0 396.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 39 55 45.9451 -90.2732 472.000 396.0 396.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 44 55 45.9451 -90.2732 472.000 30.0 415.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 49 55 45.9451 -90.2732 472.000 122.0 413.554 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 54 55 45.9451 -90.2732 472.000 396.0 396.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 09 59 55 45.9451 -90.2732 472.000 30.0 415.779 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 04 55 45.9451 -90.2732 472.000 122.0 413.642 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 09 55 45.9451 -90.2732 472.000 396.0 396.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 19 55 45.9451 -90.2732 472.000 30.0 415.798 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 24 55 45.9451 -90.2732 472.000 122.0 413.416 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 29 55 45.9451 -90.2732 472.000 396.0 396.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 34 55 45.9451 -90.2732 472.000 30.0 415.810 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 39 55 45.9451 -90.2732 472.000 122.0 413.827 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 44 55 45.9451 -90.2732 472.000 396.0 396.462 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 54 55 45.9451 -90.2732 472.000 30.0 416.135 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 10 59 55 45.9451 -90.2732 472.000 122.0 413.860 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 04 55 45.9451 -90.2732 472.000 396.0 396.389 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 09 55 45.9451 -90.2732 472.000 30.0 416.139 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 14 55 45.9451 -90.2732 472.000 122.0 413.410 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 19 55 45.9451 -90.2732 472.000 396.0 396.317 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 20 25 45.9451 -90.2732 472.000 396.0 396.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 20 55 45.9451 -90.2732 472.000 396.0 396.259 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 21 25 45.9451 -90.2732 472.000 396.0 396.264 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 21 55 45.9451 -90.2732 472.000 396.0 396.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 22 25 45.9451 -90.2732 472.000 396.0 396.248 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 22 55 45.9451 -90.2732 472.000 396.0 396.212 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 23 25 45.9451 -90.2732 472.000 396.0 396.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 23 55 45.9451 -90.2732 472.000 396.0 396.211 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 24 25 45.9451 -90.2732 472.000 396.0 396.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 24 55 45.9451 -90.2732 472.000 396.0 396.245 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 29 55 45.9451 -90.2732 472.000 30.0 416.107 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 34 55 45.9451 -90.2732 472.000 122.0 411.822 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 39 55 45.9451 -90.2732 472.000 396.0 396.204 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 44 55 45.9451 -90.2732 472.000 30.0 416.176 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 11 49 55 45.9451 -90.2732 472.000 122.0 411.484 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 14 55 45.9451 -90.2732 472.000 396.0 396.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 19 55 45.9451 -90.2732 472.000 30.0 416.338 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 24 55 45.9451 -90.2732 472.000 122.0 408.645 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 29 55 45.9451 -90.2732 472.000 396.0 396.385 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 34 55 45.9451 -90.2732 472.000 30.0 416.211 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 39 55 45.9451 -90.2732 472.000 122.0 409.385 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 44 55 45.9451 -90.2732 472.000 396.0 396.617 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 45 25 45.9451 -90.2732 472.000 396.0 396.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 45 55 45.9451 -90.2732 472.000 396.0 396.580 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 46 25 45.9451 -90.2732 472.000 396.0 396.592 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 46 55 45.9451 -90.2732 472.000 396.0 396.586 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 47 25 45.9451 -90.2732 472.000 396.0 396.572 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 47 55 45.9451 -90.2732 472.000 396.0 396.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 48 25 45.9451 -90.2732 472.000 396.0 396.571 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 48 55 45.9451 -90.2732 472.000 396.0 396.607 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 49 25 45.9451 -90.2732 472.000 396.0 396.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 49 55 45.9451 -90.2732 472.000 396.0 396.589 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 54 55 45.9451 -90.2732 472.000 30.0 416.045 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 09 12 59 55 45.9451 -90.2732 472.000 122.0 411.281 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 04 55 45.9451 -90.2732 472.000 396.0 396.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 09 55 45.9451 -90.2732 472.000 30.0 415.856 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 14 55 45.9451 -90.2732 472.000 122.0 412.269 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 19 55 45.9451 -90.2732 472.000 396.0 396.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 20 25 45.9451 -90.2732 472.000 396.0 396.367 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 20 55 45.9451 -90.2732 472.000 396.0 396.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 21 25 45.9451 -90.2732 472.000 396.0 396.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 21 55 45.9451 -90.2732 472.000 396.0 396.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 22 25 45.9451 -90.2732 472.000 396.0 396.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 22 55 45.9451 -90.2732 472.000 396.0 396.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 23 25 45.9451 -90.2732 472.000 396.0 396.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 23 55 45.9451 -90.2732 472.000 396.0 396.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 24 25 45.9451 -90.2732 472.000 396.0 396.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 24 55 45.9451 -90.2732 472.000 396.0 396.434 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 29 55 45.9451 -90.2732 472.000 30.0 415.848 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 34 55 45.9451 -90.2732 472.000 122.0 411.655 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 39 55 45.9451 -90.2732 472.000 396.0 396.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 44 55 45.9451 -90.2732 472.000 30.0 415.471 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 49 55 45.9451 -90.2732 472.000 122.0 413.667 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 09 13 54 55 45.9451 -90.2732 472.000 396.0 396.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 04 55 45.9451 -90.2732 472.000 30.0 415.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 09 55 45.9451 -90.2732 472.000 122.0 414.226 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 14 55 45.9451 -90.2732 472.000 396.0 396.060 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 19 55 45.9451 -90.2732 472.000 30.0 415.307 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 24 55 45.9451 -90.2732 472.000 122.0 414.969 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 29 55 45.9451 -90.2732 472.000 396.0 396.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 30 25 45.9451 -90.2732 472.000 396.0 396.151 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 30 55 45.9451 -90.2732 472.000 396.0 396.135 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 31 25 45.9451 -90.2732 472.000 396.0 396.102 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 31 55 45.9451 -90.2732 472.000 396.0 396.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 32 25 45.9451 -90.2732 472.000 396.0 396.104 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 32 55 45.9451 -90.2732 472.000 396.0 396.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 33 25 45.9451 -90.2732 472.000 396.0 396.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 33 55 45.9451 -90.2732 472.000 396.0 396.080 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 34 25 45.9451 -90.2732 472.000 396.0 396.059 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 34 55 45.9451 -90.2732 472.000 396.0 396.065 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 39 55 45.9451 -90.2732 472.000 30.0 415.063 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 44 55 45.9451 -90.2732 472.000 122.0 413.762 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 49 55 45.9451 -90.2732 472.000 396.0 395.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 54 55 45.9451 -90.2732 472.000 30.0 414.142 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 14 59 55 45.9451 -90.2732 472.000 122.0 413.546 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 04 55 45.9451 -90.2732 472.000 396.0 395.724 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 05 25 45.9451 -90.2732 472.000 396.0 395.667 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 05 55 45.9451 -90.2732 472.000 396.0 395.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 06 25 45.9451 -90.2732 472.000 396.0 395.628 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 06 55 45.9451 -90.2732 472.000 396.0 395.700 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 07 25 45.9451 -90.2732 472.000 396.0 395.795 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 07 55 45.9451 -90.2732 472.000 396.0 395.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 08 25 45.9451 -90.2732 472.000 396.0 395.767 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 08 55 45.9451 -90.2732 472.000 396.0 395.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 09 25 45.9451 -90.2732 472.000 396.0 395.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 09 55 45.9451 -90.2732 472.000 396.0 395.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 14 55 45.9451 -90.2732 472.000 30.0 413.067 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 19 55 45.9451 -90.2732 472.000 122.0 412.867 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 24 55 45.9451 -90.2732 472.000 396.0 395.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 29 55 45.9451 -90.2732 472.000 30.0 412.731 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 34 55 45.9451 -90.2732 472.000 122.0 412.029 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 39 55 45.9451 -90.2732 472.000 396.0 396.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 40 25 45.9451 -90.2732 472.000 396.0 396.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 40 55 45.9451 -90.2732 472.000 396.0 396.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 41 25 45.9451 -90.2732 472.000 396.0 396.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 41 55 45.9451 -90.2732 472.000 396.0 396.379 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 42 25 45.9451 -90.2732 472.000 396.0 396.328 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 42 55 45.9451 -90.2732 472.000 396.0 396.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 43 25 45.9451 -90.2732 472.000 396.0 396.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 43 55 45.9451 -90.2732 472.000 396.0 396.290 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 44 25 45.9451 -90.2732 472.000 396.0 396.381 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 44 55 45.9451 -90.2732 472.000 396.0 396.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 49 55 45.9451 -90.2732 472.000 30.0 411.127 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 54 55 45.9451 -90.2732 472.000 122.0 410.905 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 15 59 55 45.9451 -90.2732 472.000 396.0 396.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 04 55 45.9451 -90.2732 472.000 30.0 410.236 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 09 55 45.9451 -90.2732 472.000 122.0 409.736 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 14 55 45.9451 -90.2732 472.000 396.0 396.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 24 55 45.9451 -90.2732 472.000 30.0 409.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 29 55 45.9451 -90.2732 472.000 122.0 409.120 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 34 55 45.9451 -90.2732 472.000 396.0 399.385 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 39 55 45.9451 -90.2732 472.000 30.0 408.319 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 44 55 45.9451 -90.2732 472.000 122.0 408.331 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 49 55 45.9451 -90.2732 472.000 396.0 401.231 0.470 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 50 25 45.9451 -90.2732 472.000 396.0 401.286 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 50 55 45.9451 -90.2732 472.000 396.0 402.893 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 51 25 45.9451 -90.2732 472.000 396.0 401.154 0.650 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 51 55 45.9451 -90.2732 472.000 396.0 402.010 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 52 25 45.9451 -90.2732 472.000 396.0 402.260 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 52 55 45.9451 -90.2732 472.000 396.0 403.234 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 53 25 45.9451 -90.2732 472.000 396.0 402.390 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 53 55 45.9451 -90.2732 472.000 396.0 402.300 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 54 25 45.9451 -90.2732 472.000 396.0 402.590 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 09 16 54 55 45.9451 -90.2732 472.000 396.0 403.066 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 04 55 45.9451 -90.2732 472.000 30.0 407.029 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 09 55 45.9451 -90.2732 472.000 122.0 406.173 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 14 55 45.9451 -90.2732 472.000 396.0 402.344 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 19 55 45.9451 -90.2732 472.000 30.0 404.554 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 24 55 45.9451 -90.2732 472.000 122.0 403.157 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 29 55 45.9451 -90.2732 472.000 396.0 403.269 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 30 25 45.9451 -90.2732 472.000 396.0 402.115 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 30 55 45.9451 -90.2732 472.000 396.0 402.015 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 31 25 45.9451 -90.2732 472.000 396.0 401.888 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 31 55 45.9451 -90.2732 472.000 396.0 401.476 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 32 25 45.9451 -90.2732 472.000 396.0 402.135 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 32 55 45.9451 -90.2732 472.000 396.0 402.495 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 33 25 45.9451 -90.2732 472.000 396.0 402.345 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 33 55 45.9451 -90.2732 472.000 396.0 402.108 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 34 25 45.9451 -90.2732 472.000 396.0 402.018 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 34 55 45.9451 -90.2732 472.000 396.0 402.822 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 39 55 45.9451 -90.2732 472.000 30.0 403.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 44 55 45.9451 -90.2732 472.000 122.0 403.415 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 49 55 45.9451 -90.2732 472.000 396.0 403.185 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 54 55 45.9451 -90.2732 472.000 30.0 402.671 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 17 59 55 45.9451 -90.2732 472.000 122.0 402.710 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 04 55 45.9451 -90.2732 472.000 396.0 400.822 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 14 55 45.9451 -90.2732 472.000 30.0 401.541 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 19 55 45.9451 -90.2732 472.000 122.0 401.752 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 24 55 45.9451 -90.2732 472.000 396.0 401.251 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 29 55 45.9451 -90.2732 472.000 30.0 401.155 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 34 55 45.9451 -90.2732 472.000 122.0 401.421 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 39 55 45.9451 -90.2732 472.000 396.0 401.091 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 40 25 45.9451 -90.2732 472.000 396.0 401.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 40 55 45.9451 -90.2732 472.000 396.0 400.859 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 41 25 45.9451 -90.2732 472.000 396.0 400.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 41 55 45.9451 -90.2732 472.000 396.0 401.190 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 42 25 45.9451 -90.2732 472.000 396.0 401.198 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 42 55 45.9451 -90.2732 472.000 396.0 401.081 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 43 25 45.9451 -90.2732 472.000 396.0 400.816 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 43 55 45.9451 -90.2732 472.000 396.0 400.407 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 44 25 45.9451 -90.2732 472.000 396.0 400.639 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 44 55 45.9451 -90.2732 472.000 396.0 400.937 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 49 55 45.9451 -90.2732 472.000 30.0 400.684 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 54 55 45.9451 -90.2732 472.000 122.0 400.847 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 18 59 55 45.9451 -90.2732 472.000 396.0 400.637 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 04 55 45.9451 -90.2732 472.000 30.0 400.343 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 09 55 45.9451 -90.2732 472.000 122.0 400.414 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 14 55 45.9451 -90.2732 472.000 396.0 400.500 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 15 25 45.9451 -90.2732 472.000 396.0 400.516 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 15 55 45.9451 -90.2732 472.000 396.0 400.637 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 16 25 45.9451 -90.2732 472.000 396.0 400.610 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 16 55 45.9451 -90.2732 472.000 396.0 400.571 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 17 25 45.9451 -90.2732 472.000 396.0 400.536 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 17 55 45.9451 -90.2732 472.000 396.0 400.586 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 18 25 45.9451 -90.2732 472.000 396.0 399.676 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 18 55 45.9451 -90.2732 472.000 396.0 400.182 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 19 25 45.9451 -90.2732 472.000 396.0 400.510 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 19 55 45.9451 -90.2732 472.000 396.0 400.620 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 24 55 45.9451 -90.2732 472.000 30.0 400.626 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 29 55 45.9451 -90.2732 472.000 122.0 400.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 34 55 45.9451 -90.2732 472.000 396.0 400.298 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 39 55 45.9451 -90.2732 472.000 30.0 400.366 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 44 55 45.9451 -90.2732 472.000 122.0 399.442 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 49 55 45.9451 -90.2732 472.000 396.0 400.157 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 19 59 55 45.9451 -90.2732 472.000 30.0 399.293 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 04 55 45.9451 -90.2732 472.000 122.0 399.170 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 09 55 45.9451 -90.2732 472.000 396.0 399.311 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 14 55 45.9451 -90.2732 472.000 30.0 400.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 19 55 45.9451 -90.2732 472.000 122.0 400.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 24 55 45.9451 -90.2732 472.000 396.0 400.142 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 25 25 45.9451 -90.2732 472.000 396.0 400.173 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 25 55 45.9451 -90.2732 472.000 396.0 400.204 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 26 25 45.9451 -90.2732 472.000 396.0 399.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 26 55 45.9451 -90.2732 472.000 396.0 399.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 27 25 45.9451 -90.2732 472.000 396.0 399.878 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 27 55 45.9451 -90.2732 472.000 396.0 399.750 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 28 25 45.9451 -90.2732 472.000 396.0 399.515 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 28 55 45.9451 -90.2732 472.000 396.0 399.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 29 25 45.9451 -90.2732 472.000 396.0 399.491 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 29 55 45.9451 -90.2732 472.000 396.0 399.636 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 34 55 45.9451 -90.2732 472.000 30.0 399.834 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 39 55 45.9451 -90.2732 472.000 122.0 400.137 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 44 55 45.9451 -90.2732 472.000 396.0 399.959 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 49 55 45.9451 -90.2732 472.000 30.0 400.287 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 54 55 45.9451 -90.2732 472.000 122.0 400.219 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 20 59 55 45.9451 -90.2732 472.000 396.0 400.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 00 25 45.9451 -90.2732 472.000 396.0 400.241 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 00 55 45.9451 -90.2732 472.000 396.0 400.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 01 25 45.9451 -90.2732 472.000 396.0 400.276 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 01 55 45.9451 -90.2732 472.000 396.0 400.327 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 02 25 45.9451 -90.2732 472.000 396.0 400.365 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 02 55 45.9451 -90.2732 472.000 396.0 400.333 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 03 25 45.9451 -90.2732 472.000 396.0 400.379 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 03 55 45.9451 -90.2732 472.000 396.0 400.331 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 04 25 45.9451 -90.2732 472.000 396.0 400.331 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 04 55 45.9451 -90.2732 472.000 396.0 400.303 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 09 55 45.9451 -90.2732 472.000 30.0 400.384 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 14 55 45.9451 -90.2732 472.000 122.0 400.434 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 19 55 45.9451 -90.2732 472.000 396.0 400.421 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 24 55 45.9451 -90.2732 472.000 30.0 400.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 29 55 45.9451 -90.2732 472.000 122.0 400.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 34 55 45.9451 -90.2732 472.000 396.0 400.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 35 25 45.9451 -90.2732 472.000 396.0 400.221 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 35 55 45.9451 -90.2732 472.000 396.0 400.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 36 25 45.9451 -90.2732 472.000 396.0 400.026 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 36 55 45.9451 -90.2732 472.000 396.0 400.013 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 37 25 45.9451 -90.2732 472.000 396.0 400.042 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 37 55 45.9451 -90.2732 472.000 396.0 400.054 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 38 25 45.9451 -90.2732 472.000 396.0 399.976 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 38 55 45.9451 -90.2732 472.000 396.0 399.935 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 39 25 45.9451 -90.2732 472.000 396.0 400.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 39 55 45.9451 -90.2732 472.000 396.0 400.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 44 55 45.9451 -90.2732 472.000 30.0 400.561 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 49 55 45.9451 -90.2732 472.000 122.0 400.812 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 54 55 45.9451 -90.2732 472.000 396.0 400.398 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 21 59 55 45.9451 -90.2732 472.000 30.0 401.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 04 55 45.9451 -90.2732 472.000 122.0 401.219 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 09 55 45.9451 -90.2732 472.000 396.0 400.744 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 19 55 45.9451 -90.2732 472.000 30.0 401.934 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 24 55 45.9451 -90.2732 472.000 122.0 401.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 29 55 45.9451 -90.2732 472.000 396.0 401.198 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 34 55 45.9451 -90.2732 472.000 30.0 402.389 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 39 55 45.9451 -90.2732 472.000 122.0 402.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 44 55 45.9451 -90.2732 472.000 396.0 401.769 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 54 55 45.9451 -90.2732 472.000 30.0 403.184 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 22 59 55 45.9451 -90.2732 472.000 122.0 402.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 04 55 45.9451 -90.2732 472.000 396.0 402.205 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 09 55 45.9451 -90.2732 472.000 30.0 403.153 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 14 55 45.9451 -90.2732 472.000 122.0 403.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 19 55 45.9451 -90.2732 472.000 396.0 402.866 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 20 25 45.9451 -90.2732 472.000 396.0 402.774 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 20 55 45.9451 -90.2732 472.000 396.0 402.329 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 21 25 45.9451 -90.2732 472.000 396.0 402.194 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 21 55 45.9451 -90.2732 472.000 396.0 402.022 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 22 25 45.9451 -90.2732 472.000 396.0 401.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 22 55 45.9451 -90.2732 472.000 396.0 401.951 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 23 25 45.9451 -90.2732 472.000 396.0 402.070 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 23 55 45.9451 -90.2732 472.000 396.0 402.393 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 24 25 45.9451 -90.2732 472.000 396.0 401.754 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 24 55 45.9451 -90.2732 472.000 396.0 401.809 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 29 55 45.9451 -90.2732 472.000 30.0 404.094 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 34 55 45.9451 -90.2732 472.000 122.0 403.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 39 55 45.9451 -90.2732 472.000 396.0 403.167 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 44 55 45.9451 -90.2732 472.000 30.0 404.555 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 09 23 49 55 45.9451 -90.2732 472.000 122.0 404.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 14 55 45.9451 -90.2732 472.000 396.0 405.680 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 19 55 45.9451 -90.2732 472.000 30.0 405.852 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 24 55 45.9451 -90.2732 472.000 122.0 405.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 29 55 45.9451 -90.2732 472.000 396.0 405.803 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 34 55 45.9451 -90.2732 472.000 30.0 406.265 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 39 55 45.9451 -90.2732 472.000 122.0 405.797 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 44 55 45.9451 -90.2732 472.000 396.0 405.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 45 25 45.9451 -90.2732 472.000 396.0 405.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 45 55 45.9451 -90.2732 472.000 396.0 405.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 46 25 45.9451 -90.2732 472.000 396.0 405.751 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 46 55 45.9451 -90.2732 472.000 396.0 405.777 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 47 25 45.9451 -90.2732 472.000 396.0 405.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 47 55 45.9451 -90.2732 472.000 396.0 405.803 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 48 25 45.9451 -90.2732 472.000 396.0 405.760 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 48 55 45.9451 -90.2732 472.000 396.0 405.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 49 25 45.9451 -90.2732 472.000 396.0 405.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 49 55 45.9451 -90.2732 472.000 396.0 405.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 54 55 45.9451 -90.2732 472.000 30.0 406.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 00 59 55 45.9451 -90.2732 472.000 122.0 406.417 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 04 55 45.9451 -90.2732 472.000 396.0 405.217 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 09 55 45.9451 -90.2732 472.000 30.0 407.047 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 14 55 45.9451 -90.2732 472.000 122.0 406.858 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 19 55 45.9451 -90.2732 472.000 396.0 404.643 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 20 25 45.9451 -90.2732 472.000 396.0 405.123 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 20 55 45.9451 -90.2732 472.000 396.0 405.058 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 21 25 45.9451 -90.2732 472.000 396.0 405.589 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 21 55 45.9451 -90.2732 472.000 396.0 405.479 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 22 25 45.9451 -90.2732 472.000 396.0 404.811 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 22 55 45.9451 -90.2732 472.000 396.0 405.120 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 23 25 45.9451 -90.2732 472.000 396.0 405.350 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 23 55 45.9451 -90.2732 472.000 396.0 405.616 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 24 25 45.9451 -90.2732 472.000 396.0 404.972 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 24 55 45.9451 -90.2732 472.000 396.0 405.126 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 29 55 45.9451 -90.2732 472.000 30.0 407.751 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 34 55 45.9451 -90.2732 472.000 122.0 407.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 39 55 45.9451 -90.2732 472.000 396.0 403.587 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 44 55 45.9451 -90.2732 472.000 30.0 408.273 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 49 55 45.9451 -90.2732 472.000 122.0 408.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 01 54 55 45.9451 -90.2732 472.000 396.0 402.752 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 04 55 45.9451 -90.2732 472.000 30.0 408.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 09 55 45.9451 -90.2732 472.000 122.0 408.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 14 55 45.9451 -90.2732 472.000 396.0 405.017 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 19 55 45.9451 -90.2732 472.000 30.0 409.344 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 24 55 45.9451 -90.2732 472.000 122.0 409.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 29 55 45.9451 -90.2732 472.000 396.0 402.973 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 30 25 45.9451 -90.2732 472.000 396.0 403.731 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 30 55 45.9451 -90.2732 472.000 396.0 403.377 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 31 25 45.9451 -90.2732 472.000 396.0 404.035 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 31 55 45.9451 -90.2732 472.000 396.0 403.846 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 32 25 45.9451 -90.2732 472.000 396.0 404.340 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 32 55 45.9451 -90.2732 472.000 396.0 403.749 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 33 25 45.9451 -90.2732 472.000 396.0 403.756 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 33 55 45.9451 -90.2732 472.000 396.0 403.342 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 34 25 45.9451 -90.2732 472.000 396.0 403.400 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 34 55 45.9451 -90.2732 472.000 396.0 403.164 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 39 55 45.9451 -90.2732 472.000 30.0 409.885 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 44 55 45.9451 -90.2732 472.000 122.0 409.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 49 55 45.9451 -90.2732 472.000 396.0 403.302 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 54 55 45.9451 -90.2732 472.000 30.0 410.145 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 02 59 55 45.9451 -90.2732 472.000 122.0 409.722 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 04 55 45.9451 -90.2732 472.000 396.0 403.822 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 05 25 45.9451 -90.2732 472.000 396.0 404.053 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 05 55 45.9451 -90.2732 472.000 396.0 404.452 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 06 25 45.9451 -90.2732 472.000 396.0 404.366 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 06 55 45.9451 -90.2732 472.000 396.0 404.500 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 07 25 45.9451 -90.2732 472.000 396.0 404.643 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 07 55 45.9451 -90.2732 472.000 396.0 404.640 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 08 25 45.9451 -90.2732 472.000 396.0 404.346 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 08 55 45.9451 -90.2732 472.000 396.0 404.805 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 09 25 45.9451 -90.2732 472.000 396.0 404.848 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 09 55 45.9451 -90.2732 472.000 396.0 404.524 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 14 55 45.9451 -90.2732 472.000 30.0 410.203 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 19 55 45.9451 -90.2732 472.000 122.0 409.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 24 55 45.9451 -90.2732 472.000 396.0 405.812 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 29 55 45.9451 -90.2732 472.000 30.0 410.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 34 55 45.9451 -90.2732 472.000 122.0 409.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 39 55 45.9451 -90.2732 472.000 396.0 407.109 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 40 25 45.9451 -90.2732 472.000 396.0 407.401 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 40 55 45.9451 -90.2732 472.000 396.0 406.534 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 41 25 45.9451 -90.2732 472.000 396.0 406.660 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 41 55 45.9451 -90.2732 472.000 396.0 406.981 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 42 25 45.9451 -90.2732 472.000 396.0 406.925 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 42 55 45.9451 -90.2732 472.000 396.0 406.903 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 43 25 45.9451 -90.2732 472.000 396.0 406.901 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 43 55 45.9451 -90.2732 472.000 396.0 407.657 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 44 25 45.9451 -90.2732 472.000 396.0 407.553 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 44 55 45.9451 -90.2732 472.000 396.0 407.046 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 49 55 45.9451 -90.2732 472.000 30.0 410.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 54 55 45.9451 -90.2732 472.000 122.0 410.252 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 03 59 55 45.9451 -90.2732 472.000 396.0 404.453 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 04 55 45.9451 -90.2732 472.000 30.0 410.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 09 55 45.9451 -90.2732 472.000 122.0 410.271 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 14 55 45.9451 -90.2732 472.000 396.0 405.732 0.780 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 24 55 45.9451 -90.2732 472.000 30.0 410.861 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 29 55 45.9451 -90.2732 472.000 122.0 410.332 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 34 55 45.9451 -90.2732 472.000 396.0 402.711 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 39 55 45.9451 -90.2732 472.000 30.0 410.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 44 55 45.9451 -90.2732 472.000 122.0 410.411 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 49 55 45.9451 -90.2732 472.000 396.0 402.125 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 50 25 45.9451 -90.2732 472.000 396.0 402.324 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 50 55 45.9451 -90.2732 472.000 396.0 402.756 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 51 25 45.9451 -90.2732 472.000 396.0 401.995 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 51 55 45.9451 -90.2732 472.000 396.0 402.505 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 52 25 45.9451 -90.2732 472.000 396.0 402.496 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 52 55 45.9451 -90.2732 472.000 396.0 401.892 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 53 25 45.9451 -90.2732 472.000 396.0 401.649 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 53 55 45.9451 -90.2732 472.000 396.0 402.048 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 54 25 45.9451 -90.2732 472.000 396.0 402.402 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 04 54 55 45.9451 -90.2732 472.000 396.0 401.251 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 04 55 45.9451 -90.2732 472.000 30.0 410.951 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 09 55 45.9451 -90.2732 472.000 122.0 410.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 14 55 45.9451 -90.2732 472.000 396.0 402.435 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 19 55 45.9451 -90.2732 472.000 30.0 410.946 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 24 55 45.9451 -90.2732 472.000 122.0 410.339 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 29 55 45.9451 -90.2732 472.000 396.0 399.986 0.470 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 30 25 45.9451 -90.2732 472.000 396.0 399.393 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 30 55 45.9451 -90.2732 472.000 396.0 399.459 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 31 25 45.9451 -90.2732 472.000 396.0 399.359 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 31 55 45.9451 -90.2732 472.000 396.0 399.510 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 32 25 45.9451 -90.2732 472.000 396.0 399.676 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 32 55 45.9451 -90.2732 472.000 396.0 399.873 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 33 25 45.9451 -90.2732 472.000 396.0 400.478 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 33 55 45.9451 -90.2732 472.000 396.0 399.578 0.760 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 34 25 45.9451 -90.2732 472.000 396.0 399.644 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 34 55 45.9451 -90.2732 472.000 396.0 398.769 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 39 55 45.9451 -90.2732 472.000 30.0 411.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 44 55 45.9451 -90.2732 472.000 122.0 410.613 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 49 55 45.9451 -90.2732 472.000 396.0 400.836 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 54 55 45.9451 -90.2732 472.000 30.0 411.349 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 05 59 55 45.9451 -90.2732 472.000 122.0 410.604 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 04 55 45.9451 -90.2732 472.000 396.0 398.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 14 55 45.9451 -90.2732 472.000 30.0 411.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 19 55 45.9451 -90.2732 472.000 122.0 410.680 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 24 55 45.9451 -90.2732 472.000 396.0 398.958 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 29 55 45.9451 -90.2732 472.000 30.0 411.917 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 34 55 45.9451 -90.2732 472.000 122.0 410.719 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 39 55 45.9451 -90.2732 472.000 396.0 398.625 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 40 25 45.9451 -90.2732 472.000 396.0 398.191 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 40 55 45.9451 -90.2732 472.000 396.0 398.573 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 41 25 45.9451 -90.2732 472.000 396.0 398.688 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 41 55 45.9451 -90.2732 472.000 396.0 398.391 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 42 25 45.9451 -90.2732 472.000 396.0 398.435 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 42 55 45.9451 -90.2732 472.000 396.0 398.596 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 43 25 45.9451 -90.2732 472.000 396.0 398.191 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 43 55 45.9451 -90.2732 472.000 396.0 397.990 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 44 25 45.9451 -90.2732 472.000 396.0 397.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 44 55 45.9451 -90.2732 472.000 396.0 398.005 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 49 55 45.9451 -90.2732 472.000 30.0 411.897 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 54 55 45.9451 -90.2732 472.000 122.0 410.901 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 06 59 55 45.9451 -90.2732 472.000 396.0 396.921 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 04 55 45.9451 -90.2732 472.000 30.0 411.839 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 09 55 45.9451 -90.2732 472.000 122.0 411.132 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 14 55 45.9451 -90.2732 472.000 396.0 396.063 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 15 25 45.9451 -90.2732 472.000 396.0 396.014 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 15 55 45.9451 -90.2732 472.000 396.0 395.990 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 16 25 45.9451 -90.2732 472.000 396.0 395.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 16 55 45.9451 -90.2732 472.000 396.0 395.965 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 17 25 45.9451 -90.2732 472.000 396.0 396.170 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 17 55 45.9451 -90.2732 472.000 396.0 396.194 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 18 25 45.9451 -90.2732 472.000 396.0 396.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 18 55 45.9451 -90.2732 472.000 396.0 396.371 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 19 25 45.9451 -90.2732 472.000 396.0 396.243 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 19 55 45.9451 -90.2732 472.000 396.0 396.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 24 55 45.9451 -90.2732 472.000 30.0 412.103 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 29 55 45.9451 -90.2732 472.000 122.0 411.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 34 55 45.9451 -90.2732 472.000 396.0 395.074 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 39 55 45.9451 -90.2732 472.000 30.0 412.258 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 44 55 45.9451 -90.2732 472.000 122.0 411.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 49 55 45.9451 -90.2732 472.000 396.0 395.043 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 07 59 55 45.9451 -90.2732 472.000 30.0 412.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 04 55 45.9451 -90.2732 472.000 122.0 411.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 09 55 45.9451 -90.2732 472.000 396.0 394.637 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 14 55 45.9451 -90.2732 472.000 30.0 412.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 19 55 45.9451 -90.2732 472.000 122.0 411.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 24 55 45.9451 -90.2732 472.000 396.0 394.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 25 25 45.9451 -90.2732 472.000 396.0 394.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 25 55 45.9451 -90.2732 472.000 396.0 394.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 26 25 45.9451 -90.2732 472.000 396.0 394.377 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 26 55 45.9451 -90.2732 472.000 396.0 394.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 27 25 45.9451 -90.2732 472.000 396.0 394.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 27 55 45.9451 -90.2732 472.000 396.0 394.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 28 25 45.9451 -90.2732 472.000 396.0 394.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 28 55 45.9451 -90.2732 472.000 396.0 394.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 29 25 45.9451 -90.2732 472.000 396.0 394.446 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 29 55 45.9451 -90.2732 472.000 396.0 394.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 34 55 45.9451 -90.2732 472.000 30.0 412.537 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 39 55 45.9451 -90.2732 472.000 122.0 412.065 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 44 55 45.9451 -90.2732 472.000 396.0 394.396 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 49 55 45.9451 -90.2732 472.000 30.0 412.811 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 54 55 45.9451 -90.2732 472.000 122.0 412.076 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 08 59 55 45.9451 -90.2732 472.000 396.0 394.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 00 25 45.9451 -90.2732 472.000 396.0 394.099 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 00 55 45.9451 -90.2732 472.000 396.0 394.149 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 01 25 45.9451 -90.2732 472.000 396.0 394.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 01 55 45.9451 -90.2732 472.000 396.0 394.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 02 25 45.9451 -90.2732 472.000 396.0 394.224 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 02 55 45.9451 -90.2732 472.000 396.0 394.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 03 25 45.9451 -90.2732 472.000 396.0 394.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 03 55 45.9451 -90.2732 472.000 396.0 394.272 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 04 25 45.9451 -90.2732 472.000 396.0 394.220 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 04 55 45.9451 -90.2732 472.000 396.0 394.231 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 09 55 45.9451 -90.2732 472.000 30.0 412.772 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 14 55 45.9451 -90.2732 472.000 122.0 411.952 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 19 55 45.9451 -90.2732 472.000 396.0 394.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 24 55 45.9451 -90.2732 472.000 30.0 412.724 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 29 55 45.9451 -90.2732 472.000 122.0 412.060 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 34 55 45.9451 -90.2732 472.000 396.0 394.464 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 35 25 45.9451 -90.2732 472.000 396.0 394.176 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 35 55 45.9451 -90.2732 472.000 396.0 394.153 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 36 25 45.9451 -90.2732 472.000 396.0 394.185 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 36 55 45.9451 -90.2732 472.000 396.0 394.181 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 37 25 45.9451 -90.2732 472.000 396.0 394.520 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 37 55 45.9451 -90.2732 472.000 396.0 394.410 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 38 25 45.9451 -90.2732 472.000 396.0 394.408 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 38 55 45.9451 -90.2732 472.000 396.0 394.502 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 39 25 45.9451 -90.2732 472.000 396.0 394.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 39 55 45.9451 -90.2732 472.000 396.0 394.418 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 44 55 45.9451 -90.2732 472.000 30.0 412.702 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 49 55 45.9451 -90.2732 472.000 122.0 412.134 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 54 55 45.9451 -90.2732 472.000 396.0 394.015 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 09 59 55 45.9451 -90.2732 472.000 30.0 412.991 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 04 55 45.9451 -90.2732 472.000 122.0 412.153 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 09 55 45.9451 -90.2732 472.000 396.0 393.842 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 19 55 45.9451 -90.2732 472.000 30.0 413.122 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 24 55 45.9451 -90.2732 472.000 122.0 412.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 29 55 45.9451 -90.2732 472.000 396.0 393.154 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 34 55 45.9451 -90.2732 472.000 30.0 413.170 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 39 55 45.9451 -90.2732 472.000 122.0 412.285 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 44 55 45.9451 -90.2732 472.000 396.0 393.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 54 55 45.9451 -90.2732 472.000 30.0 413.127 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 10 59 55 45.9451 -90.2732 472.000 122.0 412.085 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 04 55 45.9451 -90.2732 472.000 396.0 392.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 09 55 45.9451 -90.2732 472.000 30.0 413.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 14 55 45.9451 -90.2732 472.000 122.0 412.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 19 55 45.9451 -90.2732 472.000 396.0 392.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 20 25 45.9451 -90.2732 472.000 396.0 392.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 20 55 45.9451 -90.2732 472.000 396.0 392.560 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 21 25 45.9451 -90.2732 472.000 396.0 392.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 21 55 45.9451 -90.2732 472.000 396.0 392.510 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 22 25 45.9451 -90.2732 472.000 396.0 392.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 22 55 45.9451 -90.2732 472.000 396.0 392.493 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 23 25 45.9451 -90.2732 472.000 396.0 392.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 23 55 45.9451 -90.2732 472.000 396.0 392.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 24 25 45.9451 -90.2732 472.000 396.0 392.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 24 55 45.9451 -90.2732 472.000 396.0 392.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 29 55 45.9451 -90.2732 472.000 30.0 412.943 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 34 55 45.9451 -90.2732 472.000 122.0 412.054 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 39 55 45.9451 -90.2732 472.000 396.0 392.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 44 55 45.9451 -90.2732 472.000 30.0 413.017 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 11 49 55 45.9451 -90.2732 472.000 122.0 412.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 14 55 45.9451 -90.2732 472.000 396.0 392.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 19 55 45.9451 -90.2732 472.000 30.0 413.191 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 24 55 45.9451 -90.2732 472.000 122.0 412.224 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 29 55 45.9451 -90.2732 472.000 396.0 392.316 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 34 55 45.9451 -90.2732 472.000 30.0 413.077 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 39 55 45.9451 -90.2732 472.000 122.0 412.280 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 44 55 45.9451 -90.2732 472.000 396.0 392.322 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 45 25 45.9451 -90.2732 472.000 396.0 392.343 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 45 55 45.9451 -90.2732 472.000 396.0 392.415 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 46 25 45.9451 -90.2732 472.000 396.0 392.402 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 46 55 45.9451 -90.2732 472.000 396.0 392.393 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 47 25 45.9451 -90.2732 472.000 396.0 392.296 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 47 55 45.9451 -90.2732 472.000 396.0 392.376 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 48 25 45.9451 -90.2732 472.000 396.0 392.393 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 48 55 45.9451 -90.2732 472.000 396.0 392.406 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 49 25 45.9451 -90.2732 472.000 396.0 392.458 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 49 55 45.9451 -90.2732 472.000 396.0 392.693 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 54 55 45.9451 -90.2732 472.000 30.0 413.117 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 12 59 55 45.9451 -90.2732 472.000 122.0 412.423 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 04 55 45.9451 -90.2732 472.000 396.0 395.021 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 09 55 45.9451 -90.2732 472.000 30.0 412.951 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 14 55 45.9451 -90.2732 472.000 122.0 412.229 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 19 55 45.9451 -90.2732 472.000 396.0 394.252 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 20 25 45.9451 -90.2732 472.000 396.0 394.250 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 20 55 45.9451 -90.2732 472.000 396.0 394.238 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 21 25 45.9451 -90.2732 472.000 396.0 394.270 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 21 55 45.9451 -90.2732 472.000 396.0 394.265 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 22 25 45.9451 -90.2732 472.000 396.0 394.273 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 22 55 45.9451 -90.2732 472.000 396.0 394.346 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 23 25 45.9451 -90.2732 472.000 396.0 394.393 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 23 55 45.9451 -90.2732 472.000 396.0 394.191 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 24 25 45.9451 -90.2732 472.000 396.0 394.113 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 24 55 45.9451 -90.2732 472.000 396.0 394.108 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 29 55 45.9451 -90.2732 472.000 30.0 412.763 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 34 55 45.9451 -90.2732 472.000 122.0 412.223 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 39 55 45.9451 -90.2732 472.000 396.0 394.718 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 44 55 45.9451 -90.2732 472.000 30.0 412.404 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 49 55 45.9451 -90.2732 472.000 122.0 412.101 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 13 54 55 45.9451 -90.2732 472.000 396.0 395.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 14 54 55 45.9451 -90.2732 472.000 30.0 411.094 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 14 59 55 45.9451 -90.2732 472.000 122.0 411.045 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 04 55 45.9451 -90.2732 472.000 396.0 395.542 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 05 25 45.9451 -90.2732 472.000 396.0 395.633 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 05 55 45.9451 -90.2732 472.000 396.0 395.701 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 06 25 45.9451 -90.2732 472.000 396.0 395.716 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 06 55 45.9451 -90.2732 472.000 396.0 395.754 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 07 25 45.9451 -90.2732 472.000 396.0 395.627 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 07 55 45.9451 -90.2732 472.000 396.0 395.649 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 08 25 45.9451 -90.2732 472.000 396.0 395.702 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 08 55 45.9451 -90.2732 472.000 396.0 395.687 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 09 25 45.9451 -90.2732 472.000 396.0 395.663 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 09 55 45.9451 -90.2732 472.000 396.0 395.579 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 14 55 45.9451 -90.2732 472.000 30.0 410.978 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 19 55 45.9451 -90.2732 472.000 122.0 410.710 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 24 55 45.9451 -90.2732 472.000 396.0 395.134 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 29 55 45.9451 -90.2732 472.000 30.0 410.602 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 34 55 45.9451 -90.2732 472.000 122.0 410.510 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 39 55 45.9451 -90.2732 472.000 396.0 395.082 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 40 25 45.9451 -90.2732 472.000 396.0 395.178 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 40 55 45.9451 -90.2732 472.000 396.0 395.145 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 41 25 45.9451 -90.2732 472.000 396.0 395.080 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 41 55 45.9451 -90.2732 472.000 396.0 395.075 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 42 25 45.9451 -90.2732 472.000 396.0 395.243 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 42 55 45.9451 -90.2732 472.000 396.0 395.143 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 43 25 45.9451 -90.2732 472.000 396.0 395.106 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 43 55 45.9451 -90.2732 472.000 396.0 395.174 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 44 25 45.9451 -90.2732 472.000 396.0 395.229 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 44 55 45.9451 -90.2732 472.000 396.0 395.246 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 49 55 45.9451 -90.2732 472.000 30.0 409.830 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 54 55 45.9451 -90.2732 472.000 122.0 409.492 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 15 59 55 45.9451 -90.2732 472.000 396.0 396.390 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 04 55 45.9451 -90.2732 472.000 30.0 408.788 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 09 55 45.9451 -90.2732 472.000 122.0 408.127 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 14 55 45.9451 -90.2732 472.000 396.0 396.814 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 24 55 45.9451 -90.2732 472.000 30.0 407.232 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 29 55 45.9451 -90.2732 472.000 122.0 407.096 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 34 55 45.9451 -90.2732 472.000 396.0 393.083 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 39 55 45.9451 -90.2732 472.000 30.0 406.406 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 44 55 45.9451 -90.2732 472.000 122.0 406.525 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 49 55 45.9451 -90.2732 472.000 396.0 398.877 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 50 25 45.9451 -90.2732 472.000 396.0 399.719 0.580 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 50 55 45.9451 -90.2732 472.000 396.0 399.367 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 51 25 45.9451 -90.2732 472.000 396.0 399.485 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 51 55 45.9451 -90.2732 472.000 396.0 399.651 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 52 25 45.9451 -90.2732 472.000 396.0 399.392 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 52 55 45.9451 -90.2732 472.000 396.0 399.474 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 53 25 45.9451 -90.2732 472.000 396.0 399.984 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 53 55 45.9451 -90.2732 472.000 396.0 399.687 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 54 25 45.9451 -90.2732 472.000 396.0 399.430 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 16 54 55 45.9451 -90.2732 472.000 396.0 399.607 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 04 55 45.9451 -90.2732 472.000 30.0 405.057 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 09 55 45.9451 -90.2732 472.000 122.0 404.596 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 14 55 45.9451 -90.2732 472.000 396.0 400.916 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 19 55 45.9451 -90.2732 472.000 30.0 404.082 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 24 55 45.9451 -90.2732 472.000 122.0 403.849 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 29 55 45.9451 -90.2732 472.000 396.0 401.191 1.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 30 25 45.9451 -90.2732 472.000 396.0 400.377 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 30 55 45.9451 -90.2732 472.000 396.0 401.451 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 31 25 45.9451 -90.2732 472.000 396.0 400.798 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 31 55 45.9451 -90.2732 472.000 396.0 400.425 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 32 25 45.9451 -90.2732 472.000 396.0 401.511 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 32 55 45.9451 -90.2732 472.000 396.0 402.095 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 33 25 45.9451 -90.2732 472.000 396.0 401.245 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 33 55 45.9451 -90.2732 472.000 396.0 401.126 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 34 25 45.9451 -90.2732 472.000 396.0 400.792 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 34 55 45.9451 -90.2732 472.000 396.0 401.335 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 39 55 45.9451 -90.2732 472.000 30.0 402.329 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 44 55 45.9451 -90.2732 472.000 122.0 402.202 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 49 55 45.9451 -90.2732 472.000 396.0 400.550 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 54 55 45.9451 -90.2732 472.000 30.0 401.774 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 17 59 55 45.9451 -90.2732 472.000 122.0 401.673 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 04 55 45.9451 -90.2732 472.000 396.0 400.870 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 14 55 45.9451 -90.2732 472.000 30.0 400.945 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 19 55 45.9451 -90.2732 472.000 122.0 400.758 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 24 55 45.9451 -90.2732 472.000 396.0 400.335 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 29 55 45.9451 -90.2732 472.000 30.0 400.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 34 55 45.9451 -90.2732 472.000 122.0 400.275 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 39 55 45.9451 -90.2732 472.000 396.0 400.103 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 40 25 45.9451 -90.2732 472.000 396.0 400.141 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 40 55 45.9451 -90.2732 472.000 396.0 400.299 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 41 25 45.9451 -90.2732 472.000 396.0 400.111 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 41 55 45.9451 -90.2732 472.000 396.0 399.961 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 42 25 45.9451 -90.2732 472.000 396.0 400.077 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 42 55 45.9451 -90.2732 472.000 396.0 399.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 43 25 45.9451 -90.2732 472.000 396.0 399.850 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 43 55 45.9451 -90.2732 472.000 396.0 400.005 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 44 25 45.9451 -90.2732 472.000 396.0 400.158 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 44 55 45.9451 -90.2732 472.000 396.0 400.152 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 49 55 45.9451 -90.2732 472.000 30.0 400.003 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 54 55 45.9451 -90.2732 472.000 122.0 399.885 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 18 59 55 45.9451 -90.2732 472.000 396.0 399.253 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 04 55 45.9451 -90.2732 472.000 30.0 399.577 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 09 55 45.9451 -90.2732 472.000 122.0 399.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 14 55 45.9451 -90.2732 472.000 396.0 399.335 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 15 25 45.9451 -90.2732 472.000 396.0 399.254 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 15 55 45.9451 -90.2732 472.000 396.0 398.861 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 16 25 45.9451 -90.2732 472.000 396.0 398.987 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 16 55 45.9451 -90.2732 472.000 396.0 398.483 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 17 25 45.9451 -90.2732 472.000 396.0 399.105 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 17 55 45.9451 -90.2732 472.000 396.0 398.864 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 18 25 45.9451 -90.2732 472.000 396.0 398.632 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 18 55 45.9451 -90.2732 472.000 396.0 398.402 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 19 25 45.9451 -90.2732 472.000 396.0 398.962 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 19 55 45.9451 -90.2732 472.000 396.0 398.737 0.450 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 24 55 45.9451 -90.2732 472.000 30.0 398.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 29 55 45.9451 -90.2732 472.000 122.0 399.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 34 55 45.9451 -90.2732 472.000 396.0 398.139 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 39 55 45.9451 -90.2732 472.000 30.0 398.602 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 44 55 45.9451 -90.2732 472.000 122.0 398.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 49 55 45.9451 -90.2732 472.000 396.0 397.833 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 10 19 59 55 45.9451 -90.2732 472.000 30.0 398.683 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 04 55 45.9451 -90.2732 472.000 122.0 398.919 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 09 55 45.9451 -90.2732 472.000 396.0 398.748 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 14 55 45.9451 -90.2732 472.000 30.0 398.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 19 55 45.9451 -90.2732 472.000 122.0 398.961 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 24 55 45.9451 -90.2732 472.000 396.0 398.825 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 25 25 45.9451 -90.2732 472.000 396.0 398.763 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 25 55 45.9451 -90.2732 472.000 396.0 398.595 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 26 25 45.9451 -90.2732 472.000 396.0 398.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 26 55 45.9451 -90.2732 472.000 396.0 398.435 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 27 25 45.9451 -90.2732 472.000 396.0 398.288 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 27 55 45.9451 -90.2732 472.000 396.0 398.567 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 28 25 45.9451 -90.2732 472.000 396.0 398.325 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 28 55 45.9451 -90.2732 472.000 396.0 398.439 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 29 25 45.9451 -90.2732 472.000 396.0 398.688 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 29 55 45.9451 -90.2732 472.000 396.0 398.365 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 34 55 45.9451 -90.2732 472.000 30.0 398.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 39 55 45.9451 -90.2732 472.000 122.0 399.068 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 44 55 45.9451 -90.2732 472.000 396.0 398.425 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 49 55 45.9451 -90.2732 472.000 30.0 398.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 54 55 45.9451 -90.2732 472.000 122.0 399.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 20 59 55 45.9451 -90.2732 472.000 396.0 398.981 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 00 25 45.9451 -90.2732 472.000 396.0 398.869 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 00 55 45.9451 -90.2732 472.000 396.0 398.779 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 01 25 45.9451 -90.2732 472.000 396.0 398.845 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 01 55 45.9451 -90.2732 472.000 396.0 398.927 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 02 25 45.9451 -90.2732 472.000 396.0 398.579 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 02 55 45.9451 -90.2732 472.000 396.0 398.764 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 03 25 45.9451 -90.2732 472.000 396.0 398.632 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 03 55 45.9451 -90.2732 472.000 396.0 398.694 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 04 25 45.9451 -90.2732 472.000 396.0 399.016 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 04 55 45.9451 -90.2732 472.000 396.0 399.115 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 09 55 45.9451 -90.2732 472.000 30.0 399.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 14 55 45.9451 -90.2732 472.000 122.0 399.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 19 55 45.9451 -90.2732 472.000 396.0 399.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 24 55 45.9451 -90.2732 472.000 30.0 399.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 29 55 45.9451 -90.2732 472.000 122.0 400.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 34 55 45.9451 -90.2732 472.000 396.0 400.125 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 35 25 45.9451 -90.2732 472.000 396.0 400.094 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 35 55 45.9451 -90.2732 472.000 396.0 400.293 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 36 25 45.9451 -90.2732 472.000 396.0 400.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 36 55 45.9451 -90.2732 472.000 396.0 400.231 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 37 25 45.9451 -90.2732 472.000 396.0 400.148 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 37 55 45.9451 -90.2732 472.000 396.0 400.181 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 38 25 45.9451 -90.2732 472.000 396.0 400.214 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 38 55 45.9451 -90.2732 472.000 396.0 400.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 39 25 45.9451 -90.2732 472.000 396.0 400.206 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 39 55 45.9451 -90.2732 472.000 396.0 400.372 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 44 55 45.9451 -90.2732 472.000 30.0 400.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 49 55 45.9451 -90.2732 472.000 122.0 400.831 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 54 55 45.9451 -90.2732 472.000 396.0 400.280 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 21 59 55 45.9451 -90.2732 472.000 30.0 401.110 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 04 55 45.9451 -90.2732 472.000 122.0 401.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 09 55 45.9451 -90.2732 472.000 396.0 401.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 19 55 45.9451 -90.2732 472.000 30.0 402.212 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 24 55 45.9451 -90.2732 472.000 122.0 401.667 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 29 55 45.9451 -90.2732 472.000 396.0 401.198 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 34 55 45.9451 -90.2732 472.000 30.0 402.098 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 39 55 45.9451 -90.2732 472.000 122.0 401.944 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 44 55 45.9451 -90.2732 472.000 396.0 400.964 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 54 55 45.9451 -90.2732 472.000 30.0 402.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 22 59 55 45.9451 -90.2732 472.000 122.0 402.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 04 55 45.9451 -90.2732 472.000 396.0 401.415 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 09 55 45.9451 -90.2732 472.000 30.0 402.926 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 14 55 45.9451 -90.2732 472.000 122.0 402.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 19 55 45.9451 -90.2732 472.000 396.0 401.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 20 25 45.9451 -90.2732 472.000 396.0 401.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 20 55 45.9451 -90.2732 472.000 396.0 401.948 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 21 25 45.9451 -90.2732 472.000 396.0 401.966 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 21 55 45.9451 -90.2732 472.000 396.0 402.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 22 25 45.9451 -90.2732 472.000 396.0 402.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 22 55 45.9451 -90.2732 472.000 396.0 402.076 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 23 25 45.9451 -90.2732 472.000 396.0 402.104 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 23 55 45.9451 -90.2732 472.000 396.0 402.150 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 24 25 45.9451 -90.2732 472.000 396.0 402.154 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 24 55 45.9451 -90.2732 472.000 396.0 402.167 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 29 55 45.9451 -90.2732 472.000 30.0 403.042 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 34 55 45.9451 -90.2732 472.000 122.0 402.536 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 39 55 45.9451 -90.2732 472.000 396.0 402.492 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 44 55 45.9451 -90.2732 472.000 30.0 403.068 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 10 23 49 55 45.9451 -90.2732 472.000 122.0 402.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 14 55 45.9451 -90.2732 472.000 396.0 403.138 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 19 55 45.9451 -90.2732 472.000 30.0 404.103 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 24 55 45.9451 -90.2732 472.000 122.0 403.830 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 29 55 45.9451 -90.2732 472.000 396.0 403.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 34 55 45.9451 -90.2732 472.000 30.0 404.729 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 39 55 45.9451 -90.2732 472.000 122.0 404.235 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 44 55 45.9451 -90.2732 472.000 396.0 404.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 45 25 45.9451 -90.2732 472.000 396.0 404.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 45 55 45.9451 -90.2732 472.000 396.0 404.171 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 46 25 45.9451 -90.2732 472.000 396.0 404.217 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 46 55 45.9451 -90.2732 472.000 396.0 404.222 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 47 25 45.9451 -90.2732 472.000 396.0 404.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 47 55 45.9451 -90.2732 472.000 396.0 404.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 48 25 45.9451 -90.2732 472.000 396.0 404.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 48 55 45.9451 -90.2732 472.000 396.0 404.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 49 25 45.9451 -90.2732 472.000 396.0 404.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 49 55 45.9451 -90.2732 472.000 396.0 404.275 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 54 55 45.9451 -90.2732 472.000 30.0 405.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 00 59 55 45.9451 -90.2732 472.000 122.0 405.008 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 04 55 45.9451 -90.2732 472.000 396.0 404.791 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 09 55 45.9451 -90.2732 472.000 30.0 405.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 14 55 45.9451 -90.2732 472.000 122.0 405.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 19 55 45.9451 -90.2732 472.000 396.0 405.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 20 25 45.9451 -90.2732 472.000 396.0 405.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 20 55 45.9451 -90.2732 472.000 396.0 405.667 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 21 25 45.9451 -90.2732 472.000 396.0 405.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 21 55 45.9451 -90.2732 472.000 396.0 405.533 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 22 25 45.9451 -90.2732 472.000 396.0 405.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 22 55 45.9451 -90.2732 472.000 396.0 405.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 23 25 45.9451 -90.2732 472.000 396.0 405.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 23 55 45.9451 -90.2732 472.000 396.0 405.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 24 25 45.9451 -90.2732 472.000 396.0 405.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 24 55 45.9451 -90.2732 472.000 396.0 405.695 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 29 55 45.9451 -90.2732 472.000 30.0 406.847 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 34 55 45.9451 -90.2732 472.000 122.0 406.550 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 39 55 45.9451 -90.2732 472.000 396.0 405.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 44 55 45.9451 -90.2732 472.000 30.0 407.183 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 49 55 45.9451 -90.2732 472.000 122.0 406.951 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 01 54 55 45.9451 -90.2732 472.000 396.0 405.736 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 04 55 45.9451 -90.2732 472.000 30.0 407.889 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 09 55 45.9451 -90.2732 472.000 122.0 407.752 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 14 55 45.9451 -90.2732 472.000 396.0 405.114 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 19 55 45.9451 -90.2732 472.000 30.0 408.593 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 24 55 45.9451 -90.2732 472.000 122.0 407.910 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 29 55 45.9451 -90.2732 472.000 396.0 403.715 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 30 25 45.9451 -90.2732 472.000 396.0 404.794 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 30 55 45.9451 -90.2732 472.000 396.0 405.785 0.470 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 31 25 45.9451 -90.2732 472.000 396.0 405.812 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 31 55 45.9451 -90.2732 472.000 396.0 405.042 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 32 25 45.9451 -90.2732 472.000 396.0 405.432 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 32 55 45.9451 -90.2732 472.000 396.0 405.849 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 33 25 45.9451 -90.2732 472.000 396.0 405.343 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 33 55 45.9451 -90.2732 472.000 396.0 404.921 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 34 25 45.9451 -90.2732 472.000 396.0 404.406 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 34 55 45.9451 -90.2732 472.000 396.0 404.790 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 39 55 45.9451 -90.2732 472.000 30.0 408.530 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 44 55 45.9451 -90.2732 472.000 122.0 408.103 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 49 55 45.9451 -90.2732 472.000 396.0 403.951 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 54 55 45.9451 -90.2732 472.000 30.0 408.804 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 02 59 55 45.9451 -90.2732 472.000 122.0 408.478 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 04 55 45.9451 -90.2732 472.000 396.0 400.880 0.510 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 05 25 45.9451 -90.2732 472.000 396.0 402.225 0.530 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 05 55 45.9451 -90.2732 472.000 396.0 404.374 0.510 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 06 25 45.9451 -90.2732 472.000 396.0 405.463 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 06 55 45.9451 -90.2732 472.000 396.0 406.371 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 07 25 45.9451 -90.2732 472.000 396.0 406.354 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 07 55 45.9451 -90.2732 472.000 396.0 403.706 2.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 08 25 45.9451 -90.2732 472.000 396.0 401.014 0.620 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 08 55 45.9451 -90.2732 472.000 396.0 403.663 0.830 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 09 25 45.9451 -90.2732 472.000 396.0 405.165 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 09 55 45.9451 -90.2732 472.000 396.0 405.536 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 14 55 45.9451 -90.2732 472.000 30.0 409.403 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 19 55 45.9451 -90.2732 472.000 122.0 408.805 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 24 55 45.9451 -90.2732 472.000 396.0 405.889 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 29 55 45.9451 -90.2732 472.000 30.0 409.451 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 34 55 45.9451 -90.2732 472.000 122.0 408.708 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 39 55 45.9451 -90.2732 472.000 396.0 405.148 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 40 25 45.9451 -90.2732 472.000 396.0 405.638 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 40 55 45.9451 -90.2732 472.000 396.0 405.439 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 41 25 45.9451 -90.2732 472.000 396.0 405.818 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 41 55 45.9451 -90.2732 472.000 396.0 404.893 0.670 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 42 25 45.9451 -90.2732 472.000 396.0 405.296 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 42 55 45.9451 -90.2732 472.000 396.0 405.196 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 43 25 45.9451 -90.2732 472.000 396.0 405.888 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 43 55 45.9451 -90.2732 472.000 396.0 403.986 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 44 25 45.9451 -90.2732 472.000 396.0 405.183 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 44 55 45.9451 -90.2732 472.000 396.0 406.412 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 49 55 45.9451 -90.2732 472.000 30.0 409.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 54 55 45.9451 -90.2732 472.000 122.0 409.232 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 03 59 55 45.9451 -90.2732 472.000 396.0 405.654 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 04 55 45.9451 -90.2732 472.000 30.0 409.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 09 55 45.9451 -90.2732 472.000 122.0 409.432 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 14 55 45.9451 -90.2732 472.000 396.0 405.797 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 24 55 45.9451 -90.2732 472.000 30.0 410.040 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 29 55 45.9451 -90.2732 472.000 122.0 409.686 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 34 55 45.9451 -90.2732 472.000 396.0 404.451 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 39 55 45.9451 -90.2732 472.000 30.0 410.158 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 44 55 45.9451 -90.2732 472.000 122.0 409.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 49 55 45.9451 -90.2732 472.000 396.0 402.081 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 50 25 45.9451 -90.2732 472.000 396.0 403.220 0.540 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 50 55 45.9451 -90.2732 472.000 396.0 404.312 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 51 25 45.9451 -90.2732 472.000 396.0 403.821 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 51 55 45.9451 -90.2732 472.000 396.0 404.395 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 52 25 45.9451 -90.2732 472.000 396.0 402.723 0.610 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 52 55 45.9451 -90.2732 472.000 396.0 404.281 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 53 25 45.9451 -90.2732 472.000 396.0 405.537 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 53 55 45.9451 -90.2732 472.000 396.0 406.040 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 54 25 45.9451 -90.2732 472.000 396.0 407.027 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 04 54 55 45.9451 -90.2732 472.000 396.0 406.894 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 04 55 45.9451 -90.2732 472.000 30.0 409.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 09 55 45.9451 -90.2732 472.000 122.0 409.485 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 14 55 45.9451 -90.2732 472.000 396.0 406.075 0.530 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 19 55 45.9451 -90.2732 472.000 30.0 410.080 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 24 55 45.9451 -90.2732 472.000 122.0 409.389 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 29 55 45.9451 -90.2732 472.000 396.0 404.006 1.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 30 25 45.9451 -90.2732 472.000 396.0 402.757 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 30 55 45.9451 -90.2732 472.000 396.0 403.863 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 31 25 45.9451 -90.2732 472.000 396.0 404.181 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 31 55 45.9451 -90.2732 472.000 396.0 404.049 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 32 25 45.9451 -90.2732 472.000 396.0 403.956 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 32 55 45.9451 -90.2732 472.000 396.0 403.594 0.510 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 33 25 45.9451 -90.2732 472.000 396.0 404.391 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 33 55 45.9451 -90.2732 472.000 396.0 404.519 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 34 25 45.9451 -90.2732 472.000 396.0 403.884 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 34 55 45.9451 -90.2732 472.000 396.0 403.616 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 39 55 45.9451 -90.2732 472.000 30.0 409.351 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 44 55 45.9451 -90.2732 472.000 122.0 408.330 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 49 55 45.9451 -90.2732 472.000 396.0 398.452 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 54 55 45.9451 -90.2732 472.000 30.0 408.813 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 05 59 55 45.9451 -90.2732 472.000 122.0 408.057 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 04 55 45.9451 -90.2732 472.000 396.0 400.720 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 14 55 45.9451 -90.2732 472.000 30.0 408.856 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 19 55 45.9451 -90.2732 472.000 122.0 408.214 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 24 55 45.9451 -90.2732 472.000 396.0 403.506 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 29 55 45.9451 -90.2732 472.000 30.0 408.888 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 34 55 45.9451 -90.2732 472.000 122.0 408.433 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 39 55 45.9451 -90.2732 472.000 396.0 403.467 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 40 25 45.9451 -90.2732 472.000 396.0 403.430 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 40 55 45.9451 -90.2732 472.000 396.0 403.343 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 41 25 45.9451 -90.2732 472.000 396.0 403.931 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 41 55 45.9451 -90.2732 472.000 396.0 403.575 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 42 25 45.9451 -90.2732 472.000 396.0 403.343 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 42 55 45.9451 -90.2732 472.000 396.0 404.082 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 43 25 45.9451 -90.2732 472.000 396.0 403.814 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 43 55 45.9451 -90.2732 472.000 396.0 404.370 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 44 25 45.9451 -90.2732 472.000 396.0 403.613 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 44 55 45.9451 -90.2732 472.000 396.0 402.820 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 49 55 45.9451 -90.2732 472.000 30.0 409.077 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 54 55 45.9451 -90.2732 472.000 122.0 408.694 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 06 59 55 45.9451 -90.2732 472.000 396.0 403.960 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 04 55 45.9451 -90.2732 472.000 30.0 409.060 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 09 55 45.9451 -90.2732 472.000 122.0 408.563 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 14 55 45.9451 -90.2732 472.000 396.0 403.543 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 15 25 45.9451 -90.2732 472.000 396.0 403.562 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 15 55 45.9451 -90.2732 472.000 396.0 402.926 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 16 25 45.9451 -90.2732 472.000 396.0 403.018 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 16 55 45.9451 -90.2732 472.000 396.0 401.879 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 17 25 45.9451 -90.2732 472.000 396.0 401.388 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 17 55 45.9451 -90.2732 472.000 396.0 401.309 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 18 25 45.9451 -90.2732 472.000 396.0 400.993 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 18 55 45.9451 -90.2732 472.000 396.0 401.452 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 19 25 45.9451 -90.2732 472.000 396.0 401.783 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 19 55 45.9451 -90.2732 472.000 396.0 402.158 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 24 55 45.9451 -90.2732 472.000 30.0 409.119 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 29 55 45.9451 -90.2732 472.000 122.0 408.308 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 34 55 45.9451 -90.2732 472.000 396.0 402.067 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 39 55 45.9451 -90.2732 472.000 30.0 409.323 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 44 55 45.9451 -90.2732 472.000 122.0 407.778 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 49 55 45.9451 -90.2732 472.000 396.0 400.867 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 11 07 59 55 45.9451 -90.2732 472.000 30.0 409.030 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 04 55 45.9451 -90.2732 472.000 122.0 407.635 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 09 55 45.9451 -90.2732 472.000 396.0 401.309 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 14 55 45.9451 -90.2732 472.000 30.0 408.534 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 19 55 45.9451 -90.2732 472.000 122.0 406.732 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 24 55 45.9451 -90.2732 472.000 396.0 401.070 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 25 25 45.9451 -90.2732 472.000 396.0 400.421 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 25 55 45.9451 -90.2732 472.000 396.0 400.770 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 26 25 45.9451 -90.2732 472.000 396.0 400.998 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 26 55 45.9451 -90.2732 472.000 396.0 400.921 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 27 25 45.9451 -90.2732 472.000 396.0 400.928 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 27 55 45.9451 -90.2732 472.000 396.0 400.720 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 28 25 45.9451 -90.2732 472.000 396.0 400.812 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 28 55 45.9451 -90.2732 472.000 396.0 401.012 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 29 25 45.9451 -90.2732 472.000 396.0 401.208 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 29 55 45.9451 -90.2732 472.000 396.0 401.516 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 34 55 45.9451 -90.2732 472.000 30.0 407.460 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 39 55 45.9451 -90.2732 472.000 122.0 406.055 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 44 55 45.9451 -90.2732 472.000 396.0 402.332 0.450 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 49 55 45.9451 -90.2732 472.000 30.0 406.256 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 54 55 45.9451 -90.2732 472.000 122.0 405.364 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 08 59 55 45.9451 -90.2732 472.000 396.0 401.999 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 00 25 45.9451 -90.2732 472.000 396.0 401.777 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 00 55 45.9451 -90.2732 472.000 396.0 401.810 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 01 25 45.9451 -90.2732 472.000 396.0 402.131 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 01 55 45.9451 -90.2732 472.000 396.0 401.711 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 02 25 45.9451 -90.2732 472.000 396.0 401.902 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 02 55 45.9451 -90.2732 472.000 396.0 402.068 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 03 25 45.9451 -90.2732 472.000 396.0 401.933 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 03 55 45.9451 -90.2732 472.000 396.0 401.251 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 04 25 45.9451 -90.2732 472.000 396.0 401.455 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 04 55 45.9451 -90.2732 472.000 396.0 402.170 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 09 55 45.9451 -90.2732 472.000 30.0 405.933 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 14 55 45.9451 -90.2732 472.000 122.0 404.582 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 19 55 45.9451 -90.2732 472.000 396.0 401.009 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 24 55 45.9451 -90.2732 472.000 30.0 404.793 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 29 55 45.9451 -90.2732 472.000 122.0 404.010 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 34 55 45.9451 -90.2732 472.000 396.0 401.789 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 35 25 45.9451 -90.2732 472.000 396.0 401.685 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 35 55 45.9451 -90.2732 472.000 396.0 401.707 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 36 25 45.9451 -90.2732 472.000 396.0 401.711 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 36 55 45.9451 -90.2732 472.000 396.0 401.662 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 37 25 45.9451 -90.2732 472.000 396.0 401.521 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 37 55 45.9451 -90.2732 472.000 396.0 401.780 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 38 25 45.9451 -90.2732 472.000 396.0 402.205 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 38 55 45.9451 -90.2732 472.000 396.0 402.186 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 39 25 45.9451 -90.2732 472.000 396.0 402.049 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 39 55 45.9451 -90.2732 472.000 396.0 402.220 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 44 55 45.9451 -90.2732 472.000 30.0 404.275 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 49 55 45.9451 -90.2732 472.000 122.0 403.831 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 54 55 45.9451 -90.2732 472.000 396.0 401.019 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 09 59 55 45.9451 -90.2732 472.000 30.0 403.765 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 04 55 45.9451 -90.2732 472.000 122.0 403.320 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 09 55 45.9451 -90.2732 472.000 396.0 402.485 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 19 55 45.9451 -90.2732 472.000 30.0 403.793 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 24 55 45.9451 -90.2732 472.000 122.0 403.416 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 29 55 45.9451 -90.2732 472.000 396.0 403.139 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 34 55 45.9451 -90.2732 472.000 30.0 403.865 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 39 55 45.9451 -90.2732 472.000 122.0 403.710 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 44 55 45.9451 -90.2732 472.000 396.0 403.176 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 54 55 45.9451 -90.2732 472.000 30.0 409.830 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 10 59 55 45.9451 -90.2732 472.000 122.0 409.847 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 04 55 45.9451 -90.2732 472.000 396.0 408.245 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 09 55 45.9451 -90.2732 472.000 30.0 409.012 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 14 55 45.9451 -90.2732 472.000 122.0 409.158 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 19 55 45.9451 -90.2732 472.000 396.0 408.513 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 20 25 45.9451 -90.2732 472.000 396.0 408.251 0.800 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 20 55 45.9451 -90.2732 472.000 396.0 407.581 0.840 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 21 25 45.9451 -90.2732 472.000 396.0 407.680 0.780 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 21 55 45.9451 -90.2732 472.000 396.0 407.733 0.650 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 22 25 45.9451 -90.2732 472.000 396.0 408.230 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 22 55 45.9451 -90.2732 472.000 396.0 407.254 0.930 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 23 25 45.9451 -90.2732 472.000 396.0 408.614 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 23 55 45.9451 -90.2732 472.000 396.0 408.711 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 24 25 45.9451 -90.2732 472.000 396.0 407.623 0.990 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 24 55 45.9451 -90.2732 472.000 396.0 408.440 0.770 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 29 55 45.9451 -90.2732 472.000 30.0 409.309 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 34 55 45.9451 -90.2732 472.000 122.0 407.239 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 39 55 45.9451 -90.2732 472.000 396.0 406.058 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 44 55 45.9451 -90.2732 472.000 30.0 406.566 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 11 11 49 55 45.9451 -90.2732 472.000 122.0 406.347 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 14 55 45.9451 -90.2732 472.000 396.0 406.518 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 19 55 45.9451 -90.2732 472.000 30.0 406.749 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 24 55 45.9451 -90.2732 472.000 122.0 406.169 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 29 55 45.9451 -90.2732 472.000 396.0 405.958 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 34 55 45.9451 -90.2732 472.000 30.0 405.520 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 39 55 45.9451 -90.2732 472.000 122.0 404.936 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 44 55 45.9451 -90.2732 472.000 396.0 404.610 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 45 25 45.9451 -90.2732 472.000 396.0 404.626 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 45 55 45.9451 -90.2732 472.000 396.0 404.651 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 46 25 45.9451 -90.2732 472.000 396.0 404.599 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 46 55 45.9451 -90.2732 472.000 396.0 404.388 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 47 25 45.9451 -90.2732 472.000 396.0 404.504 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 47 55 45.9451 -90.2732 472.000 396.0 404.499 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 48 25 45.9451 -90.2732 472.000 396.0 404.388 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 48 55 45.9451 -90.2732 472.000 396.0 404.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 49 25 45.9451 -90.2732 472.000 396.0 404.433 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 49 55 45.9451 -90.2732 472.000 396.0 404.436 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 54 55 45.9451 -90.2732 472.000 30.0 404.295 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 12 59 55 45.9451 -90.2732 472.000 122.0 403.378 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 04 55 45.9451 -90.2732 472.000 396.0 403.408 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 09 55 45.9451 -90.2732 472.000 30.0 403.814 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 14 55 45.9451 -90.2732 472.000 122.0 403.633 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 19 55 45.9451 -90.2732 472.000 396.0 403.427 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 20 25 45.9451 -90.2732 472.000 396.0 403.423 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 20 55 45.9451 -90.2732 472.000 396.0 403.514 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 21 25 45.9451 -90.2732 472.000 396.0 403.488 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 21 55 45.9451 -90.2732 472.000 396.0 403.353 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 22 25 45.9451 -90.2732 472.000 396.0 403.479 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 22 55 45.9451 -90.2732 472.000 396.0 403.474 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 23 25 45.9451 -90.2732 472.000 396.0 403.509 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 23 55 45.9451 -90.2732 472.000 396.0 403.534 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 24 25 45.9451 -90.2732 472.000 396.0 403.555 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 24 55 45.9451 -90.2732 472.000 396.0 403.589 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 29 55 45.9451 -90.2732 472.000 30.0 403.291 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 34 55 45.9451 -90.2732 472.000 122.0 402.860 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 39 55 45.9451 -90.2732 472.000 396.0 402.725 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 44 55 45.9451 -90.2732 472.000 30.0 402.748 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 49 55 45.9451 -90.2732 472.000 122.0 402.553 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 13 54 55 45.9451 -90.2732 472.000 396.0 402.055 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 04 55 45.9451 -90.2732 472.000 30.0 402.741 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 09 55 45.9451 -90.2732 472.000 122.0 402.374 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 14 55 45.9451 -90.2732 472.000 396.0 402.385 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 19 55 45.9451 -90.2732 472.000 30.0 402.554 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 24 55 45.9451 -90.2732 472.000 122.0 402.555 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 29 55 45.9451 -90.2732 472.000 396.0 402.126 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 30 25 45.9451 -90.2732 472.000 396.0 402.167 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 30 55 45.9451 -90.2732 472.000 396.0 402.153 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 31 25 45.9451 -90.2732 472.000 396.0 402.171 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 31 55 45.9451 -90.2732 472.000 396.0 402.000 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 32 25 45.9451 -90.2732 472.000 396.0 401.599 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 32 55 45.9451 -90.2732 472.000 396.0 401.931 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 33 25 45.9451 -90.2732 472.000 396.0 402.096 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 33 55 45.9451 -90.2732 472.000 396.0 402.183 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 34 25 45.9451 -90.2732 472.000 396.0 402.176 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 34 55 45.9451 -90.2732 472.000 396.0 402.199 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 39 55 45.9451 -90.2732 472.000 30.0 402.161 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 44 55 45.9451 -90.2732 472.000 122.0 401.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 49 55 45.9451 -90.2732 472.000 396.0 401.552 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 54 55 45.9451 -90.2732 472.000 30.0 401.576 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 14 59 55 45.9451 -90.2732 472.000 122.0 401.517 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 04 55 45.9451 -90.2732 472.000 396.0 401.446 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 05 25 45.9451 -90.2732 472.000 396.0 401.450 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 05 55 45.9451 -90.2732 472.000 396.0 401.421 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 06 25 45.9451 -90.2732 472.000 396.0 401.457 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 06 55 45.9451 -90.2732 472.000 396.0 401.354 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 07 25 45.9451 -90.2732 472.000 396.0 401.214 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 07 55 45.9451 -90.2732 472.000 396.0 401.253 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 08 25 45.9451 -90.2732 472.000 396.0 401.258 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 08 55 45.9451 -90.2732 472.000 396.0 401.174 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 09 25 45.9451 -90.2732 472.000 396.0 401.167 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 09 55 45.9451 -90.2732 472.000 396.0 401.093 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 14 55 45.9451 -90.2732 472.000 30.0 400.977 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 19 55 45.9451 -90.2732 472.000 122.0 401.108 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 24 55 45.9451 -90.2732 472.000 396.0 401.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 29 55 45.9451 -90.2732 472.000 30.0 400.711 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 34 55 45.9451 -90.2732 472.000 122.0 400.904 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 39 55 45.9451 -90.2732 472.000 396.0 400.311 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 40 25 45.9451 -90.2732 472.000 396.0 400.448 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 40 55 45.9451 -90.2732 472.000 396.0 400.521 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 41 25 45.9451 -90.2732 472.000 396.0 400.499 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 41 55 45.9451 -90.2732 472.000 396.0 400.437 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 42 25 45.9451 -90.2732 472.000 396.0 400.579 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 42 55 45.9451 -90.2732 472.000 396.0 400.347 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 43 25 45.9451 -90.2732 472.000 396.0 400.534 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 43 55 45.9451 -90.2732 472.000 396.0 400.656 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 44 25 45.9451 -90.2732 472.000 396.0 400.635 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 44 55 45.9451 -90.2732 472.000 396.0 400.682 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 49 55 45.9451 -90.2732 472.000 30.0 400.343 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 54 55 45.9451 -90.2732 472.000 122.0 400.371 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 15 59 55 45.9451 -90.2732 472.000 396.0 400.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 04 55 45.9451 -90.2732 472.000 30.0 400.279 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 09 55 45.9451 -90.2732 472.000 122.0 400.210 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 14 55 45.9451 -90.2732 472.000 396.0 400.132 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 24 55 45.9451 -90.2732 472.000 30.0 399.912 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 29 55 45.9451 -90.2732 472.000 122.0 399.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 34 55 45.9451 -90.2732 472.000 396.0 399.621 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 39 55 45.9451 -90.2732 472.000 30.0 399.595 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 44 55 45.9451 -90.2732 472.000 122.0 399.479 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 49 55 45.9451 -90.2732 472.000 396.0 399.361 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 50 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 F.P LEF 2010 11 11 16 50 55 45.9451 -90.2732 472.000 396.0 399.328 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 51 25 45.9451 -90.2732 472.000 396.0 399.322 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 51 55 45.9451 -90.2732 472.000 396.0 399.223 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 52 25 45.9451 -90.2732 472.000 396.0 399.121 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 52 55 45.9451 -90.2732 472.000 396.0 399.325 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 53 25 45.9451 -90.2732 472.000 396.0 399.356 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 53 55 45.9451 -90.2732 472.000 396.0 398.981 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 54 25 45.9451 -90.2732 472.000 396.0 399.005 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 16 54 55 45.9451 -90.2732 472.000 396.0 399.134 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 04 55 45.9451 -90.2732 472.000 30.0 398.543 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 09 55 45.9451 -90.2732 472.000 122.0 398.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 14 55 45.9451 -90.2732 472.000 396.0 398.164 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 19 55 45.9451 -90.2732 472.000 30.0 397.548 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 24 55 45.9451 -90.2732 472.000 122.0 397.460 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 29 55 45.9451 -90.2732 472.000 396.0 397.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 30 25 45.9451 -90.2732 472.000 396.0 396.872 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 30 55 45.9451 -90.2732 472.000 396.0 396.740 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 31 25 45.9451 -90.2732 472.000 396.0 397.063 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 31 55 45.9451 -90.2732 472.000 396.0 397.192 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 32 25 45.9451 -90.2732 472.000 396.0 397.075 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 32 55 45.9451 -90.2732 472.000 396.0 397.064 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 33 25 45.9451 -90.2732 472.000 396.0 397.093 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 33 55 45.9451 -90.2732 472.000 396.0 397.152 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 34 25 45.9451 -90.2732 472.000 396.0 397.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 34 55 45.9451 -90.2732 472.000 396.0 397.157 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 39 55 45.9451 -90.2732 472.000 30.0 396.932 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 44 55 45.9451 -90.2732 472.000 122.0 396.885 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 49 55 45.9451 -90.2732 472.000 396.0 396.292 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 54 55 45.9451 -90.2732 472.000 30.0 396.400 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 17 59 55 45.9451 -90.2732 472.000 122.0 396.452 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 04 55 45.9451 -90.2732 472.000 396.0 396.365 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 14 55 45.9451 -90.2732 472.000 30.0 396.149 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 19 55 45.9451 -90.2732 472.000 122.0 396.723 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 24 55 45.9451 -90.2732 472.000 396.0 396.837 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 29 55 45.9451 -90.2732 472.000 30.0 396.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 34 55 45.9451 -90.2732 472.000 122.0 396.015 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 39 55 45.9451 -90.2732 472.000 396.0 395.700 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 40 25 45.9451 -90.2732 472.000 396.0 395.787 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 40 55 45.9451 -90.2732 472.000 396.0 395.638 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 41 25 45.9451 -90.2732 472.000 396.0 395.839 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 41 55 45.9451 -90.2732 472.000 396.0 395.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 42 25 45.9451 -90.2732 472.000 396.0 395.692 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 42 55 45.9451 -90.2732 472.000 396.0 395.853 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 43 25 45.9451 -90.2732 472.000 396.0 396.101 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 43 55 45.9451 -90.2732 472.000 396.0 396.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 44 25 45.9451 -90.2732 472.000 396.0 396.174 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 44 55 45.9451 -90.2732 472.000 396.0 395.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 49 55 45.9451 -90.2732 472.000 30.0 395.638 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 54 55 45.9451 -90.2732 472.000 122.0 395.728 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 18 59 55 45.9451 -90.2732 472.000 396.0 395.979 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 04 55 45.9451 -90.2732 472.000 30.0 395.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 09 55 45.9451 -90.2732 472.000 122.0 395.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 14 55 45.9451 -90.2732 472.000 396.0 395.309 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 15 25 45.9451 -90.2732 472.000 396.0 395.359 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 15 55 45.9451 -90.2732 472.000 396.0 395.273 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 16 25 45.9451 -90.2732 472.000 396.0 395.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 16 55 45.9451 -90.2732 472.000 396.0 395.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 17 25 45.9451 -90.2732 472.000 396.0 395.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 17 55 45.9451 -90.2732 472.000 396.0 395.435 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 18 25 45.9451 -90.2732 472.000 396.0 395.525 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 18 55 45.9451 -90.2732 472.000 396.0 395.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 19 25 45.9451 -90.2732 472.000 396.0 395.534 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 19 55 45.9451 -90.2732 472.000 396.0 395.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 24 55 45.9451 -90.2732 472.000 30.0 395.646 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 29 55 45.9451 -90.2732 472.000 122.0 395.370 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 34 55 45.9451 -90.2732 472.000 396.0 395.574 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 39 55 45.9451 -90.2732 472.000 30.0 395.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 44 55 45.9451 -90.2732 472.000 122.0 395.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 49 55 45.9451 -90.2732 472.000 396.0 395.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 19 59 55 45.9451 -90.2732 472.000 30.0 395.279 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 04 55 45.9451 -90.2732 472.000 122.0 395.169 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 09 55 45.9451 -90.2732 472.000 396.0 395.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 14 55 45.9451 -90.2732 472.000 30.0 394.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 19 55 45.9451 -90.2732 472.000 122.0 395.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 24 55 45.9451 -90.2732 472.000 396.0 395.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 25 25 45.9451 -90.2732 472.000 396.0 395.265 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 25 55 45.9451 -90.2732 472.000 396.0 395.365 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 26 25 45.9451 -90.2732 472.000 396.0 395.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 26 55 45.9451 -90.2732 472.000 396.0 395.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 27 25 45.9451 -90.2732 472.000 396.0 395.412 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 27 55 45.9451 -90.2732 472.000 396.0 395.509 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 28 25 45.9451 -90.2732 472.000 396.0 395.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 28 55 45.9451 -90.2732 472.000 396.0 395.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 29 25 45.9451 -90.2732 472.000 396.0 395.642 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 29 55 45.9451 -90.2732 472.000 396.0 395.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 34 55 45.9451 -90.2732 472.000 30.0 395.629 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 39 55 45.9451 -90.2732 472.000 122.0 395.982 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 44 55 45.9451 -90.2732 472.000 396.0 395.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 49 55 45.9451 -90.2732 472.000 30.0 395.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 54 55 45.9451 -90.2732 472.000 122.0 395.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 20 59 55 45.9451 -90.2732 472.000 396.0 395.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 00 25 45.9451 -90.2732 472.000 396.0 395.378 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 00 55 45.9451 -90.2732 472.000 396.0 395.416 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 01 25 45.9451 -90.2732 472.000 396.0 395.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 01 55 45.9451 -90.2732 472.000 396.0 395.292 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 02 25 45.9451 -90.2732 472.000 396.0 395.404 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 02 55 45.9451 -90.2732 472.000 396.0 395.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 03 25 45.9451 -90.2732 472.000 396.0 395.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 03 55 45.9451 -90.2732 472.000 396.0 395.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 04 25 45.9451 -90.2732 472.000 396.0 395.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 04 55 45.9451 -90.2732 472.000 396.0 395.434 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 09 55 45.9451 -90.2732 472.000 30.0 395.674 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 14 55 45.9451 -90.2732 472.000 122.0 395.621 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 19 55 45.9451 -90.2732 472.000 396.0 395.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 24 55 45.9451 -90.2732 472.000 30.0 395.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 29 55 45.9451 -90.2732 472.000 122.0 395.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 34 55 45.9451 -90.2732 472.000 396.0 395.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 35 25 45.9451 -90.2732 472.000 396.0 395.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 35 55 45.9451 -90.2732 472.000 396.0 395.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 36 25 45.9451 -90.2732 472.000 396.0 395.510 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 36 55 45.9451 -90.2732 472.000 396.0 395.464 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 37 25 45.9451 -90.2732 472.000 396.0 395.396 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 37 55 45.9451 -90.2732 472.000 396.0 395.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 38 25 45.9451 -90.2732 472.000 396.0 395.441 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 38 55 45.9451 -90.2732 472.000 396.0 395.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 39 25 45.9451 -90.2732 472.000 396.0 395.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 39 55 45.9451 -90.2732 472.000 396.0 395.438 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 44 55 45.9451 -90.2732 472.000 30.0 395.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 49 55 45.9451 -90.2732 472.000 122.0 395.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 54 55 45.9451 -90.2732 472.000 396.0 395.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 21 59 55 45.9451 -90.2732 472.000 30.0 395.740 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 04 55 45.9451 -90.2732 472.000 122.0 395.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 09 55 45.9451 -90.2732 472.000 396.0 395.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 19 55 45.9451 -90.2732 472.000 30.0 395.846 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 24 55 45.9451 -90.2732 472.000 122.0 395.820 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 29 55 45.9451 -90.2732 472.000 396.0 395.752 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 34 55 45.9451 -90.2732 472.000 30.0 396.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 39 55 45.9451 -90.2732 472.000 122.0 395.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 44 55 45.9451 -90.2732 472.000 396.0 395.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 54 55 45.9451 -90.2732 472.000 30.0 396.385 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 22 59 55 45.9451 -90.2732 472.000 122.0 396.275 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 04 55 45.9451 -90.2732 472.000 396.0 396.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 09 55 45.9451 -90.2732 472.000 30.0 396.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 14 55 45.9451 -90.2732 472.000 122.0 396.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 19 55 45.9451 -90.2732 472.000 396.0 396.141 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 20 25 45.9451 -90.2732 472.000 396.0 396.063 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 20 55 45.9451 -90.2732 472.000 396.0 395.970 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 21 25 45.9451 -90.2732 472.000 396.0 396.103 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 21 55 45.9451 -90.2732 472.000 396.0 396.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 22 25 45.9451 -90.2732 472.000 396.0 396.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 22 55 45.9451 -90.2732 472.000 396.0 396.032 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 23 25 45.9451 -90.2732 472.000 396.0 396.038 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 23 55 45.9451 -90.2732 472.000 396.0 396.028 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 24 25 45.9451 -90.2732 472.000 396.0 396.042 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 24 55 45.9451 -90.2732 472.000 396.0 396.078 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 29 55 45.9451 -90.2732 472.000 30.0 397.196 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 34 55 45.9451 -90.2732 472.000 122.0 396.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 39 55 45.9451 -90.2732 472.000 396.0 396.255 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 44 55 45.9451 -90.2732 472.000 30.0 397.200 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 11 23 49 55 45.9451 -90.2732 472.000 122.0 396.700 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 14 55 45.9451 -90.2732 472.000 396.0 396.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 19 55 45.9451 -90.2732 472.000 30.0 397.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 24 55 45.9451 -90.2732 472.000 122.0 396.917 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 29 55 45.9451 -90.2732 472.000 396.0 396.168 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 34 55 45.9451 -90.2732 472.000 30.0 397.589 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 39 55 45.9451 -90.2732 472.000 122.0 396.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 44 55 45.9451 -90.2732 472.000 396.0 396.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 45 25 45.9451 -90.2732 472.000 396.0 396.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 45 55 45.9451 -90.2732 472.000 396.0 396.015 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 46 25 45.9451 -90.2732 472.000 396.0 395.965 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 46 55 45.9451 -90.2732 472.000 396.0 395.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 47 25 45.9451 -90.2732 472.000 396.0 395.948 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 47 55 45.9451 -90.2732 472.000 396.0 395.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 48 25 45.9451 -90.2732 472.000 396.0 395.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 48 55 45.9451 -90.2732 472.000 396.0 395.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 49 25 45.9451 -90.2732 472.000 396.0 395.979 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 49 55 45.9451 -90.2732 472.000 396.0 395.972 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 54 55 45.9451 -90.2732 472.000 30.0 397.898 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 00 59 55 45.9451 -90.2732 472.000 122.0 397.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 04 55 45.9451 -90.2732 472.000 396.0 396.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 09 55 45.9451 -90.2732 472.000 30.0 398.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 14 55 45.9451 -90.2732 472.000 122.0 397.149 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 19 55 45.9451 -90.2732 472.000 396.0 396.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 20 25 45.9451 -90.2732 472.000 396.0 396.172 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 20 55 45.9451 -90.2732 472.000 396.0 396.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 21 25 45.9451 -90.2732 472.000 396.0 396.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 21 55 45.9451 -90.2732 472.000 396.0 396.195 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 22 25 45.9451 -90.2732 472.000 396.0 396.183 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 22 55 45.9451 -90.2732 472.000 396.0 396.196 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 23 25 45.9451 -90.2732 472.000 396.0 396.189 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 23 55 45.9451 -90.2732 472.000 396.0 396.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 24 25 45.9451 -90.2732 472.000 396.0 396.164 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 24 55 45.9451 -90.2732 472.000 396.0 396.186 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 29 55 45.9451 -90.2732 472.000 30.0 398.114 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 34 55 45.9451 -90.2732 472.000 122.0 397.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 39 55 45.9451 -90.2732 472.000 396.0 396.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 44 55 45.9451 -90.2732 472.000 30.0 398.156 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 49 55 45.9451 -90.2732 472.000 122.0 397.322 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 01 54 55 45.9451 -90.2732 472.000 396.0 396.803 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 04 55 45.9451 -90.2732 472.000 30.0 398.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 09 55 45.9451 -90.2732 472.000 122.0 397.442 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 14 55 45.9451 -90.2732 472.000 396.0 396.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 19 55 45.9451 -90.2732 472.000 30.0 399.076 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 24 55 45.9451 -90.2732 472.000 122.0 397.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 29 55 45.9451 -90.2732 472.000 396.0 396.242 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 30 25 45.9451 -90.2732 472.000 396.0 396.307 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 30 55 45.9451 -90.2732 472.000 396.0 396.401 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 31 25 45.9451 -90.2732 472.000 396.0 396.295 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 31 55 45.9451 -90.2732 472.000 396.0 396.297 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 32 25 45.9451 -90.2732 472.000 396.0 396.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 32 55 45.9451 -90.2732 472.000 396.0 396.278 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 33 25 45.9451 -90.2732 472.000 396.0 396.330 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 33 55 45.9451 -90.2732 472.000 396.0 396.324 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 34 25 45.9451 -90.2732 472.000 396.0 396.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 34 55 45.9451 -90.2732 472.000 396.0 396.214 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 39 55 45.9451 -90.2732 472.000 30.0 399.195 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 44 55 45.9451 -90.2732 472.000 122.0 398.168 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 49 55 45.9451 -90.2732 472.000 396.0 396.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 54 55 45.9451 -90.2732 472.000 30.0 399.537 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 02 59 55 45.9451 -90.2732 472.000 122.0 398.161 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 04 55 45.9451 -90.2732 472.000 396.0 396.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 05 25 45.9451 -90.2732 472.000 396.0 396.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 05 55 45.9451 -90.2732 472.000 396.0 396.380 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 06 25 45.9451 -90.2732 472.000 396.0 396.010 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 06 55 45.9451 -90.2732 472.000 396.0 395.992 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 07 25 45.9451 -90.2732 472.000 396.0 395.728 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 07 55 45.9451 -90.2732 472.000 396.0 395.745 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 08 25 45.9451 -90.2732 472.000 396.0 395.940 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 08 55 45.9451 -90.2732 472.000 396.0 395.648 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 09 25 45.9451 -90.2732 472.000 396.0 395.700 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 09 55 45.9451 -90.2732 472.000 396.0 395.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 14 55 45.9451 -90.2732 472.000 30.0 399.829 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 19 55 45.9451 -90.2732 472.000 122.0 399.403 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 24 55 45.9451 -90.2732 472.000 396.0 394.684 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 29 55 45.9451 -90.2732 472.000 30.0 399.962 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 34 55 45.9451 -90.2732 472.000 122.0 398.926 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 39 55 45.9451 -90.2732 472.000 396.0 393.805 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 40 25 45.9451 -90.2732 472.000 396.0 393.463 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 40 55 45.9451 -90.2732 472.000 396.0 393.717 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 41 25 45.9451 -90.2732 472.000 396.0 393.413 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 41 55 45.9451 -90.2732 472.000 396.0 393.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 42 25 45.9451 -90.2732 472.000 396.0 393.273 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 42 55 45.9451 -90.2732 472.000 396.0 393.223 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 43 25 45.9451 -90.2732 472.000 396.0 393.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 43 55 45.9451 -90.2732 472.000 396.0 393.217 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 44 25 45.9451 -90.2732 472.000 396.0 393.139 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 44 55 45.9451 -90.2732 472.000 396.0 393.209 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 49 55 45.9451 -90.2732 472.000 30.0 401.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 54 55 45.9451 -90.2732 472.000 122.0 397.909 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 03 59 55 45.9451 -90.2732 472.000 396.0 393.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 04 55 45.9451 -90.2732 472.000 30.0 402.261 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 09 55 45.9451 -90.2732 472.000 122.0 397.331 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 14 55 45.9451 -90.2732 472.000 396.0 392.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 24 55 45.9451 -90.2732 472.000 30.0 401.818 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 29 55 45.9451 -90.2732 472.000 122.0 397.283 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 34 55 45.9451 -90.2732 472.000 396.0 392.773 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 39 55 45.9451 -90.2732 472.000 30.0 401.895 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 44 55 45.9451 -90.2732 472.000 122.0 397.040 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 49 55 45.9451 -90.2732 472.000 396.0 392.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 50 25 45.9451 -90.2732 472.000 396.0 392.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 50 55 45.9451 -90.2732 472.000 396.0 392.693 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 51 25 45.9451 -90.2732 472.000 396.0 392.692 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 51 55 45.9451 -90.2732 472.000 396.0 392.716 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 52 25 45.9451 -90.2732 472.000 396.0 392.715 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 52 55 45.9451 -90.2732 472.000 396.0 392.718 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 53 25 45.9451 -90.2732 472.000 396.0 392.720 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 53 55 45.9451 -90.2732 472.000 396.0 392.743 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 54 25 45.9451 -90.2732 472.000 396.0 392.750 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 04 54 55 45.9451 -90.2732 472.000 396.0 392.766 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 04 55 45.9451 -90.2732 472.000 30.0 402.795 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 09 55 45.9451 -90.2732 472.000 122.0 396.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 14 55 45.9451 -90.2732 472.000 396.0 392.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 19 55 45.9451 -90.2732 472.000 30.0 400.742 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 24 55 45.9451 -90.2732 472.000 122.0 397.237 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 29 55 45.9451 -90.2732 472.000 396.0 392.823 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 30 25 45.9451 -90.2732 472.000 396.0 392.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 30 55 45.9451 -90.2732 472.000 396.0 392.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 31 25 45.9451 -90.2732 472.000 396.0 392.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 31 55 45.9451 -90.2732 472.000 396.0 392.780 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 32 25 45.9451 -90.2732 472.000 396.0 392.770 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 32 55 45.9451 -90.2732 472.000 396.0 392.781 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 33 25 45.9451 -90.2732 472.000 396.0 392.810 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 33 55 45.9451 -90.2732 472.000 396.0 392.828 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 34 25 45.9451 -90.2732 472.000 396.0 392.813 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 34 55 45.9451 -90.2732 472.000 396.0 392.821 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 39 55 45.9451 -90.2732 472.000 30.0 401.162 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 44 55 45.9451 -90.2732 472.000 122.0 396.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 49 55 45.9451 -90.2732 472.000 396.0 392.815 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 54 55 45.9451 -90.2732 472.000 30.0 400.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 05 59 55 45.9451 -90.2732 472.000 122.0 396.229 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 04 55 45.9451 -90.2732 472.000 396.0 392.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 14 55 45.9451 -90.2732 472.000 30.0 401.117 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 19 55 45.9451 -90.2732 472.000 122.0 396.663 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 24 55 45.9451 -90.2732 472.000 396.0 393.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 29 55 45.9451 -90.2732 472.000 30.0 402.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 34 55 45.9451 -90.2732 472.000 122.0 396.335 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 39 55 45.9451 -90.2732 472.000 396.0 393.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 40 25 45.9451 -90.2732 472.000 396.0 393.402 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 40 55 45.9451 -90.2732 472.000 396.0 393.415 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 41 25 45.9451 -90.2732 472.000 396.0 393.405 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 41 55 45.9451 -90.2732 472.000 396.0 393.416 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 42 25 45.9451 -90.2732 472.000 396.0 393.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 42 55 45.9451 -90.2732 472.000 396.0 393.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 43 25 45.9451 -90.2732 472.000 396.0 393.418 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 43 55 45.9451 -90.2732 472.000 396.0 393.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 44 25 45.9451 -90.2732 472.000 396.0 393.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 44 55 45.9451 -90.2732 472.000 396.0 393.452 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 49 55 45.9451 -90.2732 472.000 30.0 401.880 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 54 55 45.9451 -90.2732 472.000 122.0 395.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 06 59 55 45.9451 -90.2732 472.000 396.0 393.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 04 55 45.9451 -90.2732 472.000 30.0 402.153 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 09 55 45.9451 -90.2732 472.000 122.0 396.053 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 14 55 45.9451 -90.2732 472.000 396.0 393.860 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 15 25 45.9451 -90.2732 472.000 396.0 393.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 15 55 45.9451 -90.2732 472.000 396.0 393.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 16 25 45.9451 -90.2732 472.000 396.0 393.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 16 55 45.9451 -90.2732 472.000 396.0 393.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 17 25 45.9451 -90.2732 472.000 396.0 393.811 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 17 55 45.9451 -90.2732 472.000 396.0 393.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 18 25 45.9451 -90.2732 472.000 396.0 393.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 18 55 45.9451 -90.2732 472.000 396.0 393.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 19 25 45.9451 -90.2732 472.000 396.0 393.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 19 55 45.9451 -90.2732 472.000 396.0 393.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 24 55 45.9451 -90.2732 472.000 30.0 401.755 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 29 55 45.9451 -90.2732 472.000 122.0 396.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 34 55 45.9451 -90.2732 472.000 396.0 394.053 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 39 55 45.9451 -90.2732 472.000 30.0 401.869 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 44 55 45.9451 -90.2732 472.000 122.0 396.009 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 49 55 45.9451 -90.2732 472.000 396.0 394.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 07 59 55 45.9451 -90.2732 472.000 30.0 401.118 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 04 55 45.9451 -90.2732 472.000 122.0 395.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 09 55 45.9451 -90.2732 472.000 396.0 394.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 14 55 45.9451 -90.2732 472.000 30.0 400.581 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 19 55 45.9451 -90.2732 472.000 122.0 395.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 24 55 45.9451 -90.2732 472.000 396.0 394.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 25 25 45.9451 -90.2732 472.000 396.0 394.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 25 55 45.9451 -90.2732 472.000 396.0 394.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 26 25 45.9451 -90.2732 472.000 396.0 394.011 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 26 55 45.9451 -90.2732 472.000 396.0 393.926 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 27 25 45.9451 -90.2732 472.000 396.0 393.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 27 55 45.9451 -90.2732 472.000 396.0 393.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 28 25 45.9451 -90.2732 472.000 396.0 393.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 28 55 45.9451 -90.2732 472.000 396.0 393.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 29 25 45.9451 -90.2732 472.000 396.0 393.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 29 55 45.9451 -90.2732 472.000 396.0 393.902 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 34 55 45.9451 -90.2732 472.000 30.0 400.572 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 39 55 45.9451 -90.2732 472.000 122.0 395.948 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 44 55 45.9451 -90.2732 472.000 396.0 394.086 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 49 55 45.9451 -90.2732 472.000 30.0 401.433 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 54 55 45.9451 -90.2732 472.000 122.0 396.219 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 08 59 55 45.9451 -90.2732 472.000 396.0 393.987 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 00 25 45.9451 -90.2732 472.000 396.0 393.969 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 00 55 45.9451 -90.2732 472.000 396.0 394.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 01 25 45.9451 -90.2732 472.000 396.0 394.090 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 01 55 45.9451 -90.2732 472.000 396.0 394.154 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 02 25 45.9451 -90.2732 472.000 396.0 394.200 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 02 55 45.9451 -90.2732 472.000 396.0 394.207 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 03 25 45.9451 -90.2732 472.000 396.0 394.211 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 03 55 45.9451 -90.2732 472.000 396.0 394.220 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 04 25 45.9451 -90.2732 472.000 396.0 394.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 04 55 45.9451 -90.2732 472.000 396.0 394.252 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 09 55 45.9451 -90.2732 472.000 30.0 402.868 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 14 55 45.9451 -90.2732 472.000 122.0 396.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 19 55 45.9451 -90.2732 472.000 396.0 394.393 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 24 55 45.9451 -90.2732 472.000 30.0 403.428 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 29 55 45.9451 -90.2732 472.000 122.0 395.810 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 34 55 45.9451 -90.2732 472.000 396.0 394.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 35 25 45.9451 -90.2732 472.000 396.0 394.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 35 55 45.9451 -90.2732 472.000 396.0 394.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 36 25 45.9451 -90.2732 472.000 396.0 394.547 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 36 55 45.9451 -90.2732 472.000 396.0 394.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 37 25 45.9451 -90.2732 472.000 396.0 394.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 37 55 45.9451 -90.2732 472.000 396.0 394.574 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 38 25 45.9451 -90.2732 472.000 396.0 394.610 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 38 55 45.9451 -90.2732 472.000 396.0 394.681 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 39 25 45.9451 -90.2732 472.000 396.0 394.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 39 55 45.9451 -90.2732 472.000 396.0 394.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 44 55 45.9451 -90.2732 472.000 30.0 403.319 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 49 55 45.9451 -90.2732 472.000 122.0 395.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 54 55 45.9451 -90.2732 472.000 396.0 394.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 09 59 55 45.9451 -90.2732 472.000 30.0 403.011 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 04 55 45.9451 -90.2732 472.000 122.0 396.059 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 09 55 45.9451 -90.2732 472.000 396.0 394.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 19 55 45.9451 -90.2732 472.000 30.0 403.746 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 24 55 45.9451 -90.2732 472.000 122.0 395.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 29 55 45.9451 -90.2732 472.000 396.0 393.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 34 55 45.9451 -90.2732 472.000 30.0 405.112 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 39 55 45.9451 -90.2732 472.000 122.0 395.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 44 55 45.9451 -90.2732 472.000 396.0 393.945 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 54 55 45.9451 -90.2732 472.000 30.0 403.766 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 12 10 59 55 45.9451 -90.2732 472.000 122.0 396.262 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 04 55 45.9451 -90.2732 472.000 396.0 393.555 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 09 55 45.9451 -90.2732 472.000 30.0 404.067 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 14 55 45.9451 -90.2732 472.000 122.0 396.375 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 19 55 45.9451 -90.2732 472.000 396.0 393.603 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 20 25 45.9451 -90.2732 472.000 396.0 393.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 20 55 45.9451 -90.2732 472.000 396.0 393.596 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 21 25 45.9451 -90.2732 472.000 396.0 393.602 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 21 55 45.9451 -90.2732 472.000 396.0 393.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 22 25 45.9451 -90.2732 472.000 396.0 393.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 22 55 45.9451 -90.2732 472.000 396.0 393.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 23 25 45.9451 -90.2732 472.000 396.0 393.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 23 55 45.9451 -90.2732 472.000 396.0 393.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 24 25 45.9451 -90.2732 472.000 396.0 393.586 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 24 55 45.9451 -90.2732 472.000 396.0 393.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 29 55 45.9451 -90.2732 472.000 30.0 404.762 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 34 55 45.9451 -90.2732 472.000 122.0 396.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 39 55 45.9451 -90.2732 472.000 396.0 393.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 44 55 45.9451 -90.2732 472.000 30.0 404.181 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 12 11 49 55 45.9451 -90.2732 472.000 122.0 396.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 14 55 45.9451 -90.2732 472.000 396.0 393.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 19 55 45.9451 -90.2732 472.000 30.0 407.762 0.530 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 24 55 45.9451 -90.2732 472.000 122.0 395.223 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 29 55 45.9451 -90.2732 472.000 396.0 393.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 34 55 45.9451 -90.2732 472.000 30.0 404.826 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 39 55 45.9451 -90.2732 472.000 122.0 394.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 44 55 45.9451 -90.2732 472.000 396.0 393.625 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 45 25 45.9451 -90.2732 472.000 396.0 393.614 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 45 55 45.9451 -90.2732 472.000 396.0 393.647 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 46 25 45.9451 -90.2732 472.000 396.0 393.693 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 46 55 45.9451 -90.2732 472.000 396.0 393.675 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 47 25 45.9451 -90.2732 472.000 396.0 393.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 47 55 45.9451 -90.2732 472.000 396.0 393.685 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 48 25 45.9451 -90.2732 472.000 396.0 393.674 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 48 55 45.9451 -90.2732 472.000 396.0 393.712 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 49 25 45.9451 -90.2732 472.000 396.0 393.710 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 49 55 45.9451 -90.2732 472.000 396.0 393.724 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 54 55 45.9451 -90.2732 472.000 30.0 407.021 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 12 59 55 45.9451 -90.2732 472.000 122.0 394.705 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 04 55 45.9451 -90.2732 472.000 396.0 394.067 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 09 55 45.9451 -90.2732 472.000 30.0 409.752 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 14 55 45.9451 -90.2732 472.000 122.0 395.970 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 19 55 45.9451 -90.2732 472.000 396.0 394.256 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 20 25 45.9451 -90.2732 472.000 396.0 394.229 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 20 55 45.9451 -90.2732 472.000 396.0 394.217 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 21 25 45.9451 -90.2732 472.000 396.0 394.255 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 21 55 45.9451 -90.2732 472.000 396.0 394.227 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 22 25 45.9451 -90.2732 472.000 396.0 394.232 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 22 55 45.9451 -90.2732 472.000 396.0 394.179 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 23 25 45.9451 -90.2732 472.000 396.0 394.115 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 23 55 45.9451 -90.2732 472.000 396.0 394.237 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 24 25 45.9451 -90.2732 472.000 396.0 394.305 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 24 55 45.9451 -90.2732 472.000 396.0 394.303 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 29 55 45.9451 -90.2732 472.000 30.0 407.507 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 34 55 45.9451 -90.2732 472.000 122.0 396.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 39 55 45.9451 -90.2732 472.000 396.0 394.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 44 55 45.9451 -90.2732 472.000 30.0 406.854 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 49 55 45.9451 -90.2732 472.000 122.0 395.391 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 13 54 55 45.9451 -90.2732 472.000 396.0 394.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 04 55 45.9451 -90.2732 472.000 30.0 407.066 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 09 55 45.9451 -90.2732 472.000 122.0 395.669 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 14 55 45.9451 -90.2732 472.000 396.0 393.991 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 19 55 45.9451 -90.2732 472.000 30.0 406.389 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 24 55 45.9451 -90.2732 472.000 122.0 396.128 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 29 55 45.9451 -90.2732 472.000 396.0 394.100 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 30 25 45.9451 -90.2732 472.000 396.0 394.118 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 30 55 45.9451 -90.2732 472.000 396.0 394.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 31 25 45.9451 -90.2732 472.000 396.0 394.128 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 31 55 45.9451 -90.2732 472.000 396.0 394.114 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 32 25 45.9451 -90.2732 472.000 396.0 394.106 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 32 55 45.9451 -90.2732 472.000 396.0 394.074 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 33 25 45.9451 -90.2732 472.000 396.0 394.041 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 33 55 45.9451 -90.2732 472.000 396.0 394.071 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 34 25 45.9451 -90.2732 472.000 396.0 394.072 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 34 55 45.9451 -90.2732 472.000 396.0 394.083 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 39 55 45.9451 -90.2732 472.000 30.0 407.183 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 44 55 45.9451 -90.2732 472.000 122.0 396.505 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 49 55 45.9451 -90.2732 472.000 396.0 394.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 54 55 45.9451 -90.2732 472.000 30.0 407.174 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 14 59 55 45.9451 -90.2732 472.000 122.0 396.452 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 04 55 45.9451 -90.2732 472.000 396.0 394.199 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 05 25 45.9451 -90.2732 472.000 396.0 394.184 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 05 55 45.9451 -90.2732 472.000 396.0 394.173 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 06 25 45.9451 -90.2732 472.000 396.0 394.145 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 06 55 45.9451 -90.2732 472.000 396.0 394.144 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 07 25 45.9451 -90.2732 472.000 396.0 394.158 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 07 55 45.9451 -90.2732 472.000 396.0 394.143 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 08 25 45.9451 -90.2732 472.000 396.0 394.158 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 08 55 45.9451 -90.2732 472.000 396.0 394.151 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 09 25 45.9451 -90.2732 472.000 396.0 394.171 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 09 55 45.9451 -90.2732 472.000 396.0 394.185 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 14 55 45.9451 -90.2732 472.000 30.0 407.967 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 19 55 45.9451 -90.2732 472.000 122.0 396.635 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 24 55 45.9451 -90.2732 472.000 396.0 394.230 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 29 55 45.9451 -90.2732 472.000 30.0 404.729 0.550 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 34 55 45.9451 -90.2732 472.000 122.0 400.533 0.930 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 39 55 45.9451 -90.2732 472.000 396.0 394.153 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 40 25 45.9451 -90.2732 472.000 396.0 394.179 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 40 55 45.9451 -90.2732 472.000 396.0 394.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 41 25 45.9451 -90.2732 472.000 396.0 394.180 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 41 55 45.9451 -90.2732 472.000 396.0 394.155 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 42 25 45.9451 -90.2732 472.000 396.0 394.089 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 42 55 45.9451 -90.2732 472.000 396.0 394.086 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 43 25 45.9451 -90.2732 472.000 396.0 394.153 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 43 55 45.9451 -90.2732 472.000 396.0 394.285 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 44 25 45.9451 -90.2732 472.000 396.0 394.287 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 44 55 45.9451 -90.2732 472.000 396.0 394.291 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 49 55 45.9451 -90.2732 472.000 30.0 402.485 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 54 55 45.9451 -90.2732 472.000 122.0 400.161 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 12 15 59 55 45.9451 -90.2732 472.000 396.0 394.732 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 04 55 45.9451 -90.2732 472.000 30.0 402.442 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 09 55 45.9451 -90.2732 472.000 122.0 400.251 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 14 55 45.9451 -90.2732 472.000 396.0 394.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 24 55 45.9451 -90.2732 472.000 30.0 401.591 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 29 55 45.9451 -90.2732 472.000 122.0 401.528 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 34 55 45.9451 -90.2732 472.000 396.0 394.307 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 39 55 45.9451 -90.2732 472.000 30.0 400.598 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 44 55 45.9451 -90.2732 472.000 122.0 399.679 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 49 55 45.9451 -90.2732 472.000 396.0 394.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 50 25 45.9451 -90.2732 472.000 396.0 394.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 50 55 45.9451 -90.2732 472.000 396.0 394.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 51 25 45.9451 -90.2732 472.000 396.0 394.330 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 51 55 45.9451 -90.2732 472.000 396.0 394.344 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 52 25 45.9451 -90.2732 472.000 396.0 394.296 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 52 55 45.9451 -90.2732 472.000 396.0 394.113 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 53 25 45.9451 -90.2732 472.000 396.0 393.983 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 53 55 45.9451 -90.2732 472.000 396.0 393.871 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 54 25 45.9451 -90.2732 472.000 396.0 393.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 16 54 55 45.9451 -90.2732 472.000 396.0 393.794 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 04 55 45.9451 -90.2732 472.000 30.0 399.820 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 09 55 45.9451 -90.2732 472.000 122.0 399.055 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 14 55 45.9451 -90.2732 472.000 396.0 392.127 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 19 55 45.9451 -90.2732 472.000 30.0 398.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 24 55 45.9451 -90.2732 472.000 122.0 398.810 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 29 55 45.9451 -90.2732 472.000 396.0 394.910 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 30 25 45.9451 -90.2732 472.000 396.0 394.891 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 30 55 45.9451 -90.2732 472.000 396.0 394.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 31 25 45.9451 -90.2732 472.000 396.0 395.046 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 31 55 45.9451 -90.2732 472.000 396.0 395.035 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 32 25 45.9451 -90.2732 472.000 396.0 394.545 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 32 55 45.9451 -90.2732 472.000 396.0 394.787 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 33 25 45.9451 -90.2732 472.000 396.0 394.873 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 33 55 45.9451 -90.2732 472.000 396.0 394.616 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 34 25 45.9451 -90.2732 472.000 396.0 394.075 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 34 55 45.9451 -90.2732 472.000 396.0 393.538 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 39 55 45.9451 -90.2732 472.000 30.0 398.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 44 55 45.9451 -90.2732 472.000 122.0 398.505 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 49 55 45.9451 -90.2732 472.000 396.0 396.432 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 54 55 45.9451 -90.2732 472.000 30.0 398.032 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 17 59 55 45.9451 -90.2732 472.000 122.0 398.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 04 55 45.9451 -90.2732 472.000 396.0 397.593 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 14 55 45.9451 -90.2732 472.000 30.0 398.137 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 19 55 45.9451 -90.2732 472.000 122.0 398.051 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 24 55 45.9451 -90.2732 472.000 396.0 397.646 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 29 55 45.9451 -90.2732 472.000 30.0 398.071 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 34 55 45.9451 -90.2732 472.000 122.0 397.990 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 39 55 45.9451 -90.2732 472.000 396.0 396.709 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 40 25 45.9451 -90.2732 472.000 396.0 396.525 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 40 55 45.9451 -90.2732 472.000 396.0 396.636 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 41 25 45.9451 -90.2732 472.000 396.0 396.799 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 41 55 45.9451 -90.2732 472.000 396.0 397.412 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 42 25 45.9451 -90.2732 472.000 396.0 397.646 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 42 55 45.9451 -90.2732 472.000 396.0 397.561 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 43 25 45.9451 -90.2732 472.000 396.0 397.662 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 43 55 45.9451 -90.2732 472.000 396.0 397.798 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 44 25 45.9451 -90.2732 472.000 396.0 397.611 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 44 55 45.9451 -90.2732 472.000 396.0 397.745 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 49 55 45.9451 -90.2732 472.000 30.0 397.881 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 54 55 45.9451 -90.2732 472.000 122.0 398.010 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 18 59 55 45.9451 -90.2732 472.000 396.0 396.229 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 04 55 45.9451 -90.2732 472.000 30.0 396.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 09 55 45.9451 -90.2732 472.000 122.0 396.769 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 14 55 45.9451 -90.2732 472.000 396.0 396.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 15 25 45.9451 -90.2732 472.000 396.0 396.480 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 15 55 45.9451 -90.2732 472.000 396.0 396.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 16 25 45.9451 -90.2732 472.000 396.0 396.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 16 55 45.9451 -90.2732 472.000 396.0 396.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 17 25 45.9451 -90.2732 472.000 396.0 396.468 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 17 55 45.9451 -90.2732 472.000 396.0 396.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 18 25 45.9451 -90.2732 472.000 396.0 396.370 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 18 55 45.9451 -90.2732 472.000 396.0 396.346 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 19 25 45.9451 -90.2732 472.000 396.0 396.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 19 55 45.9451 -90.2732 472.000 396.0 396.260 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 24 55 45.9451 -90.2732 472.000 30.0 395.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 29 55 45.9451 -90.2732 472.000 122.0 395.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 34 55 45.9451 -90.2732 472.000 396.0 396.360 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 39 55 45.9451 -90.2732 472.000 30.0 396.039 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 44 55 45.9451 -90.2732 472.000 122.0 396.198 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 49 55 45.9451 -90.2732 472.000 396.0 396.079 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 19 59 55 45.9451 -90.2732 472.000 30.0 395.668 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 04 55 45.9451 -90.2732 472.000 122.0 395.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 09 55 45.9451 -90.2732 472.000 396.0 395.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 14 55 45.9451 -90.2732 472.000 30.0 395.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 19 55 45.9451 -90.2732 472.000 122.0 395.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 24 55 45.9451 -90.2732 472.000 396.0 395.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 25 25 45.9451 -90.2732 472.000 396.0 395.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 25 55 45.9451 -90.2732 472.000 396.0 395.428 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 26 25 45.9451 -90.2732 472.000 396.0 395.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 26 55 45.9451 -90.2732 472.000 396.0 395.456 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 27 25 45.9451 -90.2732 472.000 396.0 395.509 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 27 55 45.9451 -90.2732 472.000 396.0 395.450 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 28 25 45.9451 -90.2732 472.000 396.0 395.697 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 28 55 45.9451 -90.2732 472.000 396.0 395.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 29 25 45.9451 -90.2732 472.000 396.0 395.678 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 29 55 45.9451 -90.2732 472.000 396.0 395.746 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 34 55 45.9451 -90.2732 472.000 30.0 395.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 39 55 45.9451 -90.2732 472.000 122.0 396.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 44 55 45.9451 -90.2732 472.000 396.0 395.730 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 49 55 45.9451 -90.2732 472.000 30.0 395.635 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 54 55 45.9451 -90.2732 472.000 122.0 395.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 20 59 55 45.9451 -90.2732 472.000 396.0 394.920 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 00 25 45.9451 -90.2732 472.000 396.0 395.114 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 00 55 45.9451 -90.2732 472.000 396.0 395.230 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 01 25 45.9451 -90.2732 472.000 396.0 394.903 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 01 55 45.9451 -90.2732 472.000 396.0 394.757 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 02 25 45.9451 -90.2732 472.000 396.0 394.707 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 02 55 45.9451 -90.2732 472.000 396.0 394.800 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 03 25 45.9451 -90.2732 472.000 396.0 394.830 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 03 55 45.9451 -90.2732 472.000 396.0 394.812 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 04 25 45.9451 -90.2732 472.000 396.0 394.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 04 55 45.9451 -90.2732 472.000 396.0 395.108 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 09 55 45.9451 -90.2732 472.000 30.0 394.851 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 14 55 45.9451 -90.2732 472.000 122.0 394.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 19 55 45.9451 -90.2732 472.000 396.0 394.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 24 55 45.9451 -90.2732 472.000 30.0 394.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 29 55 45.9451 -90.2732 472.000 122.0 394.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 34 55 45.9451 -90.2732 472.000 396.0 393.485 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 35 25 45.9451 -90.2732 472.000 396.0 393.068 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 35 55 45.9451 -90.2732 472.000 396.0 392.921 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 36 25 45.9451 -90.2732 472.000 396.0 393.179 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 36 55 45.9451 -90.2732 472.000 396.0 393.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 37 25 45.9451 -90.2732 472.000 396.0 393.350 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 37 55 45.9451 -90.2732 472.000 396.0 393.791 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 38 25 45.9451 -90.2732 472.000 396.0 393.822 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 38 55 45.9451 -90.2732 472.000 396.0 393.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 39 25 45.9451 -90.2732 472.000 396.0 393.336 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 39 55 45.9451 -90.2732 472.000 396.0 393.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 44 55 45.9451 -90.2732 472.000 30.0 394.000 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 49 55 45.9451 -90.2732 472.000 122.0 393.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 54 55 45.9451 -90.2732 472.000 396.0 393.330 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 21 59 55 45.9451 -90.2732 472.000 30.0 393.916 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 04 55 45.9451 -90.2732 472.000 122.0 393.479 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 09 55 45.9451 -90.2732 472.000 396.0 392.998 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 19 55 45.9451 -90.2732 472.000 30.0 393.662 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 24 55 45.9451 -90.2732 472.000 122.0 393.236 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 29 55 45.9451 -90.2732 472.000 396.0 392.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 34 55 45.9451 -90.2732 472.000 30.0 393.744 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 39 55 45.9451 -90.2732 472.000 122.0 393.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 44 55 45.9451 -90.2732 472.000 396.0 392.744 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 54 55 45.9451 -90.2732 472.000 30.0 394.010 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 12 22 59 55 45.9451 -90.2732 472.000 122.0 393.310 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 04 55 45.9451 -90.2732 472.000 396.0 392.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 09 55 45.9451 -90.2732 472.000 30.0 393.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 14 55 45.9451 -90.2732 472.000 122.0 393.338 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 19 55 45.9451 -90.2732 472.000 396.0 392.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 20 25 45.9451 -90.2732 472.000 396.0 392.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 20 55 45.9451 -90.2732 472.000 396.0 392.419 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 21 25 45.9451 -90.2732 472.000 396.0 392.449 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 21 55 45.9451 -90.2732 472.000 396.0 392.384 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 22 25 45.9451 -90.2732 472.000 396.0 392.483 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 22 55 45.9451 -90.2732 472.000 396.0 392.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 23 25 45.9451 -90.2732 472.000 396.0 392.451 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 23 55 45.9451 -90.2732 472.000 396.0 392.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 24 25 45.9451 -90.2732 472.000 396.0 392.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 24 55 45.9451 -90.2732 472.000 396.0 392.372 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 29 55 45.9451 -90.2732 472.000 30.0 394.193 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 34 55 45.9451 -90.2732 472.000 122.0 393.391 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 39 55 45.9451 -90.2732 472.000 396.0 392.151 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 44 55 45.9451 -90.2732 472.000 30.0 394.327 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 12 23 49 55 45.9451 -90.2732 472.000 122.0 393.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 14 55 45.9451 -90.2732 472.000 396.0 392.363 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 19 55 45.9451 -90.2732 472.000 30.0 394.842 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 24 55 45.9451 -90.2732 472.000 122.0 393.894 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 29 55 45.9451 -90.2732 472.000 396.0 391.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 34 55 45.9451 -90.2732 472.000 30.0 395.253 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 39 55 45.9451 -90.2732 472.000 122.0 394.042 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 45 25 45.9451 -90.2732 472.000 396.0 391.916 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 45 55 45.9451 -90.2732 472.000 396.0 391.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 46 25 45.9451 -90.2732 472.000 396.0 391.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 46 55 45.9451 -90.2732 472.000 396.0 391.914 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 47 25 45.9451 -90.2732 472.000 396.0 391.908 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 47 55 45.9451 -90.2732 472.000 396.0 391.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 48 25 45.9451 -90.2732 472.000 396.0 391.918 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 48 55 45.9451 -90.2732 472.000 396.0 391.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 49 25 45.9451 -90.2732 472.000 396.0 391.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 49 55 45.9451 -90.2732 472.000 396.0 391.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 54 55 45.9451 -90.2732 472.000 30.0 395.391 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 13 00 59 55 45.9451 -90.2732 472.000 122.0 394.533 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 04 55 45.9451 -90.2732 472.000 396.0 391.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 09 55 45.9451 -90.2732 472.000 30.0 395.581 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 14 55 45.9451 -90.2732 472.000 122.0 394.569 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 19 55 45.9451 -90.2732 472.000 396.0 391.959 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 20 25 45.9451 -90.2732 472.000 396.0 391.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 20 55 45.9451 -90.2732 472.000 396.0 391.944 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 21 25 45.9451 -90.2732 472.000 396.0 391.937 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 21 55 45.9451 -90.2732 472.000 396.0 391.922 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 22 25 45.9451 -90.2732 472.000 396.0 391.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 22 55 45.9451 -90.2732 472.000 396.0 391.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 23 25 45.9451 -90.2732 472.000 396.0 391.937 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 23 55 45.9451 -90.2732 472.000 396.0 391.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 24 25 45.9451 -90.2732 472.000 396.0 391.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 24 55 45.9451 -90.2732 472.000 396.0 391.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 29 55 45.9451 -90.2732 472.000 30.0 395.933 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 34 55 45.9451 -90.2732 472.000 122.0 394.356 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 39 55 45.9451 -90.2732 472.000 396.0 391.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 44 55 45.9451 -90.2732 472.000 30.0 395.935 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 49 55 45.9451 -90.2732 472.000 122.0 394.257 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 01 54 55 45.9451 -90.2732 472.000 396.0 391.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 04 55 45.9451 -90.2732 472.000 30.0 395.736 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 09 55 45.9451 -90.2732 472.000 122.0 395.001 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 14 55 45.9451 -90.2732 472.000 396.0 391.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 19 55 45.9451 -90.2732 472.000 30.0 396.018 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 24 55 45.9451 -90.2732 472.000 122.0 395.180 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 29 55 45.9451 -90.2732 472.000 396.0 392.029 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 30 25 45.9451 -90.2732 472.000 396.0 391.999 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 30 55 45.9451 -90.2732 472.000 396.0 392.007 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 31 25 45.9451 -90.2732 472.000 396.0 392.008 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 31 55 45.9451 -90.2732 472.000 396.0 392.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 32 25 45.9451 -90.2732 472.000 396.0 392.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 32 55 45.9451 -90.2732 472.000 396.0 392.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 33 25 45.9451 -90.2732 472.000 396.0 392.009 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 33 55 45.9451 -90.2732 472.000 396.0 391.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 34 25 45.9451 -90.2732 472.000 396.0 391.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 34 55 45.9451 -90.2732 472.000 396.0 392.029 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 39 55 45.9451 -90.2732 472.000 30.0 396.592 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 44 55 45.9451 -90.2732 472.000 122.0 395.465 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 49 55 45.9451 -90.2732 472.000 396.0 392.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 54 55 45.9451 -90.2732 472.000 30.0 396.486 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 02 59 55 45.9451 -90.2732 472.000 122.0 395.702 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 04 55 45.9451 -90.2732 472.000 396.0 392.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 05 25 45.9451 -90.2732 472.000 396.0 392.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 05 55 45.9451 -90.2732 472.000 396.0 392.061 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 06 25 45.9451 -90.2732 472.000 396.0 392.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 06 55 45.9451 -90.2732 472.000 396.0 392.025 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 07 25 45.9451 -90.2732 472.000 396.0 392.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 07 55 45.9451 -90.2732 472.000 396.0 392.042 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 08 25 45.9451 -90.2732 472.000 396.0 392.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 08 55 45.9451 -90.2732 472.000 396.0 392.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 09 25 45.9451 -90.2732 472.000 396.0 392.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 09 55 45.9451 -90.2732 472.000 396.0 392.042 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 14 55 45.9451 -90.2732 472.000 30.0 396.847 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 19 55 45.9451 -90.2732 472.000 122.0 395.503 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 24 55 45.9451 -90.2732 472.000 396.0 392.027 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 29 55 45.9451 -90.2732 472.000 30.0 397.064 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 34 55 45.9451 -90.2732 472.000 122.0 395.891 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 39 55 45.9451 -90.2732 472.000 396.0 391.986 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 40 25 45.9451 -90.2732 472.000 396.0 391.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 40 55 45.9451 -90.2732 472.000 396.0 391.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 41 25 45.9451 -90.2732 472.000 396.0 391.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 41 55 45.9451 -90.2732 472.000 396.0 392.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 42 25 45.9451 -90.2732 472.000 396.0 391.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 42 55 45.9451 -90.2732 472.000 396.0 392.005 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 43 25 45.9451 -90.2732 472.000 396.0 391.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 43 55 45.9451 -90.2732 472.000 396.0 391.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 44 25 45.9451 -90.2732 472.000 396.0 391.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 44 55 45.9451 -90.2732 472.000 396.0 391.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 49 55 45.9451 -90.2732 472.000 30.0 397.305 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 54 55 45.9451 -90.2732 472.000 122.0 395.633 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 13 03 59 55 45.9451 -90.2732 472.000 396.0 391.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 04 55 45.9451 -90.2732 472.000 30.0 397.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 09 55 45.9451 -90.2732 472.000 122.0 395.669 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 14 55 45.9451 -90.2732 472.000 396.0 391.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 24 55 45.9451 -90.2732 472.000 30.0 396.627 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 29 55 45.9451 -90.2732 472.000 122.0 395.754 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 34 55 45.9451 -90.2732 472.000 396.0 392.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 39 55 45.9451 -90.2732 472.000 30.0 396.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 44 55 45.9451 -90.2732 472.000 122.0 395.580 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 49 55 45.9451 -90.2732 472.000 396.0 392.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 50 25 45.9451 -90.2732 472.000 396.0 392.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 50 55 45.9451 -90.2732 472.000 396.0 392.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 51 25 45.9451 -90.2732 472.000 396.0 392.118 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 51 55 45.9451 -90.2732 472.000 396.0 392.126 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 52 25 45.9451 -90.2732 472.000 396.0 392.124 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 52 55 45.9451 -90.2732 472.000 396.0 392.164 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 53 25 45.9451 -90.2732 472.000 396.0 392.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 53 55 45.9451 -90.2732 472.000 396.0 392.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 54 25 45.9451 -90.2732 472.000 396.0 392.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 04 54 55 45.9451 -90.2732 472.000 396.0 392.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 04 55 45.9451 -90.2732 472.000 30.0 396.835 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 09 55 45.9451 -90.2732 472.000 122.0 395.902 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 14 55 45.9451 -90.2732 472.000 396.0 392.360 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 19 55 45.9451 -90.2732 472.000 30.0 396.633 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 24 55 45.9451 -90.2732 472.000 122.0 395.926 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 29 55 45.9451 -90.2732 472.000 396.0 392.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 30 25 45.9451 -90.2732 472.000 396.0 392.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 30 55 45.9451 -90.2732 472.000 396.0 392.347 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 31 25 45.9451 -90.2732 472.000 396.0 392.407 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 31 55 45.9451 -90.2732 472.000 396.0 392.473 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 32 25 45.9451 -90.2732 472.000 396.0 392.350 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 32 55 45.9451 -90.2732 472.000 396.0 392.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 33 25 45.9451 -90.2732 472.000 396.0 392.367 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 33 55 45.9451 -90.2732 472.000 396.0 392.438 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 34 25 45.9451 -90.2732 472.000 396.0 392.450 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 34 55 45.9451 -90.2732 472.000 396.0 392.412 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 39 55 45.9451 -90.2732 472.000 30.0 396.667 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 44 55 45.9451 -90.2732 472.000 122.0 396.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 49 55 45.9451 -90.2732 472.000 396.0 392.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 54 55 45.9451 -90.2732 472.000 30.0 396.468 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 05 59 55 45.9451 -90.2732 472.000 122.0 395.956 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 04 55 45.9451 -90.2732 472.000 396.0 392.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 14 55 45.9451 -90.2732 472.000 30.0 396.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 19 55 45.9451 -90.2732 472.000 122.0 395.462 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 24 55 45.9451 -90.2732 472.000 396.0 393.204 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 29 55 45.9451 -90.2732 472.000 30.0 396.183 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 34 55 45.9451 -90.2732 472.000 122.0 395.482 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 39 55 45.9451 -90.2732 472.000 396.0 393.607 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 40 25 45.9451 -90.2732 472.000 396.0 393.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 40 55 45.9451 -90.2732 472.000 396.0 393.791 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 41 25 45.9451 -90.2732 472.000 396.0 393.822 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 41 55 45.9451 -90.2732 472.000 396.0 393.486 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 42 25 45.9451 -90.2732 472.000 396.0 393.611 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 42 55 45.9451 -90.2732 472.000 396.0 393.583 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 43 25 45.9451 -90.2732 472.000 396.0 393.399 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 43 55 45.9451 -90.2732 472.000 396.0 393.589 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 44 25 45.9451 -90.2732 472.000 396.0 393.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 44 55 45.9451 -90.2732 472.000 396.0 393.462 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 49 55 45.9451 -90.2732 472.000 30.0 396.010 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 54 55 45.9451 -90.2732 472.000 122.0 395.392 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 06 59 55 45.9451 -90.2732 472.000 396.0 393.515 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 04 55 45.9451 -90.2732 472.000 30.0 395.551 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 09 55 45.9451 -90.2732 472.000 122.0 395.199 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 14 55 45.9451 -90.2732 472.000 396.0 393.573 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 15 25 45.9451 -90.2732 472.000 396.0 394.167 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 15 55 45.9451 -90.2732 472.000 396.0 394.138 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 16 25 45.9451 -90.2732 472.000 396.0 393.870 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 16 55 45.9451 -90.2732 472.000 396.0 393.912 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 17 25 45.9451 -90.2732 472.000 396.0 393.363 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 17 55 45.9451 -90.2732 472.000 396.0 393.362 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 18 25 45.9451 -90.2732 472.000 396.0 392.736 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 18 55 45.9451 -90.2732 472.000 396.0 393.580 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 19 25 45.9451 -90.2732 472.000 396.0 393.136 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 19 55 45.9451 -90.2732 472.000 396.0 392.729 0.400 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 24 55 45.9451 -90.2732 472.000 30.0 395.204 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 29 55 45.9451 -90.2732 472.000 122.0 393.974 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 34 55 45.9451 -90.2732 472.000 396.0 394.288 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 39 55 45.9451 -90.2732 472.000 30.0 393.721 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 44 55 45.9451 -90.2732 472.000 122.0 393.154 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 49 55 45.9451 -90.2732 472.000 396.0 392.803 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 13 07 59 55 45.9451 -90.2732 472.000 30.0 392.996 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 04 55 45.9451 -90.2732 472.000 122.0 392.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 09 55 45.9451 -90.2732 472.000 396.0 392.811 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 14 55 45.9451 -90.2732 472.000 30.0 392.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 19 55 45.9451 -90.2732 472.000 122.0 392.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 24 55 45.9451 -90.2732 472.000 396.0 392.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 25 25 45.9451 -90.2732 472.000 396.0 392.831 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 25 55 45.9451 -90.2732 472.000 396.0 392.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 26 25 45.9451 -90.2732 472.000 396.0 392.820 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 26 55 45.9451 -90.2732 472.000 396.0 392.815 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 27 25 45.9451 -90.2732 472.000 396.0 392.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 27 55 45.9451 -90.2732 472.000 396.0 392.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 28 25 45.9451 -90.2732 472.000 396.0 392.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 28 55 45.9451 -90.2732 472.000 396.0 392.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 29 25 45.9451 -90.2732 472.000 396.0 392.857 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 29 55 45.9451 -90.2732 472.000 396.0 392.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 34 55 45.9451 -90.2732 472.000 30.0 393.081 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 39 55 45.9451 -90.2732 472.000 122.0 392.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 44 55 45.9451 -90.2732 472.000 396.0 392.730 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 49 55 45.9451 -90.2732 472.000 30.0 392.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 54 55 45.9451 -90.2732 472.000 122.0 392.869 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 08 59 55 45.9451 -90.2732 472.000 396.0 392.847 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 00 25 45.9451 -90.2732 472.000 396.0 392.861 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 00 55 45.9451 -90.2732 472.000 396.0 392.816 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 01 25 45.9451 -90.2732 472.000 396.0 392.893 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 01 55 45.9451 -90.2732 472.000 396.0 392.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 02 25 45.9451 -90.2732 472.000 396.0 392.940 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 02 55 45.9451 -90.2732 472.000 396.0 392.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 03 25 45.9451 -90.2732 472.000 396.0 392.960 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 03 55 45.9451 -90.2732 472.000 396.0 392.967 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 04 25 45.9451 -90.2732 472.000 396.0 392.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 04 55 45.9451 -90.2732 472.000 396.0 392.970 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 09 55 45.9451 -90.2732 472.000 30.0 393.187 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 14 55 45.9451 -90.2732 472.000 122.0 392.930 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 19 55 45.9451 -90.2732 472.000 396.0 392.803 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 24 55 45.9451 -90.2732 472.000 30.0 392.925 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 29 55 45.9451 -90.2732 472.000 122.0 392.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 34 55 45.9451 -90.2732 472.000 396.0 392.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 35 25 45.9451 -90.2732 472.000 396.0 392.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 35 55 45.9451 -90.2732 472.000 396.0 392.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 36 25 45.9451 -90.2732 472.000 396.0 392.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 36 55 45.9451 -90.2732 472.000 396.0 392.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 37 25 45.9451 -90.2732 472.000 396.0 392.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 37 55 45.9451 -90.2732 472.000 396.0 392.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 38 25 45.9451 -90.2732 472.000 396.0 392.957 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 38 55 45.9451 -90.2732 472.000 396.0 393.003 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 39 25 45.9451 -90.2732 472.000 396.0 393.050 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 39 55 45.9451 -90.2732 472.000 396.0 393.081 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 44 55 45.9451 -90.2732 472.000 30.0 393.298 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 49 55 45.9451 -90.2732 472.000 122.0 393.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 54 55 45.9451 -90.2732 472.000 396.0 393.236 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 09 59 55 45.9451 -90.2732 472.000 30.0 393.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 04 55 45.9451 -90.2732 472.000 122.0 393.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 09 55 45.9451 -90.2732 472.000 396.0 393.234 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 19 55 45.9451 -90.2732 472.000 30.0 393.692 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 24 55 45.9451 -90.2732 472.000 122.0 393.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 29 55 45.9451 -90.2732 472.000 396.0 393.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 34 55 45.9451 -90.2732 472.000 30.0 393.940 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 39 55 45.9451 -90.2732 472.000 122.0 393.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 44 55 45.9451 -90.2732 472.000 396.0 393.586 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 54 55 45.9451 -90.2732 472.000 30.0 394.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 10 59 55 45.9451 -90.2732 472.000 122.0 394.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 04 55 45.9451 -90.2732 472.000 396.0 393.423 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 09 55 45.9451 -90.2732 472.000 30.0 394.297 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 14 55 45.9451 -90.2732 472.000 122.0 394.062 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 19 55 45.9451 -90.2732 472.000 396.0 393.727 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 20 25 45.9451 -90.2732 472.000 396.0 393.770 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 20 55 45.9451 -90.2732 472.000 396.0 393.813 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 21 25 45.9451 -90.2732 472.000 396.0 393.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 21 55 45.9451 -90.2732 472.000 396.0 393.810 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 22 25 45.9451 -90.2732 472.000 396.0 393.679 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 22 55 45.9451 -90.2732 472.000 396.0 393.798 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 23 25 45.9451 -90.2732 472.000 396.0 393.724 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 23 55 45.9451 -90.2732 472.000 396.0 393.734 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 24 25 45.9451 -90.2732 472.000 396.0 393.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 24 55 45.9451 -90.2732 472.000 396.0 393.745 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 29 55 45.9451 -90.2732 472.000 30.0 394.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 34 55 45.9451 -90.2732 472.000 122.0 394.153 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 39 55 45.9451 -90.2732 472.000 396.0 393.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 44 55 45.9451 -90.2732 472.000 30.0 394.190 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 11 49 55 45.9451 -90.2732 472.000 122.0 394.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 14 55 45.9451 -90.2732 472.000 396.0 394.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 19 55 45.9451 -90.2732 472.000 30.0 394.240 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 24 55 45.9451 -90.2732 472.000 122.0 394.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 29 55 45.9451 -90.2732 472.000 396.0 393.847 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 34 55 45.9451 -90.2732 472.000 30.0 394.319 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 39 55 45.9451 -90.2732 472.000 122.0 394.114 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 44 55 45.9451 -90.2732 472.000 396.0 393.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 45 25 45.9451 -90.2732 472.000 396.0 393.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 45 55 45.9451 -90.2732 472.000 396.0 393.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 46 25 45.9451 -90.2732 472.000 396.0 393.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 46 55 45.9451 -90.2732 472.000 396.0 393.932 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 47 25 45.9451 -90.2732 472.000 396.0 393.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 47 55 45.9451 -90.2732 472.000 396.0 393.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 48 25 45.9451 -90.2732 472.000 396.0 393.869 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 48 55 45.9451 -90.2732 472.000 396.0 393.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 49 25 45.9451 -90.2732 472.000 396.0 393.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 49 55 45.9451 -90.2732 472.000 396.0 393.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 54 55 45.9451 -90.2732 472.000 30.0 394.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 12 59 55 45.9451 -90.2732 472.000 122.0 394.346 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 04 55 45.9451 -90.2732 472.000 396.0 393.920 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 09 55 45.9451 -90.2732 472.000 30.0 394.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 14 55 45.9451 -90.2732 472.000 122.0 394.262 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 19 55 45.9451 -90.2732 472.000 396.0 393.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 20 25 45.9451 -90.2732 472.000 396.0 393.986 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 20 55 45.9451 -90.2732 472.000 396.0 393.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 21 25 45.9451 -90.2732 472.000 396.0 393.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 21 55 45.9451 -90.2732 472.000 396.0 393.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 22 25 45.9451 -90.2732 472.000 396.0 393.916 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 22 55 45.9451 -90.2732 472.000 396.0 393.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 23 25 45.9451 -90.2732 472.000 396.0 393.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 23 55 45.9451 -90.2732 472.000 396.0 393.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 24 25 45.9451 -90.2732 472.000 396.0 393.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 24 55 45.9451 -90.2732 472.000 396.0 393.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 29 55 45.9451 -90.2732 472.000 30.0 394.341 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 34 55 45.9451 -90.2732 472.000 122.0 394.183 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 39 55 45.9451 -90.2732 472.000 396.0 393.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 44 55 45.9451 -90.2732 472.000 30.0 394.264 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 49 55 45.9451 -90.2732 472.000 122.0 394.144 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 13 54 55 45.9451 -90.2732 472.000 396.0 393.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 04 55 45.9451 -90.2732 472.000 30.0 394.341 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 09 55 45.9451 -90.2732 472.000 122.0 394.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 14 55 45.9451 -90.2732 472.000 396.0 394.079 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 19 55 45.9451 -90.2732 472.000 30.0 394.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 24 55 45.9451 -90.2732 472.000 122.0 394.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 29 55 45.9451 -90.2732 472.000 396.0 394.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 30 25 45.9451 -90.2732 472.000 396.0 394.041 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 30 55 45.9451 -90.2732 472.000 396.0 394.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 31 25 45.9451 -90.2732 472.000 396.0 394.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 31 55 45.9451 -90.2732 472.000 396.0 394.063 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 32 25 45.9451 -90.2732 472.000 396.0 394.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 32 55 45.9451 -90.2732 472.000 396.0 394.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 33 25 45.9451 -90.2732 472.000 396.0 394.069 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 33 55 45.9451 -90.2732 472.000 396.0 394.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 34 25 45.9451 -90.2732 472.000 396.0 394.079 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 34 55 45.9451 -90.2732 472.000 396.0 394.053 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 39 55 45.9451 -90.2732 472.000 30.0 394.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 44 55 45.9451 -90.2732 472.000 122.0 394.141 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 49 55 45.9451 -90.2732 472.000 396.0 393.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 54 55 45.9451 -90.2732 472.000 30.0 394.091 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 14 59 55 45.9451 -90.2732 472.000 122.0 393.981 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 04 55 45.9451 -90.2732 472.000 396.0 393.827 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 05 25 45.9451 -90.2732 472.000 396.0 393.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 05 55 45.9451 -90.2732 472.000 396.0 393.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 06 25 45.9451 -90.2732 472.000 396.0 393.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 06 55 45.9451 -90.2732 472.000 396.0 393.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 07 25 45.9451 -90.2732 472.000 396.0 393.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 07 55 45.9451 -90.2732 472.000 396.0 393.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 08 25 45.9451 -90.2732 472.000 396.0 393.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 08 55 45.9451 -90.2732 472.000 396.0 393.803 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 09 25 45.9451 -90.2732 472.000 396.0 393.777 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 09 55 45.9451 -90.2732 472.000 396.0 393.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 14 55 45.9451 -90.2732 472.000 30.0 394.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 19 55 45.9451 -90.2732 472.000 122.0 393.959 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 24 55 45.9451 -90.2732 472.000 396.0 393.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 29 55 45.9451 -90.2732 472.000 30.0 394.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 34 55 45.9451 -90.2732 472.000 122.0 393.959 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 39 55 45.9451 -90.2732 472.000 396.0 393.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 40 25 45.9451 -90.2732 472.000 396.0 393.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 40 55 45.9451 -90.2732 472.000 396.0 393.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 41 25 45.9451 -90.2732 472.000 396.0 393.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 41 55 45.9451 -90.2732 472.000 396.0 393.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 42 25 45.9451 -90.2732 472.000 396.0 393.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 42 55 45.9451 -90.2732 472.000 396.0 393.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 43 25 45.9451 -90.2732 472.000 396.0 393.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 43 55 45.9451 -90.2732 472.000 396.0 393.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 44 25 45.9451 -90.2732 472.000 396.0 393.857 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 44 55 45.9451 -90.2732 472.000 396.0 393.857 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 49 55 45.9451 -90.2732 472.000 30.0 393.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 54 55 45.9451 -90.2732 472.000 122.0 394.001 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 15 59 55 45.9451 -90.2732 472.000 396.0 393.916 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 04 55 45.9451 -90.2732 472.000 30.0 394.065 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 09 55 45.9451 -90.2732 472.000 122.0 393.985 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 14 55 45.9451 -90.2732 472.000 396.0 393.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 24 55 45.9451 -90.2732 472.000 30.0 393.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 29 55 45.9451 -90.2732 472.000 122.0 393.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 34 55 45.9451 -90.2732 472.000 396.0 393.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 39 55 45.9451 -90.2732 472.000 30.0 393.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 44 55 45.9451 -90.2732 472.000 122.0 393.908 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 49 55 45.9451 -90.2732 472.000 396.0 393.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 50 25 45.9451 -90.2732 472.000 396.0 393.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 50 55 45.9451 -90.2732 472.000 396.0 393.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 51 25 45.9451 -90.2732 472.000 396.0 393.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 51 55 45.9451 -90.2732 472.000 396.0 393.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 52 25 45.9451 -90.2732 472.000 396.0 393.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 52 55 45.9451 -90.2732 472.000 396.0 393.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 53 25 45.9451 -90.2732 472.000 396.0 393.900 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 53 55 45.9451 -90.2732 472.000 396.0 393.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 54 25 45.9451 -90.2732 472.000 396.0 393.914 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 16 54 55 45.9451 -90.2732 472.000 396.0 393.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 04 55 45.9451 -90.2732 472.000 30.0 393.859 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 09 55 45.9451 -90.2732 472.000 122.0 393.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 14 55 45.9451 -90.2732 472.000 396.0 393.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 19 55 45.9451 -90.2732 472.000 30.0 393.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 24 55 45.9451 -90.2732 472.000 122.0 393.849 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 29 55 45.9451 -90.2732 472.000 396.0 393.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 30 25 45.9451 -90.2732 472.000 396.0 393.794 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 30 55 45.9451 -90.2732 472.000 396.0 393.798 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 31 25 45.9451 -90.2732 472.000 396.0 393.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 31 55 45.9451 -90.2732 472.000 396.0 393.794 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 32 25 45.9451 -90.2732 472.000 396.0 393.827 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 32 55 45.9451 -90.2732 472.000 396.0 393.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 33 25 45.9451 -90.2732 472.000 396.0 393.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 33 55 45.9451 -90.2732 472.000 396.0 393.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 34 25 45.9451 -90.2732 472.000 396.0 393.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 34 55 45.9451 -90.2732 472.000 396.0 393.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 39 55 45.9451 -90.2732 472.000 30.0 393.941 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 44 55 45.9451 -90.2732 472.000 122.0 393.860 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 49 55 45.9451 -90.2732 472.000 396.0 393.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 54 55 45.9451 -90.2732 472.000 30.0 393.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 17 59 55 45.9451 -90.2732 472.000 122.0 393.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 04 55 45.9451 -90.2732 472.000 396.0 393.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 14 55 45.9451 -90.2732 472.000 30.0 394.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 19 55 45.9451 -90.2732 472.000 122.0 394.000 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 24 55 45.9451 -90.2732 472.000 396.0 393.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 29 55 45.9451 -90.2732 472.000 30.0 394.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 34 55 45.9451 -90.2732 472.000 122.0 394.025 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 39 55 45.9451 -90.2732 472.000 396.0 393.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 40 25 45.9451 -90.2732 472.000 396.0 393.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 40 55 45.9451 -90.2732 472.000 396.0 393.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 41 25 45.9451 -90.2732 472.000 396.0 393.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 41 55 45.9451 -90.2732 472.000 396.0 393.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 42 25 45.9451 -90.2732 472.000 396.0 393.779 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 42 55 45.9451 -90.2732 472.000 396.0 393.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 43 25 45.9451 -90.2732 472.000 396.0 393.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 43 55 45.9451 -90.2732 472.000 396.0 393.892 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 44 25 45.9451 -90.2732 472.000 396.0 393.858 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 44 55 45.9451 -90.2732 472.000 396.0 393.841 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 49 55 45.9451 -90.2732 472.000 30.0 394.073 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 54 55 45.9451 -90.2732 472.000 122.0 393.979 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 18 59 55 45.9451 -90.2732 472.000 396.0 393.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 04 55 45.9451 -90.2732 472.000 30.0 394.053 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 09 55 45.9451 -90.2732 472.000 122.0 394.025 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 14 55 45.9451 -90.2732 472.000 396.0 393.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 15 25 45.9451 -90.2732 472.000 396.0 393.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 15 55 45.9451 -90.2732 472.000 396.0 393.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 16 25 45.9451 -90.2732 472.000 396.0 393.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 16 55 45.9451 -90.2732 472.000 396.0 393.916 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 17 25 45.9451 -90.2732 472.000 396.0 393.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 17 55 45.9451 -90.2732 472.000 396.0 393.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 18 25 45.9451 -90.2732 472.000 396.0 393.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 18 55 45.9451 -90.2732 472.000 396.0 393.953 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 19 25 45.9451 -90.2732 472.000 396.0 393.965 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 19 55 45.9451 -90.2732 472.000 396.0 393.913 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 24 55 45.9451 -90.2732 472.000 30.0 394.157 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 29 55 45.9451 -90.2732 472.000 122.0 394.111 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 34 55 45.9451 -90.2732 472.000 396.0 393.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 39 55 45.9451 -90.2732 472.000 30.0 394.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 44 55 45.9451 -90.2732 472.000 122.0 394.264 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 49 55 45.9451 -90.2732 472.000 396.0 393.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 19 59 55 45.9451 -90.2732 472.000 30.0 394.343 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 04 55 45.9451 -90.2732 472.000 122.0 394.271 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 09 55 45.9451 -90.2732 472.000 396.0 393.964 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 14 55 45.9451 -90.2732 472.000 30.0 394.347 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 19 55 45.9451 -90.2732 472.000 122.0 394.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 24 55 45.9451 -90.2732 472.000 396.0 393.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 25 25 45.9451 -90.2732 472.000 396.0 393.866 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 25 55 45.9451 -90.2732 472.000 396.0 393.856 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 26 25 45.9451 -90.2732 472.000 396.0 393.773 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 26 55 45.9451 -90.2732 472.000 396.0 393.764 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 27 25 45.9451 -90.2732 472.000 396.0 393.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 27 55 45.9451 -90.2732 472.000 396.0 393.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 28 25 45.9451 -90.2732 472.000 396.0 393.821 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 28 55 45.9451 -90.2732 472.000 396.0 393.796 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 29 25 45.9451 -90.2732 472.000 396.0 393.796 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 29 55 45.9451 -90.2732 472.000 396.0 393.867 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 34 55 45.9451 -90.2732 472.000 30.0 394.348 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 39 55 45.9451 -90.2732 472.000 122.0 394.027 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 44 55 45.9451 -90.2732 472.000 396.0 393.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 49 55 45.9451 -90.2732 472.000 30.0 394.170 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 54 55 45.9451 -90.2732 472.000 122.0 394.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 20 59 55 45.9451 -90.2732 472.000 396.0 393.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 00 25 45.9451 -90.2732 472.000 396.0 393.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 00 55 45.9451 -90.2732 472.000 396.0 393.876 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 01 25 45.9451 -90.2732 472.000 396.0 393.893 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 01 55 45.9451 -90.2732 472.000 396.0 393.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 02 25 45.9451 -90.2732 472.000 396.0 393.857 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 02 55 45.9451 -90.2732 472.000 396.0 393.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 03 25 45.9451 -90.2732 472.000 396.0 393.904 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 03 55 45.9451 -90.2732 472.000 396.0 393.857 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 04 25 45.9451 -90.2732 472.000 396.0 393.871 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 04 55 45.9451 -90.2732 472.000 396.0 393.866 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 09 55 45.9451 -90.2732 472.000 30.0 394.154 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 14 55 45.9451 -90.2732 472.000 122.0 394.110 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 19 55 45.9451 -90.2732 472.000 396.0 394.065 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 24 55 45.9451 -90.2732 472.000 30.0 394.334 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 29 55 45.9451 -90.2732 472.000 122.0 394.181 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 34 55 45.9451 -90.2732 472.000 396.0 394.043 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 35 25 45.9451 -90.2732 472.000 396.0 394.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 35 55 45.9451 -90.2732 472.000 396.0 394.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 36 25 45.9451 -90.2732 472.000 396.0 394.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 36 55 45.9451 -90.2732 472.000 396.0 394.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 37 25 45.9451 -90.2732 472.000 396.0 394.089 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 37 55 45.9451 -90.2732 472.000 396.0 394.108 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 38 25 45.9451 -90.2732 472.000 396.0 394.090 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 38 55 45.9451 -90.2732 472.000 396.0 394.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 39 25 45.9451 -90.2732 472.000 396.0 394.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 39 55 45.9451 -90.2732 472.000 396.0 394.115 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 44 55 45.9451 -90.2732 472.000 30.0 394.413 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 49 55 45.9451 -90.2732 472.000 122.0 394.317 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 54 55 45.9451 -90.2732 472.000 396.0 393.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 21 59 55 45.9451 -90.2732 472.000 30.0 394.387 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 04 55 45.9451 -90.2732 472.000 122.0 394.075 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 09 55 45.9451 -90.2732 472.000 396.0 393.951 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 19 55 45.9451 -90.2732 472.000 30.0 394.243 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 24 55 45.9451 -90.2732 472.000 122.0 394.127 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 29 55 45.9451 -90.2732 472.000 396.0 393.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 34 55 45.9451 -90.2732 472.000 30.0 394.473 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 39 55 45.9451 -90.2732 472.000 122.0 394.157 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 44 55 45.9451 -90.2732 472.000 396.0 394.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 54 55 45.9451 -90.2732 472.000 30.0 394.516 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 22 59 55 45.9451 -90.2732 472.000 122.0 394.239 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 04 55 45.9451 -90.2732 472.000 396.0 394.128 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 09 55 45.9451 -90.2732 472.000 30.0 394.449 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 14 55 45.9451 -90.2732 472.000 122.0 394.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 19 55 45.9451 -90.2732 472.000 396.0 394.322 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 20 25 45.9451 -90.2732 472.000 396.0 394.241 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 20 55 45.9451 -90.2732 472.000 396.0 394.235 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 21 25 45.9451 -90.2732 472.000 396.0 394.372 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 21 55 45.9451 -90.2732 472.000 396.0 394.414 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 22 25 45.9451 -90.2732 472.000 396.0 394.407 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 22 55 45.9451 -90.2732 472.000 396.0 394.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 23 25 45.9451 -90.2732 472.000 396.0 394.381 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 23 55 45.9451 -90.2732 472.000 396.0 394.397 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 24 25 45.9451 -90.2732 472.000 396.0 394.362 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 24 55 45.9451 -90.2732 472.000 396.0 394.452 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 29 55 45.9451 -90.2732 472.000 30.0 394.772 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 34 55 45.9451 -90.2732 472.000 122.0 394.616 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 39 55 45.9451 -90.2732 472.000 396.0 394.674 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 44 55 45.9451 -90.2732 472.000 30.0 394.931 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 13 23 49 55 45.9451 -90.2732 472.000 122.0 394.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 14 55 45.9451 -90.2732 472.000 396.0 395.211 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 19 55 45.9451 -90.2732 472.000 30.0 395.402 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 24 55 45.9451 -90.2732 472.000 122.0 395.335 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 29 55 45.9451 -90.2732 472.000 396.0 395.432 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 34 55 45.9451 -90.2732 472.000 30.0 395.553 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 39 55 45.9451 -90.2732 472.000 122.0 395.456 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 44 55 45.9451 -90.2732 472.000 396.0 395.657 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 45 25 45.9451 -90.2732 472.000 396.0 395.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 45 55 45.9451 -90.2732 472.000 396.0 395.631 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 46 25 45.9451 -90.2732 472.000 396.0 395.666 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 46 55 45.9451 -90.2732 472.000 396.0 395.614 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 47 25 45.9451 -90.2732 472.000 396.0 395.630 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 47 55 45.9451 -90.2732 472.000 396.0 395.726 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 48 25 45.9451 -90.2732 472.000 396.0 395.697 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 48 55 45.9451 -90.2732 472.000 396.0 395.709 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 49 25 45.9451 -90.2732 472.000 396.0 395.707 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 49 55 45.9451 -90.2732 472.000 396.0 395.669 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 54 55 45.9451 -90.2732 472.000 30.0 395.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 00 59 55 45.9451 -90.2732 472.000 122.0 395.571 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 04 55 45.9451 -90.2732 472.000 396.0 395.948 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 09 55 45.9451 -90.2732 472.000 30.0 396.037 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 14 55 45.9451 -90.2732 472.000 122.0 395.757 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 19 55 45.9451 -90.2732 472.000 396.0 396.115 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 20 25 45.9451 -90.2732 472.000 396.0 396.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 20 55 45.9451 -90.2732 472.000 396.0 396.145 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 21 25 45.9451 -90.2732 472.000 396.0 396.136 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 21 55 45.9451 -90.2732 472.000 396.0 396.132 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 22 25 45.9451 -90.2732 472.000 396.0 396.096 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 22 55 45.9451 -90.2732 472.000 396.0 396.184 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 23 25 45.9451 -90.2732 472.000 396.0 396.195 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 23 55 45.9451 -90.2732 472.000 396.0 396.086 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 24 25 45.9451 -90.2732 472.000 396.0 396.084 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 24 55 45.9451 -90.2732 472.000 396.0 396.063 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 29 55 45.9451 -90.2732 472.000 30.0 396.309 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 34 55 45.9451 -90.2732 472.000 122.0 396.055 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 39 55 45.9451 -90.2732 472.000 396.0 396.196 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 44 55 45.9451 -90.2732 472.000 30.0 396.434 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 49 55 45.9451 -90.2732 472.000 122.0 396.160 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 01 54 55 45.9451 -90.2732 472.000 396.0 396.366 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 04 55 45.9451 -90.2732 472.000 30.0 396.839 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 09 55 45.9451 -90.2732 472.000 122.0 396.456 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 14 55 45.9451 -90.2732 472.000 396.0 396.688 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 19 55 45.9451 -90.2732 472.000 30.0 396.822 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 24 55 45.9451 -90.2732 472.000 122.0 396.688 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 29 55 45.9451 -90.2732 472.000 396.0 396.934 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 30 25 45.9451 -90.2732 472.000 396.0 396.960 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 30 55 45.9451 -90.2732 472.000 396.0 396.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 31 25 45.9451 -90.2732 472.000 396.0 396.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 31 55 45.9451 -90.2732 472.000 396.0 396.954 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 32 25 45.9451 -90.2732 472.000 396.0 396.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 32 55 45.9451 -90.2732 472.000 396.0 396.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 33 25 45.9451 -90.2732 472.000 396.0 396.907 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 33 55 45.9451 -90.2732 472.000 396.0 396.907 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 34 25 45.9451 -90.2732 472.000 396.0 396.940 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 34 55 45.9451 -90.2732 472.000 396.0 396.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 39 55 45.9451 -90.2732 472.000 30.0 397.264 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 44 55 45.9451 -90.2732 472.000 122.0 396.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 49 55 45.9451 -90.2732 472.000 396.0 397.169 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 54 55 45.9451 -90.2732 472.000 30.0 397.348 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 02 59 55 45.9451 -90.2732 472.000 122.0 396.910 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 04 55 45.9451 -90.2732 472.000 396.0 397.218 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 05 25 45.9451 -90.2732 472.000 396.0 397.208 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 05 55 45.9451 -90.2732 472.000 396.0 397.227 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 06 25 45.9451 -90.2732 472.000 396.0 397.251 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 06 55 45.9451 -90.2732 472.000 396.0 397.303 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 07 25 45.9451 -90.2732 472.000 396.0 397.305 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 07 55 45.9451 -90.2732 472.000 396.0 397.317 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 08 25 45.9451 -90.2732 472.000 396.0 397.354 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 08 55 45.9451 -90.2732 472.000 396.0 397.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 09 25 45.9451 -90.2732 472.000 396.0 397.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 09 55 45.9451 -90.2732 472.000 396.0 397.349 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 14 55 45.9451 -90.2732 472.000 30.0 397.206 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 19 55 45.9451 -90.2732 472.000 122.0 396.840 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 24 55 45.9451 -90.2732 472.000 396.0 397.401 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 29 55 45.9451 -90.2732 472.000 30.0 397.466 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 34 55 45.9451 -90.2732 472.000 122.0 397.057 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 39 55 45.9451 -90.2732 472.000 396.0 397.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 40 25 45.9451 -90.2732 472.000 396.0 397.483 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 40 55 45.9451 -90.2732 472.000 396.0 397.537 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 41 25 45.9451 -90.2732 472.000 396.0 397.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 41 55 45.9451 -90.2732 472.000 396.0 397.490 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 42 25 45.9451 -90.2732 472.000 396.0 397.459 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 42 55 45.9451 -90.2732 472.000 396.0 397.491 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 43 25 45.9451 -90.2732 472.000 396.0 397.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 43 55 45.9451 -90.2732 472.000 396.0 397.532 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 44 25 45.9451 -90.2732 472.000 396.0 397.544 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 44 55 45.9451 -90.2732 472.000 396.0 397.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 49 55 45.9451 -90.2732 472.000 30.0 397.644 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 54 55 45.9451 -90.2732 472.000 122.0 397.057 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 03 59 55 45.9451 -90.2732 472.000 396.0 397.557 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 04 55 45.9451 -90.2732 472.000 30.0 397.632 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 09 55 45.9451 -90.2732 472.000 122.0 397.156 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 14 55 45.9451 -90.2732 472.000 396.0 397.769 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 24 55 45.9451 -90.2732 472.000 30.0 397.782 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 29 55 45.9451 -90.2732 472.000 122.0 397.342 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 34 55 45.9451 -90.2732 472.000 396.0 397.867 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 39 55 45.9451 -90.2732 472.000 30.0 398.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 44 55 45.9451 -90.2732 472.000 122.0 397.450 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 49 55 45.9451 -90.2732 472.000 396.0 397.894 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 50 25 45.9451 -90.2732 472.000 396.0 397.960 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 50 55 45.9451 -90.2732 472.000 396.0 398.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 51 25 45.9451 -90.2732 472.000 396.0 398.002 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 51 55 45.9451 -90.2732 472.000 396.0 397.960 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 52 25 45.9451 -90.2732 472.000 396.0 397.993 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 52 55 45.9451 -90.2732 472.000 396.0 397.986 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 53 25 45.9451 -90.2732 472.000 396.0 397.926 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 53 55 45.9451 -90.2732 472.000 396.0 397.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 54 25 45.9451 -90.2732 472.000 396.0 397.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 04 54 55 45.9451 -90.2732 472.000 396.0 397.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 04 55 45.9451 -90.2732 472.000 30.0 398.205 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 09 55 45.9451 -90.2732 472.000 122.0 397.674 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 14 55 45.9451 -90.2732 472.000 396.0 398.043 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 19 55 45.9451 -90.2732 472.000 30.0 398.398 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 24 55 45.9451 -90.2732 472.000 122.0 397.883 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 29 55 45.9451 -90.2732 472.000 396.0 398.212 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 30 25 45.9451 -90.2732 472.000 396.0 398.277 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 30 55 45.9451 -90.2732 472.000 396.0 398.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 31 25 45.9451 -90.2732 472.000 396.0 398.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 31 55 45.9451 -90.2732 472.000 396.0 398.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 32 25 45.9451 -90.2732 472.000 396.0 398.224 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 32 55 45.9451 -90.2732 472.000 396.0 398.207 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 33 25 45.9451 -90.2732 472.000 396.0 398.217 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 33 55 45.9451 -90.2732 472.000 396.0 398.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 34 25 45.9451 -90.2732 472.000 396.0 398.281 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 34 55 45.9451 -90.2732 472.000 396.0 398.241 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 39 55 45.9451 -90.2732 472.000 30.0 398.323 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 44 55 45.9451 -90.2732 472.000 122.0 398.002 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 49 55 45.9451 -90.2732 472.000 396.0 398.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 54 55 45.9451 -90.2732 472.000 30.0 398.583 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 05 59 55 45.9451 -90.2732 472.000 122.0 397.598 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 04 55 45.9451 -90.2732 472.000 396.0 398.451 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 14 55 45.9451 -90.2732 472.000 30.0 398.513 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 19 55 45.9451 -90.2732 472.000 122.0 397.438 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 24 55 45.9451 -90.2732 472.000 396.0 398.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 29 55 45.9451 -90.2732 472.000 30.0 398.556 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 34 55 45.9451 -90.2732 472.000 122.0 397.347 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 39 55 45.9451 -90.2732 472.000 396.0 398.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 40 25 45.9451 -90.2732 472.000 396.0 398.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 40 55 45.9451 -90.2732 472.000 396.0 398.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 41 25 45.9451 -90.2732 472.000 396.0 398.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 41 55 45.9451 -90.2732 472.000 396.0 398.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 42 25 45.9451 -90.2732 472.000 396.0 398.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 42 55 45.9451 -90.2732 472.000 396.0 398.494 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 43 25 45.9451 -90.2732 472.000 396.0 398.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 43 55 45.9451 -90.2732 472.000 396.0 398.540 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 44 25 45.9451 -90.2732 472.000 396.0 398.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 44 55 45.9451 -90.2732 472.000 396.0 398.490 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 49 55 45.9451 -90.2732 472.000 30.0 398.545 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 54 55 45.9451 -90.2732 472.000 122.0 397.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 06 59 55 45.9451 -90.2732 472.000 396.0 398.409 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 04 55 45.9451 -90.2732 472.000 30.0 398.737 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 09 55 45.9451 -90.2732 472.000 122.0 397.656 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 14 55 45.9451 -90.2732 472.000 396.0 398.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 15 25 45.9451 -90.2732 472.000 396.0 398.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 15 55 45.9451 -90.2732 472.000 396.0 398.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 16 25 45.9451 -90.2732 472.000 396.0 398.136 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 16 55 45.9451 -90.2732 472.000 396.0 398.111 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 17 25 45.9451 -90.2732 472.000 396.0 398.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 17 55 45.9451 -90.2732 472.000 396.0 398.154 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 18 25 45.9451 -90.2732 472.000 396.0 398.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 18 55 45.9451 -90.2732 472.000 396.0 398.210 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 19 25 45.9451 -90.2732 472.000 396.0 398.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 19 55 45.9451 -90.2732 472.000 396.0 398.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 24 55 45.9451 -90.2732 472.000 30.0 398.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 29 55 45.9451 -90.2732 472.000 122.0 397.553 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 34 55 45.9451 -90.2732 472.000 396.0 398.332 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 39 55 45.9451 -90.2732 472.000 30.0 398.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 44 55 45.9451 -90.2732 472.000 122.0 397.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 49 55 45.9451 -90.2732 472.000 396.0 398.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 07 59 55 45.9451 -90.2732 472.000 30.0 398.571 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 04 55 45.9451 -90.2732 472.000 122.0 397.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 09 55 45.9451 -90.2732 472.000 396.0 398.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 14 55 45.9451 -90.2732 472.000 30.0 398.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 19 55 45.9451 -90.2732 472.000 122.0 397.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 24 55 45.9451 -90.2732 472.000 396.0 398.320 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 25 25 45.9451 -90.2732 472.000 396.0 398.320 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 25 55 45.9451 -90.2732 472.000 396.0 398.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 26 25 45.9451 -90.2732 472.000 396.0 398.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 26 55 45.9451 -90.2732 472.000 396.0 398.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 27 25 45.9451 -90.2732 472.000 396.0 398.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 27 55 45.9451 -90.2732 472.000 396.0 398.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 28 25 45.9451 -90.2732 472.000 396.0 398.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 28 55 45.9451 -90.2732 472.000 396.0 398.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 29 25 45.9451 -90.2732 472.000 396.0 398.338 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 29 55 45.9451 -90.2732 472.000 396.0 398.310 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 34 55 45.9451 -90.2732 472.000 30.0 399.740 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 39 55 45.9451 -90.2732 472.000 122.0 397.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 44 55 45.9451 -90.2732 472.000 396.0 398.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 49 55 45.9451 -90.2732 472.000 30.0 400.838 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 54 55 45.9451 -90.2732 472.000 122.0 397.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 08 59 55 45.9451 -90.2732 472.000 396.0 398.228 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 00 25 45.9451 -90.2732 472.000 396.0 398.198 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 00 55 45.9451 -90.2732 472.000 396.0 398.205 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 01 25 45.9451 -90.2732 472.000 396.0 398.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 01 55 45.9451 -90.2732 472.000 396.0 398.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 02 25 45.9451 -90.2732 472.000 396.0 398.158 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 02 55 45.9451 -90.2732 472.000 396.0 398.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 03 25 45.9451 -90.2732 472.000 396.0 398.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 03 55 45.9451 -90.2732 472.000 396.0 398.126 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 04 25 45.9451 -90.2732 472.000 396.0 398.133 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 04 55 45.9451 -90.2732 472.000 396.0 398.133 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 09 55 45.9451 -90.2732 472.000 30.0 402.558 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 14 55 45.9451 -90.2732 472.000 122.0 397.596 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 19 55 45.9451 -90.2732 472.000 396.0 397.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 24 55 45.9451 -90.2732 472.000 30.0 402.298 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 29 55 45.9451 -90.2732 472.000 122.0 398.603 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 34 55 45.9451 -90.2732 472.000 396.0 397.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 35 25 45.9451 -90.2732 472.000 396.0 397.238 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 35 55 45.9451 -90.2732 472.000 396.0 397.144 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 36 25 45.9451 -90.2732 472.000 396.0 397.173 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 36 55 45.9451 -90.2732 472.000 396.0 397.203 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 37 25 45.9451 -90.2732 472.000 396.0 397.177 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 37 55 45.9451 -90.2732 472.000 396.0 397.145 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 38 25 45.9451 -90.2732 472.000 396.0 397.088 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 38 55 45.9451 -90.2732 472.000 396.0 397.057 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 39 25 45.9451 -90.2732 472.000 396.0 397.055 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 39 55 45.9451 -90.2732 472.000 396.0 397.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 44 55 45.9451 -90.2732 472.000 30.0 402.725 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 49 55 45.9451 -90.2732 472.000 122.0 399.644 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 54 55 45.9451 -90.2732 472.000 396.0 396.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 09 59 55 45.9451 -90.2732 472.000 30.0 402.631 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 04 55 45.9451 -90.2732 472.000 122.0 399.479 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 09 55 45.9451 -90.2732 472.000 396.0 396.298 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 19 55 45.9451 -90.2732 472.000 30.0 400.915 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 24 55 45.9451 -90.2732 472.000 122.0 398.468 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 29 55 45.9451 -90.2732 472.000 396.0 396.391 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 34 55 45.9451 -90.2732 472.000 30.0 399.232 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 39 55 45.9451 -90.2732 472.000 122.0 397.496 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 44 55 45.9451 -90.2732 472.000 396.0 396.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 54 55 45.9451 -90.2732 472.000 30.0 397.783 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 10 59 55 45.9451 -90.2732 472.000 122.0 397.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 04 55 45.9451 -90.2732 472.000 396.0 396.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 09 55 45.9451 -90.2732 472.000 30.0 397.141 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 14 55 45.9451 -90.2732 472.000 122.0 397.062 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 19 55 45.9451 -90.2732 472.000 396.0 396.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 20 25 45.9451 -90.2732 472.000 396.0 396.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 20 55 45.9451 -90.2732 472.000 396.0 396.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 21 25 45.9451 -90.2732 472.000 396.0 396.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 21 55 45.9451 -90.2732 472.000 396.0 396.452 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 22 25 45.9451 -90.2732 472.000 396.0 396.397 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 22 55 45.9451 -90.2732 472.000 396.0 396.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 23 25 45.9451 -90.2732 472.000 396.0 396.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 23 55 45.9451 -90.2732 472.000 396.0 396.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 24 25 45.9451 -90.2732 472.000 396.0 396.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 24 55 45.9451 -90.2732 472.000 396.0 396.482 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 29 55 45.9451 -90.2732 472.000 30.0 397.184 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 34 55 45.9451 -90.2732 472.000 122.0 396.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 39 55 45.9451 -90.2732 472.000 396.0 396.527 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 44 55 45.9451 -90.2732 472.000 30.0 397.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 11 49 55 45.9451 -90.2732 472.000 122.0 397.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 14 55 45.9451 -90.2732 472.000 396.0 396.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 19 55 45.9451 -90.2732 472.000 30.0 397.298 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 24 55 45.9451 -90.2732 472.000 122.0 397.087 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 29 55 45.9451 -90.2732 472.000 396.0 396.530 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 34 55 45.9451 -90.2732 472.000 30.0 397.174 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 39 55 45.9451 -90.2732 472.000 122.0 396.921 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 44 55 45.9451 -90.2732 472.000 396.0 396.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 45 25 45.9451 -90.2732 472.000 396.0 396.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 45 55 45.9451 -90.2732 472.000 396.0 396.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 46 25 45.9451 -90.2732 472.000 396.0 396.452 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 46 55 45.9451 -90.2732 472.000 396.0 396.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 47 25 45.9451 -90.2732 472.000 396.0 396.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 47 55 45.9451 -90.2732 472.000 396.0 396.467 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 48 25 45.9451 -90.2732 472.000 396.0 396.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 48 55 45.9451 -90.2732 472.000 396.0 396.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 49 25 45.9451 -90.2732 472.000 396.0 396.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 49 55 45.9451 -90.2732 472.000 396.0 396.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 54 55 45.9451 -90.2732 472.000 30.0 397.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 12 59 55 45.9451 -90.2732 472.000 122.0 396.828 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 04 55 45.9451 -90.2732 472.000 396.0 396.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 09 55 45.9451 -90.2732 472.000 30.0 397.048 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 14 55 45.9451 -90.2732 472.000 122.0 396.856 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 19 55 45.9451 -90.2732 472.000 396.0 396.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 20 25 45.9451 -90.2732 472.000 396.0 396.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 20 55 45.9451 -90.2732 472.000 396.0 396.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 21 25 45.9451 -90.2732 472.000 396.0 396.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 21 55 45.9451 -90.2732 472.000 396.0 396.526 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 22 25 45.9451 -90.2732 472.000 396.0 396.364 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 22 55 45.9451 -90.2732 472.000 396.0 396.415 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 23 25 45.9451 -90.2732 472.000 396.0 396.388 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 23 55 45.9451 -90.2732 472.000 396.0 396.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 24 25 45.9451 -90.2732 472.000 396.0 396.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 24 55 45.9451 -90.2732 472.000 396.0 396.356 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 29 55 45.9451 -90.2732 472.000 30.0 397.241 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 34 55 45.9451 -90.2732 472.000 122.0 396.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 39 55 45.9451 -90.2732 472.000 396.0 396.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 44 55 45.9451 -90.2732 472.000 30.0 397.151 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 49 55 45.9451 -90.2732 472.000 122.0 396.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 13 54 55 45.9451 -90.2732 472.000 396.0 396.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 04 55 45.9451 -90.2732 472.000 30.0 396.988 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 09 55 45.9451 -90.2732 472.000 122.0 396.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 14 55 45.9451 -90.2732 472.000 396.0 396.356 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 19 55 45.9451 -90.2732 472.000 30.0 396.894 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 24 55 45.9451 -90.2732 472.000 122.0 396.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 29 55 45.9451 -90.2732 472.000 396.0 396.152 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 30 25 45.9451 -90.2732 472.000 396.0 396.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 30 55 45.9451 -90.2732 472.000 396.0 396.218 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 31 25 45.9451 -90.2732 472.000 396.0 396.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 31 55 45.9451 -90.2732 472.000 396.0 396.187 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 32 25 45.9451 -90.2732 472.000 396.0 396.243 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 32 55 45.9451 -90.2732 472.000 396.0 396.217 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 33 25 45.9451 -90.2732 472.000 396.0 396.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 33 55 45.9451 -90.2732 472.000 396.0 396.231 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 34 25 45.9451 -90.2732 472.000 396.0 396.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 34 55 45.9451 -90.2732 472.000 396.0 396.268 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 39 55 45.9451 -90.2732 472.000 30.0 396.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 44 55 45.9451 -90.2732 472.000 122.0 396.517 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 49 55 45.9451 -90.2732 472.000 396.0 396.278 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 54 55 45.9451 -90.2732 472.000 30.0 396.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 14 59 55 45.9451 -90.2732 472.000 122.0 396.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 04 55 45.9451 -90.2732 472.000 396.0 396.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 05 25 45.9451 -90.2732 472.000 396.0 396.278 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 05 55 45.9451 -90.2732 472.000 396.0 396.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 06 25 45.9451 -90.2732 472.000 396.0 396.270 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 06 55 45.9451 -90.2732 472.000 396.0 396.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 07 25 45.9451 -90.2732 472.000 396.0 396.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 07 55 45.9451 -90.2732 472.000 396.0 396.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 08 25 45.9451 -90.2732 472.000 396.0 396.300 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 08 55 45.9451 -90.2732 472.000 396.0 396.368 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 09 25 45.9451 -90.2732 472.000 396.0 396.490 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 09 55 45.9451 -90.2732 472.000 396.0 396.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 14 55 45.9451 -90.2732 472.000 30.0 396.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 19 55 45.9451 -90.2732 472.000 122.0 396.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 24 55 45.9451 -90.2732 472.000 396.0 396.726 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 29 55 45.9451 -90.2732 472.000 30.0 396.770 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 34 55 45.9451 -90.2732 472.000 122.0 396.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 39 55 45.9451 -90.2732 472.000 396.0 396.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 40 25 45.9451 -90.2732 472.000 396.0 396.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 40 55 45.9451 -90.2732 472.000 396.0 396.835 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 41 25 45.9451 -90.2732 472.000 396.0 396.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 41 55 45.9451 -90.2732 472.000 396.0 396.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 42 25 45.9451 -90.2732 472.000 396.0 396.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 42 55 45.9451 -90.2732 472.000 396.0 396.811 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 43 25 45.9451 -90.2732 472.000 396.0 396.803 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 43 55 45.9451 -90.2732 472.000 396.0 396.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 44 25 45.9451 -90.2732 472.000 396.0 396.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 44 55 45.9451 -90.2732 472.000 396.0 396.846 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 49 55 45.9451 -90.2732 472.000 30.0 396.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 54 55 45.9451 -90.2732 472.000 122.0 396.925 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 15 59 55 45.9451 -90.2732 472.000 396.0 396.568 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 04 55 45.9451 -90.2732 472.000 30.0 396.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 09 55 45.9451 -90.2732 472.000 122.0 396.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 14 55 45.9451 -90.2732 472.000 396.0 396.434 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 24 55 45.9451 -90.2732 472.000 30.0 396.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 29 55 45.9451 -90.2732 472.000 122.0 396.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 34 55 45.9451 -90.2732 472.000 396.0 396.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 39 55 45.9451 -90.2732 472.000 30.0 396.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 44 55 45.9451 -90.2732 472.000 122.0 396.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 49 55 45.9451 -90.2732 472.000 396.0 396.745 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 50 25 45.9451 -90.2732 472.000 396.0 396.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 50 55 45.9451 -90.2732 472.000 396.0 396.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 51 25 45.9451 -90.2732 472.000 396.0 396.923 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 51 55 45.9451 -90.2732 472.000 396.0 396.872 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 52 25 45.9451 -90.2732 472.000 396.0 397.096 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 52 55 45.9451 -90.2732 472.000 396.0 397.145 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 53 25 45.9451 -90.2732 472.000 396.0 397.069 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 53 55 45.9451 -90.2732 472.000 396.0 397.092 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 54 25 45.9451 -90.2732 472.000 396.0 397.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 16 54 55 45.9451 -90.2732 472.000 396.0 397.127 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 04 55 45.9451 -90.2732 472.000 30.0 396.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 09 55 45.9451 -90.2732 472.000 122.0 397.235 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 14 55 45.9451 -90.2732 472.000 396.0 397.133 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 19 55 45.9451 -90.2732 472.000 30.0 397.134 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 24 55 45.9451 -90.2732 472.000 122.0 396.764 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 29 55 45.9451 -90.2732 472.000 396.0 396.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 30 25 45.9451 -90.2732 472.000 396.0 396.373 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 30 55 45.9451 -90.2732 472.000 396.0 396.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 31 25 45.9451 -90.2732 472.000 396.0 396.282 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 31 55 45.9451 -90.2732 472.000 396.0 396.206 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 32 25 45.9451 -90.2732 472.000 396.0 396.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 32 55 45.9451 -90.2732 472.000 396.0 396.370 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 33 25 45.9451 -90.2732 472.000 396.0 396.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 33 55 45.9451 -90.2732 472.000 396.0 396.715 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 34 25 45.9451 -90.2732 472.000 396.0 396.582 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 34 55 45.9451 -90.2732 472.000 396.0 396.706 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 39 55 45.9451 -90.2732 472.000 30.0 396.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 44 55 45.9451 -90.2732 472.000 122.0 396.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 49 55 45.9451 -90.2732 472.000 396.0 396.225 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 54 55 45.9451 -90.2732 472.000 30.0 396.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 17 59 55 45.9451 -90.2732 472.000 122.0 396.199 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 04 55 45.9451 -90.2732 472.000 396.0 396.256 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 14 55 45.9451 -90.2732 472.000 30.0 395.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 19 55 45.9451 -90.2732 472.000 122.0 395.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 24 55 45.9451 -90.2732 472.000 396.0 396.188 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 29 55 45.9451 -90.2732 472.000 30.0 395.798 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 34 55 45.9451 -90.2732 472.000 122.0 395.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 39 55 45.9451 -90.2732 472.000 396.0 395.953 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 40 25 45.9451 -90.2732 472.000 396.0 396.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 40 55 45.9451 -90.2732 472.000 396.0 395.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 41 25 45.9451 -90.2732 472.000 396.0 395.967 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 41 55 45.9451 -90.2732 472.000 396.0 395.913 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 42 25 45.9451 -90.2732 472.000 396.0 395.951 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 42 55 45.9451 -90.2732 472.000 396.0 395.970 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 43 25 45.9451 -90.2732 472.000 396.0 395.954 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 43 55 45.9451 -90.2732 472.000 396.0 395.956 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 44 25 45.9451 -90.2732 472.000 396.0 395.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 44 55 45.9451 -90.2732 472.000 396.0 395.917 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 49 55 45.9451 -90.2732 472.000 30.0 395.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 54 55 45.9451 -90.2732 472.000 122.0 396.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 18 59 55 45.9451 -90.2732 472.000 396.0 396.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 04 55 45.9451 -90.2732 472.000 30.0 396.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 09 55 45.9451 -90.2732 472.000 122.0 396.061 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 14 55 45.9451 -90.2732 472.000 396.0 395.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 15 25 45.9451 -90.2732 472.000 396.0 395.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 15 55 45.9451 -90.2732 472.000 396.0 395.842 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 16 25 45.9451 -90.2732 472.000 396.0 395.760 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 16 55 45.9451 -90.2732 472.000 396.0 395.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 17 25 45.9451 -90.2732 472.000 396.0 395.858 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 17 55 45.9451 -90.2732 472.000 396.0 395.881 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 18 25 45.9451 -90.2732 472.000 396.0 395.813 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 18 55 45.9451 -90.2732 472.000 396.0 395.804 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 19 25 45.9451 -90.2732 472.000 396.0 395.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 19 55 45.9451 -90.2732 472.000 396.0 395.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 24 55 45.9451 -90.2732 472.000 30.0 395.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 29 55 45.9451 -90.2732 472.000 122.0 396.038 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 34 55 45.9451 -90.2732 472.000 396.0 395.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 39 55 45.9451 -90.2732 472.000 30.0 396.176 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 44 55 45.9451 -90.2732 472.000 122.0 396.280 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 49 55 45.9451 -90.2732 472.000 396.0 396.188 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 19 59 55 45.9451 -90.2732 472.000 30.0 396.278 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 04 55 45.9451 -90.2732 472.000 122.0 396.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 09 55 45.9451 -90.2732 472.000 396.0 395.793 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 14 55 45.9451 -90.2732 472.000 30.0 396.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 19 55 45.9451 -90.2732 472.000 122.0 396.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 24 55 45.9451 -90.2732 472.000 396.0 395.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 25 25 45.9451 -90.2732 472.000 396.0 395.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 25 55 45.9451 -90.2732 472.000 396.0 395.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 26 25 45.9451 -90.2732 472.000 396.0 395.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 26 55 45.9451 -90.2732 472.000 396.0 395.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 27 25 45.9451 -90.2732 472.000 396.0 395.536 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 27 55 45.9451 -90.2732 472.000 396.0 395.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 28 25 45.9451 -90.2732 472.000 396.0 395.470 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 28 55 45.9451 -90.2732 472.000 396.0 395.403 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 29 25 45.9451 -90.2732 472.000 396.0 395.479 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 29 55 45.9451 -90.2732 472.000 396.0 395.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 34 55 45.9451 -90.2732 472.000 30.0 395.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 39 55 45.9451 -90.2732 472.000 122.0 395.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 44 55 45.9451 -90.2732 472.000 396.0 395.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 49 55 45.9451 -90.2732 472.000 30.0 395.914 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 54 55 45.9451 -90.2732 472.000 122.0 395.972 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 20 59 55 45.9451 -90.2732 472.000 396.0 395.404 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 00 25 45.9451 -90.2732 472.000 396.0 395.585 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 00 55 45.9451 -90.2732 472.000 396.0 395.667 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 01 25 45.9451 -90.2732 472.000 396.0 395.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 01 55 45.9451 -90.2732 472.000 396.0 395.722 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 02 25 45.9451 -90.2732 472.000 396.0 395.635 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 02 55 45.9451 -90.2732 472.000 396.0 395.488 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 03 25 45.9451 -90.2732 472.000 396.0 395.545 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 03 55 45.9451 -90.2732 472.000 396.0 395.554 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 04 25 45.9451 -90.2732 472.000 396.0 395.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 04 55 45.9451 -90.2732 472.000 396.0 395.609 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 09 55 45.9451 -90.2732 472.000 30.0 396.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 14 55 45.9451 -90.2732 472.000 122.0 396.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 19 55 45.9451 -90.2732 472.000 396.0 396.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 24 55 45.9451 -90.2732 472.000 30.0 396.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 29 55 45.9451 -90.2732 472.000 122.0 396.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 34 55 45.9451 -90.2732 472.000 396.0 396.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 35 25 45.9451 -90.2732 472.000 396.0 396.146 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 35 55 45.9451 -90.2732 472.000 396.0 396.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 36 25 45.9451 -90.2732 472.000 396.0 396.198 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 36 55 45.9451 -90.2732 472.000 396.0 396.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 37 25 45.9451 -90.2732 472.000 396.0 396.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 37 55 45.9451 -90.2732 472.000 396.0 396.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 38 25 45.9451 -90.2732 472.000 396.0 396.184 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 38 55 45.9451 -90.2732 472.000 396.0 396.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 39 25 45.9451 -90.2732 472.000 396.0 396.137 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 39 55 45.9451 -90.2732 472.000 396.0 396.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 44 55 45.9451 -90.2732 472.000 30.0 396.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 49 55 45.9451 -90.2732 472.000 122.0 396.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 54 55 45.9451 -90.2732 472.000 396.0 396.333 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 21 59 55 45.9451 -90.2732 472.000 30.0 396.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 04 55 45.9451 -90.2732 472.000 122.0 396.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 09 55 45.9451 -90.2732 472.000 396.0 395.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 19 55 45.9451 -90.2732 472.000 30.0 396.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 24 55 45.9451 -90.2732 472.000 122.0 396.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 29 55 45.9451 -90.2732 472.000 396.0 396.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 34 55 45.9451 -90.2732 472.000 30.0 396.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 39 55 45.9451 -90.2732 472.000 122.0 396.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 44 55 45.9451 -90.2732 472.000 396.0 396.890 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 54 55 45.9451 -90.2732 472.000 30.0 397.777 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 14 22 59 55 45.9451 -90.2732 472.000 122.0 397.983 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 04 55 45.9451 -90.2732 472.000 396.0 396.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 09 55 45.9451 -90.2732 472.000 30.0 398.187 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 14 55 45.9451 -90.2732 472.000 122.0 398.588 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 19 55 45.9451 -90.2732 472.000 396.0 396.613 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 20 25 45.9451 -90.2732 472.000 396.0 396.827 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 20 55 45.9451 -90.2732 472.000 396.0 397.222 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 21 25 45.9451 -90.2732 472.000 396.0 397.148 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 21 55 45.9451 -90.2732 472.000 396.0 396.911 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 22 25 45.9451 -90.2732 472.000 396.0 396.815 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 22 55 45.9451 -90.2732 472.000 396.0 396.713 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 23 25 45.9451 -90.2732 472.000 396.0 396.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 23 55 45.9451 -90.2732 472.000 396.0 396.655 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 24 25 45.9451 -90.2732 472.000 396.0 396.669 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 24 55 45.9451 -90.2732 472.000 396.0 396.667 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 29 55 45.9451 -90.2732 472.000 30.0 398.904 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 34 55 45.9451 -90.2732 472.000 122.0 398.254 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 39 55 45.9451 -90.2732 472.000 396.0 397.013 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 44 55 45.9451 -90.2732 472.000 30.0 399.039 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 14 23 49 55 45.9451 -90.2732 472.000 122.0 398.926 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 14 55 45.9451 -90.2732 472.000 396.0 397.085 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 19 55 45.9451 -90.2732 472.000 30.0 398.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 24 55 45.9451 -90.2732 472.000 122.0 397.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 29 55 45.9451 -90.2732 472.000 396.0 396.741 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 34 55 45.9451 -90.2732 472.000 30.0 398.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 39 55 45.9451 -90.2732 472.000 122.0 397.530 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 44 55 45.9451 -90.2732 472.000 396.0 396.154 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 45 25 45.9451 -90.2732 472.000 396.0 396.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 45 55 45.9451 -90.2732 472.000 396.0 396.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 46 25 45.9451 -90.2732 472.000 396.0 396.275 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 46 55 45.9451 -90.2732 472.000 396.0 396.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 47 25 45.9451 -90.2732 472.000 396.0 396.334 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 47 55 45.9451 -90.2732 472.000 396.0 396.339 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 48 25 45.9451 -90.2732 472.000 396.0 396.268 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 48 55 45.9451 -90.2732 472.000 396.0 396.377 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 49 25 45.9451 -90.2732 472.000 396.0 396.403 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 49 55 45.9451 -90.2732 472.000 396.0 396.415 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 54 55 45.9451 -90.2732 472.000 30.0 398.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 00 59 55 45.9451 -90.2732 472.000 122.0 398.729 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 04 55 45.9451 -90.2732 472.000 396.0 397.737 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 09 55 45.9451 -90.2732 472.000 30.0 398.385 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 14 55 45.9451 -90.2732 472.000 122.0 397.712 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 19 55 45.9451 -90.2732 472.000 396.0 397.192 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 20 25 45.9451 -90.2732 472.000 396.0 397.230 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 20 55 45.9451 -90.2732 472.000 396.0 397.379 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 21 25 45.9451 -90.2732 472.000 396.0 397.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 21 55 45.9451 -90.2732 472.000 396.0 397.500 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 22 25 45.9451 -90.2732 472.000 396.0 397.642 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 22 55 45.9451 -90.2732 472.000 396.0 397.657 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 23 25 45.9451 -90.2732 472.000 396.0 397.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 23 55 45.9451 -90.2732 472.000 396.0 397.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 24 25 45.9451 -90.2732 472.000 396.0 397.397 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 24 55 45.9451 -90.2732 472.000 396.0 397.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 29 55 45.9451 -90.2732 472.000 30.0 398.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 34 55 45.9451 -90.2732 472.000 122.0 397.476 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 39 55 45.9451 -90.2732 472.000 396.0 397.203 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 44 55 45.9451 -90.2732 472.000 30.0 397.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 49 55 45.9451 -90.2732 472.000 122.0 396.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 01 54 55 45.9451 -90.2732 472.000 396.0 396.383 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 04 55 45.9451 -90.2732 472.000 30.0 396.966 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 09 55 45.9451 -90.2732 472.000 122.0 396.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 14 55 45.9451 -90.2732 472.000 396.0 396.266 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 19 55 45.9451 -90.2732 472.000 30.0 397.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 24 55 45.9451 -90.2732 472.000 122.0 397.071 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 29 55 45.9451 -90.2732 472.000 396.0 396.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 30 25 45.9451 -90.2732 472.000 396.0 396.406 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 30 55 45.9451 -90.2732 472.000 396.0 396.285 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 31 25 45.9451 -90.2732 472.000 396.0 396.218 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 31 55 45.9451 -90.2732 472.000 396.0 396.067 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 32 25 45.9451 -90.2732 472.000 396.0 395.884 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 32 55 45.9451 -90.2732 472.000 396.0 396.005 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 33 25 45.9451 -90.2732 472.000 396.0 395.983 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 33 55 45.9451 -90.2732 472.000 396.0 395.838 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 34 25 45.9451 -90.2732 472.000 396.0 395.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 34 55 45.9451 -90.2732 472.000 396.0 396.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 39 55 45.9451 -90.2732 472.000 30.0 396.939 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 44 55 45.9451 -90.2732 472.000 122.0 396.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 49 55 45.9451 -90.2732 472.000 396.0 396.121 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 54 55 45.9451 -90.2732 472.000 30.0 397.076 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 02 59 55 45.9451 -90.2732 472.000 122.0 396.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 04 55 45.9451 -90.2732 472.000 396.0 395.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 05 25 45.9451 -90.2732 472.000 396.0 395.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 05 55 45.9451 -90.2732 472.000 396.0 395.678 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 06 25 45.9451 -90.2732 472.000 396.0 395.863 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 06 55 45.9451 -90.2732 472.000 396.0 395.401 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 07 25 45.9451 -90.2732 472.000 396.0 394.566 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 07 55 45.9451 -90.2732 472.000 396.0 394.919 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 08 25 45.9451 -90.2732 472.000 396.0 394.831 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 08 55 45.9451 -90.2732 472.000 396.0 394.869 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 09 25 45.9451 -90.2732 472.000 396.0 395.063 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 09 55 45.9451 -90.2732 472.000 396.0 395.222 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 14 55 45.9451 -90.2732 472.000 30.0 396.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 19 55 45.9451 -90.2732 472.000 122.0 395.751 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 24 55 45.9451 -90.2732 472.000 396.0 395.308 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 29 55 45.9451 -90.2732 472.000 30.0 395.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 34 55 45.9451 -90.2732 472.000 122.0 395.847 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 39 55 45.9451 -90.2732 472.000 396.0 395.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 40 25 45.9451 -90.2732 472.000 396.0 395.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 40 55 45.9451 -90.2732 472.000 396.0 395.055 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 41 25 45.9451 -90.2732 472.000 396.0 395.129 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 41 55 45.9451 -90.2732 472.000 396.0 395.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 42 25 45.9451 -90.2732 472.000 396.0 394.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 42 55 45.9451 -90.2732 472.000 396.0 395.135 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 43 25 45.9451 -90.2732 472.000 396.0 395.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 43 55 45.9451 -90.2732 472.000 396.0 395.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 44 25 45.9451 -90.2732 472.000 396.0 395.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 44 55 45.9451 -90.2732 472.000 396.0 395.248 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 49 55 45.9451 -90.2732 472.000 30.0 395.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 54 55 45.9451 -90.2732 472.000 122.0 395.554 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 03 59 55 45.9451 -90.2732 472.000 396.0 394.915 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 04 55 45.9451 -90.2732 472.000 30.0 395.957 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 09 55 45.9451 -90.2732 472.000 122.0 395.653 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 14 55 45.9451 -90.2732 472.000 396.0 395.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 24 55 45.9451 -90.2732 472.000 30.0 395.942 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 29 55 45.9451 -90.2732 472.000 122.0 395.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 34 55 45.9451 -90.2732 472.000 396.0 395.209 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 39 55 45.9451 -90.2732 472.000 30.0 396.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 44 55 45.9451 -90.2732 472.000 122.0 395.993 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 49 55 45.9451 -90.2732 472.000 396.0 395.338 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 50 25 45.9451 -90.2732 472.000 396.0 395.293 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 50 55 45.9451 -90.2732 472.000 396.0 395.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 51 25 45.9451 -90.2732 472.000 396.0 395.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 51 55 45.9451 -90.2732 472.000 396.0 395.290 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 52 25 45.9451 -90.2732 472.000 396.0 395.291 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 52 55 45.9451 -90.2732 472.000 396.0 395.343 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 53 25 45.9451 -90.2732 472.000 396.0 395.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 53 55 45.9451 -90.2732 472.000 396.0 395.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 54 25 45.9451 -90.2732 472.000 396.0 395.319 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 04 54 55 45.9451 -90.2732 472.000 396.0 395.327 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 04 55 45.9451 -90.2732 472.000 30.0 396.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 09 55 45.9451 -90.2732 472.000 122.0 396.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 14 55 45.9451 -90.2732 472.000 396.0 395.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 19 55 45.9451 -90.2732 472.000 30.0 396.851 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 24 55 45.9451 -90.2732 472.000 122.0 396.257 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 29 55 45.9451 -90.2732 472.000 396.0 395.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 30 25 45.9451 -90.2732 472.000 396.0 395.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 30 55 45.9451 -90.2732 472.000 396.0 395.700 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 31 25 45.9451 -90.2732 472.000 396.0 395.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 31 55 45.9451 -90.2732 472.000 396.0 395.720 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 32 25 45.9451 -90.2732 472.000 396.0 395.718 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 32 55 45.9451 -90.2732 472.000 396.0 395.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 33 25 45.9451 -90.2732 472.000 396.0 395.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 33 55 45.9451 -90.2732 472.000 396.0 395.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 34 25 45.9451 -90.2732 472.000 396.0 395.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 34 55 45.9451 -90.2732 472.000 396.0 395.734 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 39 55 45.9451 -90.2732 472.000 30.0 397.080 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 44 55 45.9451 -90.2732 472.000 122.0 396.510 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 49 55 45.9451 -90.2732 472.000 396.0 395.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 54 55 45.9451 -90.2732 472.000 30.0 397.348 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 05 59 55 45.9451 -90.2732 472.000 122.0 396.823 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 04 55 45.9451 -90.2732 472.000 396.0 395.904 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 14 55 45.9451 -90.2732 472.000 30.0 397.190 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 19 55 45.9451 -90.2732 472.000 122.0 396.860 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 24 55 45.9451 -90.2732 472.000 396.0 396.208 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 29 55 45.9451 -90.2732 472.000 30.0 397.481 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 34 55 45.9451 -90.2732 472.000 122.0 397.004 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 39 55 45.9451 -90.2732 472.000 396.0 396.177 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 40 25 45.9451 -90.2732 472.000 396.0 396.080 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 40 55 45.9451 -90.2732 472.000 396.0 396.186 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 41 25 45.9451 -90.2732 472.000 396.0 396.291 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 41 55 45.9451 -90.2732 472.000 396.0 396.424 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 42 25 45.9451 -90.2732 472.000 396.0 396.277 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 42 55 45.9451 -90.2732 472.000 396.0 396.187 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 43 25 45.9451 -90.2732 472.000 396.0 396.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 43 55 45.9451 -90.2732 472.000 396.0 396.247 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 44 25 45.9451 -90.2732 472.000 396.0 396.236 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 44 55 45.9451 -90.2732 472.000 396.0 396.297 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 49 55 45.9451 -90.2732 472.000 30.0 397.590 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 54 55 45.9451 -90.2732 472.000 122.0 397.192 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 06 59 55 45.9451 -90.2732 472.000 396.0 396.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 04 55 45.9451 -90.2732 472.000 30.0 397.656 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 09 55 45.9451 -90.2732 472.000 122.0 397.531 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 14 55 45.9451 -90.2732 472.000 396.0 396.408 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 15 25 45.9451 -90.2732 472.000 396.0 396.427 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 15 55 45.9451 -90.2732 472.000 396.0 396.698 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 16 25 45.9451 -90.2732 472.000 396.0 396.729 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 16 55 45.9451 -90.2732 472.000 396.0 396.646 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 17 25 45.9451 -90.2732 472.000 396.0 396.613 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 17 55 45.9451 -90.2732 472.000 396.0 396.567 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 18 25 45.9451 -90.2732 472.000 396.0 396.687 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 18 55 45.9451 -90.2732 472.000 396.0 396.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 19 25 45.9451 -90.2732 472.000 396.0 396.731 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 19 55 45.9451 -90.2732 472.000 396.0 396.349 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 24 55 45.9451 -90.2732 472.000 30.0 397.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 29 55 45.9451 -90.2732 472.000 122.0 397.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 34 55 45.9451 -90.2732 472.000 396.0 395.984 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 39 55 45.9451 -90.2732 472.000 30.0 398.262 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 44 55 45.9451 -90.2732 472.000 122.0 397.703 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 49 55 45.9451 -90.2732 472.000 396.0 396.223 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 07 59 55 45.9451 -90.2732 472.000 30.0 398.264 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 04 55 45.9451 -90.2732 472.000 122.0 397.696 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 09 55 45.9451 -90.2732 472.000 396.0 396.796 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 14 55 45.9451 -90.2732 472.000 30.0 398.236 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 19 55 45.9451 -90.2732 472.000 122.0 397.770 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 24 55 45.9451 -90.2732 472.000 396.0 396.615 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 25 25 45.9451 -90.2732 472.000 396.0 396.434 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 25 55 45.9451 -90.2732 472.000 396.0 396.318 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 26 25 45.9451 -90.2732 472.000 396.0 396.489 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 26 55 45.9451 -90.2732 472.000 396.0 396.666 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 27 25 45.9451 -90.2732 472.000 396.0 396.604 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 27 55 45.9451 -90.2732 472.000 396.0 396.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 28 25 45.9451 -90.2732 472.000 396.0 396.765 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 28 55 45.9451 -90.2732 472.000 396.0 396.813 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 29 25 45.9451 -90.2732 472.000 396.0 396.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 29 55 45.9451 -90.2732 472.000 396.0 396.874 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 34 55 45.9451 -90.2732 472.000 30.0 398.339 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 39 55 45.9451 -90.2732 472.000 122.0 398.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 44 55 45.9451 -90.2732 472.000 396.0 396.617 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 49 55 45.9451 -90.2732 472.000 30.0 398.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 54 55 45.9451 -90.2732 472.000 122.0 398.287 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 08 59 55 45.9451 -90.2732 472.000 396.0 396.540 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 00 25 45.9451 -90.2732 472.000 396.0 396.258 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 00 55 45.9451 -90.2732 472.000 396.0 396.322 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 01 25 45.9451 -90.2732 472.000 396.0 396.236 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 01 55 45.9451 -90.2732 472.000 396.0 396.391 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 02 25 45.9451 -90.2732 472.000 396.0 396.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 02 55 45.9451 -90.2732 472.000 396.0 396.743 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 03 25 45.9451 -90.2732 472.000 396.0 397.114 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 03 55 45.9451 -90.2732 472.000 396.0 396.864 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 04 25 45.9451 -90.2732 472.000 396.0 396.898 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 04 55 45.9451 -90.2732 472.000 396.0 396.513 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 09 55 45.9451 -90.2732 472.000 30.0 398.891 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 14 55 45.9451 -90.2732 472.000 122.0 398.254 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 19 55 45.9451 -90.2732 472.000 396.0 395.775 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 24 55 45.9451 -90.2732 472.000 30.0 399.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 29 55 45.9451 -90.2732 472.000 122.0 398.371 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 34 55 45.9451 -90.2732 472.000 396.0 394.623 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 35 25 45.9451 -90.2732 472.000 396.0 394.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 35 55 45.9451 -90.2732 472.000 396.0 394.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 36 25 45.9451 -90.2732 472.000 396.0 394.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 36 55 45.9451 -90.2732 472.000 396.0 394.791 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 37 25 45.9451 -90.2732 472.000 396.0 394.578 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 37 55 45.9451 -90.2732 472.000 396.0 394.561 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 38 25 45.9451 -90.2732 472.000 396.0 394.542 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 38 55 45.9451 -90.2732 472.000 396.0 394.665 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 39 25 45.9451 -90.2732 472.000 396.0 395.042 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 39 55 45.9451 -90.2732 472.000 396.0 395.699 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 44 55 45.9451 -90.2732 472.000 30.0 399.144 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 49 55 45.9451 -90.2732 472.000 122.0 398.815 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 54 55 45.9451 -90.2732 472.000 396.0 397.151 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 09 59 55 45.9451 -90.2732 472.000 30.0 399.306 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 04 55 45.9451 -90.2732 472.000 122.0 399.125 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 09 55 45.9451 -90.2732 472.000 396.0 397.181 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 19 55 45.9451 -90.2732 472.000 30.0 399.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 24 55 45.9451 -90.2732 472.000 122.0 399.548 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 29 55 45.9451 -90.2732 472.000 396.0 396.148 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 34 55 45.9451 -90.2732 472.000 30.0 400.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 39 55 45.9451 -90.2732 472.000 122.0 399.657 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 44 55 45.9451 -90.2732 472.000 396.0 395.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 54 55 45.9451 -90.2732 472.000 30.0 400.221 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 10 59 55 45.9451 -90.2732 472.000 122.0 399.675 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 04 55 45.9451 -90.2732 472.000 396.0 396.856 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 09 55 45.9451 -90.2732 472.000 30.0 400.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 14 55 45.9451 -90.2732 472.000 122.0 399.809 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 19 55 45.9451 -90.2732 472.000 396.0 396.619 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 20 25 45.9451 -90.2732 472.000 396.0 396.747 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 20 55 45.9451 -90.2732 472.000 396.0 396.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 21 25 45.9451 -90.2732 472.000 396.0 396.005 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 21 55 45.9451 -90.2732 472.000 396.0 395.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 22 25 45.9451 -90.2732 472.000 396.0 395.880 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 22 55 45.9451 -90.2732 472.000 396.0 395.773 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 23 25 45.9451 -90.2732 472.000 396.0 395.714 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 23 55 45.9451 -90.2732 472.000 396.0 395.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 24 25 45.9451 -90.2732 472.000 396.0 395.681 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 24 55 45.9451 -90.2732 472.000 396.0 395.698 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 29 55 45.9451 -90.2732 472.000 30.0 400.481 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 34 55 45.9451 -90.2732 472.000 122.0 399.991 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 39 55 45.9451 -90.2732 472.000 396.0 395.721 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 44 55 45.9451 -90.2732 472.000 30.0 400.682 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 11 49 55 45.9451 -90.2732 472.000 122.0 400.031 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 14 55 45.9451 -90.2732 472.000 396.0 395.799 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 19 55 45.9451 -90.2732 472.000 30.0 400.947 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 24 55 45.9451 -90.2732 472.000 122.0 400.103 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 29 55 45.9451 -90.2732 472.000 396.0 395.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 34 55 45.9451 -90.2732 472.000 30.0 400.851 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 39 55 45.9451 -90.2732 472.000 122.0 400.073 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 44 55 45.9451 -90.2732 472.000 396.0 395.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 45 25 45.9451 -90.2732 472.000 396.0 395.627 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 45 55 45.9451 -90.2732 472.000 396.0 395.617 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 46 25 45.9451 -90.2732 472.000 396.0 395.487 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 46 55 45.9451 -90.2732 472.000 396.0 395.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 47 25 45.9451 -90.2732 472.000 396.0 395.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 47 55 45.9451 -90.2732 472.000 396.0 395.413 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 48 25 45.9451 -90.2732 472.000 396.0 395.413 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 48 55 45.9451 -90.2732 472.000 396.0 395.579 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 49 25 45.9451 -90.2732 472.000 396.0 396.182 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 49 55 45.9451 -90.2732 472.000 396.0 396.838 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 54 55 45.9451 -90.2732 472.000 30.0 401.152 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 12 59 55 45.9451 -90.2732 472.000 122.0 399.548 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 04 55 45.9451 -90.2732 472.000 396.0 398.450 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 09 55 45.9451 -90.2732 472.000 30.0 401.546 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 14 55 45.9451 -90.2732 472.000 122.0 400.111 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 19 55 45.9451 -90.2732 472.000 396.0 397.461 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 20 25 45.9451 -90.2732 472.000 396.0 397.763 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 20 55 45.9451 -90.2732 472.000 396.0 396.754 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 21 25 45.9451 -90.2732 472.000 396.0 396.330 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 21 55 45.9451 -90.2732 472.000 396.0 397.335 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 22 25 45.9451 -90.2732 472.000 396.0 395.058 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 22 55 45.9451 -90.2732 472.000 396.0 395.739 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 23 25 45.9451 -90.2732 472.000 396.0 396.671 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 23 55 45.9451 -90.2732 472.000 396.0 396.368 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 24 25 45.9451 -90.2732 472.000 396.0 395.864 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 24 55 45.9451 -90.2732 472.000 396.0 396.726 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 29 55 45.9451 -90.2732 472.000 30.0 401.442 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 34 55 45.9451 -90.2732 472.000 122.0 399.784 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 39 55 45.9451 -90.2732 472.000 396.0 396.425 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 44 55 45.9451 -90.2732 472.000 30.0 401.740 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 49 55 45.9451 -90.2732 472.000 122.0 399.740 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 13 54 55 45.9451 -90.2732 472.000 396.0 394.632 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 04 55 45.9451 -90.2732 472.000 30.0 401.718 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 09 55 45.9451 -90.2732 472.000 122.0 400.579 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 14 55 45.9451 -90.2732 472.000 396.0 397.602 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 19 55 45.9451 -90.2732 472.000 30.0 401.510 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 24 55 45.9451 -90.2732 472.000 122.0 400.638 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 29 55 45.9451 -90.2732 472.000 396.0 397.400 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 30 25 45.9451 -90.2732 472.000 396.0 395.221 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 30 55 45.9451 -90.2732 472.000 396.0 394.871 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 31 25 45.9451 -90.2732 472.000 396.0 394.646 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 31 55 45.9451 -90.2732 472.000 396.0 394.961 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 32 25 45.9451 -90.2732 472.000 396.0 395.950 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 32 55 45.9451 -90.2732 472.000 396.0 397.447 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 33 25 45.9451 -90.2732 472.000 396.0 398.986 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 33 55 45.9451 -90.2732 472.000 396.0 399.233 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 34 25 45.9451 -90.2732 472.000 396.0 398.495 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 34 55 45.9451 -90.2732 472.000 396.0 397.153 0.520 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 39 55 45.9451 -90.2732 472.000 30.0 401.303 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 44 55 45.9451 -90.2732 472.000 122.0 400.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 49 55 45.9451 -90.2732 472.000 396.0 396.446 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 54 55 45.9451 -90.2732 472.000 30.0 401.201 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 14 59 55 45.9451 -90.2732 472.000 122.0 401.093 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 04 55 45.9451 -90.2732 472.000 396.0 394.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 05 25 45.9451 -90.2732 472.000 396.0 394.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 05 55 45.9451 -90.2732 472.000 396.0 394.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 06 25 45.9451 -90.2732 472.000 396.0 394.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 06 55 45.9451 -90.2732 472.000 396.0 394.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 07 25 45.9451 -90.2732 472.000 396.0 394.420 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 07 55 45.9451 -90.2732 472.000 396.0 395.456 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 08 25 45.9451 -90.2732 472.000 396.0 396.419 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 08 55 45.9451 -90.2732 472.000 396.0 398.260 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 09 25 45.9451 -90.2732 472.000 396.0 398.519 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 09 55 45.9451 -90.2732 472.000 396.0 396.640 0.670 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 14 55 45.9451 -90.2732 472.000 30.0 401.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 19 55 45.9451 -90.2732 472.000 122.0 401.143 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 24 55 45.9451 -90.2732 472.000 396.0 397.178 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 29 55 45.9451 -90.2732 472.000 30.0 401.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 34 55 45.9451 -90.2732 472.000 122.0 401.413 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 39 55 45.9451 -90.2732 472.000 396.0 395.295 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 40 25 45.9451 -90.2732 472.000 396.0 395.352 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 40 55 45.9451 -90.2732 472.000 396.0 394.896 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 41 25 45.9451 -90.2732 472.000 396.0 394.398 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 41 55 45.9451 -90.2732 472.000 396.0 394.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 42 25 45.9451 -90.2732 472.000 396.0 394.241 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 42 55 45.9451 -90.2732 472.000 396.0 394.197 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 43 25 45.9451 -90.2732 472.000 396.0 394.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 43 55 45.9451 -90.2732 472.000 396.0 394.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 44 25 45.9451 -90.2732 472.000 396.0 394.265 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 44 55 45.9451 -90.2732 472.000 396.0 394.236 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 49 55 45.9451 -90.2732 472.000 30.0 401.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 54 55 45.9451 -90.2732 472.000 122.0 401.196 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 15 59 55 45.9451 -90.2732 472.000 396.0 395.541 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 04 55 45.9451 -90.2732 472.000 30.0 401.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 09 55 45.9451 -90.2732 472.000 122.0 401.493 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 14 55 45.9451 -90.2732 472.000 396.0 397.676 0.860 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 24 55 45.9451 -90.2732 472.000 30.0 401.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 29 55 45.9451 -90.2732 472.000 122.0 401.200 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 34 55 45.9451 -90.2732 472.000 396.0 399.634 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 39 55 45.9451 -90.2732 472.000 30.0 401.162 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 44 55 45.9451 -90.2732 472.000 122.0 401.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 49 55 45.9451 -90.2732 472.000 396.0 399.627 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 50 25 45.9451 -90.2732 472.000 396.0 398.337 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 50 55 45.9451 -90.2732 472.000 396.0 399.629 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 51 25 45.9451 -90.2732 472.000 396.0 400.199 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 51 55 45.9451 -90.2732 472.000 396.0 399.337 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 52 25 45.9451 -90.2732 472.000 396.0 399.110 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 52 55 45.9451 -90.2732 472.000 396.0 397.762 0.660 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 53 25 45.9451 -90.2732 472.000 396.0 396.626 0.530 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 53 55 45.9451 -90.2732 472.000 396.0 398.828 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 54 25 45.9451 -90.2732 472.000 396.0 399.031 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 15 16 54 55 45.9451 -90.2732 472.000 396.0 400.177 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 04 55 45.9451 -90.2732 472.000 30.0 400.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 09 55 45.9451 -90.2732 472.000 122.0 400.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 14 55 45.9451 -90.2732 472.000 396.0 399.539 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 19 55 45.9451 -90.2732 472.000 30.0 400.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 24 55 45.9451 -90.2732 472.000 122.0 400.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 29 55 45.9451 -90.2732 472.000 396.0 398.786 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 30 25 45.9451 -90.2732 472.000 396.0 398.633 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 30 55 45.9451 -90.2732 472.000 396.0 398.573 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 31 25 45.9451 -90.2732 472.000 396.0 398.524 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 31 55 45.9451 -90.2732 472.000 396.0 398.773 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 32 25 45.9451 -90.2732 472.000 396.0 398.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 32 55 45.9451 -90.2732 472.000 396.0 398.488 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 33 25 45.9451 -90.2732 472.000 396.0 398.955 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 33 55 45.9451 -90.2732 472.000 396.0 399.076 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 34 25 45.9451 -90.2732 472.000 396.0 399.394 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 34 55 45.9451 -90.2732 472.000 396.0 399.264 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 39 55 45.9451 -90.2732 472.000 30.0 400.677 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 44 55 45.9451 -90.2732 472.000 122.0 400.627 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 49 55 45.9451 -90.2732 472.000 396.0 398.876 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 54 55 45.9451 -90.2732 472.000 30.0 400.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 17 59 55 45.9451 -90.2732 472.000 122.0 400.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 04 55 45.9451 -90.2732 472.000 396.0 399.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 14 55 45.9451 -90.2732 472.000 30.0 400.407 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 19 55 45.9451 -90.2732 472.000 122.0 400.439 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 24 55 45.9451 -90.2732 472.000 396.0 399.459 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 29 55 45.9451 -90.2732 472.000 30.0 400.352 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 34 55 45.9451 -90.2732 472.000 122.0 400.431 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 39 55 45.9451 -90.2732 472.000 396.0 399.625 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 40 25 45.9451 -90.2732 472.000 396.0 399.744 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 40 55 45.9451 -90.2732 472.000 396.0 400.203 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 41 25 45.9451 -90.2732 472.000 396.0 400.307 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 41 55 45.9451 -90.2732 472.000 396.0 400.236 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 42 25 45.9451 -90.2732 472.000 396.0 399.871 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 42 55 45.9451 -90.2732 472.000 396.0 399.474 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 43 25 45.9451 -90.2732 472.000 396.0 399.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 43 55 45.9451 -90.2732 472.000 396.0 399.461 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 44 25 45.9451 -90.2732 472.000 396.0 399.373 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 44 55 45.9451 -90.2732 472.000 396.0 399.330 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 49 55 45.9451 -90.2732 472.000 30.0 400.333 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 54 55 45.9451 -90.2732 472.000 122.0 400.308 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 18 59 55 45.9451 -90.2732 472.000 396.0 399.035 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 04 55 45.9451 -90.2732 472.000 30.0 400.232 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 09 55 45.9451 -90.2732 472.000 122.0 400.209 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 14 55 45.9451 -90.2732 472.000 396.0 399.245 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 15 25 45.9451 -90.2732 472.000 396.0 399.300 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 15 55 45.9451 -90.2732 472.000 396.0 398.963 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 16 25 45.9451 -90.2732 472.000 396.0 398.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 16 55 45.9451 -90.2732 472.000 396.0 398.847 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 17 25 45.9451 -90.2732 472.000 396.0 399.099 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 17 55 45.9451 -90.2732 472.000 396.0 398.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 18 25 45.9451 -90.2732 472.000 396.0 398.864 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 18 55 45.9451 -90.2732 472.000 396.0 399.035 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 19 25 45.9451 -90.2732 472.000 396.0 398.995 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 19 55 45.9451 -90.2732 472.000 396.0 398.933 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 24 55 45.9451 -90.2732 472.000 30.0 399.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 29 55 45.9451 -90.2732 472.000 122.0 399.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 34 55 45.9451 -90.2732 472.000 396.0 398.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 39 55 45.9451 -90.2732 472.000 30.0 399.538 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 44 55 45.9451 -90.2732 472.000 122.0 399.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 49 55 45.9451 -90.2732 472.000 396.0 399.111 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 19 59 55 45.9451 -90.2732 472.000 30.0 399.266 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 04 55 45.9451 -90.2732 472.000 122.0 399.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 09 55 45.9451 -90.2732 472.000 396.0 398.219 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 14 55 45.9451 -90.2732 472.000 30.0 399.343 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 19 55 45.9451 -90.2732 472.000 122.0 399.520 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 24 55 45.9451 -90.2732 472.000 396.0 398.886 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 25 25 45.9451 -90.2732 472.000 396.0 398.844 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 25 55 45.9451 -90.2732 472.000 396.0 398.516 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 26 25 45.9451 -90.2732 472.000 396.0 398.417 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 26 55 45.9451 -90.2732 472.000 396.0 398.733 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 27 25 45.9451 -90.2732 472.000 396.0 399.252 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 27 55 45.9451 -90.2732 472.000 396.0 398.590 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 28 25 45.9451 -90.2732 472.000 396.0 398.423 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 28 55 45.9451 -90.2732 472.000 396.0 397.953 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 29 25 45.9451 -90.2732 472.000 396.0 398.259 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 29 55 45.9451 -90.2732 472.000 396.0 397.583 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 34 55 45.9451 -90.2732 472.000 30.0 399.502 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 39 55 45.9451 -90.2732 472.000 122.0 399.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 44 55 45.9451 -90.2732 472.000 396.0 398.991 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 49 55 45.9451 -90.2732 472.000 30.0 399.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 54 55 45.9451 -90.2732 472.000 122.0 399.621 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 20 59 55 45.9451 -90.2732 472.000 396.0 397.901 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 00 25 45.9451 -90.2732 472.000 396.0 397.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 00 55 45.9451 -90.2732 472.000 396.0 397.789 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 01 25 45.9451 -90.2732 472.000 396.0 397.887 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 01 55 45.9451 -90.2732 472.000 396.0 397.910 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 02 25 45.9451 -90.2732 472.000 396.0 397.745 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 02 55 45.9451 -90.2732 472.000 396.0 397.807 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 03 25 45.9451 -90.2732 472.000 396.0 397.788 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 03 55 45.9451 -90.2732 472.000 396.0 397.698 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 04 25 45.9451 -90.2732 472.000 396.0 397.632 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 04 55 45.9451 -90.2732 472.000 396.0 397.599 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 09 55 45.9451 -90.2732 472.000 30.0 399.289 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 14 55 45.9451 -90.2732 472.000 122.0 399.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 19 55 45.9451 -90.2732 472.000 396.0 396.694 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 24 55 45.9451 -90.2732 472.000 30.0 399.087 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 29 55 45.9451 -90.2732 472.000 122.0 398.803 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 34 55 45.9451 -90.2732 472.000 396.0 398.184 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 35 25 45.9451 -90.2732 472.000 396.0 398.198 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 35 55 45.9451 -90.2732 472.000 396.0 398.255 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 36 25 45.9451 -90.2732 472.000 396.0 398.419 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 36 55 45.9451 -90.2732 472.000 396.0 398.384 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 37 25 45.9451 -90.2732 472.000 396.0 398.465 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 37 55 45.9451 -90.2732 472.000 396.0 398.624 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 38 25 45.9451 -90.2732 472.000 396.0 398.600 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 38 55 45.9451 -90.2732 472.000 396.0 398.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 39 25 45.9451 -90.2732 472.000 396.0 398.679 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 39 55 45.9451 -90.2732 472.000 396.0 398.629 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 44 55 45.9451 -90.2732 472.000 30.0 399.336 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 49 55 45.9451 -90.2732 472.000 122.0 398.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 54 55 45.9451 -90.2732 472.000 396.0 398.319 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 15 21 59 55 45.9451 -90.2732 472.000 30.0 399.116 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 04 55 45.9451 -90.2732 472.000 122.0 398.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 09 55 45.9451 -90.2732 472.000 396.0 398.079 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 19 55 45.9451 -90.2732 472.000 30.0 399.276 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 24 55 45.9451 -90.2732 472.000 122.0 399.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 29 55 45.9451 -90.2732 472.000 396.0 397.554 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 34 55 45.9451 -90.2732 472.000 30.0 399.362 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 39 55 45.9451 -90.2732 472.000 122.0 399.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 44 55 45.9451 -90.2732 472.000 396.0 397.029 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 54 55 45.9451 -90.2732 472.000 30.0 399.689 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 22 59 55 45.9451 -90.2732 472.000 122.0 399.241 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 04 55 45.9451 -90.2732 472.000 396.0 397.155 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 09 55 45.9451 -90.2732 472.000 30.0 400.179 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 14 55 45.9451 -90.2732 472.000 122.0 399.144 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 19 55 45.9451 -90.2732 472.000 396.0 397.621 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 20 25 45.9451 -90.2732 472.000 396.0 397.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 20 55 45.9451 -90.2732 472.000 396.0 397.647 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 21 25 45.9451 -90.2732 472.000 396.0 397.639 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 21 55 45.9451 -90.2732 472.000 396.0 397.669 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 22 25 45.9451 -90.2732 472.000 396.0 397.482 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 22 55 45.9451 -90.2732 472.000 396.0 397.621 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 23 25 45.9451 -90.2732 472.000 396.0 397.684 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 23 55 45.9451 -90.2732 472.000 396.0 397.691 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 24 25 45.9451 -90.2732 472.000 396.0 397.510 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 24 55 45.9451 -90.2732 472.000 396.0 397.589 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 29 55 45.9451 -90.2732 472.000 30.0 400.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 34 55 45.9451 -90.2732 472.000 122.0 399.025 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 39 55 45.9451 -90.2732 472.000 396.0 397.492 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 44 55 45.9451 -90.2732 472.000 30.0 399.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 15 23 49 55 45.9451 -90.2732 472.000 122.0 398.426 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 14 55 45.9451 -90.2732 472.000 396.0 396.791 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 19 55 45.9451 -90.2732 472.000 30.0 399.564 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 24 55 45.9451 -90.2732 472.000 122.0 398.174 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 29 55 45.9451 -90.2732 472.000 396.0 396.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 34 55 45.9451 -90.2732 472.000 30.0 399.531 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 39 55 45.9451 -90.2732 472.000 122.0 397.630 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 44 55 45.9451 -90.2732 472.000 396.0 396.936 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 45 25 45.9451 -90.2732 472.000 396.0 396.903 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 45 55 45.9451 -90.2732 472.000 396.0 396.901 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 46 25 45.9451 -90.2732 472.000 396.0 396.917 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 46 55 45.9451 -90.2732 472.000 396.0 396.917 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 47 25 45.9451 -90.2732 472.000 396.0 396.939 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 47 55 45.9451 -90.2732 472.000 396.0 396.953 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 48 25 45.9451 -90.2732 472.000 396.0 396.947 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 48 55 45.9451 -90.2732 472.000 396.0 396.964 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 49 25 45.9451 -90.2732 472.000 396.0 396.956 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 49 55 45.9451 -90.2732 472.000 396.0 396.947 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 54 55 45.9451 -90.2732 472.000 30.0 399.424 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 00 59 55 45.9451 -90.2732 472.000 122.0 397.255 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 04 55 45.9451 -90.2732 472.000 396.0 396.949 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 09 55 45.9451 -90.2732 472.000 30.0 406.630 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 14 55 45.9451 -90.2732 472.000 122.0 397.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 19 55 45.9451 -90.2732 472.000 396.0 396.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 20 25 45.9451 -90.2732 472.000 396.0 396.931 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 20 55 45.9451 -90.2732 472.000 396.0 396.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 21 25 45.9451 -90.2732 472.000 396.0 396.898 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 21 55 45.9451 -90.2732 472.000 396.0 396.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 22 25 45.9451 -90.2732 472.000 396.0 396.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 22 55 45.9451 -90.2732 472.000 396.0 396.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 23 25 45.9451 -90.2732 472.000 396.0 396.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 23 55 45.9451 -90.2732 472.000 396.0 396.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 24 25 45.9451 -90.2732 472.000 396.0 396.900 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 24 55 45.9451 -90.2732 472.000 396.0 396.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 29 55 45.9451 -90.2732 472.000 30.0 405.361 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 34 55 45.9451 -90.2732 472.000 122.0 397.498 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 39 55 45.9451 -90.2732 472.000 396.0 397.111 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 44 55 45.9451 -90.2732 472.000 30.0 404.369 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 49 55 45.9451 -90.2732 472.000 122.0 397.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 01 54 55 45.9451 -90.2732 472.000 396.0 397.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 04 55 45.9451 -90.2732 472.000 30.0 406.268 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 09 55 45.9451 -90.2732 472.000 122.0 398.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 14 55 45.9451 -90.2732 472.000 396.0 397.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 19 55 45.9451 -90.2732 472.000 30.0 405.291 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 24 55 45.9451 -90.2732 472.000 122.0 398.646 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 29 55 45.9451 -90.2732 472.000 396.0 397.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 30 25 45.9451 -90.2732 472.000 396.0 397.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 30 55 45.9451 -90.2732 472.000 396.0 397.312 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 31 25 45.9451 -90.2732 472.000 396.0 397.302 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 31 55 45.9451 -90.2732 472.000 396.0 397.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 32 25 45.9451 -90.2732 472.000 396.0 397.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 32 55 45.9451 -90.2732 472.000 396.0 397.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 33 25 45.9451 -90.2732 472.000 396.0 397.413 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 33 55 45.9451 -90.2732 472.000 396.0 397.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 34 25 45.9451 -90.2732 472.000 396.0 397.398 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 34 55 45.9451 -90.2732 472.000 396.0 397.384 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 39 55 45.9451 -90.2732 472.000 30.0 406.311 1.360 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 44 55 45.9451 -90.2732 472.000 122.0 398.965 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 49 55 45.9451 -90.2732 472.000 396.0 397.231 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 54 55 45.9451 -90.2732 472.000 30.0 405.097 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 02 59 55 45.9451 -90.2732 472.000 122.0 398.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 04 55 45.9451 -90.2732 472.000 396.0 397.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 05 25 45.9451 -90.2732 472.000 396.0 397.203 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 05 55 45.9451 -90.2732 472.000 396.0 397.233 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 06 25 45.9451 -90.2732 472.000 396.0 397.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 06 55 45.9451 -90.2732 472.000 396.0 397.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 07 25 45.9451 -90.2732 472.000 396.0 397.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 07 55 45.9451 -90.2732 472.000 396.0 397.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 08 25 45.9451 -90.2732 472.000 396.0 397.278 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 08 55 45.9451 -90.2732 472.000 396.0 397.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 09 25 45.9451 -90.2732 472.000 396.0 397.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 09 55 45.9451 -90.2732 472.000 396.0 397.265 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 14 55 45.9451 -90.2732 472.000 30.0 406.513 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 19 55 45.9451 -90.2732 472.000 122.0 398.900 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 24 55 45.9451 -90.2732 472.000 396.0 397.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 29 55 45.9451 -90.2732 472.000 30.0 405.707 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 34 55 45.9451 -90.2732 472.000 122.0 399.474 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 39 55 45.9451 -90.2732 472.000 396.0 397.763 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 40 25 45.9451 -90.2732 472.000 396.0 397.903 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 40 55 45.9451 -90.2732 472.000 396.0 398.135 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 41 25 45.9451 -90.2732 472.000 396.0 398.259 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 41 55 45.9451 -90.2732 472.000 396.0 398.775 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 42 25 45.9451 -90.2732 472.000 396.0 398.756 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 42 55 45.9451 -90.2732 472.000 396.0 398.811 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 43 25 45.9451 -90.2732 472.000 396.0 398.414 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 43 55 45.9451 -90.2732 472.000 396.0 397.608 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 44 25 45.9451 -90.2732 472.000 396.0 397.311 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 44 55 45.9451 -90.2732 472.000 396.0 397.275 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 49 55 45.9451 -90.2732 472.000 30.0 405.782 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 54 55 45.9451 -90.2732 472.000 122.0 399.426 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 03 59 55 45.9451 -90.2732 472.000 396.0 398.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 04 55 45.9451 -90.2732 472.000 30.0 406.483 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 09 55 45.9451 -90.2732 472.000 122.0 398.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 14 55 45.9451 -90.2732 472.000 396.0 398.463 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 24 55 45.9451 -90.2732 472.000 30.0 406.117 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 29 55 45.9451 -90.2732 472.000 122.0 399.267 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 34 55 45.9451 -90.2732 472.000 396.0 398.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 39 55 45.9451 -90.2732 472.000 30.0 405.379 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 44 55 45.9451 -90.2732 472.000 122.0 398.998 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 49 55 45.9451 -90.2732 472.000 396.0 398.774 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 50 25 45.9451 -90.2732 472.000 396.0 398.613 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 50 55 45.9451 -90.2732 472.000 396.0 398.582 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 51 25 45.9451 -90.2732 472.000 396.0 398.492 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 51 55 45.9451 -90.2732 472.000 396.0 398.665 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 52 25 45.9451 -90.2732 472.000 396.0 398.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 52 55 45.9451 -90.2732 472.000 396.0 398.596 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 53 25 45.9451 -90.2732 472.000 396.0 398.663 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 53 55 45.9451 -90.2732 472.000 396.0 398.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 54 25 45.9451 -90.2732 472.000 396.0 398.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 04 54 55 45.9451 -90.2732 472.000 396.0 398.627 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 04 55 45.9451 -90.2732 472.000 30.0 412.951 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 09 55 45.9451 -90.2732 472.000 122.0 398.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 14 55 45.9451 -90.2732 472.000 396.0 398.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 19 55 45.9451 -90.2732 472.000 30.0 406.520 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 24 55 45.9451 -90.2732 472.000 122.0 398.956 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 29 55 45.9451 -90.2732 472.000 396.0 398.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 30 25 45.9451 -90.2732 472.000 396.0 398.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 30 55 45.9451 -90.2732 472.000 396.0 398.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 31 25 45.9451 -90.2732 472.000 396.0 398.676 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 31 55 45.9451 -90.2732 472.000 396.0 398.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 32 25 45.9451 -90.2732 472.000 396.0 398.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 32 55 45.9451 -90.2732 472.000 396.0 398.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 33 25 45.9451 -90.2732 472.000 396.0 398.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 33 55 45.9451 -90.2732 472.000 396.0 398.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 34 25 45.9451 -90.2732 472.000 396.0 398.745 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 34 55 45.9451 -90.2732 472.000 396.0 398.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 39 55 45.9451 -90.2732 472.000 30.0 408.337 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 44 55 45.9451 -90.2732 472.000 122.0 399.211 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 49 55 45.9451 -90.2732 472.000 396.0 398.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 54 55 45.9451 -90.2732 472.000 30.0 410.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 05 59 55 45.9451 -90.2732 472.000 122.0 399.178 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 04 55 45.9451 -90.2732 472.000 396.0 398.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 14 55 45.9451 -90.2732 472.000 30.0 409.784 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 19 55 45.9451 -90.2732 472.000 122.0 399.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 24 55 45.9451 -90.2732 472.000 396.0 398.443 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 29 55 45.9451 -90.2732 472.000 30.0 409.496 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 34 55 45.9451 -90.2732 472.000 122.0 398.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 39 55 45.9451 -90.2732 472.000 396.0 398.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 40 25 45.9451 -90.2732 472.000 396.0 398.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 40 55 45.9451 -90.2732 472.000 396.0 398.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 41 25 45.9451 -90.2732 472.000 396.0 398.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 41 55 45.9451 -90.2732 472.000 396.0 398.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 42 25 45.9451 -90.2732 472.000 396.0 398.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 42 55 45.9451 -90.2732 472.000 396.0 398.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 43 25 45.9451 -90.2732 472.000 396.0 398.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 43 55 45.9451 -90.2732 472.000 396.0 398.552 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 44 25 45.9451 -90.2732 472.000 396.0 398.018 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 44 55 45.9451 -90.2732 472.000 396.0 397.977 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 49 55 45.9451 -90.2732 472.000 30.0 416.222 0.680 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 54 55 45.9451 -90.2732 472.000 122.0 399.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 06 59 55 45.9451 -90.2732 472.000 396.0 397.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 04 55 45.9451 -90.2732 472.000 30.0 415.154 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 09 55 45.9451 -90.2732 472.000 122.0 398.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 14 55 45.9451 -90.2732 472.000 396.0 397.831 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 15 25 45.9451 -90.2732 472.000 396.0 397.850 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 15 55 45.9451 -90.2732 472.000 396.0 398.042 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 16 25 45.9451 -90.2732 472.000 396.0 398.142 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 16 55 45.9451 -90.2732 472.000 396.0 398.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 17 25 45.9451 -90.2732 472.000 396.0 397.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 17 55 45.9451 -90.2732 472.000 396.0 398.034 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 18 25 45.9451 -90.2732 472.000 396.0 397.847 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 18 55 45.9451 -90.2732 472.000 396.0 398.022 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 19 25 45.9451 -90.2732 472.000 396.0 398.241 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 19 55 45.9451 -90.2732 472.000 396.0 398.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 24 55 45.9451 -90.2732 472.000 30.0 417.133 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 29 55 45.9451 -90.2732 472.000 122.0 398.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 34 55 45.9451 -90.2732 472.000 396.0 397.546 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 39 55 45.9451 -90.2732 472.000 30.0 416.032 0.650 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 44 55 45.9451 -90.2732 472.000 122.0 399.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 49 55 45.9451 -90.2732 472.000 396.0 397.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 07 59 55 45.9451 -90.2732 472.000 30.0 408.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 04 55 45.9451 -90.2732 472.000 122.0 402.703 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 09 55 45.9451 -90.2732 472.000 396.0 398.009 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 14 55 45.9451 -90.2732 472.000 30.0 411.284 1.350 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 19 55 45.9451 -90.2732 472.000 122.0 402.343 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 24 55 45.9451 -90.2732 472.000 396.0 397.932 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 25 25 45.9451 -90.2732 472.000 396.0 397.918 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 25 55 45.9451 -90.2732 472.000 396.0 397.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 26 25 45.9451 -90.2732 472.000 396.0 397.756 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 26 55 45.9451 -90.2732 472.000 396.0 397.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 27 25 45.9451 -90.2732 472.000 396.0 397.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 27 55 45.9451 -90.2732 472.000 396.0 397.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 28 25 45.9451 -90.2732 472.000 396.0 397.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 28 55 45.9451 -90.2732 472.000 396.0 397.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 29 25 45.9451 -90.2732 472.000 396.0 398.003 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 29 55 45.9451 -90.2732 472.000 396.0 397.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 34 55 45.9451 -90.2732 472.000 30.0 413.254 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 39 55 45.9451 -90.2732 472.000 122.0 402.050 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 44 55 45.9451 -90.2732 472.000 396.0 398.602 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 49 55 45.9451 -90.2732 472.000 30.0 413.717 0.600 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 54 55 45.9451 -90.2732 472.000 122.0 400.356 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 08 59 55 45.9451 -90.2732 472.000 396.0 397.591 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 00 25 45.9451 -90.2732 472.000 396.0 397.971 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 00 55 45.9451 -90.2732 472.000 396.0 398.168 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 01 25 45.9451 -90.2732 472.000 396.0 398.164 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 01 55 45.9451 -90.2732 472.000 396.0 398.229 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 02 25 45.9451 -90.2732 472.000 396.0 398.545 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 02 55 45.9451 -90.2732 472.000 396.0 398.836 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 03 25 45.9451 -90.2732 472.000 396.0 399.430 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 03 55 45.9451 -90.2732 472.000 396.0 398.582 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 04 25 45.9451 -90.2732 472.000 396.0 398.644 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 04 55 45.9451 -90.2732 472.000 396.0 398.080 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 09 55 45.9451 -90.2732 472.000 30.0 409.213 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 14 55 45.9451 -90.2732 472.000 122.0 404.162 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 19 55 45.9451 -90.2732 472.000 396.0 397.858 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 24 55 45.9451 -90.2732 472.000 30.0 414.806 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 29 55 45.9451 -90.2732 472.000 122.0 405.704 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 34 55 45.9451 -90.2732 472.000 396.0 398.101 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 35 25 45.9451 -90.2732 472.000 396.0 397.998 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 35 55 45.9451 -90.2732 472.000 396.0 398.190 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 36 25 45.9451 -90.2732 472.000 396.0 397.966 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 36 55 45.9451 -90.2732 472.000 396.0 397.861 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 37 25 45.9451 -90.2732 472.000 396.0 397.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 37 55 45.9451 -90.2732 472.000 396.0 397.511 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 38 25 45.9451 -90.2732 472.000 396.0 397.130 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 38 55 45.9451 -90.2732 472.000 396.0 397.009 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 39 25 45.9451 -90.2732 472.000 396.0 396.700 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 39 55 45.9451 -90.2732 472.000 396.0 396.667 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 44 55 45.9451 -90.2732 472.000 30.0 415.606 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 49 55 45.9451 -90.2732 472.000 122.0 403.643 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 54 55 45.9451 -90.2732 472.000 396.0 396.668 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 09 59 55 45.9451 -90.2732 472.000 30.0 410.782 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 04 55 45.9451 -90.2732 472.000 122.0 404.606 0.710 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 09 55 45.9451 -90.2732 472.000 396.0 396.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 19 55 45.9451 -90.2732 472.000 30.0 414.365 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 24 55 45.9451 -90.2732 472.000 122.0 406.937 0.620 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 29 55 45.9451 -90.2732 472.000 396.0 395.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 34 55 45.9451 -90.2732 472.000 30.0 409.223 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 39 55 45.9451 -90.2732 472.000 122.0 404.672 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 44 55 45.9451 -90.2732 472.000 396.0 393.831 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 54 55 45.9451 -90.2732 472.000 30.0 406.438 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 10 59 55 45.9451 -90.2732 472.000 122.0 406.582 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 04 55 45.9451 -90.2732 472.000 396.0 396.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 09 55 45.9451 -90.2732 472.000 30.0 406.478 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 14 55 45.9451 -90.2732 472.000 122.0 406.240 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 19 55 45.9451 -90.2732 472.000 396.0 398.545 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 20 25 45.9451 -90.2732 472.000 396.0 398.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 20 55 45.9451 -90.2732 472.000 396.0 398.694 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 21 25 45.9451 -90.2732 472.000 396.0 398.594 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 21 55 45.9451 -90.2732 472.000 396.0 398.396 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 22 25 45.9451 -90.2732 472.000 396.0 398.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 22 55 45.9451 -90.2732 472.000 396.0 398.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 23 25 45.9451 -90.2732 472.000 396.0 398.229 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 23 55 45.9451 -90.2732 472.000 396.0 398.404 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 24 25 45.9451 -90.2732 472.000 396.0 398.542 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 24 55 45.9451 -90.2732 472.000 396.0 398.324 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 29 55 45.9451 -90.2732 472.000 30.0 406.609 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 34 55 45.9451 -90.2732 472.000 122.0 407.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 39 55 45.9451 -90.2732 472.000 396.0 398.347 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 44 55 45.9451 -90.2732 472.000 30.0 405.945 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 11 49 55 45.9451 -90.2732 472.000 122.0 405.553 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 14 55 45.9451 -90.2732 472.000 396.0 400.372 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 19 55 45.9451 -90.2732 472.000 30.0 406.646 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 24 55 45.9451 -90.2732 472.000 122.0 406.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 29 55 45.9451 -90.2732 472.000 396.0 399.702 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 34 55 45.9451 -90.2732 472.000 30.0 406.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 39 55 45.9451 -90.2732 472.000 122.0 407.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 44 55 45.9451 -90.2732 472.000 396.0 395.453 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 45 25 45.9451 -90.2732 472.000 396.0 395.121 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 45 55 45.9451 -90.2732 472.000 396.0 395.067 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 46 25 45.9451 -90.2732 472.000 396.0 394.891 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 46 55 45.9451 -90.2732 472.000 396.0 394.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 47 25 45.9451 -90.2732 472.000 396.0 394.827 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 47 55 45.9451 -90.2732 472.000 396.0 394.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 48 25 45.9451 -90.2732 472.000 396.0 394.832 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 48 55 45.9451 -90.2732 472.000 396.0 394.699 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 49 25 45.9451 -90.2732 472.000 396.0 394.559 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 49 55 45.9451 -90.2732 472.000 396.0 394.523 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 54 55 45.9451 -90.2732 472.000 30.0 406.384 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 12 59 55 45.9451 -90.2732 472.000 122.0 406.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 04 55 45.9451 -90.2732 472.000 396.0 394.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 09 55 45.9451 -90.2732 472.000 30.0 405.804 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 14 55 45.9451 -90.2732 472.000 122.0 405.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 19 55 45.9451 -90.2732 472.000 396.0 393.972 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 20 25 45.9451 -90.2732 472.000 396.0 393.962 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 20 55 45.9451 -90.2732 472.000 396.0 393.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 21 25 45.9451 -90.2732 472.000 396.0 393.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 21 55 45.9451 -90.2732 472.000 396.0 393.964 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 22 25 45.9451 -90.2732 472.000 396.0 394.180 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 22 55 45.9451 -90.2732 472.000 396.0 394.093 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 23 25 45.9451 -90.2732 472.000 396.0 394.050 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 23 55 45.9451 -90.2732 472.000 396.0 393.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 24 25 45.9451 -90.2732 472.000 396.0 393.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 24 55 45.9451 -90.2732 472.000 396.0 393.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 29 55 45.9451 -90.2732 472.000 30.0 406.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 34 55 45.9451 -90.2732 472.000 122.0 406.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 39 55 45.9451 -90.2732 472.000 396.0 394.243 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 44 55 45.9451 -90.2732 472.000 30.0 406.559 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 49 55 45.9451 -90.2732 472.000 122.0 406.327 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 13 54 55 45.9451 -90.2732 472.000 396.0 394.764 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 04 55 45.9451 -90.2732 472.000 30.0 406.173 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 09 55 45.9451 -90.2732 472.000 122.0 405.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 14 55 45.9451 -90.2732 472.000 396.0 394.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 19 55 45.9451 -90.2732 472.000 30.0 406.173 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 24 55 45.9451 -90.2732 472.000 122.0 405.983 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 29 55 45.9451 -90.2732 472.000 396.0 394.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 30 25 45.9451 -90.2732 472.000 396.0 394.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 30 55 45.9451 -90.2732 472.000 396.0 394.983 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 31 25 45.9451 -90.2732 472.000 396.0 395.102 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 31 55 45.9451 -90.2732 472.000 396.0 395.450 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 32 25 45.9451 -90.2732 472.000 396.0 396.017 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 32 55 45.9451 -90.2732 472.000 396.0 396.453 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 33 25 45.9451 -90.2732 472.000 396.0 396.676 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 33 55 45.9451 -90.2732 472.000 396.0 396.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 34 25 45.9451 -90.2732 472.000 396.0 396.925 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 34 55 45.9451 -90.2732 472.000 396.0 397.186 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 39 55 45.9451 -90.2732 472.000 30.0 406.434 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 44 55 45.9451 -90.2732 472.000 122.0 406.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 49 55 45.9451 -90.2732 472.000 396.0 395.696 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 54 55 45.9451 -90.2732 472.000 30.0 406.451 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 14 59 55 45.9451 -90.2732 472.000 122.0 405.831 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 04 55 45.9451 -90.2732 472.000 396.0 393.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 05 25 45.9451 -90.2732 472.000 396.0 393.382 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 05 55 45.9451 -90.2732 472.000 396.0 394.145 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 06 25 45.9451 -90.2732 472.000 396.0 395.481 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 06 55 45.9451 -90.2732 472.000 396.0 396.268 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 07 25 45.9451 -90.2732 472.000 396.0 397.096 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 07 55 45.9451 -90.2732 472.000 396.0 396.737 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 08 25 45.9451 -90.2732 472.000 396.0 395.352 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 08 55 45.9451 -90.2732 472.000 396.0 394.270 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 09 25 45.9451 -90.2732 472.000 396.0 393.441 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 09 55 45.9451 -90.2732 472.000 396.0 393.384 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 14 55 45.9451 -90.2732 472.000 30.0 406.114 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 19 55 45.9451 -90.2732 472.000 122.0 405.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 24 55 45.9451 -90.2732 472.000 396.0 398.895 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 29 55 45.9451 -90.2732 472.000 30.0 405.955 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 34 55 45.9451 -90.2732 472.000 122.0 406.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 39 55 45.9451 -90.2732 472.000 396.0 402.230 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 40 25 45.9451 -90.2732 472.000 396.0 402.488 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 40 55 45.9451 -90.2732 472.000 396.0 402.588 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 41 25 45.9451 -90.2732 472.000 396.0 402.590 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 41 55 45.9451 -90.2732 472.000 396.0 402.879 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 42 25 45.9451 -90.2732 472.000 396.0 402.898 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 42 55 45.9451 -90.2732 472.000 396.0 403.406 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 43 25 45.9451 -90.2732 472.000 396.0 403.541 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 43 55 45.9451 -90.2732 472.000 396.0 403.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 44 25 45.9451 -90.2732 472.000 396.0 403.565 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 44 55 45.9451 -90.2732 472.000 396.0 403.368 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 49 55 45.9451 -90.2732 472.000 30.0 406.132 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 54 55 45.9451 -90.2732 472.000 122.0 405.890 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 15 59 55 45.9451 -90.2732 472.000 396.0 402.816 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 04 55 45.9451 -90.2732 472.000 30.0 405.955 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 09 55 45.9451 -90.2732 472.000 122.0 405.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 14 55 45.9451 -90.2732 472.000 396.0 401.772 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 24 55 45.9451 -90.2732 472.000 30.0 406.057 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 29 55 45.9451 -90.2732 472.000 122.0 405.412 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 34 55 45.9451 -90.2732 472.000 396.0 399.890 1.270 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 39 55 45.9451 -90.2732 472.000 30.0 405.854 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 44 55 45.9451 -90.2732 472.000 122.0 405.400 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 49 55 45.9451 -90.2732 472.000 396.0 400.888 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 50 25 45.9451 -90.2732 472.000 396.0 401.540 0.660 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 50 55 45.9451 -90.2732 472.000 396.0 403.264 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 51 25 45.9451 -90.2732 472.000 396.0 403.675 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 51 55 45.9451 -90.2732 472.000 396.0 403.730 0.670 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 52 25 45.9451 -90.2732 472.000 396.0 400.653 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 52 55 45.9451 -90.2732 472.000 396.0 401.031 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 53 25 45.9451 -90.2732 472.000 396.0 401.346 0.640 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 53 55 45.9451 -90.2732 472.000 396.0 402.520 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 54 25 45.9451 -90.2732 472.000 396.0 402.068 0.400 -999.990 -999.990 0.070 ..P LEF 2010 11 16 16 54 55 45.9451 -90.2732 472.000 396.0 401.918 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 04 55 45.9451 -90.2732 472.000 30.0 404.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 09 55 45.9451 -90.2732 472.000 122.0 404.776 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 14 55 45.9451 -90.2732 472.000 396.0 398.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 19 55 45.9451 -90.2732 472.000 30.0 404.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 24 55 45.9451 -90.2732 472.000 122.0 404.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 29 55 45.9451 -90.2732 472.000 396.0 399.937 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 30 25 45.9451 -90.2732 472.000 396.0 400.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 30 55 45.9451 -90.2732 472.000 396.0 400.151 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 31 25 45.9451 -90.2732 472.000 396.0 400.225 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 31 55 45.9451 -90.2732 472.000 396.0 399.807 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 32 25 45.9451 -90.2732 472.000 396.0 399.724 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 32 55 45.9451 -90.2732 472.000 396.0 399.680 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 33 25 45.9451 -90.2732 472.000 396.0 399.668 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 33 55 45.9451 -90.2732 472.000 396.0 399.668 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 34 25 45.9451 -90.2732 472.000 396.0 399.559 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 34 55 45.9451 -90.2732 472.000 396.0 399.512 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 39 55 45.9451 -90.2732 472.000 30.0 404.717 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 44 55 45.9451 -90.2732 472.000 122.0 404.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 49 55 45.9451 -90.2732 472.000 396.0 398.875 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 54 55 45.9451 -90.2732 472.000 30.0 404.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 17 59 55 45.9451 -90.2732 472.000 122.0 404.836 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 04 55 45.9451 -90.2732 472.000 396.0 398.089 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 14 55 45.9451 -90.2732 472.000 30.0 404.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 19 55 45.9451 -90.2732 472.000 122.0 404.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 24 55 45.9451 -90.2732 472.000 396.0 395.276 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 29 55 45.9451 -90.2732 472.000 30.0 404.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 34 55 45.9451 -90.2732 472.000 122.0 404.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 39 55 45.9451 -90.2732 472.000 396.0 395.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 40 25 45.9451 -90.2732 472.000 396.0 395.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 40 55 45.9451 -90.2732 472.000 396.0 395.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 41 25 45.9451 -90.2732 472.000 396.0 395.355 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 41 55 45.9451 -90.2732 472.000 396.0 395.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 42 25 45.9451 -90.2732 472.000 396.0 395.623 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 42 55 45.9451 -90.2732 472.000 396.0 395.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 43 25 45.9451 -90.2732 472.000 396.0 395.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 43 55 45.9451 -90.2732 472.000 396.0 395.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 44 25 45.9451 -90.2732 472.000 396.0 395.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 44 55 45.9451 -90.2732 472.000 396.0 395.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 49 55 45.9451 -90.2732 472.000 30.0 404.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 54 55 45.9451 -90.2732 472.000 122.0 403.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 18 59 55 45.9451 -90.2732 472.000 396.0 394.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 04 55 45.9451 -90.2732 472.000 30.0 403.196 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 09 55 45.9451 -90.2732 472.000 122.0 403.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 14 55 45.9451 -90.2732 472.000 396.0 394.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 15 25 45.9451 -90.2732 472.000 396.0 394.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 15 55 45.9451 -90.2732 472.000 396.0 394.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 16 25 45.9451 -90.2732 472.000 396.0 394.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 16 55 45.9451 -90.2732 472.000 396.0 394.999 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 17 25 45.9451 -90.2732 472.000 396.0 394.973 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 17 55 45.9451 -90.2732 472.000 396.0 395.022 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 18 25 45.9451 -90.2732 472.000 396.0 395.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 18 55 45.9451 -90.2732 472.000 396.0 395.265 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 19 25 45.9451 -90.2732 472.000 396.0 395.277 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 19 55 45.9451 -90.2732 472.000 396.0 395.282 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 24 55 45.9451 -90.2732 472.000 30.0 402.860 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 29 55 45.9451 -90.2732 472.000 122.0 402.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 34 55 45.9451 -90.2732 472.000 396.0 398.515 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 39 55 45.9451 -90.2732 472.000 30.0 402.438 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 44 55 45.9451 -90.2732 472.000 122.0 402.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 49 55 45.9451 -90.2732 472.000 396.0 399.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 19 59 55 45.9451 -90.2732 472.000 30.0 402.052 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 04 55 45.9451 -90.2732 472.000 122.0 402.082 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 09 55 45.9451 -90.2732 472.000 396.0 401.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 14 55 45.9451 -90.2732 472.000 30.0 402.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 19 55 45.9451 -90.2732 472.000 122.0 402.352 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 24 55 45.9451 -90.2732 472.000 396.0 401.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 25 25 45.9451 -90.2732 472.000 396.0 401.214 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 25 55 45.9451 -90.2732 472.000 396.0 401.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 26 25 45.9451 -90.2732 472.000 396.0 401.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 26 55 45.9451 -90.2732 472.000 396.0 401.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 27 25 45.9451 -90.2732 472.000 396.0 401.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 27 55 45.9451 -90.2732 472.000 396.0 401.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 28 25 45.9451 -90.2732 472.000 396.0 401.411 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 28 55 45.9451 -90.2732 472.000 396.0 401.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 29 25 45.9451 -90.2732 472.000 396.0 401.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 29 55 45.9451 -90.2732 472.000 396.0 401.418 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 34 55 45.9451 -90.2732 472.000 30.0 401.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 39 55 45.9451 -90.2732 472.000 122.0 402.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 44 55 45.9451 -90.2732 472.000 396.0 401.028 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 49 55 45.9451 -90.2732 472.000 30.0 402.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 54 55 45.9451 -90.2732 472.000 122.0 402.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 20 59 55 45.9451 -90.2732 472.000 396.0 400.981 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 00 25 45.9451 -90.2732 472.000 396.0 401.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 00 55 45.9451 -90.2732 472.000 396.0 401.036 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 01 25 45.9451 -90.2732 472.000 396.0 401.028 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 01 55 45.9451 -90.2732 472.000 396.0 401.125 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 02 25 45.9451 -90.2732 472.000 396.0 401.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 02 55 45.9451 -90.2732 472.000 396.0 401.266 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 03 25 45.9451 -90.2732 472.000 396.0 401.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 03 55 45.9451 -90.2732 472.000 396.0 401.199 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 04 25 45.9451 -90.2732 472.000 396.0 401.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 04 55 45.9451 -90.2732 472.000 396.0 401.256 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 09 55 45.9451 -90.2732 472.000 30.0 402.122 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 14 55 45.9451 -90.2732 472.000 122.0 402.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 19 55 45.9451 -90.2732 472.000 396.0 401.584 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 24 55 45.9451 -90.2732 472.000 30.0 401.822 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 29 55 45.9451 -90.2732 472.000 122.0 404.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 34 55 45.9451 -90.2732 472.000 396.0 401.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 35 25 45.9451 -90.2732 472.000 396.0 401.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 35 55 45.9451 -90.2732 472.000 396.0 402.076 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 36 25 45.9451 -90.2732 472.000 396.0 402.425 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 36 55 45.9451 -90.2732 472.000 396.0 402.916 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 37 25 45.9451 -90.2732 472.000 396.0 403.498 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 37 55 45.9451 -90.2732 472.000 396.0 402.907 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 38 25 45.9451 -90.2732 472.000 396.0 402.340 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 38 55 45.9451 -90.2732 472.000 396.0 401.697 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 39 25 45.9451 -90.2732 472.000 396.0 402.202 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 39 55 45.9451 -90.2732 472.000 396.0 402.629 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 44 55 45.9451 -90.2732 472.000 30.0 401.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 49 55 45.9451 -90.2732 472.000 122.0 404.424 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 54 55 45.9451 -90.2732 472.000 396.0 403.119 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 16 21 59 55 45.9451 -90.2732 472.000 30.0 401.594 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 04 55 45.9451 -90.2732 472.000 122.0 402.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 09 55 45.9451 -90.2732 472.000 396.0 402.664 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 19 55 45.9451 -90.2732 472.000 30.0 401.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 24 55 45.9451 -90.2732 472.000 122.0 403.070 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 29 55 45.9451 -90.2732 472.000 396.0 402.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 34 55 45.9451 -90.2732 472.000 30.0 402.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 39 55 45.9451 -90.2732 472.000 122.0 403.696 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 44 55 45.9451 -90.2732 472.000 396.0 402.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 54 55 45.9451 -90.2732 472.000 30.0 403.152 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 22 59 55 45.9451 -90.2732 472.000 122.0 402.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 04 55 45.9451 -90.2732 472.000 396.0 399.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 09 55 45.9451 -90.2732 472.000 30.0 403.155 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 14 55 45.9451 -90.2732 472.000 122.0 401.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 19 55 45.9451 -90.2732 472.000 396.0 401.114 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 20 25 45.9451 -90.2732 472.000 396.0 401.134 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 20 55 45.9451 -90.2732 472.000 396.0 401.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 21 25 45.9451 -90.2732 472.000 396.0 401.043 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 21 55 45.9451 -90.2732 472.000 396.0 400.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 22 25 45.9451 -90.2732 472.000 396.0 400.861 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 22 55 45.9451 -90.2732 472.000 396.0 401.065 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 23 25 45.9451 -90.2732 472.000 396.0 401.101 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 23 55 45.9451 -90.2732 472.000 396.0 400.835 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 24 25 45.9451 -90.2732 472.000 396.0 400.710 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 24 55 45.9451 -90.2732 472.000 396.0 400.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 29 55 45.9451 -90.2732 472.000 30.0 403.758 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 34 55 45.9451 -90.2732 472.000 122.0 401.342 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 39 55 45.9451 -90.2732 472.000 396.0 401.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 44 55 45.9451 -90.2732 472.000 30.0 404.026 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 16 23 49 55 45.9451 -90.2732 472.000 122.0 401.367 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 14 55 45.9451 -90.2732 472.000 396.0 402.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 19 55 45.9451 -90.2732 472.000 30.0 403.655 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 24 55 45.9451 -90.2732 472.000 122.0 401.992 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 29 55 45.9451 -90.2732 472.000 396.0 402.484 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 34 55 45.9451 -90.2732 472.000 30.0 403.334 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 39 55 45.9451 -90.2732 472.000 122.0 402.416 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 44 55 45.9451 -90.2732 472.000 396.0 403.093 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 45 25 45.9451 -90.2732 472.000 396.0 403.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 45 55 45.9451 -90.2732 472.000 396.0 403.205 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 46 25 45.9451 -90.2732 472.000 396.0 403.134 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 46 55 45.9451 -90.2732 472.000 396.0 403.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 47 25 45.9451 -90.2732 472.000 396.0 402.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 47 55 45.9451 -90.2732 472.000 396.0 402.968 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 48 25 45.9451 -90.2732 472.000 396.0 402.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 48 55 45.9451 -90.2732 472.000 396.0 402.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 49 25 45.9451 -90.2732 472.000 396.0 402.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 49 55 45.9451 -90.2732 472.000 396.0 403.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 54 55 45.9451 -90.2732 472.000 30.0 402.936 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 00 59 55 45.9451 -90.2732 472.000 122.0 402.388 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 04 55 45.9451 -90.2732 472.000 396.0 401.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 09 55 45.9451 -90.2732 472.000 30.0 403.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 14 55 45.9451 -90.2732 472.000 122.0 403.358 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 19 55 45.9451 -90.2732 472.000 396.0 401.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 20 25 45.9451 -90.2732 472.000 396.0 401.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 20 55 45.9451 -90.2732 472.000 396.0 401.285 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 21 25 45.9451 -90.2732 472.000 396.0 401.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 21 55 45.9451 -90.2732 472.000 396.0 401.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 22 25 45.9451 -90.2732 472.000 396.0 401.161 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 22 55 45.9451 -90.2732 472.000 396.0 401.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 23 25 45.9451 -90.2732 472.000 396.0 401.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 23 55 45.9451 -90.2732 472.000 396.0 401.029 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 24 25 45.9451 -90.2732 472.000 396.0 401.019 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 24 55 45.9451 -90.2732 472.000 396.0 400.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 29 55 45.9451 -90.2732 472.000 30.0 404.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 34 55 45.9451 -90.2732 472.000 122.0 404.883 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 39 55 45.9451 -90.2732 472.000 396.0 400.980 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 44 55 45.9451 -90.2732 472.000 30.0 405.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 49 55 45.9451 -90.2732 472.000 122.0 405.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 01 54 55 45.9451 -90.2732 472.000 396.0 401.022 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 04 55 45.9451 -90.2732 472.000 30.0 406.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 09 55 45.9451 -90.2732 472.000 122.0 407.050 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 14 55 45.9451 -90.2732 472.000 396.0 400.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 19 55 45.9451 -90.2732 472.000 30.0 407.523 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 24 55 45.9451 -90.2732 472.000 122.0 407.115 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 29 55 45.9451 -90.2732 472.000 396.0 400.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 30 25 45.9451 -90.2732 472.000 396.0 400.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 30 55 45.9451 -90.2732 472.000 396.0 400.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 31 25 45.9451 -90.2732 472.000 396.0 400.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 31 55 45.9451 -90.2732 472.000 396.0 400.656 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 32 25 45.9451 -90.2732 472.000 396.0 400.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 32 55 45.9451 -90.2732 472.000 396.0 400.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 33 25 45.9451 -90.2732 472.000 396.0 400.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 33 55 45.9451 -90.2732 472.000 396.0 400.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 34 25 45.9451 -90.2732 472.000 396.0 400.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 34 55 45.9451 -90.2732 472.000 396.0 400.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 39 55 45.9451 -90.2732 472.000 30.0 407.805 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 44 55 45.9451 -90.2732 472.000 122.0 407.146 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 49 55 45.9451 -90.2732 472.000 396.0 400.325 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 54 55 45.9451 -90.2732 472.000 30.0 407.794 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 02 59 55 45.9451 -90.2732 472.000 122.0 406.482 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 04 55 45.9451 -90.2732 472.000 396.0 400.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 05 25 45.9451 -90.2732 472.000 396.0 400.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 05 55 45.9451 -90.2732 472.000 396.0 400.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 06 25 45.9451 -90.2732 472.000 396.0 400.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 06 55 45.9451 -90.2732 472.000 396.0 400.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 07 25 45.9451 -90.2732 472.000 396.0 400.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 07 55 45.9451 -90.2732 472.000 396.0 400.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 08 25 45.9451 -90.2732 472.000 396.0 400.410 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 08 55 45.9451 -90.2732 472.000 396.0 400.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 09 25 45.9451 -90.2732 472.000 396.0 400.359 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 09 55 45.9451 -90.2732 472.000 396.0 400.389 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 14 55 45.9451 -90.2732 472.000 30.0 406.890 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 19 55 45.9451 -90.2732 472.000 122.0 406.074 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 24 55 45.9451 -90.2732 472.000 396.0 399.095 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 29 55 45.9451 -90.2732 472.000 30.0 406.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 34 55 45.9451 -90.2732 472.000 122.0 405.109 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 39 55 45.9451 -90.2732 472.000 396.0 399.878 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 40 25 45.9451 -90.2732 472.000 396.0 400.022 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 40 55 45.9451 -90.2732 472.000 396.0 400.103 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 41 25 45.9451 -90.2732 472.000 396.0 400.066 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 41 55 45.9451 -90.2732 472.000 396.0 400.070 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 42 25 45.9451 -90.2732 472.000 396.0 400.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 42 55 45.9451 -90.2732 472.000 396.0 400.222 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 43 25 45.9451 -90.2732 472.000 396.0 400.243 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 43 55 45.9451 -90.2732 472.000 396.0 400.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 44 25 45.9451 -90.2732 472.000 396.0 400.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 44 55 45.9451 -90.2732 472.000 396.0 400.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 49 55 45.9451 -90.2732 472.000 30.0 405.403 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 54 55 45.9451 -90.2732 472.000 122.0 405.129 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 03 59 55 45.9451 -90.2732 472.000 396.0 400.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 04 55 45.9451 -90.2732 472.000 30.0 405.899 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 09 55 45.9451 -90.2732 472.000 122.0 404.903 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 14 55 45.9451 -90.2732 472.000 396.0 401.056 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 24 55 45.9451 -90.2732 472.000 30.0 404.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 29 55 45.9451 -90.2732 472.000 122.0 404.312 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 34 55 45.9451 -90.2732 472.000 396.0 400.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 39 55 45.9451 -90.2732 472.000 30.0 404.127 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 44 55 45.9451 -90.2732 472.000 122.0 403.450 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 49 55 45.9451 -90.2732 472.000 396.0 401.355 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 50 25 45.9451 -90.2732 472.000 396.0 401.123 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 50 55 45.9451 -90.2732 472.000 396.0 401.165 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 51 25 45.9451 -90.2732 472.000 396.0 401.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 51 55 45.9451 -90.2732 472.000 396.0 401.097 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 52 25 45.9451 -90.2732 472.000 396.0 401.251 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 52 55 45.9451 -90.2732 472.000 396.0 401.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 53 25 45.9451 -90.2732 472.000 396.0 401.543 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 53 55 45.9451 -90.2732 472.000 396.0 401.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 54 25 45.9451 -90.2732 472.000 396.0 401.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 04 54 55 45.9451 -90.2732 472.000 396.0 401.731 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 04 55 45.9451 -90.2732 472.000 30.0 402.831 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 09 55 45.9451 -90.2732 472.000 122.0 402.190 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 14 55 45.9451 -90.2732 472.000 396.0 400.905 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 19 55 45.9451 -90.2732 472.000 30.0 402.570 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 24 55 45.9451 -90.2732 472.000 122.0 401.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 29 55 45.9451 -90.2732 472.000 396.0 400.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 30 25 45.9451 -90.2732 472.000 396.0 401.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 30 55 45.9451 -90.2732 472.000 396.0 400.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 31 25 45.9451 -90.2732 472.000 396.0 400.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 31 55 45.9451 -90.2732 472.000 396.0 401.044 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 32 25 45.9451 -90.2732 472.000 396.0 400.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 32 55 45.9451 -90.2732 472.000 396.0 400.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 33 25 45.9451 -90.2732 472.000 396.0 400.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 33 55 45.9451 -90.2732 472.000 396.0 400.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 34 25 45.9451 -90.2732 472.000 396.0 400.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 34 55 45.9451 -90.2732 472.000 396.0 400.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 39 55 45.9451 -90.2732 472.000 30.0 402.550 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 44 55 45.9451 -90.2732 472.000 122.0 402.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 49 55 45.9451 -90.2732 472.000 396.0 401.245 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 54 55 45.9451 -90.2732 472.000 30.0 402.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 05 59 55 45.9451 -90.2732 472.000 122.0 401.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 04 55 45.9451 -90.2732 472.000 396.0 401.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 14 55 45.9451 -90.2732 472.000 30.0 402.347 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 19 55 45.9451 -90.2732 472.000 122.0 401.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 24 55 45.9451 -90.2732 472.000 396.0 400.986 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 29 55 45.9451 -90.2732 472.000 30.0 402.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 34 55 45.9451 -90.2732 472.000 122.0 402.154 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 39 55 45.9451 -90.2732 472.000 396.0 400.535 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 40 25 45.9451 -90.2732 472.000 396.0 400.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 40 55 45.9451 -90.2732 472.000 396.0 400.497 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 41 25 45.9451 -90.2732 472.000 396.0 400.364 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 41 55 45.9451 -90.2732 472.000 396.0 400.366 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 42 25 45.9451 -90.2732 472.000 396.0 400.375 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 42 55 45.9451 -90.2732 472.000 396.0 400.481 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 43 25 45.9451 -90.2732 472.000 396.0 400.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 43 55 45.9451 -90.2732 472.000 396.0 400.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 44 25 45.9451 -90.2732 472.000 396.0 400.870 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 44 55 45.9451 -90.2732 472.000 396.0 400.958 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 49 55 45.9451 -90.2732 472.000 30.0 402.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 54 55 45.9451 -90.2732 472.000 122.0 401.860 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 06 59 55 45.9451 -90.2732 472.000 396.0 399.922 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 04 55 45.9451 -90.2732 472.000 30.0 402.195 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 09 55 45.9451 -90.2732 472.000 122.0 401.783 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 14 55 45.9451 -90.2732 472.000 396.0 399.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 15 25 45.9451 -90.2732 472.000 396.0 399.527 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 15 55 45.9451 -90.2732 472.000 396.0 399.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 16 25 45.9451 -90.2732 472.000 396.0 399.646 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 16 55 45.9451 -90.2732 472.000 396.0 399.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 17 25 45.9451 -90.2732 472.000 396.0 399.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 17 55 45.9451 -90.2732 472.000 396.0 399.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 18 25 45.9451 -90.2732 472.000 396.0 399.657 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 18 55 45.9451 -90.2732 472.000 396.0 399.652 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 19 25 45.9451 -90.2732 472.000 396.0 399.440 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 19 55 45.9451 -90.2732 472.000 396.0 399.411 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 24 55 45.9451 -90.2732 472.000 30.0 402.158 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 29 55 45.9451 -90.2732 472.000 122.0 401.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 34 55 45.9451 -90.2732 472.000 396.0 399.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 39 55 45.9451 -90.2732 472.000 30.0 402.008 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 44 55 45.9451 -90.2732 472.000 122.0 401.494 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 49 55 45.9451 -90.2732 472.000 396.0 399.846 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 07 59 55 45.9451 -90.2732 472.000 30.0 400.999 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 04 55 45.9451 -90.2732 472.000 122.0 400.088 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 09 55 45.9451 -90.2732 472.000 396.0 396.935 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 14 55 45.9451 -90.2732 472.000 30.0 400.985 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 19 55 45.9451 -90.2732 472.000 122.0 400.294 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 24 55 45.9451 -90.2732 472.000 396.0 398.127 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 25 25 45.9451 -90.2732 472.000 396.0 398.025 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 25 55 45.9451 -90.2732 472.000 396.0 397.878 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 26 25 45.9451 -90.2732 472.000 396.0 397.902 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 26 55 45.9451 -90.2732 472.000 396.0 397.791 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 27 25 45.9451 -90.2732 472.000 396.0 397.261 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 27 55 45.9451 -90.2732 472.000 396.0 397.031 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 28 25 45.9451 -90.2732 472.000 396.0 396.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 28 55 45.9451 -90.2732 472.000 396.0 396.801 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 29 25 45.9451 -90.2732 472.000 396.0 396.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 29 55 45.9451 -90.2732 472.000 396.0 396.836 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 34 55 45.9451 -90.2732 472.000 30.0 400.740 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 39 55 45.9451 -90.2732 472.000 122.0 400.409 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 44 55 45.9451 -90.2732 472.000 396.0 397.026 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 49 55 45.9451 -90.2732 472.000 30.0 400.672 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 54 55 45.9451 -90.2732 472.000 122.0 400.305 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 17 08 59 55 45.9451 -90.2732 472.000 396.0 396.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 00 25 45.9451 -90.2732 472.000 396.0 396.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 00 55 45.9451 -90.2732 472.000 396.0 396.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 01 25 45.9451 -90.2732 472.000 396.0 396.656 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 01 55 45.9451 -90.2732 472.000 396.0 396.761 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 02 25 45.9451 -90.2732 472.000 396.0 396.818 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 02 55 45.9451 -90.2732 472.000 396.0 396.779 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 03 25 45.9451 -90.2732 472.000 396.0 396.810 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 03 55 45.9451 -90.2732 472.000 396.0 396.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 04 25 45.9451 -90.2732 472.000 396.0 396.753 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 04 55 45.9451 -90.2732 472.000 396.0 396.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 09 55 45.9451 -90.2732 472.000 30.0 400.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 14 55 45.9451 -90.2732 472.000 122.0 400.046 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 19 55 45.9451 -90.2732 472.000 396.0 396.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 24 55 45.9451 -90.2732 472.000 30.0 400.754 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 29 55 45.9451 -90.2732 472.000 122.0 399.797 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 34 55 45.9451 -90.2732 472.000 396.0 396.540 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 35 25 45.9451 -90.2732 472.000 396.0 396.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 35 55 45.9451 -90.2732 472.000 396.0 396.415 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 36 25 45.9451 -90.2732 472.000 396.0 396.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 36 55 45.9451 -90.2732 472.000 396.0 396.490 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 37 25 45.9451 -90.2732 472.000 396.0 396.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 37 55 45.9451 -90.2732 472.000 396.0 396.400 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 38 25 45.9451 -90.2732 472.000 396.0 396.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 38 55 45.9451 -90.2732 472.000 396.0 396.394 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 39 25 45.9451 -90.2732 472.000 396.0 396.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 39 55 45.9451 -90.2732 472.000 396.0 396.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 44 55 45.9451 -90.2732 472.000 30.0 400.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 49 55 45.9451 -90.2732 472.000 122.0 400.005 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 54 55 45.9451 -90.2732 472.000 396.0 396.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 09 59 55 45.9451 -90.2732 472.000 30.0 400.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 04 55 45.9451 -90.2732 472.000 122.0 399.681 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 09 55 45.9451 -90.2732 472.000 396.0 396.360 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 19 55 45.9451 -90.2732 472.000 30.0 400.250 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 24 55 45.9451 -90.2732 472.000 122.0 399.732 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 29 55 45.9451 -90.2732 472.000 396.0 396.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 34 55 45.9451 -90.2732 472.000 30.0 400.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 39 55 45.9451 -90.2732 472.000 122.0 399.591 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 44 55 45.9451 -90.2732 472.000 396.0 396.958 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 54 55 45.9451 -90.2732 472.000 30.0 399.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 10 59 55 45.9451 -90.2732 472.000 122.0 399.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 04 55 45.9451 -90.2732 472.000 396.0 396.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 09 55 45.9451 -90.2732 472.000 30.0 399.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 14 55 45.9451 -90.2732 472.000 122.0 399.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 19 55 45.9451 -90.2732 472.000 396.0 396.631 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 20 25 45.9451 -90.2732 472.000 396.0 396.403 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 20 55 45.9451 -90.2732 472.000 396.0 397.716 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 21 25 45.9451 -90.2732 472.000 396.0 396.568 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 21 55 45.9451 -90.2732 472.000 396.0 396.372 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 22 25 45.9451 -90.2732 472.000 396.0 396.895 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 22 55 45.9451 -90.2732 472.000 396.0 397.033 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 23 25 45.9451 -90.2732 472.000 396.0 396.549 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 23 55 45.9451 -90.2732 472.000 396.0 396.079 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 24 25 45.9451 -90.2732 472.000 396.0 396.435 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 24 55 45.9451 -90.2732 472.000 396.0 396.591 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 29 55 45.9451 -90.2732 472.000 30.0 400.179 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 34 55 45.9451 -90.2732 472.000 122.0 399.814 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 39 55 45.9451 -90.2732 472.000 396.0 396.700 0.620 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 44 55 45.9451 -90.2732 472.000 30.0 400.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 11 49 55 45.9451 -90.2732 472.000 122.0 399.915 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 14 55 45.9451 -90.2732 472.000 396.0 397.952 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 19 55 45.9451 -90.2732 472.000 30.0 399.700 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 24 55 45.9451 -90.2732 472.000 122.0 399.022 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 29 55 45.9451 -90.2732 472.000 396.0 397.622 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 34 55 45.9451 -90.2732 472.000 30.0 399.206 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 39 55 45.9451 -90.2732 472.000 122.0 398.728 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 44 55 45.9451 -90.2732 472.000 396.0 394.808 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 45 25 45.9451 -90.2732 472.000 396.0 394.971 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 45 55 45.9451 -90.2732 472.000 396.0 395.039 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 46 25 45.9451 -90.2732 472.000 396.0 394.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 46 55 45.9451 -90.2732 472.000 396.0 394.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 47 25 45.9451 -90.2732 472.000 396.0 395.196 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 47 55 45.9451 -90.2732 472.000 396.0 395.046 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 48 25 45.9451 -90.2732 472.000 396.0 395.575 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 48 55 45.9451 -90.2732 472.000 396.0 394.922 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 49 25 45.9451 -90.2732 472.000 396.0 394.790 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 49 55 45.9451 -90.2732 472.000 396.0 394.765 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 54 55 45.9451 -90.2732 472.000 30.0 398.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 12 59 55 45.9451 -90.2732 472.000 122.0 398.117 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 04 55 45.9451 -90.2732 472.000 396.0 394.692 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 09 55 45.9451 -90.2732 472.000 30.0 398.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 14 55 45.9451 -90.2732 472.000 122.0 398.121 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 19 55 45.9451 -90.2732 472.000 396.0 395.727 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 20 25 45.9451 -90.2732 472.000 396.0 395.691 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 20 55 45.9451 -90.2732 472.000 396.0 395.409 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 21 25 45.9451 -90.2732 472.000 396.0 395.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 21 55 45.9451 -90.2732 472.000 396.0 396.158 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 22 25 45.9451 -90.2732 472.000 396.0 396.177 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 22 55 45.9451 -90.2732 472.000 396.0 395.731 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 23 25 45.9451 -90.2732 472.000 396.0 395.647 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 23 55 45.9451 -90.2732 472.000 396.0 395.462 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 24 25 45.9451 -90.2732 472.000 396.0 395.659 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 24 55 45.9451 -90.2732 472.000 396.0 396.022 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 29 55 45.9451 -90.2732 472.000 30.0 398.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 34 55 45.9451 -90.2732 472.000 122.0 398.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 39 55 45.9451 -90.2732 472.000 396.0 397.175 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 44 55 45.9451 -90.2732 472.000 30.0 398.759 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 49 55 45.9451 -90.2732 472.000 122.0 398.347 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 13 54 55 45.9451 -90.2732 472.000 396.0 397.087 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 04 55 45.9451 -90.2732 472.000 30.0 398.036 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 09 55 45.9451 -90.2732 472.000 122.0 397.890 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 14 55 45.9451 -90.2732 472.000 396.0 396.531 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 19 55 45.9451 -90.2732 472.000 30.0 397.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 24 55 45.9451 -90.2732 472.000 122.0 397.562 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 29 55 45.9451 -90.2732 472.000 396.0 396.777 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 30 25 45.9451 -90.2732 472.000 396.0 396.362 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 30 55 45.9451 -90.2732 472.000 396.0 396.799 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 31 25 45.9451 -90.2732 472.000 396.0 396.417 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 31 55 45.9451 -90.2732 472.000 396.0 396.528 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 32 25 45.9451 -90.2732 472.000 396.0 396.299 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 32 55 45.9451 -90.2732 472.000 396.0 396.363 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 33 25 45.9451 -90.2732 472.000 396.0 396.474 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 33 55 45.9451 -90.2732 472.000 396.0 396.418 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 34 25 45.9451 -90.2732 472.000 396.0 396.174 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 34 55 45.9451 -90.2732 472.000 396.0 396.435 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 39 55 45.9451 -90.2732 472.000 30.0 397.510 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 44 55 45.9451 -90.2732 472.000 122.0 397.295 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 49 55 45.9451 -90.2732 472.000 396.0 396.182 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 54 55 45.9451 -90.2732 472.000 30.0 397.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 14 59 55 45.9451 -90.2732 472.000 122.0 397.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 04 55 45.9451 -90.2732 472.000 396.0 396.612 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 05 25 45.9451 -90.2732 472.000 396.0 396.245 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 05 55 45.9451 -90.2732 472.000 396.0 396.193 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 06 25 45.9451 -90.2732 472.000 396.0 396.304 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 06 55 45.9451 -90.2732 472.000 396.0 396.471 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 07 25 45.9451 -90.2732 472.000 396.0 396.248 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 07 55 45.9451 -90.2732 472.000 396.0 396.148 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 08 25 45.9451 -90.2732 472.000 396.0 396.393 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 08 55 45.9451 -90.2732 472.000 396.0 396.594 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 09 25 45.9451 -90.2732 472.000 396.0 396.382 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 09 55 45.9451 -90.2732 472.000 396.0 396.346 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 14 55 45.9451 -90.2732 472.000 30.0 396.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 19 55 45.9451 -90.2732 472.000 122.0 396.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 24 55 45.9451 -90.2732 472.000 396.0 396.051 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 29 55 45.9451 -90.2732 472.000 30.0 396.714 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 34 55 45.9451 -90.2732 472.000 122.0 396.725 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 39 55 45.9451 -90.2732 472.000 396.0 396.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 40 25 45.9451 -90.2732 472.000 396.0 396.254 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 40 55 45.9451 -90.2732 472.000 396.0 396.503 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 41 25 45.9451 -90.2732 472.000 396.0 396.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 41 55 45.9451 -90.2732 472.000 396.0 396.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 42 25 45.9451 -90.2732 472.000 396.0 395.993 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 42 55 45.9451 -90.2732 472.000 396.0 395.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 43 25 45.9451 -90.2732 472.000 396.0 396.032 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 43 55 45.9451 -90.2732 472.000 396.0 396.210 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 44 25 45.9451 -90.2732 472.000 396.0 396.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 44 55 45.9451 -90.2732 472.000 396.0 396.210 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 49 55 45.9451 -90.2732 472.000 30.0 396.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 54 55 45.9451 -90.2732 472.000 122.0 396.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 15 59 55 45.9451 -90.2732 472.000 396.0 396.246 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 04 55 45.9451 -90.2732 472.000 30.0 396.303 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 09 55 45.9451 -90.2732 472.000 122.0 396.302 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 14 55 45.9451 -90.2732 472.000 396.0 396.088 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 24 55 45.9451 -90.2732 472.000 30.0 396.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 29 55 45.9451 -90.2732 472.000 122.0 396.234 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 34 55 45.9451 -90.2732 472.000 396.0 396.180 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 39 55 45.9451 -90.2732 472.000 30.0 396.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 44 55 45.9451 -90.2732 472.000 122.0 396.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 49 55 45.9451 -90.2732 472.000 396.0 396.157 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 50 25 45.9451 -90.2732 472.000 396.0 396.076 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 50 55 45.9451 -90.2732 472.000 396.0 396.097 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 51 25 45.9451 -90.2732 472.000 396.0 396.089 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 51 55 45.9451 -90.2732 472.000 396.0 396.103 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 52 25 45.9451 -90.2732 472.000 396.0 395.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 52 55 45.9451 -90.2732 472.000 396.0 396.045 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 53 25 45.9451 -90.2732 472.000 396.0 396.097 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 53 55 45.9451 -90.2732 472.000 396.0 396.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 54 25 45.9451 -90.2732 472.000 396.0 396.184 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 16 54 55 45.9451 -90.2732 472.000 396.0 396.048 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 04 55 45.9451 -90.2732 472.000 30.0 396.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 09 55 45.9451 -90.2732 472.000 122.0 395.879 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 14 55 45.9451 -90.2732 472.000 396.0 395.481 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 19 55 45.9451 -90.2732 472.000 30.0 395.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 24 55 45.9451 -90.2732 472.000 122.0 395.446 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 29 55 45.9451 -90.2732 472.000 396.0 395.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 30 25 45.9451 -90.2732 472.000 396.0 395.311 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 30 55 45.9451 -90.2732 472.000 396.0 395.292 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 31 25 45.9451 -90.2732 472.000 396.0 395.515 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 31 55 45.9451 -90.2732 472.000 396.0 395.367 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 32 25 45.9451 -90.2732 472.000 396.0 395.329 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 32 55 45.9451 -90.2732 472.000 396.0 395.177 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 33 25 45.9451 -90.2732 472.000 396.0 395.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 33 55 45.9451 -90.2732 472.000 396.0 395.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 34 25 45.9451 -90.2732 472.000 396.0 395.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 34 55 45.9451 -90.2732 472.000 396.0 395.160 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 39 55 45.9451 -90.2732 472.000 30.0 395.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 44 55 45.9451 -90.2732 472.000 122.0 395.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 49 55 45.9451 -90.2732 472.000 396.0 395.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 54 55 45.9451 -90.2732 472.000 30.0 395.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 17 59 55 45.9451 -90.2732 472.000 122.0 395.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 04 55 45.9451 -90.2732 472.000 396.0 395.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 14 55 45.9451 -90.2732 472.000 30.0 395.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 19 55 45.9451 -90.2732 472.000 122.0 395.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 24 55 45.9451 -90.2732 472.000 396.0 396.058 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 29 55 45.9451 -90.2732 472.000 30.0 395.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 34 55 45.9451 -90.2732 472.000 122.0 396.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 39 55 45.9451 -90.2732 472.000 396.0 396.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 40 25 45.9451 -90.2732 472.000 396.0 396.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 40 55 45.9451 -90.2732 472.000 396.0 396.153 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 41 25 45.9451 -90.2732 472.000 396.0 396.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 41 55 45.9451 -90.2732 472.000 396.0 396.110 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 42 25 45.9451 -90.2732 472.000 396.0 396.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 42 55 45.9451 -90.2732 472.000 396.0 396.082 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 43 25 45.9451 -90.2732 472.000 396.0 396.130 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 43 55 45.9451 -90.2732 472.000 396.0 396.097 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 44 25 45.9451 -90.2732 472.000 396.0 396.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 44 55 45.9451 -90.2732 472.000 396.0 396.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 49 55 45.9451 -90.2732 472.000 30.0 395.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 54 55 45.9451 -90.2732 472.000 122.0 396.008 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 18 59 55 45.9451 -90.2732 472.000 396.0 396.024 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 04 55 45.9451 -90.2732 472.000 30.0 395.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 09 55 45.9451 -90.2732 472.000 122.0 395.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 14 55 45.9451 -90.2732 472.000 396.0 395.903 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 15 25 45.9451 -90.2732 472.000 396.0 395.847 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 15 55 45.9451 -90.2732 472.000 396.0 395.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 16 25 45.9451 -90.2732 472.000 396.0 395.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 16 55 45.9451 -90.2732 472.000 396.0 395.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 17 25 45.9451 -90.2732 472.000 396.0 395.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 17 55 45.9451 -90.2732 472.000 396.0 395.879 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 18 25 45.9451 -90.2732 472.000 396.0 395.851 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 18 55 45.9451 -90.2732 472.000 396.0 395.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 19 25 45.9451 -90.2732 472.000 396.0 395.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 19 55 45.9451 -90.2732 472.000 396.0 395.898 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 24 55 45.9451 -90.2732 472.000 30.0 395.797 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 29 55 45.9451 -90.2732 472.000 122.0 396.008 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 34 55 45.9451 -90.2732 472.000 396.0 395.913 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 39 55 45.9451 -90.2732 472.000 30.0 396.091 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 44 55 45.9451 -90.2732 472.000 122.0 396.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 49 55 45.9451 -90.2732 472.000 396.0 396.007 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 19 59 55 45.9451 -90.2732 472.000 30.0 396.043 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 04 55 45.9451 -90.2732 472.000 122.0 396.120 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 09 55 45.9451 -90.2732 472.000 396.0 396.150 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 14 55 45.9451 -90.2732 472.000 30.0 396.124 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 19 55 45.9451 -90.2732 472.000 122.0 396.185 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 24 55 45.9451 -90.2732 472.000 396.0 396.097 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 25 25 45.9451 -90.2732 472.000 396.0 396.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 25 55 45.9451 -90.2732 472.000 396.0 396.094 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 26 25 45.9451 -90.2732 472.000 396.0 396.088 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 26 55 45.9451 -90.2732 472.000 396.0 396.097 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 27 25 45.9451 -90.2732 472.000 396.0 396.097 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 27 55 45.9451 -90.2732 472.000 396.0 396.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 28 25 45.9451 -90.2732 472.000 396.0 396.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 28 55 45.9451 -90.2732 472.000 396.0 396.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 29 25 45.9451 -90.2732 472.000 396.0 395.991 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 29 55 45.9451 -90.2732 472.000 396.0 395.990 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 34 55 45.9451 -90.2732 472.000 30.0 396.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 39 55 45.9451 -90.2732 472.000 122.0 396.197 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 44 55 45.9451 -90.2732 472.000 396.0 396.225 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 49 55 45.9451 -90.2732 472.000 30.0 396.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 54 55 45.9451 -90.2732 472.000 122.0 396.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 20 59 55 45.9451 -90.2732 472.000 396.0 396.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 00 25 45.9451 -90.2732 472.000 396.0 396.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 00 55 45.9451 -90.2732 472.000 396.0 396.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 01 25 45.9451 -90.2732 472.000 396.0 396.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 01 55 45.9451 -90.2732 472.000 396.0 396.297 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 02 25 45.9451 -90.2732 472.000 396.0 396.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 02 55 45.9451 -90.2732 472.000 396.0 396.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 03 25 45.9451 -90.2732 472.000 396.0 396.426 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 03 55 45.9451 -90.2732 472.000 396.0 396.445 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 04 25 45.9451 -90.2732 472.000 396.0 396.488 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 04 55 45.9451 -90.2732 472.000 396.0 396.490 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 09 55 45.9451 -90.2732 472.000 30.0 396.409 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 14 55 45.9451 -90.2732 472.000 122.0 396.093 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 19 55 45.9451 -90.2732 472.000 396.0 396.119 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 24 55 45.9451 -90.2732 472.000 30.0 396.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 29 55 45.9451 -90.2732 472.000 122.0 396.276 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 34 55 45.9451 -90.2732 472.000 396.0 396.349 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 35 25 45.9451 -90.2732 472.000 396.0 396.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 35 55 45.9451 -90.2732 472.000 396.0 396.373 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 36 25 45.9451 -90.2732 472.000 396.0 396.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 36 55 45.9451 -90.2732 472.000 396.0 396.167 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 37 25 45.9451 -90.2732 472.000 396.0 396.249 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 37 55 45.9451 -90.2732 472.000 396.0 396.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 38 25 45.9451 -90.2732 472.000 396.0 396.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 38 55 45.9451 -90.2732 472.000 396.0 396.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 39 25 45.9451 -90.2732 472.000 396.0 396.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 39 55 45.9451 -90.2732 472.000 396.0 396.404 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 44 55 45.9451 -90.2732 472.000 30.0 396.673 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 49 55 45.9451 -90.2732 472.000 122.0 396.652 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 54 55 45.9451 -90.2732 472.000 396.0 396.321 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 21 59 55 45.9451 -90.2732 472.000 30.0 396.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 04 55 45.9451 -90.2732 472.000 122.0 396.692 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 09 55 45.9451 -90.2732 472.000 396.0 396.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 19 55 45.9451 -90.2732 472.000 30.0 396.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 24 55 45.9451 -90.2732 472.000 122.0 396.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 29 55 45.9451 -90.2732 472.000 396.0 396.764 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 34 55 45.9451 -90.2732 472.000 30.0 397.195 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 39 55 45.9451 -90.2732 472.000 122.0 397.027 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 44 55 45.9451 -90.2732 472.000 396.0 396.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 54 55 45.9451 -90.2732 472.000 30.0 397.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 22 59 55 45.9451 -90.2732 472.000 122.0 397.317 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 04 55 45.9451 -90.2732 472.000 396.0 397.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 09 55 45.9451 -90.2732 472.000 30.0 397.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 14 55 45.9451 -90.2732 472.000 122.0 397.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 19 55 45.9451 -90.2732 472.000 396.0 397.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 20 25 45.9451 -90.2732 472.000 396.0 397.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 20 55 45.9451 -90.2732 472.000 396.0 397.653 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 21 25 45.9451 -90.2732 472.000 396.0 397.656 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 21 55 45.9451 -90.2732 472.000 396.0 397.578 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 22 25 45.9451 -90.2732 472.000 396.0 397.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 22 55 45.9451 -90.2732 472.000 396.0 397.564 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 23 25 45.9451 -90.2732 472.000 396.0 397.474 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 23 55 45.9451 -90.2732 472.000 396.0 397.362 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 24 25 45.9451 -90.2732 472.000 396.0 397.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 24 55 45.9451 -90.2732 472.000 396.0 397.464 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 29 55 45.9451 -90.2732 472.000 30.0 397.997 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 34 55 45.9451 -90.2732 472.000 122.0 397.980 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 39 55 45.9451 -90.2732 472.000 396.0 397.734 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 44 55 45.9451 -90.2732 472.000 30.0 398.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 17 23 49 55 45.9451 -90.2732 472.000 122.0 398.188 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 14 55 45.9451 -90.2732 472.000 396.0 398.790 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 19 55 45.9451 -90.2732 472.000 30.0 399.097 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 24 55 45.9451 -90.2732 472.000 122.0 399.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 29 55 45.9451 -90.2732 472.000 396.0 399.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 34 55 45.9451 -90.2732 472.000 30.0 399.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 39 55 45.9451 -90.2732 472.000 122.0 399.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 44 55 45.9451 -90.2732 472.000 396.0 399.298 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 45 25 45.9451 -90.2732 472.000 396.0 399.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 45 55 45.9451 -90.2732 472.000 396.0 399.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 46 25 45.9451 -90.2732 472.000 396.0 399.326 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 46 55 45.9451 -90.2732 472.000 396.0 399.256 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 47 25 45.9451 -90.2732 472.000 396.0 399.254 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 47 55 45.9451 -90.2732 472.000 396.0 399.295 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 48 25 45.9451 -90.2732 472.000 396.0 399.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 48 55 45.9451 -90.2732 472.000 396.0 399.327 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 49 25 45.9451 -90.2732 472.000 396.0 399.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 49 55 45.9451 -90.2732 472.000 396.0 399.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 54 55 45.9451 -90.2732 472.000 30.0 399.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 00 59 55 45.9451 -90.2732 472.000 122.0 399.759 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 04 55 45.9451 -90.2732 472.000 396.0 398.539 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 09 55 45.9451 -90.2732 472.000 30.0 400.186 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 14 55 45.9451 -90.2732 472.000 122.0 399.986 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 19 55 45.9451 -90.2732 472.000 396.0 399.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 20 25 45.9451 -90.2732 472.000 396.0 399.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 20 55 45.9451 -90.2732 472.000 396.0 399.396 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 21 25 45.9451 -90.2732 472.000 396.0 399.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 21 55 45.9451 -90.2732 472.000 396.0 399.394 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 22 25 45.9451 -90.2732 472.000 396.0 399.506 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 22 55 45.9451 -90.2732 472.000 396.0 399.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 23 25 45.9451 -90.2732 472.000 396.0 399.340 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 23 55 45.9451 -90.2732 472.000 396.0 399.165 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 24 25 45.9451 -90.2732 472.000 396.0 398.966 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 24 55 45.9451 -90.2732 472.000 396.0 399.073 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 29 55 45.9451 -90.2732 472.000 30.0 400.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 34 55 45.9451 -90.2732 472.000 122.0 400.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 39 55 45.9451 -90.2732 472.000 396.0 399.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 44 55 45.9451 -90.2732 472.000 30.0 400.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 49 55 45.9451 -90.2732 472.000 122.0 400.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 01 54 55 45.9451 -90.2732 472.000 396.0 400.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 04 55 45.9451 -90.2732 472.000 30.0 401.086 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 09 55 45.9451 -90.2732 472.000 122.0 400.944 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 14 55 45.9451 -90.2732 472.000 396.0 400.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 19 55 45.9451 -90.2732 472.000 30.0 400.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 24 55 45.9451 -90.2732 472.000 122.0 400.990 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 29 55 45.9451 -90.2732 472.000 396.0 400.593 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 30 25 45.9451 -90.2732 472.000 396.0 400.686 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 30 55 45.9451 -90.2732 472.000 396.0 400.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 31 25 45.9451 -90.2732 472.000 396.0 400.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 31 55 45.9451 -90.2732 472.000 396.0 400.552 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 32 25 45.9451 -90.2732 472.000 396.0 400.559 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 32 55 45.9451 -90.2732 472.000 396.0 400.690 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 33 25 45.9451 -90.2732 472.000 396.0 400.493 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 33 55 45.9451 -90.2732 472.000 396.0 400.440 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 34 25 45.9451 -90.2732 472.000 396.0 400.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 34 55 45.9451 -90.2732 472.000 396.0 400.610 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 39 55 45.9451 -90.2732 472.000 30.0 401.254 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 44 55 45.9451 -90.2732 472.000 122.0 401.097 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 49 55 45.9451 -90.2732 472.000 396.0 400.886 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 54 55 45.9451 -90.2732 472.000 30.0 401.371 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 02 59 55 45.9451 -90.2732 472.000 122.0 401.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 04 55 45.9451 -90.2732 472.000 396.0 400.747 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 05 25 45.9451 -90.2732 472.000 396.0 400.882 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 05 55 45.9451 -90.2732 472.000 396.0 400.668 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 06 25 45.9451 -90.2732 472.000 396.0 400.597 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 06 55 45.9451 -90.2732 472.000 396.0 400.647 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 07 25 45.9451 -90.2732 472.000 396.0 400.575 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 07 55 45.9451 -90.2732 472.000 396.0 400.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 08 25 45.9451 -90.2732 472.000 396.0 400.814 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 08 55 45.9451 -90.2732 472.000 396.0 400.529 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 09 25 45.9451 -90.2732 472.000 396.0 400.416 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 09 55 45.9451 -90.2732 472.000 396.0 400.767 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 14 55 45.9451 -90.2732 472.000 30.0 401.450 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 19 55 45.9451 -90.2732 472.000 122.0 401.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 24 55 45.9451 -90.2732 472.000 396.0 400.041 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 29 55 45.9451 -90.2732 472.000 30.0 400.891 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 34 55 45.9451 -90.2732 472.000 122.0 400.573 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 39 55 45.9451 -90.2732 472.000 396.0 400.089 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 40 25 45.9451 -90.2732 472.000 396.0 399.952 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 40 55 45.9451 -90.2732 472.000 396.0 400.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 41 25 45.9451 -90.2732 472.000 396.0 400.241 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 41 55 45.9451 -90.2732 472.000 396.0 400.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 42 25 45.9451 -90.2732 472.000 396.0 400.240 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 42 55 45.9451 -90.2732 472.000 396.0 400.126 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 43 25 45.9451 -90.2732 472.000 396.0 400.122 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 43 55 45.9451 -90.2732 472.000 396.0 400.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 44 25 45.9451 -90.2732 472.000 396.0 400.057 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 44 55 45.9451 -90.2732 472.000 396.0 399.658 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 49 55 45.9451 -90.2732 472.000 30.0 400.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 54 55 45.9451 -90.2732 472.000 122.0 400.218 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 03 59 55 45.9451 -90.2732 472.000 396.0 399.749 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 04 55 45.9451 -90.2732 472.000 30.0 400.271 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 09 55 45.9451 -90.2732 472.000 122.0 400.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 14 55 45.9451 -90.2732 472.000 396.0 399.327 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 24 55 45.9451 -90.2732 472.000 30.0 399.629 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 29 55 45.9451 -90.2732 472.000 122.0 399.487 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 34 55 45.9451 -90.2732 472.000 396.0 398.948 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 39 55 45.9451 -90.2732 472.000 30.0 399.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 44 55 45.9451 -90.2732 472.000 122.0 399.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 49 55 45.9451 -90.2732 472.000 396.0 398.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 50 25 45.9451 -90.2732 472.000 396.0 398.639 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 50 55 45.9451 -90.2732 472.000 396.0 398.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 51 25 45.9451 -90.2732 472.000 396.0 398.525 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 51 55 45.9451 -90.2732 472.000 396.0 398.666 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 52 25 45.9451 -90.2732 472.000 396.0 398.711 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 52 55 45.9451 -90.2732 472.000 396.0 398.709 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 53 25 45.9451 -90.2732 472.000 396.0 399.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 53 55 45.9451 -90.2732 472.000 396.0 398.805 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 54 25 45.9451 -90.2732 472.000 396.0 398.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 04 54 55 45.9451 -90.2732 472.000 396.0 398.563 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 04 55 45.9451 -90.2732 472.000 30.0 399.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 09 55 45.9451 -90.2732 472.000 122.0 399.116 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 14 55 45.9451 -90.2732 472.000 396.0 398.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 19 55 45.9451 -90.2732 472.000 30.0 399.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 24 55 45.9451 -90.2732 472.000 122.0 398.880 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 29 55 45.9451 -90.2732 472.000 396.0 398.095 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 30 25 45.9451 -90.2732 472.000 396.0 398.083 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 30 55 45.9451 -90.2732 472.000 396.0 398.115 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 31 25 45.9451 -90.2732 472.000 396.0 398.495 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 31 55 45.9451 -90.2732 472.000 396.0 398.691 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 32 25 45.9451 -90.2732 472.000 396.0 398.312 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 32 55 45.9451 -90.2732 472.000 396.0 398.389 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 33 25 45.9451 -90.2732 472.000 396.0 398.620 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 33 55 45.9451 -90.2732 472.000 396.0 398.408 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 34 25 45.9451 -90.2732 472.000 396.0 398.455 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 34 55 45.9451 -90.2732 472.000 396.0 398.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 39 55 45.9451 -90.2732 472.000 30.0 398.932 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 44 55 45.9451 -90.2732 472.000 122.0 398.706 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 49 55 45.9451 -90.2732 472.000 396.0 398.388 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 54 55 45.9451 -90.2732 472.000 30.0 398.779 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 05 59 55 45.9451 -90.2732 472.000 122.0 398.450 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 04 55 45.9451 -90.2732 472.000 396.0 398.105 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 14 55 45.9451 -90.2732 472.000 30.0 398.882 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 19 55 45.9451 -90.2732 472.000 122.0 398.551 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 24 55 45.9451 -90.2732 472.000 396.0 398.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 29 55 45.9451 -90.2732 472.000 30.0 398.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 34 55 45.9451 -90.2732 472.000 122.0 398.416 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 39 55 45.9451 -90.2732 472.000 396.0 398.053 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 40 25 45.9451 -90.2732 472.000 396.0 398.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 40 55 45.9451 -90.2732 472.000 396.0 398.027 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 41 25 45.9451 -90.2732 472.000 396.0 397.987 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 41 55 45.9451 -90.2732 472.000 396.0 397.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 42 25 45.9451 -90.2732 472.000 396.0 397.968 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 42 55 45.9451 -90.2732 472.000 396.0 397.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 43 25 45.9451 -90.2732 472.000 396.0 397.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 43 55 45.9451 -90.2732 472.000 396.0 397.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 44 25 45.9451 -90.2732 472.000 396.0 397.917 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 44 55 45.9451 -90.2732 472.000 396.0 397.941 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 49 55 45.9451 -90.2732 472.000 30.0 398.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 54 55 45.9451 -90.2732 472.000 122.0 398.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 06 59 55 45.9451 -90.2732 472.000 396.0 397.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 04 55 45.9451 -90.2732 472.000 30.0 398.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 09 55 45.9451 -90.2732 472.000 122.0 398.246 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 14 55 45.9451 -90.2732 472.000 396.0 397.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 15 25 45.9451 -90.2732 472.000 396.0 397.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 15 55 45.9451 -90.2732 472.000 396.0 397.932 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 16 25 45.9451 -90.2732 472.000 396.0 397.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 16 55 45.9451 -90.2732 472.000 396.0 397.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 17 25 45.9451 -90.2732 472.000 396.0 397.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 17 55 45.9451 -90.2732 472.000 396.0 397.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 18 25 45.9451 -90.2732 472.000 396.0 397.904 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 18 55 45.9451 -90.2732 472.000 396.0 397.960 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 19 25 45.9451 -90.2732 472.000 396.0 397.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 19 55 45.9451 -90.2732 472.000 396.0 397.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 24 55 45.9451 -90.2732 472.000 30.0 398.280 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 29 55 45.9451 -90.2732 472.000 122.0 398.050 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 34 55 45.9451 -90.2732 472.000 396.0 397.953 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 39 55 45.9451 -90.2732 472.000 30.0 398.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 44 55 45.9451 -90.2732 472.000 122.0 398.090 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 49 55 45.9451 -90.2732 472.000 396.0 397.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 07 59 55 45.9451 -90.2732 472.000 30.0 398.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 04 55 45.9451 -90.2732 472.000 122.0 398.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 09 55 45.9451 -90.2732 472.000 396.0 397.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 14 55 45.9451 -90.2732 472.000 30.0 398.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 19 55 45.9451 -90.2732 472.000 122.0 398.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 24 55 45.9451 -90.2732 472.000 396.0 397.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 25 25 45.9451 -90.2732 472.000 396.0 397.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 25 55 45.9451 -90.2732 472.000 396.0 397.880 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 26 25 45.9451 -90.2732 472.000 396.0 397.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 26 55 45.9451 -90.2732 472.000 396.0 397.804 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 27 25 45.9451 -90.2732 472.000 396.0 397.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 27 55 45.9451 -90.2732 472.000 396.0 397.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 28 25 45.9451 -90.2732 472.000 396.0 397.773 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 28 55 45.9451 -90.2732 472.000 396.0 397.847 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 29 25 45.9451 -90.2732 472.000 396.0 397.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 29 55 45.9451 -90.2732 472.000 396.0 397.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 34 55 45.9451 -90.2732 472.000 30.0 397.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 39 55 45.9451 -90.2732 472.000 122.0 397.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 44 55 45.9451 -90.2732 472.000 396.0 397.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 49 55 45.9451 -90.2732 472.000 30.0 397.872 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 54 55 45.9451 -90.2732 472.000 122.0 397.624 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 08 59 55 45.9451 -90.2732 472.000 396.0 397.307 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 00 25 45.9451 -90.2732 472.000 396.0 397.316 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 00 55 45.9451 -90.2732 472.000 396.0 397.132 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 01 25 45.9451 -90.2732 472.000 396.0 397.220 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 01 55 45.9451 -90.2732 472.000 396.0 397.181 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 02 25 45.9451 -90.2732 472.000 396.0 397.153 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 02 55 45.9451 -90.2732 472.000 396.0 397.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 03 25 45.9451 -90.2732 472.000 396.0 397.358 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 03 55 45.9451 -90.2732 472.000 396.0 397.362 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 04 25 45.9451 -90.2732 472.000 396.0 397.180 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 04 55 45.9451 -90.2732 472.000 396.0 397.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 09 55 45.9451 -90.2732 472.000 30.0 397.909 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 14 55 45.9451 -90.2732 472.000 122.0 397.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 19 55 45.9451 -90.2732 472.000 396.0 397.131 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 24 55 45.9451 -90.2732 472.000 30.0 397.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 29 55 45.9451 -90.2732 472.000 122.0 397.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 34 55 45.9451 -90.2732 472.000 396.0 397.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 35 25 45.9451 -90.2732 472.000 396.0 397.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 35 55 45.9451 -90.2732 472.000 396.0 397.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 36 25 45.9451 -90.2732 472.000 396.0 397.575 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 36 55 45.9451 -90.2732 472.000 396.0 397.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 37 25 45.9451 -90.2732 472.000 396.0 397.335 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 37 55 45.9451 -90.2732 472.000 396.0 397.468 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 38 25 45.9451 -90.2732 472.000 396.0 397.488 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 38 55 45.9451 -90.2732 472.000 396.0 397.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 39 25 45.9451 -90.2732 472.000 396.0 397.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 39 55 45.9451 -90.2732 472.000 396.0 397.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 44 55 45.9451 -90.2732 472.000 30.0 397.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 49 55 45.9451 -90.2732 472.000 122.0 397.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 54 55 45.9451 -90.2732 472.000 396.0 397.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 09 59 55 45.9451 -90.2732 472.000 30.0 397.574 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 04 55 45.9451 -90.2732 472.000 122.0 397.459 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 09 55 45.9451 -90.2732 472.000 396.0 397.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 19 55 45.9451 -90.2732 472.000 30.0 397.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 24 55 45.9451 -90.2732 472.000 122.0 397.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 29 55 45.9451 -90.2732 472.000 396.0 396.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 34 55 45.9451 -90.2732 472.000 30.0 397.275 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 39 55 45.9451 -90.2732 472.000 122.0 397.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 44 55 45.9451 -90.2732 472.000 396.0 396.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 54 55 45.9451 -90.2732 472.000 30.0 397.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 10 59 55 45.9451 -90.2732 472.000 122.0 396.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 04 55 45.9451 -90.2732 472.000 396.0 396.663 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 09 55 45.9451 -90.2732 472.000 30.0 397.112 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 14 55 45.9451 -90.2732 472.000 122.0 397.160 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 19 55 45.9451 -90.2732 472.000 396.0 396.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 20 25 45.9451 -90.2732 472.000 396.0 396.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 20 55 45.9451 -90.2732 472.000 396.0 396.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 21 25 45.9451 -90.2732 472.000 396.0 396.841 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 21 55 45.9451 -90.2732 472.000 396.0 396.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 22 25 45.9451 -90.2732 472.000 396.0 396.864 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 22 55 45.9451 -90.2732 472.000 396.0 396.879 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 23 25 45.9451 -90.2732 472.000 396.0 396.898 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 23 55 45.9451 -90.2732 472.000 396.0 396.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 24 25 45.9451 -90.2732 472.000 396.0 396.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 24 55 45.9451 -90.2732 472.000 396.0 396.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 29 55 45.9451 -90.2732 472.000 30.0 397.173 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 34 55 45.9451 -90.2732 472.000 122.0 397.017 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 39 55 45.9451 -90.2732 472.000 396.0 396.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 44 55 45.9451 -90.2732 472.000 30.0 397.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 11 49 55 45.9451 -90.2732 472.000 122.0 397.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 14 55 45.9451 -90.2732 472.000 396.0 397.059 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 19 55 45.9451 -90.2732 472.000 30.0 397.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 24 55 45.9451 -90.2732 472.000 122.0 397.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 29 55 45.9451 -90.2732 472.000 396.0 397.131 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 34 55 45.9451 -90.2732 472.000 30.0 397.428 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 39 55 45.9451 -90.2732 472.000 122.0 397.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 44 55 45.9451 -90.2732 472.000 396.0 396.990 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 45 25 45.9451 -90.2732 472.000 396.0 397.007 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 45 55 45.9451 -90.2732 472.000 396.0 397.052 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 46 25 45.9451 -90.2732 472.000 396.0 397.014 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 46 55 45.9451 -90.2732 472.000 396.0 396.931 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 47 25 45.9451 -90.2732 472.000 396.0 396.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 47 55 45.9451 -90.2732 472.000 396.0 397.016 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 48 25 45.9451 -90.2732 472.000 396.0 396.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 48 55 45.9451 -90.2732 472.000 396.0 397.030 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 49 25 45.9451 -90.2732 472.000 396.0 397.082 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 49 55 45.9451 -90.2732 472.000 396.0 397.013 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 54 55 45.9451 -90.2732 472.000 30.0 397.427 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 12 59 55 45.9451 -90.2732 472.000 122.0 397.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 04 55 45.9451 -90.2732 472.000 396.0 397.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 09 55 45.9451 -90.2732 472.000 30.0 397.491 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 14 55 45.9451 -90.2732 472.000 122.0 397.300 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 19 55 45.9451 -90.2732 472.000 396.0 396.982 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 20 25 45.9451 -90.2732 472.000 396.0 397.042 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 20 55 45.9451 -90.2732 472.000 396.0 397.078 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 21 25 45.9451 -90.2732 472.000 396.0 397.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 21 55 45.9451 -90.2732 472.000 396.0 397.113 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 22 25 45.9451 -90.2732 472.000 396.0 397.072 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 22 55 45.9451 -90.2732 472.000 396.0 397.048 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 23 25 45.9451 -90.2732 472.000 396.0 397.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 23 55 45.9451 -90.2732 472.000 396.0 397.133 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 24 25 45.9451 -90.2732 472.000 396.0 397.052 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 24 55 45.9451 -90.2732 472.000 396.0 397.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 29 55 45.9451 -90.2732 472.000 30.0 397.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 34 55 45.9451 -90.2732 472.000 122.0 397.393 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 39 55 45.9451 -90.2732 472.000 396.0 397.102 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 44 55 45.9451 -90.2732 472.000 30.0 397.419 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 49 55 45.9451 -90.2732 472.000 122.0 397.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 13 54 55 45.9451 -90.2732 472.000 396.0 397.008 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 04 55 45.9451 -90.2732 472.000 30.0 397.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 09 55 45.9451 -90.2732 472.000 122.0 397.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 14 55 45.9451 -90.2732 472.000 396.0 397.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 19 55 45.9451 -90.2732 472.000 30.0 397.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 24 55 45.9451 -90.2732 472.000 122.0 397.316 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 29 55 45.9451 -90.2732 472.000 396.0 396.952 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 30 25 45.9451 -90.2732 472.000 396.0 397.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 30 55 45.9451 -90.2732 472.000 396.0 396.951 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 31 25 45.9451 -90.2732 472.000 396.0 396.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 31 55 45.9451 -90.2732 472.000 396.0 396.963 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 32 25 45.9451 -90.2732 472.000 396.0 396.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 32 55 45.9451 -90.2732 472.000 396.0 397.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 33 25 45.9451 -90.2732 472.000 396.0 397.059 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 33 55 45.9451 -90.2732 472.000 396.0 397.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 34 25 45.9451 -90.2732 472.000 396.0 396.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 34 55 45.9451 -90.2732 472.000 396.0 396.881 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 39 55 45.9451 -90.2732 472.000 30.0 397.000 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 44 55 45.9451 -90.2732 472.000 122.0 396.724 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 49 55 45.9451 -90.2732 472.000 396.0 396.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 54 55 45.9451 -90.2732 472.000 30.0 396.276 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 14 59 55 45.9451 -90.2732 472.000 122.0 396.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 04 55 45.9451 -90.2732 472.000 396.0 396.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 05 25 45.9451 -90.2732 472.000 396.0 396.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 05 55 45.9451 -90.2732 472.000 396.0 396.104 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 06 25 45.9451 -90.2732 472.000 396.0 396.011 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 06 55 45.9451 -90.2732 472.000 396.0 396.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 07 25 45.9451 -90.2732 472.000 396.0 396.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 07 55 45.9451 -90.2732 472.000 396.0 396.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 08 25 45.9451 -90.2732 472.000 396.0 396.220 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 08 55 45.9451 -90.2732 472.000 396.0 396.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 09 25 45.9451 -90.2732 472.000 396.0 396.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 09 55 45.9451 -90.2732 472.000 396.0 396.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 14 55 45.9451 -90.2732 472.000 30.0 396.389 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 19 55 45.9451 -90.2732 472.000 122.0 396.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 24 55 45.9451 -90.2732 472.000 396.0 396.290 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 29 55 45.9451 -90.2732 472.000 30.0 396.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 34 55 45.9451 -90.2732 472.000 122.0 396.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 39 55 45.9451 -90.2732 472.000 396.0 396.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 40 25 45.9451 -90.2732 472.000 396.0 396.372 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 40 55 45.9451 -90.2732 472.000 396.0 396.370 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 41 25 45.9451 -90.2732 472.000 396.0 396.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 41 55 45.9451 -90.2732 472.000 396.0 396.384 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 42 25 45.9451 -90.2732 472.000 396.0 396.372 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 42 55 45.9451 -90.2732 472.000 396.0 396.358 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 43 25 45.9451 -90.2732 472.000 396.0 396.367 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 43 55 45.9451 -90.2732 472.000 396.0 396.350 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 44 25 45.9451 -90.2732 472.000 396.0 396.365 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 44 55 45.9451 -90.2732 472.000 396.0 396.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 49 55 45.9451 -90.2732 472.000 30.0 396.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 54 55 45.9451 -90.2732 472.000 122.0 396.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 15 59 55 45.9451 -90.2732 472.000 396.0 396.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 04 55 45.9451 -90.2732 472.000 30.0 396.381 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 09 55 45.9451 -90.2732 472.000 122.0 396.231 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 14 55 45.9451 -90.2732 472.000 396.0 396.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 24 55 45.9451 -90.2732 472.000 30.0 396.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 29 55 45.9451 -90.2732 472.000 122.0 396.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 34 55 45.9451 -90.2732 472.000 396.0 396.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 39 55 45.9451 -90.2732 472.000 30.0 396.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 44 55 45.9451 -90.2732 472.000 122.0 396.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 49 55 45.9451 -90.2732 472.000 396.0 395.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 50 25 45.9451 -90.2732 472.000 396.0 395.953 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 50 55 45.9451 -90.2732 472.000 396.0 395.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 51 25 45.9451 -90.2732 472.000 396.0 395.968 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 51 55 45.9451 -90.2732 472.000 396.0 395.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 52 25 45.9451 -90.2732 472.000 396.0 395.979 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 52 55 45.9451 -90.2732 472.000 396.0 395.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 53 25 45.9451 -90.2732 472.000 396.0 395.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 53 55 45.9451 -90.2732 472.000 396.0 396.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 54 25 45.9451 -90.2732 472.000 396.0 396.000 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 16 54 55 45.9451 -90.2732 472.000 396.0 395.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 04 55 45.9451 -90.2732 472.000 30.0 395.982 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 09 55 45.9451 -90.2732 472.000 122.0 395.878 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 14 55 45.9451 -90.2732 472.000 396.0 395.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 19 55 45.9451 -90.2732 472.000 30.0 395.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 24 55 45.9451 -90.2732 472.000 122.0 395.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 29 55 45.9451 -90.2732 472.000 396.0 395.509 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 30 25 45.9451 -90.2732 472.000 396.0 395.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 30 55 45.9451 -90.2732 472.000 396.0 395.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 31 25 45.9451 -90.2732 472.000 396.0 395.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 31 55 45.9451 -90.2732 472.000 396.0 395.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 32 25 45.9451 -90.2732 472.000 396.0 395.530 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 32 55 45.9451 -90.2732 472.000 396.0 395.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 33 25 45.9451 -90.2732 472.000 396.0 395.570 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 33 55 45.9451 -90.2732 472.000 396.0 395.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 34 25 45.9451 -90.2732 472.000 396.0 395.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 34 55 45.9451 -90.2732 472.000 396.0 395.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 39 55 45.9451 -90.2732 472.000 30.0 395.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 44 55 45.9451 -90.2732 472.000 122.0 395.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 49 55 45.9451 -90.2732 472.000 396.0 395.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 54 55 45.9451 -90.2732 472.000 30.0 395.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 17 59 55 45.9451 -90.2732 472.000 122.0 395.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 04 55 45.9451 -90.2732 472.000 396.0 395.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 14 55 45.9451 -90.2732 472.000 30.0 395.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 19 55 45.9451 -90.2732 472.000 122.0 395.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 24 55 45.9451 -90.2732 472.000 396.0 395.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 29 55 45.9451 -90.2732 472.000 30.0 395.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 34 55 45.9451 -90.2732 472.000 122.0 395.411 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 39 55 45.9451 -90.2732 472.000 396.0 395.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 40 25 45.9451 -90.2732 472.000 396.0 395.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 40 55 45.9451 -90.2732 472.000 396.0 395.462 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 41 25 45.9451 -90.2732 472.000 396.0 395.445 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 41 55 45.9451 -90.2732 472.000 396.0 395.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 42 25 45.9451 -90.2732 472.000 396.0 395.438 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 42 55 45.9451 -90.2732 472.000 396.0 395.470 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 43 25 45.9451 -90.2732 472.000 396.0 395.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 43 55 45.9451 -90.2732 472.000 396.0 395.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 44 25 45.9451 -90.2732 472.000 396.0 395.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 44 55 45.9451 -90.2732 472.000 396.0 395.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 49 55 45.9451 -90.2732 472.000 30.0 395.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 54 55 45.9451 -90.2732 472.000 122.0 395.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 18 59 55 45.9451 -90.2732 472.000 396.0 395.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 04 55 45.9451 -90.2732 472.000 30.0 395.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 09 55 45.9451 -90.2732 472.000 122.0 395.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 14 55 45.9451 -90.2732 472.000 396.0 395.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 15 25 45.9451 -90.2732 472.000 396.0 395.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 15 55 45.9451 -90.2732 472.000 396.0 395.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 16 25 45.9451 -90.2732 472.000 396.0 395.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 16 55 45.9451 -90.2732 472.000 396.0 395.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 17 25 45.9451 -90.2732 472.000 396.0 395.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 17 55 45.9451 -90.2732 472.000 396.0 395.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 18 25 45.9451 -90.2732 472.000 396.0 395.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 18 55 45.9451 -90.2732 472.000 396.0 395.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 19 25 45.9451 -90.2732 472.000 396.0 395.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 19 55 45.9451 -90.2732 472.000 396.0 395.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 24 55 45.9451 -90.2732 472.000 30.0 395.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 29 55 45.9451 -90.2732 472.000 122.0 395.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 34 55 45.9451 -90.2732 472.000 396.0 395.598 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 39 55 45.9451 -90.2732 472.000 30.0 395.559 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 44 55 45.9451 -90.2732 472.000 122.0 395.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 49 55 45.9451 -90.2732 472.000 396.0 395.492 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 19 59 55 45.9451 -90.2732 472.000 30.0 395.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 04 55 45.9451 -90.2732 472.000 122.0 395.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 09 55 45.9451 -90.2732 472.000 396.0 395.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 14 55 45.9451 -90.2732 472.000 30.0 395.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 19 55 45.9451 -90.2732 472.000 122.0 395.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 24 55 45.9451 -90.2732 472.000 396.0 395.497 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 25 25 45.9451 -90.2732 472.000 396.0 395.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 25 55 45.9451 -90.2732 472.000 396.0 395.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 26 25 45.9451 -90.2732 472.000 396.0 395.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 26 55 45.9451 -90.2732 472.000 396.0 395.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 27 25 45.9451 -90.2732 472.000 396.0 395.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 27 55 45.9451 -90.2732 472.000 396.0 395.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 28 25 45.9451 -90.2732 472.000 396.0 395.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 28 55 45.9451 -90.2732 472.000 396.0 395.464 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 29 25 45.9451 -90.2732 472.000 396.0 395.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 29 55 45.9451 -90.2732 472.000 396.0 395.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 34 55 45.9451 -90.2732 472.000 30.0 395.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 39 55 45.9451 -90.2732 472.000 122.0 395.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 44 55 45.9451 -90.2732 472.000 396.0 395.471 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 49 55 45.9451 -90.2732 472.000 30.0 395.523 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 54 55 45.9451 -90.2732 472.000 122.0 395.500 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 20 59 55 45.9451 -90.2732 472.000 396.0 395.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 00 25 45.9451 -90.2732 472.000 396.0 395.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 00 55 45.9451 -90.2732 472.000 396.0 395.606 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 01 25 45.9451 -90.2732 472.000 396.0 395.597 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 01 55 45.9451 -90.2732 472.000 396.0 395.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 02 25 45.9451 -90.2732 472.000 396.0 395.626 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 02 55 45.9451 -90.2732 472.000 396.0 395.643 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 03 25 45.9451 -90.2732 472.000 396.0 395.643 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 03 55 45.9451 -90.2732 472.000 396.0 395.660 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 04 25 45.9451 -90.2732 472.000 396.0 395.656 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 04 55 45.9451 -90.2732 472.000 396.0 395.632 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 09 55 45.9451 -90.2732 472.000 30.0 395.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 14 55 45.9451 -90.2732 472.000 122.0 395.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 19 55 45.9451 -90.2732 472.000 396.0 395.625 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 24 55 45.9451 -90.2732 472.000 30.0 395.672 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 29 55 45.9451 -90.2732 472.000 122.0 395.690 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 34 55 45.9451 -90.2732 472.000 396.0 395.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 35 25 45.9451 -90.2732 472.000 396.0 395.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 35 55 45.9451 -90.2732 472.000 396.0 395.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 36 25 45.9451 -90.2732 472.000 396.0 395.674 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 36 55 45.9451 -90.2732 472.000 396.0 395.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 37 25 45.9451 -90.2732 472.000 396.0 395.684 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 37 55 45.9451 -90.2732 472.000 396.0 395.680 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 38 25 45.9451 -90.2732 472.000 396.0 395.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 38 55 45.9451 -90.2732 472.000 396.0 395.681 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 39 25 45.9451 -90.2732 472.000 396.0 395.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 39 55 45.9451 -90.2732 472.000 396.0 395.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 44 55 45.9451 -90.2732 472.000 30.0 395.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 49 55 45.9451 -90.2732 472.000 122.0 395.915 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 54 55 45.9451 -90.2732 472.000 396.0 395.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 21 59 55 45.9451 -90.2732 472.000 30.0 395.890 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 04 55 45.9451 -90.2732 472.000 122.0 395.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 09 55 45.9451 -90.2732 472.000 396.0 395.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 19 55 45.9451 -90.2732 472.000 30.0 395.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 24 55 45.9451 -90.2732 472.000 122.0 396.047 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 29 55 45.9451 -90.2732 472.000 396.0 395.914 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 34 55 45.9451 -90.2732 472.000 30.0 396.172 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 39 55 45.9451 -90.2732 472.000 122.0 395.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 44 55 45.9451 -90.2732 472.000 396.0 395.966 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 54 55 45.9451 -90.2732 472.000 30.0 396.368 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 22 59 55 45.9451 -90.2732 472.000 122.0 395.860 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 04 55 45.9451 -90.2732 472.000 396.0 395.941 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 09 55 45.9451 -90.2732 472.000 30.0 396.373 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 14 55 45.9451 -90.2732 472.000 122.0 395.913 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 19 55 45.9451 -90.2732 472.000 396.0 395.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 20 25 45.9451 -90.2732 472.000 396.0 395.917 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 20 55 45.9451 -90.2732 472.000 396.0 395.926 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 21 25 45.9451 -90.2732 472.000 396.0 395.928 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 21 55 45.9451 -90.2732 472.000 396.0 395.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 22 25 45.9451 -90.2732 472.000 396.0 395.942 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 22 55 45.9451 -90.2732 472.000 396.0 395.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 23 25 45.9451 -90.2732 472.000 396.0 395.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 23 55 45.9451 -90.2732 472.000 396.0 395.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 24 25 45.9451 -90.2732 472.000 396.0 395.906 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 24 55 45.9451 -90.2732 472.000 396.0 395.939 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 29 55 45.9451 -90.2732 472.000 30.0 396.676 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 34 55 45.9451 -90.2732 472.000 122.0 396.267 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 39 55 45.9451 -90.2732 472.000 396.0 395.942 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 44 55 45.9451 -90.2732 472.000 30.0 396.619 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 18 23 49 55 45.9451 -90.2732 472.000 122.0 396.126 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 14 55 45.9451 -90.2732 472.000 396.0 396.128 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 19 55 45.9451 -90.2732 472.000 30.0 397.047 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 24 55 45.9451 -90.2732 472.000 122.0 396.321 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 29 55 45.9451 -90.2732 472.000 396.0 396.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 34 55 45.9451 -90.2732 472.000 30.0 397.256 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 39 55 45.9451 -90.2732 472.000 122.0 396.411 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 44 55 45.9451 -90.2732 472.000 396.0 396.014 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 45 25 45.9451 -90.2732 472.000 396.0 396.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 45 55 45.9451 -90.2732 472.000 396.0 396.053 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 46 25 45.9451 -90.2732 472.000 396.0 396.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 46 55 45.9451 -90.2732 472.000 396.0 396.039 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 47 25 45.9451 -90.2732 472.000 396.0 396.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 47 55 45.9451 -90.2732 472.000 396.0 396.045 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 48 25 45.9451 -90.2732 472.000 396.0 396.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 48 55 45.9451 -90.2732 472.000 396.0 396.051 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 49 25 45.9451 -90.2732 472.000 396.0 396.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 49 55 45.9451 -90.2732 472.000 396.0 396.054 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 54 55 45.9451 -90.2732 472.000 30.0 397.234 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 00 59 55 45.9451 -90.2732 472.000 122.0 396.574 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 04 55 45.9451 -90.2732 472.000 396.0 396.184 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 09 55 45.9451 -90.2732 472.000 30.0 397.284 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 14 55 45.9451 -90.2732 472.000 122.0 396.464 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 19 55 45.9451 -90.2732 472.000 396.0 396.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 20 25 45.9451 -90.2732 472.000 396.0 396.160 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 20 55 45.9451 -90.2732 472.000 396.0 396.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 21 25 45.9451 -90.2732 472.000 396.0 396.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 21 55 45.9451 -90.2732 472.000 396.0 396.205 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 22 25 45.9451 -90.2732 472.000 396.0 396.193 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 22 55 45.9451 -90.2732 472.000 396.0 396.198 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 23 25 45.9451 -90.2732 472.000 396.0 396.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 23 55 45.9451 -90.2732 472.000 396.0 396.245 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 24 25 45.9451 -90.2732 472.000 396.0 396.210 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 24 55 45.9451 -90.2732 472.000 396.0 396.138 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 29 55 45.9451 -90.2732 472.000 30.0 397.350 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 34 55 45.9451 -90.2732 472.000 122.0 396.744 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 39 55 45.9451 -90.2732 472.000 396.0 396.079 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 44 55 45.9451 -90.2732 472.000 30.0 396.948 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 49 55 45.9451 -90.2732 472.000 122.0 396.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 01 54 55 45.9451 -90.2732 472.000 396.0 396.311 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 04 55 45.9451 -90.2732 472.000 30.0 396.965 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 09 55 45.9451 -90.2732 472.000 122.0 396.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 14 55 45.9451 -90.2732 472.000 396.0 396.350 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 19 55 45.9451 -90.2732 472.000 30.0 397.159 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 24 55 45.9451 -90.2732 472.000 122.0 396.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 29 55 45.9451 -90.2732 472.000 396.0 396.184 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 30 25 45.9451 -90.2732 472.000 396.0 396.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 30 55 45.9451 -90.2732 472.000 396.0 396.262 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 31 25 45.9451 -90.2732 472.000 396.0 396.295 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 31 55 45.9451 -90.2732 472.000 396.0 396.295 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 32 25 45.9451 -90.2732 472.000 396.0 396.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 32 55 45.9451 -90.2732 472.000 396.0 396.352 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 33 25 45.9451 -90.2732 472.000 396.0 396.348 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 33 55 45.9451 -90.2732 472.000 396.0 396.283 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 34 25 45.9451 -90.2732 472.000 396.0 396.264 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 34 55 45.9451 -90.2732 472.000 396.0 396.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 39 55 45.9451 -90.2732 472.000 30.0 397.119 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 44 55 45.9451 -90.2732 472.000 122.0 396.837 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 49 55 45.9451 -90.2732 472.000 396.0 396.312 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 54 55 45.9451 -90.2732 472.000 30.0 397.069 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 02 59 55 45.9451 -90.2732 472.000 122.0 396.671 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 04 55 45.9451 -90.2732 472.000 396.0 396.226 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 05 25 45.9451 -90.2732 472.000 396.0 396.264 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 05 55 45.9451 -90.2732 472.000 396.0 396.265 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 06 25 45.9451 -90.2732 472.000 396.0 396.274 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 06 55 45.9451 -90.2732 472.000 396.0 396.315 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 07 25 45.9451 -90.2732 472.000 396.0 396.298 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 07 55 45.9451 -90.2732 472.000 396.0 396.409 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 08 25 45.9451 -90.2732 472.000 396.0 396.295 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 08 55 45.9451 -90.2732 472.000 396.0 396.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 09 25 45.9451 -90.2732 472.000 396.0 396.317 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 09 55 45.9451 -90.2732 472.000 396.0 396.260 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 14 55 45.9451 -90.2732 472.000 30.0 396.892 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 19 55 45.9451 -90.2732 472.000 122.0 396.725 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 24 55 45.9451 -90.2732 472.000 396.0 396.275 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 29 55 45.9451 -90.2732 472.000 30.0 396.870 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 34 55 45.9451 -90.2732 472.000 122.0 396.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 39 55 45.9451 -90.2732 472.000 396.0 396.379 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 40 25 45.9451 -90.2732 472.000 396.0 396.346 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 40 55 45.9451 -90.2732 472.000 396.0 396.291 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 41 25 45.9451 -90.2732 472.000 396.0 396.374 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 41 55 45.9451 -90.2732 472.000 396.0 396.308 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 42 25 45.9451 -90.2732 472.000 396.0 396.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 42 55 45.9451 -90.2732 472.000 396.0 396.315 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 43 25 45.9451 -90.2732 472.000 396.0 396.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 43 55 45.9451 -90.2732 472.000 396.0 396.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 44 25 45.9451 -90.2732 472.000 396.0 396.270 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 44 55 45.9451 -90.2732 472.000 396.0 396.182 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 49 55 45.9451 -90.2732 472.000 30.0 396.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 54 55 45.9451 -90.2732 472.000 122.0 396.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 03 59 55 45.9451 -90.2732 472.000 396.0 396.253 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 04 55 45.9451 -90.2732 472.000 30.0 396.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 09 55 45.9451 -90.2732 472.000 122.0 396.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 14 55 45.9451 -90.2732 472.000 396.0 396.389 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 24 55 45.9451 -90.2732 472.000 30.0 396.950 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 29 55 45.9451 -90.2732 472.000 122.0 396.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 34 55 45.9451 -90.2732 472.000 396.0 396.402 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 39 55 45.9451 -90.2732 472.000 30.0 397.015 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 44 55 45.9451 -90.2732 472.000 122.0 396.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 49 55 45.9451 -90.2732 472.000 396.0 396.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 50 25 45.9451 -90.2732 472.000 396.0 396.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 50 55 45.9451 -90.2732 472.000 396.0 396.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 51 25 45.9451 -90.2732 472.000 396.0 396.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 51 55 45.9451 -90.2732 472.000 396.0 396.618 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 52 25 45.9451 -90.2732 472.000 396.0 396.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 52 55 45.9451 -90.2732 472.000 396.0 396.569 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 53 25 45.9451 -90.2732 472.000 396.0 396.573 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 53 55 45.9451 -90.2732 472.000 396.0 396.592 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 54 25 45.9451 -90.2732 472.000 396.0 396.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 04 54 55 45.9451 -90.2732 472.000 396.0 396.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 04 55 45.9451 -90.2732 472.000 30.0 397.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 09 55 45.9451 -90.2732 472.000 122.0 397.099 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 14 55 45.9451 -90.2732 472.000 396.0 397.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 19 55 45.9451 -90.2732 472.000 30.0 397.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 24 55 45.9451 -90.2732 472.000 122.0 397.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 29 55 45.9451 -90.2732 472.000 396.0 397.321 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 30 25 45.9451 -90.2732 472.000 396.0 397.206 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 30 55 45.9451 -90.2732 472.000 396.0 397.045 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 31 25 45.9451 -90.2732 472.000 396.0 397.190 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 31 55 45.9451 -90.2732 472.000 396.0 397.135 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 32 25 45.9451 -90.2732 472.000 396.0 397.351 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 32 55 45.9451 -90.2732 472.000 396.0 397.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 33 25 45.9451 -90.2732 472.000 396.0 397.207 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 33 55 45.9451 -90.2732 472.000 396.0 397.261 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 34 25 45.9451 -90.2732 472.000 396.0 397.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 34 55 45.9451 -90.2732 472.000 396.0 397.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 39 55 45.9451 -90.2732 472.000 30.0 397.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 44 55 45.9451 -90.2732 472.000 122.0 397.647 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 49 55 45.9451 -90.2732 472.000 396.0 397.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 54 55 45.9451 -90.2732 472.000 30.0 397.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 05 59 55 45.9451 -90.2732 472.000 122.0 397.846 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 04 55 45.9451 -90.2732 472.000 396.0 397.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 14 55 45.9451 -90.2732 472.000 30.0 397.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 19 55 45.9451 -90.2732 472.000 122.0 397.758 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 24 55 45.9451 -90.2732 472.000 396.0 397.370 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 29 55 45.9451 -90.2732 472.000 30.0 397.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 34 55 45.9451 -90.2732 472.000 122.0 397.857 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 39 55 45.9451 -90.2732 472.000 396.0 397.637 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 40 25 45.9451 -90.2732 472.000 396.0 397.695 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 40 55 45.9451 -90.2732 472.000 396.0 397.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 41 25 45.9451 -90.2732 472.000 396.0 397.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 41 55 45.9451 -90.2732 472.000 396.0 397.624 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 42 25 45.9451 -90.2732 472.000 396.0 397.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 42 55 45.9451 -90.2732 472.000 396.0 397.530 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 43 25 45.9451 -90.2732 472.000 396.0 397.617 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 43 55 45.9451 -90.2732 472.000 396.0 397.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 44 25 45.9451 -90.2732 472.000 396.0 397.634 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 44 55 45.9451 -90.2732 472.000 396.0 397.633 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 49 55 45.9451 -90.2732 472.000 30.0 398.021 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 54 55 45.9451 -90.2732 472.000 122.0 397.819 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 06 59 55 45.9451 -90.2732 472.000 396.0 397.593 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 04 55 45.9451 -90.2732 472.000 30.0 398.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 09 55 45.9451 -90.2732 472.000 122.0 397.777 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 14 55 45.9451 -90.2732 472.000 396.0 397.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 15 25 45.9451 -90.2732 472.000 396.0 397.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 15 55 45.9451 -90.2732 472.000 396.0 397.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 16 25 45.9451 -90.2732 472.000 396.0 397.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 16 55 45.9451 -90.2732 472.000 396.0 397.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 17 25 45.9451 -90.2732 472.000 396.0 397.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 17 55 45.9451 -90.2732 472.000 396.0 397.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 18 25 45.9451 -90.2732 472.000 396.0 397.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 18 55 45.9451 -90.2732 472.000 396.0 397.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 19 25 45.9451 -90.2732 472.000 396.0 397.553 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 19 55 45.9451 -90.2732 472.000 396.0 397.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 24 55 45.9451 -90.2732 472.000 30.0 397.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 29 55 45.9451 -90.2732 472.000 122.0 397.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 34 55 45.9451 -90.2732 472.000 396.0 397.511 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 39 55 45.9451 -90.2732 472.000 30.0 397.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 44 55 45.9451 -90.2732 472.000 122.0 397.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 49 55 45.9451 -90.2732 472.000 396.0 397.418 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 07 59 55 45.9451 -90.2732 472.000 30.0 397.688 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 04 55 45.9451 -90.2732 472.000 122.0 397.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 09 55 45.9451 -90.2732 472.000 396.0 397.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 14 55 45.9451 -90.2732 472.000 30.0 397.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 19 55 45.9451 -90.2732 472.000 122.0 397.593 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 24 55 45.9451 -90.2732 472.000 396.0 397.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 25 25 45.9451 -90.2732 472.000 396.0 397.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 25 55 45.9451 -90.2732 472.000 396.0 397.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 26 25 45.9451 -90.2732 472.000 396.0 397.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 26 55 45.9451 -90.2732 472.000 396.0 397.490 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 27 25 45.9451 -90.2732 472.000 396.0 397.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 27 55 45.9451 -90.2732 472.000 396.0 397.495 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 28 25 45.9451 -90.2732 472.000 396.0 397.480 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 28 55 45.9451 -90.2732 472.000 396.0 397.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 29 25 45.9451 -90.2732 472.000 396.0 397.421 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 29 55 45.9451 -90.2732 472.000 396.0 397.438 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 34 55 45.9451 -90.2732 472.000 30.0 397.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 39 55 45.9451 -90.2732 472.000 122.0 397.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 44 55 45.9451 -90.2732 472.000 396.0 397.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 49 55 45.9451 -90.2732 472.000 30.0 397.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 54 55 45.9451 -90.2732 472.000 122.0 397.837 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 08 59 55 45.9451 -90.2732 472.000 396.0 397.702 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 00 25 45.9451 -90.2732 472.000 396.0 397.733 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 00 55 45.9451 -90.2732 472.000 396.0 397.707 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 01 25 45.9451 -90.2732 472.000 396.0 397.754 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 01 55 45.9451 -90.2732 472.000 396.0 397.748 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 02 25 45.9451 -90.2732 472.000 396.0 397.783 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 02 55 45.9451 -90.2732 472.000 396.0 397.804 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 03 25 45.9451 -90.2732 472.000 396.0 397.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 03 55 45.9451 -90.2732 472.000 396.0 397.790 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 04 25 45.9451 -90.2732 472.000 396.0 397.781 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 04 55 45.9451 -90.2732 472.000 396.0 397.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 09 55 45.9451 -90.2732 472.000 30.0 398.131 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 14 55 45.9451 -90.2732 472.000 122.0 398.027 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 19 55 45.9451 -90.2732 472.000 396.0 397.979 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 24 55 45.9451 -90.2732 472.000 30.0 398.281 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 29 55 45.9451 -90.2732 472.000 122.0 398.230 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 34 55 45.9451 -90.2732 472.000 396.0 398.138 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 35 25 45.9451 -90.2732 472.000 396.0 398.154 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 35 55 45.9451 -90.2732 472.000 396.0 398.102 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 36 25 45.9451 -90.2732 472.000 396.0 398.102 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 36 55 45.9451 -90.2732 472.000 396.0 398.122 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 37 25 45.9451 -90.2732 472.000 396.0 398.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 37 55 45.9451 -90.2732 472.000 396.0 398.165 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 38 25 45.9451 -90.2732 472.000 396.0 398.184 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 38 55 45.9451 -90.2732 472.000 396.0 398.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 39 25 45.9451 -90.2732 472.000 396.0 398.212 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 39 55 45.9451 -90.2732 472.000 396.0 398.238 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 44 55 45.9451 -90.2732 472.000 30.0 398.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 49 55 45.9451 -90.2732 472.000 122.0 398.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 54 55 45.9451 -90.2732 472.000 396.0 398.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 09 59 55 45.9451 -90.2732 472.000 30.0 398.783 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 04 55 45.9451 -90.2732 472.000 122.0 398.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 09 55 45.9451 -90.2732 472.000 396.0 398.588 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 19 55 45.9451 -90.2732 472.000 30.0 399.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 24 55 45.9451 -90.2732 472.000 122.0 399.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 29 55 45.9451 -90.2732 472.000 396.0 398.840 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 34 55 45.9451 -90.2732 472.000 30.0 399.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 39 55 45.9451 -90.2732 472.000 122.0 399.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 44 55 45.9451 -90.2732 472.000 396.0 399.040 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 54 55 45.9451 -90.2732 472.000 30.0 399.426 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 10 59 55 45.9451 -90.2732 472.000 122.0 399.348 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 04 55 45.9451 -90.2732 472.000 396.0 399.272 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 09 55 45.9451 -90.2732 472.000 30.0 399.513 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 14 55 45.9451 -90.2732 472.000 122.0 399.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 19 55 45.9451 -90.2732 472.000 396.0 399.338 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 20 25 45.9451 -90.2732 472.000 396.0 399.385 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 20 55 45.9451 -90.2732 472.000 396.0 399.355 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 21 25 45.9451 -90.2732 472.000 396.0 399.425 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 21 55 45.9451 -90.2732 472.000 396.0 399.446 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 22 25 45.9451 -90.2732 472.000 396.0 399.460 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 22 55 45.9451 -90.2732 472.000 396.0 399.461 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 23 25 45.9451 -90.2732 472.000 396.0 399.425 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 23 55 45.9451 -90.2732 472.000 396.0 399.420 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 24 25 45.9451 -90.2732 472.000 396.0 399.562 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 24 55 45.9451 -90.2732 472.000 396.0 399.542 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 29 55 45.9451 -90.2732 472.000 30.0 399.836 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 34 55 45.9451 -90.2732 472.000 122.0 399.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 39 55 45.9451 -90.2732 472.000 396.0 399.596 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 44 55 45.9451 -90.2732 472.000 30.0 400.071 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 19 11 49 55 45.9451 -90.2732 472.000 122.0 400.087 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 19 12 14 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 19 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 24 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 29 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 34 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 39 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 44 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 45 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 45 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 46 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 46 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 47 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 47 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 48 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 48 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 49 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 49 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 54 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 12 59 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 04 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 09 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 14 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 19 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 20 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 20 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 21 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 21 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 22 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 22 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 23 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 23 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 24 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 24 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 29 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 34 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 39 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 44 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 49 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 13 54 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 04 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 09 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 14 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 19 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 24 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 29 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 30 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 30 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 31 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 31 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 32 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 32 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 33 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 33 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 34 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 34 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 39 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 44 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 49 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 54 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 14 59 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 04 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 05 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 05 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 06 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 06 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 07 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 07 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 08 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 08 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 09 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 09 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 14 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 19 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 24 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 29 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 34 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 39 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 40 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 40 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 41 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 41 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 42 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 42 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 43 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 43 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 44 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 44 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 49 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 54 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 15 59 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 04 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 09 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 14 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 24 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 29 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 34 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 39 55 45.9451 -90.2732 472.000 30.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 44 55 45.9451 -90.2732 472.000 122.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 49 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 50 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 50 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 51 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 51 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 52 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 52 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 53 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 53 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 54 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 19 16 54 55 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 C.P LEF 2010 11 21 00 14 55 45.9451 -90.2732 472.000 396.0 396.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 19 55 45.9451 -90.2732 472.000 30.0 396.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 24 55 45.9451 -90.2732 472.000 122.0 396.586 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 29 55 45.9451 -90.2732 472.000 396.0 396.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 34 55 45.9451 -90.2732 472.000 30.0 396.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 39 55 45.9451 -90.2732 472.000 122.0 396.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 44 55 45.9451 -90.2732 472.000 396.0 396.378 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 45 25 45.9451 -90.2732 472.000 396.0 396.402 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 45 55 45.9451 -90.2732 472.000 396.0 396.385 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 46 25 45.9451 -90.2732 472.000 396.0 396.400 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 46 55 45.9451 -90.2732 472.000 396.0 396.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 47 25 45.9451 -90.2732 472.000 396.0 396.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 47 55 45.9451 -90.2732 472.000 396.0 396.476 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 48 25 45.9451 -90.2732 472.000 396.0 396.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 48 55 45.9451 -90.2732 472.000 396.0 396.470 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 49 25 45.9451 -90.2732 472.000 396.0 396.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 49 55 45.9451 -90.2732 472.000 396.0 396.456 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 54 55 45.9451 -90.2732 472.000 30.0 396.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 00 59 55 45.9451 -90.2732 472.000 122.0 396.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 04 55 45.9451 -90.2732 472.000 396.0 396.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 09 55 45.9451 -90.2732 472.000 30.0 396.903 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 14 55 45.9451 -90.2732 472.000 122.0 396.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 19 55 45.9451 -90.2732 472.000 396.0 396.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 20 25 45.9451 -90.2732 472.000 396.0 396.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 20 55 45.9451 -90.2732 472.000 396.0 396.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 21 25 45.9451 -90.2732 472.000 396.0 396.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 21 55 45.9451 -90.2732 472.000 396.0 396.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 22 25 45.9451 -90.2732 472.000 396.0 396.668 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 22 55 45.9451 -90.2732 472.000 396.0 396.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 23 25 45.9451 -90.2732 472.000 396.0 396.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 23 55 45.9451 -90.2732 472.000 396.0 396.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 24 25 45.9451 -90.2732 472.000 396.0 396.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 24 55 45.9451 -90.2732 472.000 396.0 396.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 29 55 45.9451 -90.2732 472.000 30.0 397.030 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 34 55 45.9451 -90.2732 472.000 122.0 396.930 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 39 55 45.9451 -90.2732 472.000 396.0 396.798 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 44 55 45.9451 -90.2732 472.000 30.0 397.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 49 55 45.9451 -90.2732 472.000 122.0 396.923 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 01 54 55 45.9451 -90.2732 472.000 396.0 396.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 04 55 45.9451 -90.2732 472.000 30.0 397.142 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 09 55 45.9451 -90.2732 472.000 122.0 396.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 14 55 45.9451 -90.2732 472.000 396.0 396.662 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 19 55 45.9451 -90.2732 472.000 30.0 397.118 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 24 55 45.9451 -90.2732 472.000 122.0 397.044 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 29 55 45.9451 -90.2732 472.000 396.0 396.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 30 25 45.9451 -90.2732 472.000 396.0 396.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 30 55 45.9451 -90.2732 472.000 396.0 396.671 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 31 25 45.9451 -90.2732 472.000 396.0 396.723 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 31 55 45.9451 -90.2732 472.000 396.0 396.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 32 25 45.9451 -90.2732 472.000 396.0 396.762 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 32 55 45.9451 -90.2732 472.000 396.0 396.834 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 33 25 45.9451 -90.2732 472.000 396.0 396.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 33 55 45.9451 -90.2732 472.000 396.0 396.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 34 25 45.9451 -90.2732 472.000 396.0 396.725 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 34 55 45.9451 -90.2732 472.000 396.0 396.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 39 55 45.9451 -90.2732 472.000 30.0 396.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 44 55 45.9451 -90.2732 472.000 122.0 396.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 49 55 45.9451 -90.2732 472.000 396.0 396.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 54 55 45.9451 -90.2732 472.000 30.0 396.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 02 59 55 45.9451 -90.2732 472.000 122.0 396.648 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 04 55 45.9451 -90.2732 472.000 396.0 396.496 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 05 25 45.9451 -90.2732 472.000 396.0 396.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 05 55 45.9451 -90.2732 472.000 396.0 396.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 06 25 45.9451 -90.2732 472.000 396.0 396.473 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 06 55 45.9451 -90.2732 472.000 396.0 396.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 07 25 45.9451 -90.2732 472.000 396.0 396.482 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 07 55 45.9451 -90.2732 472.000 396.0 396.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 08 25 45.9451 -90.2732 472.000 396.0 396.474 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 08 55 45.9451 -90.2732 472.000 396.0 396.486 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 09 25 45.9451 -90.2732 472.000 396.0 396.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 09 55 45.9451 -90.2732 472.000 396.0 396.588 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 14 55 45.9451 -90.2732 472.000 30.0 396.666 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 19 55 45.9451 -90.2732 472.000 122.0 396.632 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 24 55 45.9451 -90.2732 472.000 396.0 396.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 29 55 45.9451 -90.2732 472.000 30.0 396.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 34 55 45.9451 -90.2732 472.000 122.0 396.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 39 55 45.9451 -90.2732 472.000 396.0 396.676 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 40 25 45.9451 -90.2732 472.000 396.0 396.681 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 40 55 45.9451 -90.2732 472.000 396.0 396.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 41 25 45.9451 -90.2732 472.000 396.0 396.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 41 55 45.9451 -90.2732 472.000 396.0 396.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 42 25 45.9451 -90.2732 472.000 396.0 396.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 42 55 45.9451 -90.2732 472.000 396.0 396.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 43 25 45.9451 -90.2732 472.000 396.0 396.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 43 55 45.9451 -90.2732 472.000 396.0 396.609 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 44 25 45.9451 -90.2732 472.000 396.0 396.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 44 55 45.9451 -90.2732 472.000 396.0 396.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 49 55 45.9451 -90.2732 472.000 30.0 396.780 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 54 55 45.9451 -90.2732 472.000 122.0 396.669 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 03 59 55 45.9451 -90.2732 472.000 396.0 396.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 04 55 45.9451 -90.2732 472.000 30.0 396.789 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 09 55 45.9451 -90.2732 472.000 122.0 396.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 14 55 45.9451 -90.2732 472.000 396.0 396.395 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 24 55 45.9451 -90.2732 472.000 30.0 396.562 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 29 55 45.9451 -90.2732 472.000 122.0 396.386 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 34 55 45.9451 -90.2732 472.000 396.0 396.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 39 55 45.9451 -90.2732 472.000 30.0 396.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 44 55 45.9451 -90.2732 472.000 122.0 396.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 49 55 45.9451 -90.2732 472.000 396.0 396.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 50 25 45.9451 -90.2732 472.000 396.0 396.259 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 50 55 45.9451 -90.2732 472.000 396.0 396.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 51 25 45.9451 -90.2732 472.000 396.0 396.268 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 51 55 45.9451 -90.2732 472.000 396.0 396.245 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 52 25 45.9451 -90.2732 472.000 396.0 396.265 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 52 55 45.9451 -90.2732 472.000 396.0 396.273 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 53 25 45.9451 -90.2732 472.000 396.0 396.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 53 55 45.9451 -90.2732 472.000 396.0 396.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 54 25 45.9451 -90.2732 472.000 396.0 396.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 04 54 55 45.9451 -90.2732 472.000 396.0 396.281 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 04 55 45.9451 -90.2732 472.000 30.0 396.344 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 09 55 45.9451 -90.2732 472.000 122.0 396.324 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 14 55 45.9451 -90.2732 472.000 396.0 396.152 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 19 55 45.9451 -90.2732 472.000 30.0 396.311 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 24 55 45.9451 -90.2732 472.000 122.0 396.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 29 55 45.9451 -90.2732 472.000 396.0 396.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 30 25 45.9451 -90.2732 472.000 396.0 396.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 30 55 45.9451 -90.2732 472.000 396.0 396.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 31 25 45.9451 -90.2732 472.000 396.0 396.066 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 31 55 45.9451 -90.2732 472.000 396.0 396.043 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 32 25 45.9451 -90.2732 472.000 396.0 396.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 32 55 45.9451 -90.2732 472.000 396.0 396.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 33 25 45.9451 -90.2732 472.000 396.0 396.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 33 55 45.9451 -90.2732 472.000 396.0 396.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 34 25 45.9451 -90.2732 472.000 396.0 396.067 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 34 55 45.9451 -90.2732 472.000 396.0 396.048 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 39 55 45.9451 -90.2732 472.000 30.0 396.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 44 55 45.9451 -90.2732 472.000 122.0 396.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 49 55 45.9451 -90.2732 472.000 396.0 396.024 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 54 55 45.9451 -90.2732 472.000 30.0 396.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 05 59 55 45.9451 -90.2732 472.000 122.0 396.183 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 04 55 45.9451 -90.2732 472.000 396.0 396.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 14 55 45.9451 -90.2732 472.000 30.0 396.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 19 55 45.9451 -90.2732 472.000 122.0 396.315 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 24 55 45.9451 -90.2732 472.000 396.0 396.031 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 29 55 45.9451 -90.2732 472.000 30.0 396.390 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 34 55 45.9451 -90.2732 472.000 122.0 396.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 39 55 45.9451 -90.2732 472.000 396.0 395.999 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 40 25 45.9451 -90.2732 472.000 396.0 395.953 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 40 55 45.9451 -90.2732 472.000 396.0 396.007 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 41 25 45.9451 -90.2732 472.000 396.0 396.045 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 41 55 45.9451 -90.2732 472.000 396.0 396.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 42 25 45.9451 -90.2732 472.000 396.0 396.052 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 42 55 45.9451 -90.2732 472.000 396.0 395.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 43 25 45.9451 -90.2732 472.000 396.0 396.055 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 43 55 45.9451 -90.2732 472.000 396.0 396.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 44 25 45.9451 -90.2732 472.000 396.0 395.903 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 44 55 45.9451 -90.2732 472.000 396.0 395.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 49 55 45.9451 -90.2732 472.000 30.0 396.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 54 55 45.9451 -90.2732 472.000 122.0 396.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 06 59 55 45.9451 -90.2732 472.000 396.0 395.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 04 55 45.9451 -90.2732 472.000 30.0 396.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 09 55 45.9451 -90.2732 472.000 122.0 396.384 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 14 55 45.9451 -90.2732 472.000 396.0 395.850 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 15 25 45.9451 -90.2732 472.000 396.0 395.997 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 15 55 45.9451 -90.2732 472.000 396.0 395.907 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 16 25 45.9451 -90.2732 472.000 396.0 395.894 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 16 55 45.9451 -90.2732 472.000 396.0 395.972 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 17 25 45.9451 -90.2732 472.000 396.0 395.965 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 17 55 45.9451 -90.2732 472.000 396.0 395.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 18 25 45.9451 -90.2732 472.000 396.0 395.897 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 18 55 45.9451 -90.2732 472.000 396.0 395.968 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 19 25 45.9451 -90.2732 472.000 396.0 395.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 19 55 45.9451 -90.2732 472.000 396.0 395.981 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 24 55 45.9451 -90.2732 472.000 30.0 396.449 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 29 55 45.9451 -90.2732 472.000 122.0 396.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 34 55 45.9451 -90.2732 472.000 396.0 395.848 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 39 55 45.9451 -90.2732 472.000 30.0 396.285 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 44 55 45.9451 -90.2732 472.000 122.0 396.233 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 49 55 45.9451 -90.2732 472.000 396.0 395.882 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 07 59 55 45.9451 -90.2732 472.000 30.0 396.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 04 55 45.9451 -90.2732 472.000 122.0 396.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 09 55 45.9451 -90.2732 472.000 396.0 395.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 14 55 45.9451 -90.2732 472.000 30.0 396.235 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 19 55 45.9451 -90.2732 472.000 122.0 396.184 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 24 55 45.9451 -90.2732 472.000 396.0 395.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 25 25 45.9451 -90.2732 472.000 396.0 395.767 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 25 55 45.9451 -90.2732 472.000 396.0 395.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 26 25 45.9451 -90.2732 472.000 396.0 395.781 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 26 55 45.9451 -90.2732 472.000 396.0 395.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 27 25 45.9451 -90.2732 472.000 396.0 395.639 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 27 55 45.9451 -90.2732 472.000 396.0 395.673 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 28 25 45.9451 -90.2732 472.000 396.0 395.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 28 55 45.9451 -90.2732 472.000 396.0 395.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 29 25 45.9451 -90.2732 472.000 396.0 395.732 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 29 55 45.9451 -90.2732 472.000 396.0 395.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 34 55 45.9451 -90.2732 472.000 30.0 396.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 39 55 45.9451 -90.2732 472.000 122.0 396.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 44 55 45.9451 -90.2732 472.000 396.0 395.608 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 49 55 45.9451 -90.2732 472.000 30.0 396.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 54 55 45.9451 -90.2732 472.000 122.0 396.091 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 08 59 55 45.9451 -90.2732 472.000 396.0 395.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 00 25 45.9451 -90.2732 472.000 396.0 395.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 00 55 45.9451 -90.2732 472.000 396.0 395.619 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 01 25 45.9451 -90.2732 472.000 396.0 395.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 01 55 45.9451 -90.2732 472.000 396.0 395.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 02 25 45.9451 -90.2732 472.000 396.0 395.700 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 02 55 45.9451 -90.2732 472.000 396.0 395.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 03 25 45.9451 -90.2732 472.000 396.0 395.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 03 55 45.9451 -90.2732 472.000 396.0 395.684 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 04 25 45.9451 -90.2732 472.000 396.0 395.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 04 55 45.9451 -90.2732 472.000 396.0 395.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 09 55 45.9451 -90.2732 472.000 30.0 396.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 14 55 45.9451 -90.2732 472.000 122.0 396.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 19 55 45.9451 -90.2732 472.000 396.0 395.674 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 24 55 45.9451 -90.2732 472.000 30.0 396.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 29 55 45.9451 -90.2732 472.000 122.0 395.915 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 34 55 45.9451 -90.2732 472.000 396.0 395.523 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 35 25 45.9451 -90.2732 472.000 396.0 395.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 35 55 45.9451 -90.2732 472.000 396.0 395.577 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 36 25 45.9451 -90.2732 472.000 396.0 395.564 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 36 55 45.9451 -90.2732 472.000 396.0 395.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 37 25 45.9451 -90.2732 472.000 396.0 395.618 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 37 55 45.9451 -90.2732 472.000 396.0 395.595 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 38 25 45.9451 -90.2732 472.000 396.0 395.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 38 55 45.9451 -90.2732 472.000 396.0 395.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 39 25 45.9451 -90.2732 472.000 396.0 395.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 39 55 45.9451 -90.2732 472.000 396.0 395.645 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 44 55 45.9451 -90.2732 472.000 30.0 395.947 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 49 55 45.9451 -90.2732 472.000 122.0 395.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 54 55 45.9451 -90.2732 472.000 396.0 395.604 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 09 59 55 45.9451 -90.2732 472.000 30.0 395.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 04 55 45.9451 -90.2732 472.000 122.0 395.793 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 09 55 45.9451 -90.2732 472.000 396.0 395.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 19 55 45.9451 -90.2732 472.000 30.0 395.934 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 24 55 45.9451 -90.2732 472.000 122.0 395.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 29 55 45.9451 -90.2732 472.000 396.0 395.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 34 55 45.9451 -90.2732 472.000 30.0 395.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 39 55 45.9451 -90.2732 472.000 122.0 396.012 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 44 55 45.9451 -90.2732 472.000 396.0 395.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 54 55 45.9451 -90.2732 472.000 30.0 396.064 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 10 59 55 45.9451 -90.2732 472.000 122.0 395.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 04 55 45.9451 -90.2732 472.000 396.0 395.790 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 09 55 45.9451 -90.2732 472.000 30.0 396.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 14 55 45.9451 -90.2732 472.000 122.0 396.151 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 19 55 45.9451 -90.2732 472.000 396.0 395.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 20 25 45.9451 -90.2732 472.000 396.0 395.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 20 55 45.9451 -90.2732 472.000 396.0 395.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 21 25 45.9451 -90.2732 472.000 396.0 395.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 21 55 45.9451 -90.2732 472.000 396.0 395.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 22 25 45.9451 -90.2732 472.000 396.0 395.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 22 55 45.9451 -90.2732 472.000 396.0 395.852 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 23 25 45.9451 -90.2732 472.000 396.0 395.849 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 23 55 45.9451 -90.2732 472.000 396.0 395.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 24 25 45.9451 -90.2732 472.000 396.0 395.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 24 55 45.9451 -90.2732 472.000 396.0 395.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 29 55 45.9451 -90.2732 472.000 30.0 396.303 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 34 55 45.9451 -90.2732 472.000 122.0 396.275 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 39 55 45.9451 -90.2732 472.000 396.0 395.958 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 44 55 45.9451 -90.2732 472.000 30.0 396.406 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 11 49 55 45.9451 -90.2732 472.000 122.0 396.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 14 55 45.9451 -90.2732 472.000 396.0 396.219 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 19 55 45.9451 -90.2732 472.000 30.0 396.455 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 24 55 45.9451 -90.2732 472.000 122.0 396.438 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 29 55 45.9451 -90.2732 472.000 396.0 396.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 34 55 45.9451 -90.2732 472.000 30.0 396.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 39 55 45.9451 -90.2732 472.000 122.0 396.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 44 55 45.9451 -90.2732 472.000 396.0 396.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 45 25 45.9451 -90.2732 472.000 396.0 396.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 45 55 45.9451 -90.2732 472.000 396.0 396.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 46 25 45.9451 -90.2732 472.000 396.0 396.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 46 55 45.9451 -90.2732 472.000 396.0 396.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 47 25 45.9451 -90.2732 472.000 396.0 396.487 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 47 55 45.9451 -90.2732 472.000 396.0 396.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 48 25 45.9451 -90.2732 472.000 396.0 396.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 48 55 45.9451 -90.2732 472.000 396.0 396.494 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 49 25 45.9451 -90.2732 472.000 396.0 396.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 49 55 45.9451 -90.2732 472.000 396.0 396.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 54 55 45.9451 -90.2732 472.000 30.0 396.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 12 59 55 45.9451 -90.2732 472.000 122.0 396.553 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 04 55 45.9451 -90.2732 472.000 396.0 396.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 09 55 45.9451 -90.2732 472.000 30.0 396.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 14 55 45.9451 -90.2732 472.000 122.0 396.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 19 55 45.9451 -90.2732 472.000 396.0 396.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 20 25 45.9451 -90.2732 472.000 396.0 396.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 20 55 45.9451 -90.2732 472.000 396.0 396.816 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 21 25 45.9451 -90.2732 472.000 396.0 396.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 21 55 45.9451 -90.2732 472.000 396.0 396.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 22 25 45.9451 -90.2732 472.000 396.0 396.904 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 22 55 45.9451 -90.2732 472.000 396.0 396.823 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 23 25 45.9451 -90.2732 472.000 396.0 396.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 23 55 45.9451 -90.2732 472.000 396.0 396.994 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 24 25 45.9451 -90.2732 472.000 396.0 396.972 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 24 55 45.9451 -90.2732 472.000 396.0 396.925 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 29 55 45.9451 -90.2732 472.000 30.0 396.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 34 55 45.9451 -90.2732 472.000 122.0 396.835 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 39 55 45.9451 -90.2732 472.000 396.0 397.185 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 44 55 45.9451 -90.2732 472.000 30.0 396.975 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 49 55 45.9451 -90.2732 472.000 122.0 397.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 13 54 55 45.9451 -90.2732 472.000 396.0 397.335 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 04 55 45.9451 -90.2732 472.000 30.0 397.290 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 09 55 45.9451 -90.2732 472.000 122.0 397.260 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 14 55 45.9451 -90.2732 472.000 396.0 397.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 19 55 45.9451 -90.2732 472.000 30.0 397.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 24 55 45.9451 -90.2732 472.000 122.0 397.482 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 29 55 45.9451 -90.2732 472.000 396.0 398.163 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 30 25 45.9451 -90.2732 472.000 396.0 398.068 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 30 55 45.9451 -90.2732 472.000 396.0 398.133 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 31 25 45.9451 -90.2732 472.000 396.0 397.941 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 31 55 45.9451 -90.2732 472.000 396.0 398.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 32 25 45.9451 -90.2732 472.000 396.0 397.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 32 55 45.9451 -90.2732 472.000 396.0 398.023 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 33 25 45.9451 -90.2732 472.000 396.0 397.977 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 33 55 45.9451 -90.2732 472.000 396.0 397.975 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 34 25 45.9451 -90.2732 472.000 396.0 398.059 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 34 55 45.9451 -90.2732 472.000 396.0 398.002 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 39 55 45.9451 -90.2732 472.000 30.0 397.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 44 55 45.9451 -90.2732 472.000 122.0 397.692 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 49 55 45.9451 -90.2732 472.000 396.0 398.245 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 54 55 45.9451 -90.2732 472.000 30.0 397.957 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 14 59 55 45.9451 -90.2732 472.000 122.0 397.959 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 04 55 45.9451 -90.2732 472.000 396.0 398.743 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 05 25 45.9451 -90.2732 472.000 396.0 399.039 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 05 55 45.9451 -90.2732 472.000 396.0 398.727 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 06 25 45.9451 -90.2732 472.000 396.0 399.189 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 06 55 45.9451 -90.2732 472.000 396.0 399.593 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 07 25 45.9451 -90.2732 472.000 396.0 398.633 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 07 55 45.9451 -90.2732 472.000 396.0 398.573 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 08 25 45.9451 -90.2732 472.000 396.0 399.362 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 08 55 45.9451 -90.2732 472.000 396.0 398.973 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 09 25 45.9451 -90.2732 472.000 396.0 399.013 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 09 55 45.9451 -90.2732 472.000 396.0 398.930 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 14 55 45.9451 -90.2732 472.000 30.0 398.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 19 55 45.9451 -90.2732 472.000 122.0 398.279 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 24 55 45.9451 -90.2732 472.000 396.0 399.468 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 29 55 45.9451 -90.2732 472.000 30.0 398.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 34 55 45.9451 -90.2732 472.000 122.0 398.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 39 55 45.9451 -90.2732 472.000 396.0 400.414 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 40 25 45.9451 -90.2732 472.000 396.0 400.125 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 40 55 45.9451 -90.2732 472.000 396.0 399.430 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 41 25 45.9451 -90.2732 472.000 396.0 399.370 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 41 55 45.9451 -90.2732 472.000 396.0 399.675 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 42 25 45.9451 -90.2732 472.000 396.0 399.590 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 42 55 45.9451 -90.2732 472.000 396.0 399.303 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 43 25 45.9451 -90.2732 472.000 396.0 399.346 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 43 55 45.9451 -90.2732 472.000 396.0 400.013 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 44 25 45.9451 -90.2732 472.000 396.0 399.902 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 44 55 45.9451 -90.2732 472.000 396.0 399.111 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 49 55 45.9451 -90.2732 472.000 30.0 398.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 54 55 45.9451 -90.2732 472.000 122.0 398.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 15 59 55 45.9451 -90.2732 472.000 396.0 400.365 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 04 55 45.9451 -90.2732 472.000 30.0 398.919 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 09 55 45.9451 -90.2732 472.000 122.0 399.009 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 14 55 45.9451 -90.2732 472.000 396.0 400.329 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 24 55 45.9451 -90.2732 472.000 30.0 399.259 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 29 55 45.9451 -90.2732 472.000 122.0 399.316 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 34 55 45.9451 -90.2732 472.000 396.0 401.084 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 39 55 45.9451 -90.2732 472.000 30.0 399.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 44 55 45.9451 -90.2732 472.000 122.0 399.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 49 55 45.9451 -90.2732 472.000 396.0 402.180 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 50 25 45.9451 -90.2732 472.000 396.0 401.331 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 50 55 45.9451 -90.2732 472.000 396.0 400.844 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 51 25 45.9451 -90.2732 472.000 396.0 402.345 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 51 55 45.9451 -90.2732 472.000 396.0 402.117 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 52 25 45.9451 -90.2732 472.000 396.0 401.252 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 52 55 45.9451 -90.2732 472.000 396.0 401.579 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 53 25 45.9451 -90.2732 472.000 396.0 402.224 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 53 55 45.9451 -90.2732 472.000 396.0 401.422 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 54 25 45.9451 -90.2732 472.000 396.0 402.344 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 21 16 54 55 45.9451 -90.2732 472.000 396.0 401.801 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 04 55 45.9451 -90.2732 472.000 30.0 399.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 09 55 45.9451 -90.2732 472.000 122.0 399.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 14 55 45.9451 -90.2732 472.000 396.0 402.309 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 19 55 45.9451 -90.2732 472.000 30.0 400.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 24 55 45.9451 -90.2732 472.000 122.0 400.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 29 55 45.9451 -90.2732 472.000 396.0 402.622 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 30 25 45.9451 -90.2732 472.000 396.0 402.040 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 30 55 45.9451 -90.2732 472.000 396.0 401.838 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 31 25 45.9451 -90.2732 472.000 396.0 401.974 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 31 55 45.9451 -90.2732 472.000 396.0 402.835 0.400 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 32 25 45.9451 -90.2732 472.000 396.0 402.564 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 32 55 45.9451 -90.2732 472.000 396.0 402.642 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 33 25 45.9451 -90.2732 472.000 396.0 402.822 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 33 55 45.9451 -90.2732 472.000 396.0 402.604 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 34 25 45.9451 -90.2732 472.000 396.0 402.568 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 34 55 45.9451 -90.2732 472.000 396.0 403.447 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 39 55 45.9451 -90.2732 472.000 30.0 400.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 44 55 45.9451 -90.2732 472.000 122.0 400.525 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 49 55 45.9451 -90.2732 472.000 396.0 402.461 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 54 55 45.9451 -90.2732 472.000 30.0 400.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 17 59 55 45.9451 -90.2732 472.000 122.0 400.795 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 04 55 45.9451 -90.2732 472.000 396.0 402.634 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 14 55 45.9451 -90.2732 472.000 30.0 400.970 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 19 55 45.9451 -90.2732 472.000 122.0 401.178 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 24 55 45.9451 -90.2732 472.000 396.0 402.980 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 29 55 45.9451 -90.2732 472.000 30.0 401.249 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 34 55 45.9451 -90.2732 472.000 122.0 401.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 39 55 45.9451 -90.2732 472.000 396.0 403.294 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 40 25 45.9451 -90.2732 472.000 396.0 402.966 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 40 55 45.9451 -90.2732 472.000 396.0 403.026 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 41 25 45.9451 -90.2732 472.000 396.0 403.379 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 41 55 45.9451 -90.2732 472.000 396.0 403.827 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 42 25 45.9451 -90.2732 472.000 396.0 403.375 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 42 55 45.9451 -90.2732 472.000 396.0 403.033 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 43 25 45.9451 -90.2732 472.000 396.0 402.806 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 43 55 45.9451 -90.2732 472.000 396.0 403.018 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 44 25 45.9451 -90.2732 472.000 396.0 403.436 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 44 55 45.9451 -90.2732 472.000 396.0 402.951 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 49 55 45.9451 -90.2732 472.000 30.0 401.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 54 55 45.9451 -90.2732 472.000 122.0 401.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 18 59 55 45.9451 -90.2732 472.000 396.0 402.924 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 04 55 45.9451 -90.2732 472.000 30.0 401.870 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 09 55 45.9451 -90.2732 472.000 122.0 401.957 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 14 55 45.9451 -90.2732 472.000 396.0 403.083 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 15 25 45.9451 -90.2732 472.000 396.0 402.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 15 55 45.9451 -90.2732 472.000 396.0 403.086 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 16 25 45.9451 -90.2732 472.000 396.0 403.276 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 16 55 45.9451 -90.2732 472.000 396.0 403.195 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 17 25 45.9451 -90.2732 472.000 396.0 403.034 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 17 55 45.9451 -90.2732 472.000 396.0 403.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 18 25 45.9451 -90.2732 472.000 396.0 403.783 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 18 55 45.9451 -90.2732 472.000 396.0 403.856 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 19 25 45.9451 -90.2732 472.000 396.0 403.518 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 19 55 45.9451 -90.2732 472.000 396.0 403.350 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 24 55 45.9451 -90.2732 472.000 30.0 402.132 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 29 55 45.9451 -90.2732 472.000 122.0 402.216 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 34 55 45.9451 -90.2732 472.000 396.0 403.916 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 39 55 45.9451 -90.2732 472.000 30.0 402.347 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 44 55 45.9451 -90.2732 472.000 122.0 402.429 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 49 55 45.9451 -90.2732 472.000 396.0 404.403 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 21 19 59 55 45.9451 -90.2732 472.000 30.0 402.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 04 55 45.9451 -90.2732 472.000 122.0 402.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 09 55 45.9451 -90.2732 472.000 396.0 404.965 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 14 55 45.9451 -90.2732 472.000 30.0 402.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 19 55 45.9451 -90.2732 472.000 122.0 402.800 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 24 55 45.9451 -90.2732 472.000 396.0 405.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 25 25 45.9451 -90.2732 472.000 396.0 405.720 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 25 55 45.9451 -90.2732 472.000 396.0 405.513 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 26 25 45.9451 -90.2732 472.000 396.0 405.407 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 26 55 45.9451 -90.2732 472.000 396.0 405.028 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 27 25 45.9451 -90.2732 472.000 396.0 405.365 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 27 55 45.9451 -90.2732 472.000 396.0 405.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 28 25 45.9451 -90.2732 472.000 396.0 405.384 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 28 55 45.9451 -90.2732 472.000 396.0 405.051 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 29 25 45.9451 -90.2732 472.000 396.0 405.058 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 29 55 45.9451 -90.2732 472.000 396.0 406.045 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 34 55 45.9451 -90.2732 472.000 30.0 403.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 39 55 45.9451 -90.2732 472.000 122.0 403.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 44 55 45.9451 -90.2732 472.000 396.0 406.126 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 49 55 45.9451 -90.2732 472.000 30.0 403.287 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 54 55 45.9451 -90.2732 472.000 122.0 403.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 20 59 55 45.9451 -90.2732 472.000 396.0 407.884 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 00 25 45.9451 -90.2732 472.000 396.0 407.910 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 00 55 45.9451 -90.2732 472.000 396.0 408.012 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 01 25 45.9451 -90.2732 472.000 396.0 407.913 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 01 55 45.9451 -90.2732 472.000 396.0 408.094 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 02 25 45.9451 -90.2732 472.000 396.0 408.540 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 02 55 45.9451 -90.2732 472.000 396.0 408.282 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 03 25 45.9451 -90.2732 472.000 396.0 408.282 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 03 55 45.9451 -90.2732 472.000 396.0 408.223 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 04 25 45.9451 -90.2732 472.000 396.0 408.460 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 04 55 45.9451 -90.2732 472.000 396.0 408.307 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 09 55 45.9451 -90.2732 472.000 30.0 403.563 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 14 55 45.9451 -90.2732 472.000 122.0 403.497 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 19 55 45.9451 -90.2732 472.000 396.0 407.915 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 24 55 45.9451 -90.2732 472.000 30.0 403.727 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 29 55 45.9451 -90.2732 472.000 122.0 403.673 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 34 55 45.9451 -90.2732 472.000 396.0 407.133 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 35 25 45.9451 -90.2732 472.000 396.0 407.313 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 35 55 45.9451 -90.2732 472.000 396.0 407.166 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 36 25 45.9451 -90.2732 472.000 396.0 406.770 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 36 55 45.9451 -90.2732 472.000 396.0 406.415 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 37 25 45.9451 -90.2732 472.000 396.0 406.027 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 37 55 45.9451 -90.2732 472.000 396.0 406.283 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 38 25 45.9451 -90.2732 472.000 396.0 407.365 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 38 55 45.9451 -90.2732 472.000 396.0 407.664 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 39 25 45.9451 -90.2732 472.000 396.0 407.313 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 39 55 45.9451 -90.2732 472.000 396.0 406.889 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 44 55 45.9451 -90.2732 472.000 30.0 403.998 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 49 55 45.9451 -90.2732 472.000 122.0 403.892 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 54 55 45.9451 -90.2732 472.000 396.0 407.425 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 21 59 55 45.9451 -90.2732 472.000 30.0 404.124 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 04 55 45.9451 -90.2732 472.000 122.0 404.179 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 09 55 45.9451 -90.2732 472.000 396.0 408.782 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 19 55 45.9451 -90.2732 472.000 30.0 404.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 24 55 45.9451 -90.2732 472.000 122.0 404.816 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 29 55 45.9451 -90.2732 472.000 396.0 408.803 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 34 55 45.9451 -90.2732 472.000 30.0 404.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 39 55 45.9451 -90.2732 472.000 122.0 404.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 44 55 45.9451 -90.2732 472.000 396.0 409.120 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 54 55 45.9451 -90.2732 472.000 30.0 404.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 22 59 55 45.9451 -90.2732 472.000 122.0 405.480 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 04 55 45.9451 -90.2732 472.000 396.0 410.214 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 09 55 45.9451 -90.2732 472.000 30.0 405.512 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 14 55 45.9451 -90.2732 472.000 122.0 405.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 19 55 45.9451 -90.2732 472.000 396.0 410.011 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 20 25 45.9451 -90.2732 472.000 396.0 410.031 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 20 55 45.9451 -90.2732 472.000 396.0 410.011 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 21 25 45.9451 -90.2732 472.000 396.0 409.956 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 21 55 45.9451 -90.2732 472.000 396.0 409.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 22 25 45.9451 -90.2732 472.000 396.0 409.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 22 55 45.9451 -90.2732 472.000 396.0 409.937 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 23 25 45.9451 -90.2732 472.000 396.0 409.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 23 55 45.9451 -90.2732 472.000 396.0 409.615 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 24 25 45.9451 -90.2732 472.000 396.0 409.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 24 55 45.9451 -90.2732 472.000 396.0 409.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 29 55 45.9451 -90.2732 472.000 30.0 405.870 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 34 55 45.9451 -90.2732 472.000 122.0 405.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 39 55 45.9451 -90.2732 472.000 396.0 409.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 44 55 45.9451 -90.2732 472.000 30.0 405.836 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 21 23 49 55 45.9451 -90.2732 472.000 122.0 406.044 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 14 55 45.9451 -90.2732 472.000 396.0 409.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 19 55 45.9451 -90.2732 472.000 30.0 406.024 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 24 55 45.9451 -90.2732 472.000 122.0 406.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 29 55 45.9451 -90.2732 472.000 396.0 409.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 34 55 45.9451 -90.2732 472.000 30.0 405.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 39 55 45.9451 -90.2732 472.000 122.0 406.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 44 55 45.9451 -90.2732 472.000 396.0 409.789 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 45 25 45.9451 -90.2732 472.000 396.0 409.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 45 55 45.9451 -90.2732 472.000 396.0 409.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 46 25 45.9451 -90.2732 472.000 396.0 409.733 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 46 55 45.9451 -90.2732 472.000 396.0 409.698 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 47 25 45.9451 -90.2732 472.000 396.0 409.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 47 55 45.9451 -90.2732 472.000 396.0 409.733 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 48 25 45.9451 -90.2732 472.000 396.0 409.700 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 48 55 45.9451 -90.2732 472.000 396.0 409.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 49 25 45.9451 -90.2732 472.000 396.0 409.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 49 55 45.9451 -90.2732 472.000 396.0 409.712 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 54 55 45.9451 -90.2732 472.000 30.0 406.006 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 00 59 55 45.9451 -90.2732 472.000 122.0 406.641 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 04 55 45.9451 -90.2732 472.000 396.0 409.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 09 55 45.9451 -90.2732 472.000 30.0 405.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 14 55 45.9451 -90.2732 472.000 122.0 406.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 19 55 45.9451 -90.2732 472.000 396.0 409.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 20 25 45.9451 -90.2732 472.000 396.0 409.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 20 55 45.9451 -90.2732 472.000 396.0 409.259 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 21 25 45.9451 -90.2732 472.000 396.0 409.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 21 55 45.9451 -90.2732 472.000 396.0 409.150 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 22 25 45.9451 -90.2732 472.000 396.0 409.124 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 22 55 45.9451 -90.2732 472.000 396.0 409.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 23 25 45.9451 -90.2732 472.000 396.0 409.070 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 23 55 45.9451 -90.2732 472.000 396.0 409.077 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 24 25 45.9451 -90.2732 472.000 396.0 409.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 24 55 45.9451 -90.2732 472.000 396.0 409.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 29 55 45.9451 -90.2732 472.000 30.0 406.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 34 55 45.9451 -90.2732 472.000 122.0 406.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 39 55 45.9451 -90.2732 472.000 396.0 409.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 44 55 45.9451 -90.2732 472.000 30.0 410.675 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 49 55 45.9451 -90.2732 472.000 122.0 406.179 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 01 54 55 45.9451 -90.2732 472.000 396.0 408.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 04 55 45.9451 -90.2732 472.000 30.0 409.663 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 09 55 45.9451 -90.2732 472.000 122.0 405.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 14 55 45.9451 -90.2732 472.000 396.0 408.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 19 55 45.9451 -90.2732 472.000 30.0 410.334 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 24 55 45.9451 -90.2732 472.000 122.0 405.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 29 55 45.9451 -90.2732 472.000 396.0 407.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 30 25 45.9451 -90.2732 472.000 396.0 407.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 30 55 45.9451 -90.2732 472.000 396.0 407.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 31 25 45.9451 -90.2732 472.000 396.0 407.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 31 55 45.9451 -90.2732 472.000 396.0 407.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 32 25 45.9451 -90.2732 472.000 396.0 407.809 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 32 55 45.9451 -90.2732 472.000 396.0 407.605 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 33 25 45.9451 -90.2732 472.000 396.0 407.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 33 55 45.9451 -90.2732 472.000 396.0 407.610 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 34 25 45.9451 -90.2732 472.000 396.0 407.506 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 34 55 45.9451 -90.2732 472.000 396.0 407.442 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 39 55 45.9451 -90.2732 472.000 30.0 409.628 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 44 55 45.9451 -90.2732 472.000 122.0 406.203 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 49 55 45.9451 -90.2732 472.000 396.0 406.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 54 55 45.9451 -90.2732 472.000 30.0 409.230 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 02 59 55 45.9451 -90.2732 472.000 122.0 406.999 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 04 55 45.9451 -90.2732 472.000 396.0 406.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 05 25 45.9451 -90.2732 472.000 396.0 406.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 05 55 45.9451 -90.2732 472.000 396.0 406.145 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 06 25 45.9451 -90.2732 472.000 396.0 406.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 06 55 45.9451 -90.2732 472.000 396.0 406.212 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 07 25 45.9451 -90.2732 472.000 396.0 406.407 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 07 55 45.9451 -90.2732 472.000 396.0 406.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 08 25 45.9451 -90.2732 472.000 396.0 406.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 08 55 45.9451 -90.2732 472.000 396.0 406.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 09 25 45.9451 -90.2732 472.000 396.0 406.265 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 09 55 45.9451 -90.2732 472.000 396.0 406.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 14 55 45.9451 -90.2732 472.000 30.0 409.015 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 19 55 45.9451 -90.2732 472.000 122.0 406.654 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 24 55 45.9451 -90.2732 472.000 396.0 405.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 29 55 45.9451 -90.2732 472.000 30.0 408.423 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 34 55 45.9451 -90.2732 472.000 122.0 407.765 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 39 55 45.9451 -90.2732 472.000 396.0 404.828 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 40 25 45.9451 -90.2732 472.000 396.0 404.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 40 55 45.9451 -90.2732 472.000 396.0 404.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 41 25 45.9451 -90.2732 472.000 396.0 404.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 41 55 45.9451 -90.2732 472.000 396.0 404.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 42 25 45.9451 -90.2732 472.000 396.0 404.634 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 42 55 45.9451 -90.2732 472.000 396.0 404.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 43 25 45.9451 -90.2732 472.000 396.0 404.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 43 55 45.9451 -90.2732 472.000 396.0 404.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 44 25 45.9451 -90.2732 472.000 396.0 404.601 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 44 55 45.9451 -90.2732 472.000 396.0 404.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 49 55 45.9451 -90.2732 472.000 30.0 407.705 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 54 55 45.9451 -90.2732 472.000 122.0 407.140 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 22 03 59 55 45.9451 -90.2732 472.000 396.0 404.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 04 55 45.9451 -90.2732 472.000 30.0 408.128 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 09 55 45.9451 -90.2732 472.000 122.0 407.130 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 14 55 45.9451 -90.2732 472.000 396.0 405.828 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 24 55 45.9451 -90.2732 472.000 30.0 407.022 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 29 55 45.9451 -90.2732 472.000 122.0 405.746 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 34 55 45.9451 -90.2732 472.000 396.0 405.046 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 39 55 45.9451 -90.2732 472.000 30.0 404.904 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 44 55 45.9451 -90.2732 472.000 122.0 403.753 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 49 55 45.9451 -90.2732 472.000 396.0 403.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 50 25 45.9451 -90.2732 472.000 396.0 403.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 50 55 45.9451 -90.2732 472.000 396.0 403.581 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 51 25 45.9451 -90.2732 472.000 396.0 403.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 51 55 45.9451 -90.2732 472.000 396.0 403.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 52 25 45.9451 -90.2732 472.000 396.0 403.533 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 52 55 45.9451 -90.2732 472.000 396.0 403.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 53 25 45.9451 -90.2732 472.000 396.0 403.598 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 53 55 45.9451 -90.2732 472.000 396.0 403.584 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 54 25 45.9451 -90.2732 472.000 396.0 403.456 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 04 54 55 45.9451 -90.2732 472.000 396.0 403.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 04 55 45.9451 -90.2732 472.000 30.0 403.952 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 09 55 45.9451 -90.2732 472.000 122.0 403.668 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 14 55 45.9451 -90.2732 472.000 396.0 403.020 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 19 55 45.9451 -90.2732 472.000 30.0 403.414 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 24 55 45.9451 -90.2732 472.000 122.0 402.929 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 29 55 45.9451 -90.2732 472.000 396.0 402.578 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 30 25 45.9451 -90.2732 472.000 396.0 402.586 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 30 55 45.9451 -90.2732 472.000 396.0 402.591 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 31 25 45.9451 -90.2732 472.000 396.0 402.500 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 31 55 45.9451 -90.2732 472.000 396.0 402.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 32 25 45.9451 -90.2732 472.000 396.0 402.458 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 32 55 45.9451 -90.2732 472.000 396.0 402.510 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 33 25 45.9451 -90.2732 472.000 396.0 402.508 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 33 55 45.9451 -90.2732 472.000 396.0 402.521 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 34 25 45.9451 -90.2732 472.000 396.0 402.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 34 55 45.9451 -90.2732 472.000 396.0 402.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 39 55 45.9451 -90.2732 472.000 30.0 402.872 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 44 55 45.9451 -90.2732 472.000 122.0 402.484 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 49 55 45.9451 -90.2732 472.000 396.0 401.881 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 54 55 45.9451 -90.2732 472.000 30.0 402.656 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 05 59 55 45.9451 -90.2732 472.000 122.0 401.741 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 04 55 45.9451 -90.2732 472.000 396.0 401.342 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 14 55 45.9451 -90.2732 472.000 30.0 402.037 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 19 55 45.9451 -90.2732 472.000 122.0 402.042 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 24 55 45.9451 -90.2732 472.000 396.0 401.223 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 29 55 45.9451 -90.2732 472.000 30.0 401.882 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 34 55 45.9451 -90.2732 472.000 122.0 401.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 39 55 45.9451 -90.2732 472.000 396.0 401.461 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 40 25 45.9451 -90.2732 472.000 396.0 401.501 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 40 55 45.9451 -90.2732 472.000 396.0 401.518 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 41 25 45.9451 -90.2732 472.000 396.0 401.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 41 55 45.9451 -90.2732 472.000 396.0 401.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 42 25 45.9451 -90.2732 472.000 396.0 401.542 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 42 55 45.9451 -90.2732 472.000 396.0 401.563 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 43 25 45.9451 -90.2732 472.000 396.0 401.557 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 43 55 45.9451 -90.2732 472.000 396.0 401.602 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 44 25 45.9451 -90.2732 472.000 396.0 401.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 44 55 45.9451 -90.2732 472.000 396.0 401.644 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 49 55 45.9451 -90.2732 472.000 30.0 401.905 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 54 55 45.9451 -90.2732 472.000 122.0 401.861 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 06 59 55 45.9451 -90.2732 472.000 396.0 401.529 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 04 55 45.9451 -90.2732 472.000 30.0 402.245 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 09 55 45.9451 -90.2732 472.000 122.0 402.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 14 55 45.9451 -90.2732 472.000 396.0 401.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 15 25 45.9451 -90.2732 472.000 396.0 402.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 15 55 45.9451 -90.2732 472.000 396.0 402.053 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 16 25 45.9451 -90.2732 472.000 396.0 401.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 16 55 45.9451 -90.2732 472.000 396.0 401.965 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 17 25 45.9451 -90.2732 472.000 396.0 402.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 17 55 45.9451 -90.2732 472.000 396.0 402.007 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 18 25 45.9451 -90.2732 472.000 396.0 402.041 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 18 55 45.9451 -90.2732 472.000 396.0 402.065 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 19 25 45.9451 -90.2732 472.000 396.0 402.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 19 55 45.9451 -90.2732 472.000 396.0 402.035 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 24 55 45.9451 -90.2732 472.000 30.0 402.011 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 29 55 45.9451 -90.2732 472.000 122.0 401.926 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 34 55 45.9451 -90.2732 472.000 396.0 401.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 39 55 45.9451 -90.2732 472.000 30.0 401.928 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 44 55 45.9451 -90.2732 472.000 122.0 401.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 49 55 45.9451 -90.2732 472.000 396.0 401.720 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 07 59 55 45.9451 -90.2732 472.000 30.0 401.672 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 04 55 45.9451 -90.2732 472.000 122.0 401.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 09 55 45.9451 -90.2732 472.000 396.0 401.617 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 14 55 45.9451 -90.2732 472.000 30.0 401.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 19 55 45.9451 -90.2732 472.000 122.0 401.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 24 55 45.9451 -90.2732 472.000 396.0 401.536 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 25 25 45.9451 -90.2732 472.000 396.0 401.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 25 55 45.9451 -90.2732 472.000 396.0 401.525 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 26 25 45.9451 -90.2732 472.000 396.0 401.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 26 55 45.9451 -90.2732 472.000 396.0 401.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 27 25 45.9451 -90.2732 472.000 396.0 401.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 27 55 45.9451 -90.2732 472.000 396.0 401.490 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 28 25 45.9451 -90.2732 472.000 396.0 401.456 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 28 55 45.9451 -90.2732 472.000 396.0 401.407 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 29 25 45.9451 -90.2732 472.000 396.0 401.433 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 29 55 45.9451 -90.2732 472.000 396.0 401.461 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 34 55 45.9451 -90.2732 472.000 30.0 401.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 39 55 45.9451 -90.2732 472.000 122.0 401.452 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 44 55 45.9451 -90.2732 472.000 396.0 401.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 49 55 45.9451 -90.2732 472.000 30.0 401.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 54 55 45.9451 -90.2732 472.000 122.0 401.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 08 59 55 45.9451 -90.2732 472.000 396.0 401.603 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 00 25 45.9451 -90.2732 472.000 396.0 401.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 00 55 45.9451 -90.2732 472.000 396.0 401.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 01 25 45.9451 -90.2732 472.000 396.0 401.577 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 01 55 45.9451 -90.2732 472.000 396.0 401.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 02 25 45.9451 -90.2732 472.000 396.0 401.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 02 55 45.9451 -90.2732 472.000 396.0 401.504 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 03 25 45.9451 -90.2732 472.000 396.0 401.594 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 03 55 45.9451 -90.2732 472.000 396.0 401.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 04 25 45.9451 -90.2732 472.000 396.0 401.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 04 55 45.9451 -90.2732 472.000 396.0 401.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 09 55 45.9451 -90.2732 472.000 30.0 401.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 14 55 45.9451 -90.2732 472.000 122.0 401.791 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 19 55 45.9451 -90.2732 472.000 396.0 401.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 24 55 45.9451 -90.2732 472.000 30.0 401.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 29 55 45.9451 -90.2732 472.000 122.0 401.717 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 34 55 45.9451 -90.2732 472.000 396.0 401.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 35 25 45.9451 -90.2732 472.000 396.0 401.820 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 35 55 45.9451 -90.2732 472.000 396.0 401.858 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 36 25 45.9451 -90.2732 472.000 396.0 401.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 36 55 45.9451 -90.2732 472.000 396.0 401.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 37 25 45.9451 -90.2732 472.000 396.0 401.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 37 55 45.9451 -90.2732 472.000 396.0 401.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 38 25 45.9451 -90.2732 472.000 396.0 402.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 38 55 45.9451 -90.2732 472.000 396.0 401.906 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 39 25 45.9451 -90.2732 472.000 396.0 401.833 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 39 55 45.9451 -90.2732 472.000 396.0 401.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 44 55 45.9451 -90.2732 472.000 30.0 401.901 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 49 55 45.9451 -90.2732 472.000 122.0 401.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 54 55 45.9451 -90.2732 472.000 396.0 401.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 09 59 55 45.9451 -90.2732 472.000 30.0 402.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 04 55 45.9451 -90.2732 472.000 122.0 401.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 09 55 45.9451 -90.2732 472.000 396.0 401.969 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 19 55 45.9451 -90.2732 472.000 30.0 402.056 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 24 55 45.9451 -90.2732 472.000 122.0 401.895 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 29 55 45.9451 -90.2732 472.000 396.0 401.930 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 34 55 45.9451 -90.2732 472.000 30.0 401.945 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 39 55 45.9451 -90.2732 472.000 122.0 401.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 44 55 45.9451 -90.2732 472.000 396.0 401.912 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 54 55 45.9451 -90.2732 472.000 30.0 402.121 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 10 59 55 45.9451 -90.2732 472.000 122.0 401.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 04 55 45.9451 -90.2732 472.000 396.0 402.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 09 55 45.9451 -90.2732 472.000 30.0 402.108 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 14 55 45.9451 -90.2732 472.000 122.0 401.981 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 19 55 45.9451 -90.2732 472.000 396.0 402.009 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 20 25 45.9451 -90.2732 472.000 396.0 402.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 20 55 45.9451 -90.2732 472.000 396.0 402.010 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 21 25 45.9451 -90.2732 472.000 396.0 402.039 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 21 55 45.9451 -90.2732 472.000 396.0 402.014 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 22 25 45.9451 -90.2732 472.000 396.0 402.047 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 22 55 45.9451 -90.2732 472.000 396.0 402.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 23 25 45.9451 -90.2732 472.000 396.0 402.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 23 55 45.9451 -90.2732 472.000 396.0 402.122 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 24 25 45.9451 -90.2732 472.000 396.0 402.131 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 24 55 45.9451 -90.2732 472.000 396.0 402.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 29 55 45.9451 -90.2732 472.000 30.0 402.303 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 34 55 45.9451 -90.2732 472.000 122.0 402.088 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 39 55 45.9451 -90.2732 472.000 396.0 402.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 44 55 45.9451 -90.2732 472.000 30.0 402.284 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 11 49 55 45.9451 -90.2732 472.000 122.0 401.760 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 14 55 45.9451 -90.2732 472.000 396.0 401.226 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 19 55 45.9451 -90.2732 472.000 30.0 401.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 24 55 45.9451 -90.2732 472.000 122.0 401.328 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 29 55 45.9451 -90.2732 472.000 396.0 401.386 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 34 55 45.9451 -90.2732 472.000 30.0 401.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 39 55 45.9451 -90.2732 472.000 122.0 401.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 44 55 45.9451 -90.2732 472.000 396.0 401.531 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 45 25 45.9451 -90.2732 472.000 396.0 401.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 45 55 45.9451 -90.2732 472.000 396.0 401.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 46 25 45.9451 -90.2732 472.000 396.0 401.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 46 55 45.9451 -90.2732 472.000 396.0 401.552 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 47 25 45.9451 -90.2732 472.000 396.0 401.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 47 55 45.9451 -90.2732 472.000 396.0 401.542 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 48 25 45.9451 -90.2732 472.000 396.0 401.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 48 55 45.9451 -90.2732 472.000 396.0 401.598 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 49 25 45.9451 -90.2732 472.000 396.0 401.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 49 55 45.9451 -90.2732 472.000 396.0 401.641 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 54 55 45.9451 -90.2732 472.000 30.0 401.742 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 12 59 55 45.9451 -90.2732 472.000 122.0 401.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 04 55 45.9451 -90.2732 472.000 396.0 401.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 09 55 45.9451 -90.2732 472.000 30.0 402.095 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 14 55 45.9451 -90.2732 472.000 122.0 401.822 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 19 55 45.9451 -90.2732 472.000 396.0 401.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 20 25 45.9451 -90.2732 472.000 396.0 401.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 20 55 45.9451 -90.2732 472.000 396.0 401.845 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 21 25 45.9451 -90.2732 472.000 396.0 401.842 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 21 55 45.9451 -90.2732 472.000 396.0 401.826 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 22 25 45.9451 -90.2732 472.000 396.0 401.860 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 22 55 45.9451 -90.2732 472.000 396.0 401.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 23 25 45.9451 -90.2732 472.000 396.0 401.820 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 23 55 45.9451 -90.2732 472.000 396.0 401.808 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 24 25 45.9451 -90.2732 472.000 396.0 401.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 24 55 45.9451 -90.2732 472.000 396.0 401.835 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 29 55 45.9451 -90.2732 472.000 30.0 402.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 34 55 45.9451 -90.2732 472.000 122.0 401.870 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 39 55 45.9451 -90.2732 472.000 396.0 401.881 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 44 55 45.9451 -90.2732 472.000 30.0 401.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 49 55 45.9451 -90.2732 472.000 122.0 401.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 13 54 55 45.9451 -90.2732 472.000 396.0 401.883 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 04 55 45.9451 -90.2732 472.000 30.0 402.358 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 09 55 45.9451 -90.2732 472.000 122.0 401.945 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 14 55 45.9451 -90.2732 472.000 396.0 401.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 19 55 45.9451 -90.2732 472.000 30.0 402.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 24 55 45.9451 -90.2732 472.000 122.0 402.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 29 55 45.9451 -90.2732 472.000 396.0 401.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 30 25 45.9451 -90.2732 472.000 396.0 401.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 30 55 45.9451 -90.2732 472.000 396.0 401.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 31 25 45.9451 -90.2732 472.000 396.0 401.913 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 31 55 45.9451 -90.2732 472.000 396.0 401.894 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 32 25 45.9451 -90.2732 472.000 396.0 401.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 32 55 45.9451 -90.2732 472.000 396.0 401.867 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 33 25 45.9451 -90.2732 472.000 396.0 401.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 33 55 45.9451 -90.2732 472.000 396.0 401.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 34 25 45.9451 -90.2732 472.000 396.0 401.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 34 55 45.9451 -90.2732 472.000 396.0 401.853 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 39 55 45.9451 -90.2732 472.000 30.0 402.398 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 44 55 45.9451 -90.2732 472.000 122.0 402.101 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 49 55 45.9451 -90.2732 472.000 396.0 401.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 54 55 45.9451 -90.2732 472.000 30.0 402.264 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 14 59 55 45.9451 -90.2732 472.000 122.0 402.162 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 04 55 45.9451 -90.2732 472.000 396.0 401.907 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 05 25 45.9451 -90.2732 472.000 396.0 401.924 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 05 55 45.9451 -90.2732 472.000 396.0 401.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 06 25 45.9451 -90.2732 472.000 396.0 401.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 06 55 45.9451 -90.2732 472.000 396.0 401.902 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 07 25 45.9451 -90.2732 472.000 396.0 401.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 07 55 45.9451 -90.2732 472.000 396.0 401.882 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 08 25 45.9451 -90.2732 472.000 396.0 401.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 08 55 45.9451 -90.2732 472.000 396.0 401.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 09 25 45.9451 -90.2732 472.000 396.0 401.908 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 09 55 45.9451 -90.2732 472.000 396.0 401.913 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 14 55 45.9451 -90.2732 472.000 30.0 402.457 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 19 55 45.9451 -90.2732 472.000 122.0 402.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 24 55 45.9451 -90.2732 472.000 396.0 401.796 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 29 55 45.9451 -90.2732 472.000 30.0 402.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 34 55 45.9451 -90.2732 472.000 122.0 402.202 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 39 55 45.9451 -90.2732 472.000 396.0 401.935 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 40 25 45.9451 -90.2732 472.000 396.0 401.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 40 55 45.9451 -90.2732 472.000 396.0 402.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 41 25 45.9451 -90.2732 472.000 396.0 402.076 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 41 55 45.9451 -90.2732 472.000 396.0 402.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 42 25 45.9451 -90.2732 472.000 396.0 402.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 42 55 45.9451 -90.2732 472.000 396.0 402.052 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 43 25 45.9451 -90.2732 472.000 396.0 401.997 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 43 55 45.9451 -90.2732 472.000 396.0 402.036 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 44 25 45.9451 -90.2732 472.000 396.0 402.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 44 55 45.9451 -90.2732 472.000 396.0 402.102 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 49 55 45.9451 -90.2732 472.000 30.0 401.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 54 55 45.9451 -90.2732 472.000 122.0 401.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 15 59 55 45.9451 -90.2732 472.000 396.0 402.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 04 55 45.9451 -90.2732 472.000 30.0 401.850 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 09 55 45.9451 -90.2732 472.000 122.0 401.448 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 14 55 45.9451 -90.2732 472.000 396.0 402.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 24 55 45.9451 -90.2732 472.000 30.0 401.568 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 29 55 45.9451 -90.2732 472.000 122.0 401.155 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 34 55 45.9451 -90.2732 472.000 396.0 402.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 39 55 45.9451 -90.2732 472.000 30.0 401.329 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 44 55 45.9451 -90.2732 472.000 122.0 401.261 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 49 55 45.9451 -90.2732 472.000 396.0 402.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 50 25 45.9451 -90.2732 472.000 396.0 402.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 50 55 45.9451 -90.2732 472.000 396.0 402.541 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 51 25 45.9451 -90.2732 472.000 396.0 402.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 51 55 45.9451 -90.2732 472.000 396.0 402.562 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 52 25 45.9451 -90.2732 472.000 396.0 402.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 52 55 45.9451 -90.2732 472.000 396.0 402.572 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 53 25 45.9451 -90.2732 472.000 396.0 402.580 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 53 55 45.9451 -90.2732 472.000 396.0 402.551 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 54 25 45.9451 -90.2732 472.000 396.0 402.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 16 54 55 45.9451 -90.2732 472.000 396.0 402.517 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 04 55 45.9451 -90.2732 472.000 30.0 401.240 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 09 55 45.9451 -90.2732 472.000 122.0 401.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 14 55 45.9451 -90.2732 472.000 396.0 402.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 19 55 45.9451 -90.2732 472.000 30.0 401.440 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 24 55 45.9451 -90.2732 472.000 122.0 401.514 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 29 55 45.9451 -90.2732 472.000 396.0 402.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 30 25 45.9451 -90.2732 472.000 396.0 402.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 30 55 45.9451 -90.2732 472.000 396.0 402.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 31 25 45.9451 -90.2732 472.000 396.0 402.706 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 31 55 45.9451 -90.2732 472.000 396.0 402.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 32 25 45.9451 -90.2732 472.000 396.0 402.645 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 32 55 45.9451 -90.2732 472.000 396.0 402.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 33 25 45.9451 -90.2732 472.000 396.0 402.784 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 33 55 45.9451 -90.2732 472.000 396.0 402.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 34 25 45.9451 -90.2732 472.000 396.0 402.715 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 34 55 45.9451 -90.2732 472.000 396.0 402.737 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 39 55 45.9451 -90.2732 472.000 30.0 401.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 44 55 45.9451 -90.2732 472.000 122.0 401.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 49 55 45.9451 -90.2732 472.000 396.0 402.543 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 54 55 45.9451 -90.2732 472.000 30.0 401.981 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 17 59 55 45.9451 -90.2732 472.000 122.0 402.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 04 55 45.9451 -90.2732 472.000 396.0 402.618 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 14 55 45.9451 -90.2732 472.000 30.0 402.242 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 19 55 45.9451 -90.2732 472.000 122.0 402.266 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 24 55 45.9451 -90.2732 472.000 396.0 402.427 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 29 55 45.9451 -90.2732 472.000 30.0 402.442 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 34 55 45.9451 -90.2732 472.000 122.0 402.367 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 39 55 45.9451 -90.2732 472.000 396.0 402.482 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 40 25 45.9451 -90.2732 472.000 396.0 402.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 40 55 45.9451 -90.2732 472.000 396.0 402.503 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 41 25 45.9451 -90.2732 472.000 396.0 402.452 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 41 55 45.9451 -90.2732 472.000 396.0 402.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 42 25 45.9451 -90.2732 472.000 396.0 402.606 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 42 55 45.9451 -90.2732 472.000 396.0 402.527 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 43 25 45.9451 -90.2732 472.000 396.0 402.489 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 43 55 45.9451 -90.2732 472.000 396.0 402.464 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 44 25 45.9451 -90.2732 472.000 396.0 402.433 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 44 55 45.9451 -90.2732 472.000 396.0 402.373 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 49 55 45.9451 -90.2732 472.000 30.0 402.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 54 55 45.9451 -90.2732 472.000 122.0 402.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 18 59 55 45.9451 -90.2732 472.000 396.0 402.239 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 04 55 45.9451 -90.2732 472.000 30.0 402.274 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 09 55 45.9451 -90.2732 472.000 122.0 402.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 14 55 45.9451 -90.2732 472.000 396.0 402.211 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 15 25 45.9451 -90.2732 472.000 396.0 402.221 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 15 55 45.9451 -90.2732 472.000 396.0 402.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 16 25 45.9451 -90.2732 472.000 396.0 402.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 16 55 45.9451 -90.2732 472.000 396.0 402.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 17 25 45.9451 -90.2732 472.000 396.0 402.285 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 17 55 45.9451 -90.2732 472.000 396.0 402.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 18 25 45.9451 -90.2732 472.000 396.0 402.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 18 55 45.9451 -90.2732 472.000 396.0 402.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 19 25 45.9451 -90.2732 472.000 396.0 402.298 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 19 55 45.9451 -90.2732 472.000 396.0 402.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 24 55 45.9451 -90.2732 472.000 30.0 402.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 29 55 45.9451 -90.2732 472.000 122.0 402.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 34 55 45.9451 -90.2732 472.000 396.0 402.221 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 39 55 45.9451 -90.2732 472.000 30.0 402.228 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 44 55 45.9451 -90.2732 472.000 122.0 402.045 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 49 55 45.9451 -90.2732 472.000 396.0 402.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 19 59 55 45.9451 -90.2732 472.000 30.0 402.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 04 55 45.9451 -90.2732 472.000 122.0 402.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 09 55 45.9451 -90.2732 472.000 396.0 402.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 14 55 45.9451 -90.2732 472.000 30.0 402.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 19 55 45.9451 -90.2732 472.000 122.0 402.158 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 24 55 45.9451 -90.2732 472.000 396.0 402.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 25 25 45.9451 -90.2732 472.000 396.0 402.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 25 55 45.9451 -90.2732 472.000 396.0 402.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 26 25 45.9451 -90.2732 472.000 396.0 402.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 26 55 45.9451 -90.2732 472.000 396.0 402.768 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 27 25 45.9451 -90.2732 472.000 396.0 402.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 27 55 45.9451 -90.2732 472.000 396.0 402.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 28 25 45.9451 -90.2732 472.000 396.0 402.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 28 55 45.9451 -90.2732 472.000 396.0 402.802 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 29 25 45.9451 -90.2732 472.000 396.0 402.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 29 55 45.9451 -90.2732 472.000 396.0 402.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 34 55 45.9451 -90.2732 472.000 30.0 402.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 39 55 45.9451 -90.2732 472.000 122.0 402.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 44 55 45.9451 -90.2732 472.000 396.0 402.789 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 49 55 45.9451 -90.2732 472.000 30.0 402.499 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 54 55 45.9451 -90.2732 472.000 122.0 402.455 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 20 59 55 45.9451 -90.2732 472.000 396.0 402.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 00 25 45.9451 -90.2732 472.000 396.0 402.811 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 00 55 45.9451 -90.2732 472.000 396.0 402.807 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 01 25 45.9451 -90.2732 472.000 396.0 402.783 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 01 55 45.9451 -90.2732 472.000 396.0 402.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 02 25 45.9451 -90.2732 472.000 396.0 402.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 02 55 45.9451 -90.2732 472.000 396.0 402.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 03 25 45.9451 -90.2732 472.000 396.0 402.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 03 55 45.9451 -90.2732 472.000 396.0 402.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 04 25 45.9451 -90.2732 472.000 396.0 402.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 04 55 45.9451 -90.2732 472.000 396.0 402.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 09 55 45.9451 -90.2732 472.000 30.0 402.332 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 14 55 45.9451 -90.2732 472.000 122.0 401.958 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 19 55 45.9451 -90.2732 472.000 396.0 402.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 24 55 45.9451 -90.2732 472.000 30.0 402.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 29 55 45.9451 -90.2732 472.000 122.0 402.078 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 34 55 45.9451 -90.2732 472.000 396.0 403.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 35 25 45.9451 -90.2732 472.000 396.0 402.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 35 55 45.9451 -90.2732 472.000 396.0 402.966 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 36 25 45.9451 -90.2732 472.000 396.0 402.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 36 55 45.9451 -90.2732 472.000 396.0 402.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 37 25 45.9451 -90.2732 472.000 396.0 402.943 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 37 55 45.9451 -90.2732 472.000 396.0 402.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 38 25 45.9451 -90.2732 472.000 396.0 402.995 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 38 55 45.9451 -90.2732 472.000 396.0 402.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 39 25 45.9451 -90.2732 472.000 396.0 402.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 39 55 45.9451 -90.2732 472.000 396.0 403.028 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 44 55 45.9451 -90.2732 472.000 30.0 402.197 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 49 55 45.9451 -90.2732 472.000 122.0 401.797 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 54 55 45.9451 -90.2732 472.000 396.0 402.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 21 59 55 45.9451 -90.2732 472.000 30.0 402.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 04 55 45.9451 -90.2732 472.000 122.0 401.679 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 09 55 45.9451 -90.2732 472.000 396.0 403.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 19 55 45.9451 -90.2732 472.000 30.0 402.111 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 24 55 45.9451 -90.2732 472.000 122.0 401.813 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 29 55 45.9451 -90.2732 472.000 396.0 402.993 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 34 55 45.9451 -90.2732 472.000 30.0 402.102 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 39 55 45.9451 -90.2732 472.000 122.0 401.626 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 44 55 45.9451 -90.2732 472.000 396.0 402.964 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 54 55 45.9451 -90.2732 472.000 30.0 402.068 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 22 59 55 45.9451 -90.2732 472.000 122.0 401.509 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 04 55 45.9451 -90.2732 472.000 396.0 402.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 09 55 45.9451 -90.2732 472.000 30.0 402.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 14 55 45.9451 -90.2732 472.000 122.0 401.333 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 19 55 45.9451 -90.2732 472.000 396.0 402.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 20 25 45.9451 -90.2732 472.000 396.0 402.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 20 55 45.9451 -90.2732 472.000 396.0 402.505 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 21 25 45.9451 -90.2732 472.000 396.0 402.503 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 21 55 45.9451 -90.2732 472.000 396.0 402.401 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 22 25 45.9451 -90.2732 472.000 396.0 402.360 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 22 55 45.9451 -90.2732 472.000 396.0 402.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 23 25 45.9451 -90.2732 472.000 396.0 402.517 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 23 55 45.9451 -90.2732 472.000 396.0 402.595 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 24 25 45.9451 -90.2732 472.000 396.0 402.495 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 24 55 45.9451 -90.2732 472.000 396.0 402.120 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 29 55 45.9451 -90.2732 472.000 30.0 401.948 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 34 55 45.9451 -90.2732 472.000 122.0 401.573 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 39 55 45.9451 -90.2732 472.000 396.0 401.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 44 55 45.9451 -90.2732 472.000 30.0 402.069 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 22 23 49 55 45.9451 -90.2732 472.000 122.0 401.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 14 55 45.9451 -90.2732 472.000 396.0 402.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 19 55 45.9451 -90.2732 472.000 30.0 401.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 24 55 45.9451 -90.2732 472.000 122.0 401.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 29 55 45.9451 -90.2732 472.000 396.0 401.920 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 34 55 45.9451 -90.2732 472.000 30.0 401.784 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 39 55 45.9451 -90.2732 472.000 122.0 400.992 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 44 55 45.9451 -90.2732 472.000 396.0 401.455 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 45 25 45.9451 -90.2732 472.000 396.0 401.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 45 55 45.9451 -90.2732 472.000 396.0 401.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 46 25 45.9451 -90.2732 472.000 396.0 401.491 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 46 55 45.9451 -90.2732 472.000 396.0 401.493 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 47 25 45.9451 -90.2732 472.000 396.0 401.448 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 47 55 45.9451 -90.2732 472.000 396.0 401.386 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 48 25 45.9451 -90.2732 472.000 396.0 401.242 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 48 55 45.9451 -90.2732 472.000 396.0 401.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 49 25 45.9451 -90.2732 472.000 396.0 401.401 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 49 55 45.9451 -90.2732 472.000 396.0 401.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 54 55 45.9451 -90.2732 472.000 30.0 401.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 00 59 55 45.9451 -90.2732 472.000 122.0 401.309 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 04 55 45.9451 -90.2732 472.000 396.0 400.840 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 09 55 45.9451 -90.2732 472.000 30.0 401.730 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 14 55 45.9451 -90.2732 472.000 122.0 401.225 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 19 55 45.9451 -90.2732 472.000 396.0 401.205 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 20 25 45.9451 -90.2732 472.000 396.0 401.452 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 20 55 45.9451 -90.2732 472.000 396.0 401.851 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 21 25 45.9451 -90.2732 472.000 396.0 400.939 0.350 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 21 55 45.9451 -90.2732 472.000 396.0 400.618 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 22 25 45.9451 -90.2732 472.000 396.0 401.425 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 22 55 45.9451 -90.2732 472.000 396.0 401.824 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 23 25 45.9451 -90.2732 472.000 396.0 401.497 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 23 55 45.9451 -90.2732 472.000 396.0 401.692 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 24 25 45.9451 -90.2732 472.000 396.0 401.611 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 24 55 45.9451 -90.2732 472.000 396.0 401.537 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 29 55 45.9451 -90.2732 472.000 30.0 401.987 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 34 55 45.9451 -90.2732 472.000 122.0 401.242 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 39 55 45.9451 -90.2732 472.000 396.0 400.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 44 55 45.9451 -90.2732 472.000 30.0 401.991 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 49 55 45.9451 -90.2732 472.000 122.0 401.366 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 01 54 55 45.9451 -90.2732 472.000 396.0 400.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 04 55 45.9451 -90.2732 472.000 30.0 401.851 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 09 55 45.9451 -90.2732 472.000 122.0 401.735 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 14 55 45.9451 -90.2732 472.000 396.0 400.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 19 55 45.9451 -90.2732 472.000 30.0 403.597 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 24 55 45.9451 -90.2732 472.000 122.0 403.591 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 29 55 45.9451 -90.2732 472.000 396.0 400.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 30 25 45.9451 -90.2732 472.000 396.0 400.293 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 30 55 45.9451 -90.2732 472.000 396.0 400.559 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 31 25 45.9451 -90.2732 472.000 396.0 400.215 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 31 55 45.9451 -90.2732 472.000 396.0 400.217 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 32 25 45.9451 -90.2732 472.000 396.0 400.179 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 32 55 45.9451 -90.2732 472.000 396.0 400.138 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 33 25 45.9451 -90.2732 472.000 396.0 400.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 33 55 45.9451 -90.2732 472.000 396.0 400.248 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 34 25 45.9451 -90.2732 472.000 396.0 400.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 34 55 45.9451 -90.2732 472.000 396.0 400.220 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 39 55 45.9451 -90.2732 472.000 30.0 402.802 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 44 55 45.9451 -90.2732 472.000 122.0 401.986 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 49 55 45.9451 -90.2732 472.000 396.0 402.178 0.430 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 54 55 45.9451 -90.2732 472.000 30.0 401.959 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 02 59 55 45.9451 -90.2732 472.000 122.0 401.546 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 04 55 45.9451 -90.2732 472.000 396.0 401.532 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 05 25 45.9451 -90.2732 472.000 396.0 401.360 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 05 55 45.9451 -90.2732 472.000 396.0 401.456 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 06 25 45.9451 -90.2732 472.000 396.0 401.125 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 06 55 45.9451 -90.2732 472.000 396.0 401.014 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 07 25 45.9451 -90.2732 472.000 396.0 401.415 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 07 55 45.9451 -90.2732 472.000 396.0 401.344 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 08 25 45.9451 -90.2732 472.000 396.0 401.429 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 08 55 45.9451 -90.2732 472.000 396.0 401.429 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 09 25 45.9451 -90.2732 472.000 396.0 401.356 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 09 55 45.9451 -90.2732 472.000 396.0 401.285 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 14 55 45.9451 -90.2732 472.000 30.0 401.799 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 19 55 45.9451 -90.2732 472.000 122.0 401.439 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 24 55 45.9451 -90.2732 472.000 396.0 401.386 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 29 55 45.9451 -90.2732 472.000 30.0 401.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 34 55 45.9451 -90.2732 472.000 122.0 401.021 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 39 55 45.9451 -90.2732 472.000 396.0 400.711 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 40 25 45.9451 -90.2732 472.000 396.0 400.728 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 40 55 45.9451 -90.2732 472.000 396.0 400.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 41 25 45.9451 -90.2732 472.000 396.0 400.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 41 55 45.9451 -90.2732 472.000 396.0 400.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 42 25 45.9451 -90.2732 472.000 396.0 400.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 42 55 45.9451 -90.2732 472.000 396.0 400.858 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 43 25 45.9451 -90.2732 472.000 396.0 400.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 43 55 45.9451 -90.2732 472.000 396.0 400.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 44 25 45.9451 -90.2732 472.000 396.0 400.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 44 55 45.9451 -90.2732 472.000 396.0 400.939 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 49 55 45.9451 -90.2732 472.000 30.0 400.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 54 55 45.9451 -90.2732 472.000 122.0 400.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 03 59 55 45.9451 -90.2732 472.000 396.0 400.659 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 04 55 45.9451 -90.2732 472.000 30.0 401.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 09 55 45.9451 -90.2732 472.000 122.0 401.041 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 14 55 45.9451 -90.2732 472.000 396.0 400.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 24 55 45.9451 -90.2732 472.000 30.0 400.937 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 29 55 45.9451 -90.2732 472.000 122.0 400.954 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 34 55 45.9451 -90.2732 472.000 396.0 400.843 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 39 55 45.9451 -90.2732 472.000 30.0 400.964 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 44 55 45.9451 -90.2732 472.000 122.0 400.820 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 49 55 45.9451 -90.2732 472.000 396.0 400.722 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 50 25 45.9451 -90.2732 472.000 396.0 400.660 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 50 55 45.9451 -90.2732 472.000 396.0 400.708 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 51 25 45.9451 -90.2732 472.000 396.0 400.846 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 51 55 45.9451 -90.2732 472.000 396.0 400.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 52 25 45.9451 -90.2732 472.000 396.0 400.759 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 52 55 45.9451 -90.2732 472.000 396.0 400.689 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 53 25 45.9451 -90.2732 472.000 396.0 400.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 53 55 45.9451 -90.2732 472.000 396.0 400.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 54 25 45.9451 -90.2732 472.000 396.0 400.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 04 54 55 45.9451 -90.2732 472.000 396.0 400.743 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 04 55 45.9451 -90.2732 472.000 30.0 401.104 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 09 55 45.9451 -90.2732 472.000 122.0 400.977 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 14 55 45.9451 -90.2732 472.000 396.0 400.762 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 19 55 45.9451 -90.2732 472.000 30.0 400.208 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 24 55 45.9451 -90.2732 472.000 122.0 400.215 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 29 55 45.9451 -90.2732 472.000 396.0 399.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 30 25 45.9451 -90.2732 472.000 396.0 399.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 30 55 45.9451 -90.2732 472.000 396.0 399.441 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 31 25 45.9451 -90.2732 472.000 396.0 399.394 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 31 55 45.9451 -90.2732 472.000 396.0 399.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 32 25 45.9451 -90.2732 472.000 396.0 399.452 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 32 55 45.9451 -90.2732 472.000 396.0 399.409 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 33 25 45.9451 -90.2732 472.000 396.0 399.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 33 55 45.9451 -90.2732 472.000 396.0 399.489 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 34 25 45.9451 -90.2732 472.000 396.0 399.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 34 55 45.9451 -90.2732 472.000 396.0 399.551 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 39 55 45.9451 -90.2732 472.000 30.0 399.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 44 55 45.9451 -90.2732 472.000 122.0 399.118 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 49 55 45.9451 -90.2732 472.000 396.0 399.152 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 54 55 45.9451 -90.2732 472.000 30.0 399.032 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 05 59 55 45.9451 -90.2732 472.000 122.0 399.212 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 04 55 45.9451 -90.2732 472.000 396.0 399.028 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 14 55 45.9451 -90.2732 472.000 30.0 399.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 19 55 45.9451 -90.2732 472.000 122.0 399.491 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 24 55 45.9451 -90.2732 472.000 396.0 399.310 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 29 55 45.9451 -90.2732 472.000 30.0 399.751 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 34 55 45.9451 -90.2732 472.000 122.0 399.818 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 39 55 45.9451 -90.2732 472.000 396.0 399.450 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 40 25 45.9451 -90.2732 472.000 396.0 399.696 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 40 55 45.9451 -90.2732 472.000 396.0 399.431 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 41 25 45.9451 -90.2732 472.000 396.0 399.701 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 41 55 45.9451 -90.2732 472.000 396.0 399.883 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 42 25 45.9451 -90.2732 472.000 396.0 399.503 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 42 55 45.9451 -90.2732 472.000 396.0 399.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 43 25 45.9451 -90.2732 472.000 396.0 399.368 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 43 55 45.9451 -90.2732 472.000 396.0 399.303 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 44 25 45.9451 -90.2732 472.000 396.0 399.178 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 44 55 45.9451 -90.2732 472.000 396.0 399.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 49 55 45.9451 -90.2732 472.000 30.0 399.268 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 54 55 45.9451 -90.2732 472.000 122.0 399.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 06 59 55 45.9451 -90.2732 472.000 396.0 399.097 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 04 55 45.9451 -90.2732 472.000 30.0 399.089 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 09 55 45.9451 -90.2732 472.000 122.0 399.137 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 14 55 45.9451 -90.2732 472.000 396.0 398.831 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 15 25 45.9451 -90.2732 472.000 396.0 398.823 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 15 55 45.9451 -90.2732 472.000 396.0 399.127 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 16 25 45.9451 -90.2732 472.000 396.0 399.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 16 55 45.9451 -90.2732 472.000 396.0 399.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 17 25 45.9451 -90.2732 472.000 396.0 399.128 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 17 55 45.9451 -90.2732 472.000 396.0 399.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 18 25 45.9451 -90.2732 472.000 396.0 398.965 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 18 55 45.9451 -90.2732 472.000 396.0 399.090 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 19 25 45.9451 -90.2732 472.000 396.0 399.032 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 19 55 45.9451 -90.2732 472.000 396.0 398.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 24 55 45.9451 -90.2732 472.000 30.0 398.961 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 29 55 45.9451 -90.2732 472.000 122.0 398.691 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 34 55 45.9451 -90.2732 472.000 396.0 398.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 39 55 45.9451 -90.2732 472.000 30.0 399.014 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 44 55 45.9451 -90.2732 472.000 122.0 398.529 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 49 55 45.9451 -90.2732 472.000 396.0 398.665 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 07 59 55 45.9451 -90.2732 472.000 30.0 398.692 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 04 55 45.9451 -90.2732 472.000 122.0 398.742 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 09 55 45.9451 -90.2732 472.000 396.0 398.798 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 14 55 45.9451 -90.2732 472.000 30.0 399.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 19 55 45.9451 -90.2732 472.000 122.0 398.872 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 24 55 45.9451 -90.2732 472.000 396.0 398.217 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 25 25 45.9451 -90.2732 472.000 396.0 398.272 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 25 55 45.9451 -90.2732 472.000 396.0 398.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 26 25 45.9451 -90.2732 472.000 396.0 398.433 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 26 55 45.9451 -90.2732 472.000 396.0 398.514 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 27 25 45.9451 -90.2732 472.000 396.0 398.458 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 27 55 45.9451 -90.2732 472.000 396.0 398.341 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 28 25 45.9451 -90.2732 472.000 396.0 398.310 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 28 55 45.9451 -90.2732 472.000 396.0 398.470 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 29 25 45.9451 -90.2732 472.000 396.0 398.555 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 29 55 45.9451 -90.2732 472.000 396.0 398.499 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 34 55 45.9451 -90.2732 472.000 30.0 398.280 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 39 55 45.9451 -90.2732 472.000 122.0 398.156 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 44 55 45.9451 -90.2732 472.000 396.0 398.644 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 49 55 45.9451 -90.2732 472.000 30.0 398.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 54 55 45.9451 -90.2732 472.000 122.0 398.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 08 59 55 45.9451 -90.2732 472.000 396.0 398.573 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 00 25 45.9451 -90.2732 472.000 396.0 398.608 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 00 55 45.9451 -90.2732 472.000 396.0 398.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 01 25 45.9451 -90.2732 472.000 396.0 398.649 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 01 55 45.9451 -90.2732 472.000 396.0 398.706 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 02 25 45.9451 -90.2732 472.000 396.0 398.785 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 02 55 45.9451 -90.2732 472.000 396.0 399.031 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 03 25 45.9451 -90.2732 472.000 396.0 398.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 03 55 45.9451 -90.2732 472.000 396.0 398.954 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 04 25 45.9451 -90.2732 472.000 396.0 398.762 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 04 55 45.9451 -90.2732 472.000 396.0 398.779 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 09 55 45.9451 -90.2732 472.000 30.0 399.231 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 14 55 45.9451 -90.2732 472.000 122.0 399.586 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 19 55 45.9451 -90.2732 472.000 396.0 399.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 24 55 45.9451 -90.2732 472.000 30.0 399.703 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 29 55 45.9451 -90.2732 472.000 122.0 399.776 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 34 55 45.9451 -90.2732 472.000 396.0 399.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 35 25 45.9451 -90.2732 472.000 396.0 -999.999 -999.990 -999.990 -999.990 0.070 F.P LEF 2010 11 23 09 35 55 45.9451 -90.2732 472.000 396.0 399.849 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 36 25 45.9451 -90.2732 472.000 396.0 399.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 36 55 45.9451 -90.2732 472.000 396.0 399.646 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 37 25 45.9451 -90.2732 472.000 396.0 399.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 37 55 45.9451 -90.2732 472.000 396.0 399.810 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 38 25 45.9451 -90.2732 472.000 396.0 399.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 38 55 45.9451 -90.2732 472.000 396.0 399.758 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 39 25 45.9451 -90.2732 472.000 396.0 399.739 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 39 55 45.9451 -90.2732 472.000 396.0 399.812 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 44 55 45.9451 -90.2732 472.000 30.0 399.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 49 55 45.9451 -90.2732 472.000 122.0 400.105 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 54 55 45.9451 -90.2732 472.000 396.0 399.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 09 59 55 45.9451 -90.2732 472.000 30.0 399.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 04 55 45.9451 -90.2732 472.000 122.0 399.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 09 55 45.9451 -90.2732 472.000 396.0 399.905 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 19 55 45.9451 -90.2732 472.000 30.0 399.895 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 24 55 45.9451 -90.2732 472.000 122.0 399.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 29 55 45.9451 -90.2732 472.000 396.0 399.865 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 34 55 45.9451 -90.2732 472.000 30.0 399.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 39 55 45.9451 -90.2732 472.000 122.0 399.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 44 55 45.9451 -90.2732 472.000 396.0 399.836 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 54 55 45.9451 -90.2732 472.000 30.0 399.994 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 10 59 55 45.9451 -90.2732 472.000 122.0 400.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 04 55 45.9451 -90.2732 472.000 396.0 400.150 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 09 55 45.9451 -90.2732 472.000 30.0 400.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 14 55 45.9451 -90.2732 472.000 122.0 400.065 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 19 55 45.9451 -90.2732 472.000 396.0 399.809 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 20 25 45.9451 -90.2732 472.000 396.0 399.837 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 20 55 45.9451 -90.2732 472.000 396.0 399.894 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 21 25 45.9451 -90.2732 472.000 396.0 399.834 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 21 55 45.9451 -90.2732 472.000 396.0 399.880 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 22 25 45.9451 -90.2732 472.000 396.0 400.068 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 22 55 45.9451 -90.2732 472.000 396.0 400.041 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 23 25 45.9451 -90.2732 472.000 396.0 399.887 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 23 55 45.9451 -90.2732 472.000 396.0 399.858 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 24 25 45.9451 -90.2732 472.000 396.0 399.862 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 24 55 45.9451 -90.2732 472.000 396.0 400.044 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 29 55 45.9451 -90.2732 472.000 30.0 400.423 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 34 55 45.9451 -90.2732 472.000 122.0 400.675 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 39 55 45.9451 -90.2732 472.000 396.0 399.838 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 44 55 45.9451 -90.2732 472.000 30.0 401.107 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 11 49 55 45.9451 -90.2732 472.000 122.0 400.810 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 14 55 45.9451 -90.2732 472.000 396.0 399.497 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 19 55 45.9451 -90.2732 472.000 30.0 399.850 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 24 55 45.9451 -90.2732 472.000 122.0 399.704 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 29 55 45.9451 -90.2732 472.000 396.0 399.067 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 34 55 45.9451 -90.2732 472.000 30.0 399.782 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 39 55 45.9451 -90.2732 472.000 122.0 399.513 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 44 55 45.9451 -90.2732 472.000 396.0 398.731 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 45 25 45.9451 -90.2732 472.000 396.0 398.771 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 45 55 45.9451 -90.2732 472.000 396.0 398.993 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 46 25 45.9451 -90.2732 472.000 396.0 399.019 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 46 55 45.9451 -90.2732 472.000 396.0 398.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 47 25 45.9451 -90.2732 472.000 396.0 399.005 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 47 55 45.9451 -90.2732 472.000 396.0 399.228 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 48 25 45.9451 -90.2732 472.000 396.0 399.065 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 48 55 45.9451 -90.2732 472.000 396.0 398.912 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 49 25 45.9451 -90.2732 472.000 396.0 398.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 49 55 45.9451 -90.2732 472.000 396.0 398.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 54 55 45.9451 -90.2732 472.000 30.0 399.739 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 12 59 55 45.9451 -90.2732 472.000 122.0 399.542 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 04 55 45.9451 -90.2732 472.000 396.0 398.857 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 09 55 45.9451 -90.2732 472.000 30.0 399.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 14 55 45.9451 -90.2732 472.000 122.0 399.218 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 19 55 45.9451 -90.2732 472.000 396.0 398.751 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 20 25 45.9451 -90.2732 472.000 396.0 398.719 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 20 55 45.9451 -90.2732 472.000 396.0 398.793 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 21 25 45.9451 -90.2732 472.000 396.0 398.796 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 21 55 45.9451 -90.2732 472.000 396.0 398.848 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 22 25 45.9451 -90.2732 472.000 396.0 398.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 22 55 45.9451 -90.2732 472.000 396.0 398.567 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 23 25 45.9451 -90.2732 472.000 396.0 398.620 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 23 55 45.9451 -90.2732 472.000 396.0 398.572 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 24 25 45.9451 -90.2732 472.000 396.0 398.791 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 24 55 45.9451 -90.2732 472.000 396.0 398.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 29 55 45.9451 -90.2732 472.000 30.0 399.366 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 34 55 45.9451 -90.2732 472.000 122.0 399.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 39 55 45.9451 -90.2732 472.000 396.0 398.749 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 44 55 45.9451 -90.2732 472.000 30.0 399.130 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 49 55 45.9451 -90.2732 472.000 122.0 398.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 13 54 55 45.9451 -90.2732 472.000 396.0 398.725 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 04 55 45.9451 -90.2732 472.000 30.0 398.793 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 09 55 45.9451 -90.2732 472.000 122.0 398.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 14 55 45.9451 -90.2732 472.000 396.0 397.996 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 19 55 45.9451 -90.2732 472.000 30.0 398.470 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 24 55 45.9451 -90.2732 472.000 122.0 397.935 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 29 55 45.9451 -90.2732 472.000 396.0 397.581 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 30 25 45.9451 -90.2732 472.000 396.0 397.679 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 30 55 45.9451 -90.2732 472.000 396.0 397.646 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 31 25 45.9451 -90.2732 472.000 396.0 397.606 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 31 55 45.9451 -90.2732 472.000 396.0 397.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 32 25 45.9451 -90.2732 472.000 396.0 397.739 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 32 55 45.9451 -90.2732 472.000 396.0 397.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 33 25 45.9451 -90.2732 472.000 396.0 397.767 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 33 55 45.9451 -90.2732 472.000 396.0 397.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 34 25 45.9451 -90.2732 472.000 396.0 397.623 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 34 55 45.9451 -90.2732 472.000 396.0 397.562 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 39 55 45.9451 -90.2732 472.000 30.0 397.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 44 55 45.9451 -90.2732 472.000 122.0 397.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 49 55 45.9451 -90.2732 472.000 396.0 397.587 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 54 55 45.9451 -90.2732 472.000 30.0 397.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 14 59 55 45.9451 -90.2732 472.000 122.0 397.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 04 55 45.9451 -90.2732 472.000 396.0 397.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 05 25 45.9451 -90.2732 472.000 396.0 397.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 05 55 45.9451 -90.2732 472.000 396.0 397.407 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 06 25 45.9451 -90.2732 472.000 396.0 397.383 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 06 55 45.9451 -90.2732 472.000 396.0 397.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 07 25 45.9451 -90.2732 472.000 396.0 397.320 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 07 55 45.9451 -90.2732 472.000 396.0 397.434 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 08 25 45.9451 -90.2732 472.000 396.0 397.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 08 55 45.9451 -90.2732 472.000 396.0 397.442 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 09 25 45.9451 -90.2732 472.000 396.0 397.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 09 55 45.9451 -90.2732 472.000 396.0 397.421 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 14 55 45.9451 -90.2732 472.000 30.0 397.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 19 55 45.9451 -90.2732 472.000 122.0 397.458 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 24 55 45.9451 -90.2732 472.000 396.0 397.401 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 29 55 45.9451 -90.2732 472.000 30.0 397.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 34 55 45.9451 -90.2732 472.000 122.0 397.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 39 55 45.9451 -90.2732 472.000 396.0 397.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 40 25 45.9451 -90.2732 472.000 396.0 397.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 40 55 45.9451 -90.2732 472.000 396.0 397.469 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 41 25 45.9451 -90.2732 472.000 396.0 397.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 41 55 45.9451 -90.2732 472.000 396.0 397.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 42 25 45.9451 -90.2732 472.000 396.0 397.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 42 55 45.9451 -90.2732 472.000 396.0 397.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 43 25 45.9451 -90.2732 472.000 396.0 397.461 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 43 55 45.9451 -90.2732 472.000 396.0 397.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 44 25 45.9451 -90.2732 472.000 396.0 397.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 44 55 45.9451 -90.2732 472.000 396.0 397.415 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 49 55 45.9451 -90.2732 472.000 30.0 397.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 54 55 45.9451 -90.2732 472.000 122.0 397.540 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 15 59 55 45.9451 -90.2732 472.000 396.0 397.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 04 55 45.9451 -90.2732 472.000 30.0 397.610 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 09 55 45.9451 -90.2732 472.000 122.0 397.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 14 55 45.9451 -90.2732 472.000 396.0 397.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 24 55 45.9451 -90.2732 472.000 30.0 397.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 29 55 45.9451 -90.2732 472.000 122.0 397.362 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 34 55 45.9451 -90.2732 472.000 396.0 397.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 39 55 45.9451 -90.2732 472.000 30.0 397.417 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 44 55 45.9451 -90.2732 472.000 122.0 397.323 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 49 55 45.9451 -90.2732 472.000 396.0 397.276 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 50 25 45.9451 -90.2732 472.000 396.0 397.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 50 55 45.9451 -90.2732 472.000 396.0 397.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 51 25 45.9451 -90.2732 472.000 396.0 397.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 51 55 45.9451 -90.2732 472.000 396.0 397.278 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 52 25 45.9451 -90.2732 472.000 396.0 397.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 52 55 45.9451 -90.2732 472.000 396.0 397.233 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 53 25 45.9451 -90.2732 472.000 396.0 397.229 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 53 55 45.9451 -90.2732 472.000 396.0 397.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 54 25 45.9451 -90.2732 472.000 396.0 397.238 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 16 54 55 45.9451 -90.2732 472.000 396.0 397.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 04 55 45.9451 -90.2732 472.000 30.0 397.031 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 09 55 45.9451 -90.2732 472.000 122.0 397.051 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 14 55 45.9451 -90.2732 472.000 396.0 396.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 19 55 45.9451 -90.2732 472.000 30.0 396.848 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 24 55 45.9451 -90.2732 472.000 122.0 396.727 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 29 55 45.9451 -90.2732 472.000 396.0 396.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 30 25 45.9451 -90.2732 472.000 396.0 396.622 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 30 55 45.9451 -90.2732 472.000 396.0 396.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 31 25 45.9451 -90.2732 472.000 396.0 396.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 31 55 45.9451 -90.2732 472.000 396.0 396.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 32 25 45.9451 -90.2732 472.000 396.0 396.604 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 32 55 45.9451 -90.2732 472.000 396.0 396.578 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 33 25 45.9451 -90.2732 472.000 396.0 396.550 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 33 55 45.9451 -90.2732 472.000 396.0 396.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 34 25 45.9451 -90.2732 472.000 396.0 396.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 34 55 45.9451 -90.2732 472.000 396.0 396.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 39 55 45.9451 -90.2732 472.000 30.0 396.560 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 44 55 45.9451 -90.2732 472.000 122.0 396.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 49 55 45.9451 -90.2732 472.000 396.0 396.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 54 55 45.9451 -90.2732 472.000 30.0 396.652 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 17 59 55 45.9451 -90.2732 472.000 122.0 396.690 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 04 55 45.9451 -90.2732 472.000 396.0 396.700 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 14 55 45.9451 -90.2732 472.000 30.0 396.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 19 55 45.9451 -90.2732 472.000 122.0 396.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 24 55 45.9451 -90.2732 472.000 396.0 396.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 29 55 45.9451 -90.2732 472.000 30.0 396.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 34 55 45.9451 -90.2732 472.000 122.0 396.765 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 39 55 45.9451 -90.2732 472.000 396.0 396.728 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 40 25 45.9451 -90.2732 472.000 396.0 396.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 40 55 45.9451 -90.2732 472.000 396.0 396.729 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 41 25 45.9451 -90.2732 472.000 396.0 396.740 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 41 55 45.9451 -90.2732 472.000 396.0 396.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 42 25 45.9451 -90.2732 472.000 396.0 396.756 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 42 55 45.9451 -90.2732 472.000 396.0 396.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 43 25 45.9451 -90.2732 472.000 396.0 396.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 43 55 45.9451 -90.2732 472.000 396.0 396.780 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 44 25 45.9451 -90.2732 472.000 396.0 396.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 44 55 45.9451 -90.2732 472.000 396.0 396.764 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 49 55 45.9451 -90.2732 472.000 30.0 396.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 54 55 45.9451 -90.2732 472.000 122.0 396.589 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 18 59 55 45.9451 -90.2732 472.000 396.0 396.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 04 55 45.9451 -90.2732 472.000 30.0 396.707 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 09 55 45.9451 -90.2732 472.000 122.0 396.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 14 55 45.9451 -90.2732 472.000 396.0 396.675 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 15 25 45.9451 -90.2732 472.000 396.0 396.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 15 55 45.9451 -90.2732 472.000 396.0 396.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 16 25 45.9451 -90.2732 472.000 396.0 396.738 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 16 55 45.9451 -90.2732 472.000 396.0 396.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 17 25 45.9451 -90.2732 472.000 396.0 396.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 17 55 45.9451 -90.2732 472.000 396.0 396.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 18 25 45.9451 -90.2732 472.000 396.0 396.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 18 55 45.9451 -90.2732 472.000 396.0 396.712 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 19 25 45.9451 -90.2732 472.000 396.0 396.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 19 55 45.9451 -90.2732 472.000 396.0 396.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 24 55 45.9451 -90.2732 472.000 30.0 396.820 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 29 55 45.9451 -90.2732 472.000 122.0 396.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 34 55 45.9451 -90.2732 472.000 396.0 396.684 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 39 55 45.9451 -90.2732 472.000 30.0 396.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 44 55 45.9451 -90.2732 472.000 122.0 396.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 49 55 45.9451 -90.2732 472.000 396.0 396.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 19 59 55 45.9451 -90.2732 472.000 30.0 396.742 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 04 55 45.9451 -90.2732 472.000 122.0 396.642 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 09 55 45.9451 -90.2732 472.000 396.0 396.451 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 14 55 45.9451 -90.2732 472.000 30.0 396.534 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 19 55 45.9451 -90.2732 472.000 122.0 396.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 24 55 45.9451 -90.2732 472.000 396.0 396.468 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 25 25 45.9451 -90.2732 472.000 396.0 396.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 25 55 45.9451 -90.2732 472.000 396.0 396.569 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 26 25 45.9451 -90.2732 472.000 396.0 396.609 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 26 55 45.9451 -90.2732 472.000 396.0 396.621 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 27 25 45.9451 -90.2732 472.000 396.0 396.511 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 27 55 45.9451 -90.2732 472.000 396.0 396.565 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 28 25 45.9451 -90.2732 472.000 396.0 396.610 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 28 55 45.9451 -90.2732 472.000 396.0 396.610 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 29 25 45.9451 -90.2732 472.000 396.0 396.590 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 29 55 45.9451 -90.2732 472.000 396.0 396.592 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 34 55 45.9451 -90.2732 472.000 30.0 396.585 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 39 55 45.9451 -90.2732 472.000 122.0 396.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 44 55 45.9451 -90.2732 472.000 396.0 396.479 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 49 55 45.9451 -90.2732 472.000 30.0 396.672 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 54 55 45.9451 -90.2732 472.000 122.0 396.501 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 20 59 55 45.9451 -90.2732 472.000 396.0 396.461 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 00 25 45.9451 -90.2732 472.000 396.0 396.424 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 00 55 45.9451 -90.2732 472.000 396.0 396.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 01 25 45.9451 -90.2732 472.000 396.0 396.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 01 55 45.9451 -90.2732 472.000 396.0 396.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 02 25 45.9451 -90.2732 472.000 396.0 396.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 02 55 45.9451 -90.2732 472.000 396.0 396.412 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 03 25 45.9451 -90.2732 472.000 396.0 396.419 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 03 55 45.9451 -90.2732 472.000 396.0 396.392 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 04 25 45.9451 -90.2732 472.000 396.0 396.406 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 04 55 45.9451 -90.2732 472.000 396.0 396.380 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 09 55 45.9451 -90.2732 472.000 30.0 396.443 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 14 55 45.9451 -90.2732 472.000 122.0 396.423 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 19 55 45.9451 -90.2732 472.000 396.0 396.401 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 24 55 45.9451 -90.2732 472.000 30.0 396.410 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 29 55 45.9451 -90.2732 472.000 122.0 396.482 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 34 55 45.9451 -90.2732 472.000 396.0 396.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 35 25 45.9451 -90.2732 472.000 396.0 396.489 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 35 55 45.9451 -90.2732 472.000 396.0 396.502 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 36 25 45.9451 -90.2732 472.000 396.0 396.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 36 55 45.9451 -90.2732 472.000 396.0 396.430 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 37 25 45.9451 -90.2732 472.000 396.0 396.319 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 37 55 45.9451 -90.2732 472.000 396.0 396.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 38 25 45.9451 -90.2732 472.000 396.0 396.283 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 38 55 45.9451 -90.2732 472.000 396.0 396.270 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 39 25 45.9451 -90.2732 472.000 396.0 396.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 39 55 45.9451 -90.2732 472.000 396.0 396.236 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 44 55 45.9451 -90.2732 472.000 30.0 396.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 49 55 45.9451 -90.2732 472.000 122.0 396.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 54 55 45.9451 -90.2732 472.000 396.0 396.258 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 21 59 55 45.9451 -90.2732 472.000 30.0 396.712 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 04 55 45.9451 -90.2732 472.000 122.0 396.173 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 09 55 45.9451 -90.2732 472.000 396.0 396.207 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 19 55 45.9451 -90.2732 472.000 30.0 396.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 24 55 45.9451 -90.2732 472.000 122.0 396.288 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 29 55 45.9451 -90.2732 472.000 396.0 396.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 34 55 45.9451 -90.2732 472.000 30.0 396.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 39 55 45.9451 -90.2732 472.000 122.0 396.383 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 44 55 45.9451 -90.2732 472.000 396.0 396.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 54 55 45.9451 -90.2732 472.000 30.0 396.641 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 22 59 55 45.9451 -90.2732 472.000 122.0 396.204 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 04 55 45.9451 -90.2732 472.000 396.0 396.098 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 09 55 45.9451 -90.2732 472.000 30.0 396.386 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 14 55 45.9451 -90.2732 472.000 122.0 396.058 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 19 55 45.9451 -90.2732 472.000 396.0 396.108 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 20 25 45.9451 -90.2732 472.000 396.0 396.113 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 20 55 45.9451 -90.2732 472.000 396.0 396.099 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 21 25 45.9451 -90.2732 472.000 396.0 396.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 21 55 45.9451 -90.2732 472.000 396.0 396.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 22 25 45.9451 -90.2732 472.000 396.0 396.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 22 55 45.9451 -90.2732 472.000 396.0 396.109 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 23 25 45.9451 -90.2732 472.000 396.0 396.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 23 55 45.9451 -90.2732 472.000 396.0 396.100 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 24 25 45.9451 -90.2732 472.000 396.0 396.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 24 55 45.9451 -90.2732 472.000 396.0 396.122 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 29 55 45.9451 -90.2732 472.000 30.0 396.443 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 34 55 45.9451 -90.2732 472.000 122.0 396.158 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 39 55 45.9451 -90.2732 472.000 396.0 396.057 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 44 55 45.9451 -90.2732 472.000 30.0 397.118 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 23 23 49 55 45.9451 -90.2732 472.000 122.0 396.320 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 14 55 45.9451 -90.2732 472.000 396.0 396.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 19 55 45.9451 -90.2732 472.000 30.0 396.308 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 24 55 45.9451 -90.2732 472.000 122.0 396.333 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 29 55 45.9451 -90.2732 472.000 396.0 396.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 34 55 45.9451 -90.2732 472.000 30.0 396.261 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 39 55 45.9451 -90.2732 472.000 122.0 396.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 44 55 45.9451 -90.2732 472.000 396.0 396.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 45 25 45.9451 -90.2732 472.000 396.0 396.113 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 45 55 45.9451 -90.2732 472.000 396.0 395.934 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 46 25 45.9451 -90.2732 472.000 396.0 395.896 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 46 55 45.9451 -90.2732 472.000 396.0 395.906 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 47 25 45.9451 -90.2732 472.000 396.0 395.913 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 47 55 45.9451 -90.2732 472.000 396.0 396.039 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 48 25 45.9451 -90.2732 472.000 396.0 396.117 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 48 55 45.9451 -90.2732 472.000 396.0 396.193 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 49 25 45.9451 -90.2732 472.000 396.0 396.189 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 49 55 45.9451 -90.2732 472.000 396.0 396.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 54 55 45.9451 -90.2732 472.000 30.0 396.570 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 00 59 55 45.9451 -90.2732 472.000 122.0 396.188 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 04 55 45.9451 -90.2732 472.000 396.0 395.471 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 09 55 45.9451 -90.2732 472.000 30.0 396.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 14 55 45.9451 -90.2732 472.000 122.0 396.297 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 19 55 45.9451 -90.2732 472.000 396.0 395.131 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 20 25 45.9451 -90.2732 472.000 396.0 395.186 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 20 55 45.9451 -90.2732 472.000 396.0 395.281 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 21 25 45.9451 -90.2732 472.000 396.0 395.443 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 21 55 45.9451 -90.2732 472.000 396.0 395.546 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 22 25 45.9451 -90.2732 472.000 396.0 395.672 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 22 55 45.9451 -90.2732 472.000 396.0 395.776 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 23 25 45.9451 -90.2732 472.000 396.0 395.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 23 55 45.9451 -90.2732 472.000 396.0 395.603 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 24 25 45.9451 -90.2732 472.000 396.0 395.381 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 24 55 45.9451 -90.2732 472.000 396.0 395.197 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 29 55 45.9451 -90.2732 472.000 30.0 396.949 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 34 55 45.9451 -90.2732 472.000 122.0 396.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 39 55 45.9451 -90.2732 472.000 396.0 395.147 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 44 55 45.9451 -90.2732 472.000 30.0 397.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 49 55 45.9451 -90.2732 472.000 122.0 396.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 01 54 55 45.9451 -90.2732 472.000 396.0 394.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 04 55 45.9451 -90.2732 472.000 30.0 396.969 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 09 55 45.9451 -90.2732 472.000 122.0 396.234 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 14 55 45.9451 -90.2732 472.000 396.0 394.779 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 19 55 45.9451 -90.2732 472.000 30.0 397.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 24 55 45.9451 -90.2732 472.000 122.0 396.431 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 29 55 45.9451 -90.2732 472.000 396.0 394.818 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 30 25 45.9451 -90.2732 472.000 396.0 394.853 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 30 55 45.9451 -90.2732 472.000 396.0 394.885 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 31 25 45.9451 -90.2732 472.000 396.0 394.882 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 31 55 45.9451 -90.2732 472.000 396.0 394.873 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 32 25 45.9451 -90.2732 472.000 396.0 394.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 32 55 45.9451 -90.2732 472.000 396.0 394.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 33 25 45.9451 -90.2732 472.000 396.0 394.891 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 33 55 45.9451 -90.2732 472.000 396.0 394.937 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 34 25 45.9451 -90.2732 472.000 396.0 394.920 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 34 55 45.9451 -90.2732 472.000 396.0 394.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 39 55 45.9451 -90.2732 472.000 30.0 396.737 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 44 55 45.9451 -90.2732 472.000 122.0 396.428 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 49 55 45.9451 -90.2732 472.000 396.0 394.989 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 54 55 45.9451 -90.2732 472.000 30.0 397.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 02 59 55 45.9451 -90.2732 472.000 122.0 396.178 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 04 55 45.9451 -90.2732 472.000 396.0 395.025 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 05 25 45.9451 -90.2732 472.000 396.0 395.039 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 05 55 45.9451 -90.2732 472.000 396.0 395.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 06 25 45.9451 -90.2732 472.000 396.0 395.045 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 06 55 45.9451 -90.2732 472.000 396.0 395.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 07 25 45.9451 -90.2732 472.000 396.0 395.041 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 07 55 45.9451 -90.2732 472.000 396.0 395.043 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 08 25 45.9451 -90.2732 472.000 396.0 395.029 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 08 55 45.9451 -90.2732 472.000 396.0 394.998 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 09 25 45.9451 -90.2732 472.000 396.0 395.016 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 09 55 45.9451 -90.2732 472.000 396.0 395.028 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 14 55 45.9451 -90.2732 472.000 30.0 397.023 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 19 55 45.9451 -90.2732 472.000 122.0 395.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 24 55 45.9451 -90.2732 472.000 396.0 394.987 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 29 55 45.9451 -90.2732 472.000 30.0 396.871 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 34 55 45.9451 -90.2732 472.000 122.0 395.802 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 39 55 45.9451 -90.2732 472.000 396.0 394.907 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 40 25 45.9451 -90.2732 472.000 396.0 394.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 40 55 45.9451 -90.2732 472.000 396.0 394.864 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 41 25 45.9451 -90.2732 472.000 396.0 394.863 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 41 55 45.9451 -90.2732 472.000 396.0 394.846 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 42 25 45.9451 -90.2732 472.000 396.0 394.853 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 42 55 45.9451 -90.2732 472.000 396.0 394.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 43 25 45.9451 -90.2732 472.000 396.0 394.859 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 43 55 45.9451 -90.2732 472.000 396.0 394.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 44 25 45.9451 -90.2732 472.000 396.0 394.846 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 44 55 45.9451 -90.2732 472.000 396.0 394.875 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 49 55 45.9451 -90.2732 472.000 30.0 397.481 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 54 55 45.9451 -90.2732 472.000 122.0 395.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 03 59 55 45.9451 -90.2732 472.000 396.0 394.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 04 55 45.9451 -90.2732 472.000 30.0 397.937 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 09 55 45.9451 -90.2732 472.000 122.0 395.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 14 55 45.9451 -90.2732 472.000 396.0 394.882 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 24 55 45.9451 -90.2732 472.000 30.0 398.660 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 29 55 45.9451 -90.2732 472.000 122.0 395.999 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 34 55 45.9451 -90.2732 472.000 396.0 394.972 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 39 55 45.9451 -90.2732 472.000 30.0 398.280 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 44 55 45.9451 -90.2732 472.000 122.0 395.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 49 55 45.9451 -90.2732 472.000 396.0 394.992 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 50 25 45.9451 -90.2732 472.000 396.0 394.993 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 50 55 45.9451 -90.2732 472.000 396.0 395.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 51 25 45.9451 -90.2732 472.000 396.0 395.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 51 55 45.9451 -90.2732 472.000 396.0 394.990 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 52 25 45.9451 -90.2732 472.000 396.0 395.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 52 55 45.9451 -90.2732 472.000 396.0 395.017 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 53 25 45.9451 -90.2732 472.000 396.0 395.043 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 53 55 45.9451 -90.2732 472.000 396.0 395.075 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 54 25 45.9451 -90.2732 472.000 396.0 395.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 04 54 55 45.9451 -90.2732 472.000 396.0 395.056 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 04 55 45.9451 -90.2732 472.000 30.0 398.321 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 09 55 45.9451 -90.2732 472.000 122.0 395.932 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 14 55 45.9451 -90.2732 472.000 396.0 395.047 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 19 55 45.9451 -90.2732 472.000 30.0 399.176 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 24 55 45.9451 -90.2732 472.000 122.0 396.126 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 29 55 45.9451 -90.2732 472.000 396.0 394.973 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 30 25 45.9451 -90.2732 472.000 396.0 394.993 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 30 55 45.9451 -90.2732 472.000 396.0 394.974 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 31 25 45.9451 -90.2732 472.000 396.0 394.945 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 31 55 45.9451 -90.2732 472.000 396.0 394.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 32 25 45.9451 -90.2732 472.000 396.0 394.953 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 32 55 45.9451 -90.2732 472.000 396.0 394.955 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 33 25 45.9451 -90.2732 472.000 396.0 394.958 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 33 55 45.9451 -90.2732 472.000 396.0 394.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 34 25 45.9451 -90.2732 472.000 396.0 394.977 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 34 55 45.9451 -90.2732 472.000 396.0 394.951 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 39 55 45.9451 -90.2732 472.000 30.0 398.290 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 44 55 45.9451 -90.2732 472.000 122.0 395.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 49 55 45.9451 -90.2732 472.000 396.0 394.917 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 54 55 45.9451 -90.2732 472.000 30.0 398.358 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 24 05 59 55 45.9451 -90.2732 472.000 122.0 395.718 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 04 55 45.9451 -90.2732 472.000 396.0 394.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 14 55 45.9451 -90.2732 472.000 30.0 399.068 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 19 55 45.9451 -90.2732 472.000 122.0 395.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 24 55 45.9451 -90.2732 472.000 396.0 395.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 29 55 45.9451 -90.2732 472.000 30.0 399.417 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 34 55 45.9451 -90.2732 472.000 122.0 395.497 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 39 55 45.9451 -90.2732 472.000 396.0 395.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 40 25 45.9451 -90.2732 472.000 396.0 395.906 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 40 55 45.9451 -90.2732 472.000 396.0 395.888 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 41 25 45.9451 -90.2732 472.000 396.0 395.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 41 55 45.9451 -90.2732 472.000 396.0 395.775 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 42 25 45.9451 -90.2732 472.000 396.0 395.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 42 55 45.9451 -90.2732 472.000 396.0 395.643 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 43 25 45.9451 -90.2732 472.000 396.0 395.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 43 55 45.9451 -90.2732 472.000 396.0 395.650 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 44 25 45.9451 -90.2732 472.000 396.0 395.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 44 55 45.9451 -90.2732 472.000 396.0 395.795 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 49 55 45.9451 -90.2732 472.000 30.0 398.533 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 54 55 45.9451 -90.2732 472.000 122.0 395.456 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 06 59 55 45.9451 -90.2732 472.000 396.0 396.024 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 04 55 45.9451 -90.2732 472.000 30.0 399.414 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 09 55 45.9451 -90.2732 472.000 122.0 395.963 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 14 55 45.9451 -90.2732 472.000 396.0 396.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 15 25 45.9451 -90.2732 472.000 396.0 395.931 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 15 55 45.9451 -90.2732 472.000 396.0 395.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 16 25 45.9451 -90.2732 472.000 396.0 395.833 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 16 55 45.9451 -90.2732 472.000 396.0 395.746 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 17 25 45.9451 -90.2732 472.000 396.0 395.735 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 17 55 45.9451 -90.2732 472.000 396.0 395.693 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 18 25 45.9451 -90.2732 472.000 396.0 395.634 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 18 55 45.9451 -90.2732 472.000 396.0 395.682 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 19 25 45.9451 -90.2732 472.000 396.0 395.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 19 55 45.9451 -90.2732 472.000 396.0 395.676 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 24 55 45.9451 -90.2732 472.000 30.0 400.320 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 29 55 45.9451 -90.2732 472.000 122.0 397.720 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 34 55 45.9451 -90.2732 472.000 396.0 394.937 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 39 55 45.9451 -90.2732 472.000 30.0 401.168 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 44 55 45.9451 -90.2732 472.000 122.0 397.404 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 49 55 45.9451 -90.2732 472.000 396.0 394.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 07 59 55 45.9451 -90.2732 472.000 30.0 400.148 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 04 55 45.9451 -90.2732 472.000 122.0 397.775 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 09 55 45.9451 -90.2732 472.000 396.0 395.309 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 14 55 45.9451 -90.2732 472.000 30.0 398.909 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 19 55 45.9451 -90.2732 472.000 122.0 397.856 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 24 55 45.9451 -90.2732 472.000 396.0 395.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 25 25 45.9451 -90.2732 472.000 396.0 395.246 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 25 55 45.9451 -90.2732 472.000 396.0 395.178 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 26 25 45.9451 -90.2732 472.000 396.0 395.087 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 26 55 45.9451 -90.2732 472.000 396.0 395.088 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 27 25 45.9451 -90.2732 472.000 396.0 395.038 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 27 55 45.9451 -90.2732 472.000 396.0 394.867 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 28 25 45.9451 -90.2732 472.000 396.0 394.862 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 28 55 45.9451 -90.2732 472.000 396.0 394.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 29 25 45.9451 -90.2732 472.000 396.0 394.950 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 29 55 45.9451 -90.2732 472.000 396.0 395.142 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 34 55 45.9451 -90.2732 472.000 30.0 398.339 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 39 55 45.9451 -90.2732 472.000 122.0 397.562 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 44 55 45.9451 -90.2732 472.000 396.0 394.909 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 49 55 45.9451 -90.2732 472.000 30.0 398.336 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 54 55 45.9451 -90.2732 472.000 122.0 397.681 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 08 59 55 45.9451 -90.2732 472.000 396.0 395.042 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 00 25 45.9451 -90.2732 472.000 396.0 395.085 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 00 55 45.9451 -90.2732 472.000 396.0 395.050 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 01 25 45.9451 -90.2732 472.000 396.0 395.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 01 55 45.9451 -90.2732 472.000 396.0 395.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 02 25 45.9451 -90.2732 472.000 396.0 395.059 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 02 55 45.9451 -90.2732 472.000 396.0 395.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 03 25 45.9451 -90.2732 472.000 396.0 395.036 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 03 55 45.9451 -90.2732 472.000 396.0 395.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 04 25 45.9451 -90.2732 472.000 396.0 394.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 04 55 45.9451 -90.2732 472.000 396.0 394.972 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 09 55 45.9451 -90.2732 472.000 30.0 398.071 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 14 55 45.9451 -90.2732 472.000 122.0 397.372 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 19 55 45.9451 -90.2732 472.000 396.0 394.830 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 24 55 45.9451 -90.2732 472.000 30.0 397.665 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 29 55 45.9451 -90.2732 472.000 122.0 397.321 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 34 55 45.9451 -90.2732 472.000 396.0 394.701 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 35 25 45.9451 -90.2732 472.000 396.0 394.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 35 55 45.9451 -90.2732 472.000 396.0 394.689 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 36 25 45.9451 -90.2732 472.000 396.0 394.711 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 36 55 45.9451 -90.2732 472.000 396.0 394.720 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 37 25 45.9451 -90.2732 472.000 396.0 394.735 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 37 55 45.9451 -90.2732 472.000 396.0 394.730 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 38 25 45.9451 -90.2732 472.000 396.0 394.702 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 38 55 45.9451 -90.2732 472.000 396.0 394.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 39 25 45.9451 -90.2732 472.000 396.0 394.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 39 55 45.9451 -90.2732 472.000 396.0 394.726 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 44 55 45.9451 -90.2732 472.000 30.0 397.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 49 55 45.9451 -90.2732 472.000 122.0 397.282 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 54 55 45.9451 -90.2732 472.000 396.0 394.599 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 09 59 55 45.9451 -90.2732 472.000 30.0 397.525 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 04 55 45.9451 -90.2732 472.000 122.0 397.400 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 09 55 45.9451 -90.2732 472.000 396.0 394.628 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 19 55 45.9451 -90.2732 472.000 30.0 397.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 24 55 45.9451 -90.2732 472.000 122.0 397.054 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 29 55 45.9451 -90.2732 472.000 396.0 394.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 34 55 45.9451 -90.2732 472.000 30.0 397.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 39 55 45.9451 -90.2732 472.000 122.0 397.324 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 44 55 45.9451 -90.2732 472.000 396.0 394.924 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 54 55 45.9451 -90.2732 472.000 30.0 397.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 10 59 55 45.9451 -90.2732 472.000 122.0 396.883 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 04 55 45.9451 -90.2732 472.000 396.0 395.968 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 09 55 45.9451 -90.2732 472.000 30.0 397.238 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 14 55 45.9451 -90.2732 472.000 122.0 396.871 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 19 55 45.9451 -90.2732 472.000 396.0 395.817 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 20 25 45.9451 -90.2732 472.000 396.0 396.136 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 20 55 45.9451 -90.2732 472.000 396.0 395.986 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 21 25 45.9451 -90.2732 472.000 396.0 395.611 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 21 55 45.9451 -90.2732 472.000 396.0 395.693 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 22 25 45.9451 -90.2732 472.000 396.0 395.520 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 22 55 45.9451 -90.2732 472.000 396.0 395.427 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 23 25 45.9451 -90.2732 472.000 396.0 395.466 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 23 55 45.9451 -90.2732 472.000 396.0 395.304 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 24 25 45.9451 -90.2732 472.000 396.0 395.140 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 24 55 45.9451 -90.2732 472.000 396.0 395.310 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 29 55 45.9451 -90.2732 472.000 30.0 397.087 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 34 55 45.9451 -90.2732 472.000 122.0 396.875 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 39 55 45.9451 -90.2732 472.000 396.0 396.110 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 44 55 45.9451 -90.2732 472.000 30.0 397.016 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 11 49 55 45.9451 -90.2732 472.000 122.0 396.742 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 14 55 45.9451 -90.2732 472.000 396.0 395.609 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 19 55 45.9451 -90.2732 472.000 30.0 396.679 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 24 55 45.9451 -90.2732 472.000 122.0 396.369 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 29 55 45.9451 -90.2732 472.000 396.0 395.695 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 34 55 45.9451 -90.2732 472.000 30.0 396.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 39 55 45.9451 -90.2732 472.000 122.0 396.337 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 44 55 45.9451 -90.2732 472.000 396.0 395.773 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 45 25 45.9451 -90.2732 472.000 396.0 395.829 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 45 55 45.9451 -90.2732 472.000 396.0 395.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 46 25 45.9451 -90.2732 472.000 396.0 395.820 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 46 55 45.9451 -90.2732 472.000 396.0 395.867 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 47 25 45.9451 -90.2732 472.000 396.0 395.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 47 55 45.9451 -90.2732 472.000 396.0 395.818 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 48 25 45.9451 -90.2732 472.000 396.0 395.834 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 48 55 45.9451 -90.2732 472.000 396.0 395.818 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 49 25 45.9451 -90.2732 472.000 396.0 395.758 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 49 55 45.9451 -90.2732 472.000 396.0 395.759 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 54 55 45.9451 -90.2732 472.000 30.0 396.434 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 12 59 55 45.9451 -90.2732 472.000 122.0 396.191 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 04 55 45.9451 -90.2732 472.000 396.0 395.932 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 09 55 45.9451 -90.2732 472.000 30.0 396.258 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 14 55 45.9451 -90.2732 472.000 122.0 396.161 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 19 55 45.9451 -90.2732 472.000 396.0 396.081 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 20 25 45.9451 -90.2732 472.000 396.0 396.073 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 20 55 45.9451 -90.2732 472.000 396.0 396.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 21 25 45.9451 -90.2732 472.000 396.0 396.088 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 21 55 45.9451 -90.2732 472.000 396.0 396.100 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 22 25 45.9451 -90.2732 472.000 396.0 396.092 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 22 55 45.9451 -90.2732 472.000 396.0 396.123 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 23 25 45.9451 -90.2732 472.000 396.0 396.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 23 55 45.9451 -90.2732 472.000 396.0 396.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 24 25 45.9451 -90.2732 472.000 396.0 396.137 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 24 55 45.9451 -90.2732 472.000 396.0 396.123 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 29 55 45.9451 -90.2732 472.000 30.0 396.249 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 34 55 45.9451 -90.2732 472.000 122.0 396.176 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 39 55 45.9451 -90.2732 472.000 396.0 396.039 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 44 55 45.9451 -90.2732 472.000 30.0 396.243 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 49 55 45.9451 -90.2732 472.000 122.0 396.184 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 13 54 55 45.9451 -90.2732 472.000 396.0 395.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 04 55 45.9451 -90.2732 472.000 30.0 396.221 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 09 55 45.9451 -90.2732 472.000 122.0 396.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 14 55 45.9451 -90.2732 472.000 396.0 395.760 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 19 55 45.9451 -90.2732 472.000 30.0 396.147 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 24 55 45.9451 -90.2732 472.000 122.0 396.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 29 55 45.9451 -90.2732 472.000 396.0 395.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 30 25 45.9451 -90.2732 472.000 396.0 395.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 30 55 45.9451 -90.2732 472.000 396.0 395.782 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 31 25 45.9451 -90.2732 472.000 396.0 395.754 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 31 55 45.9451 -90.2732 472.000 396.0 395.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 32 25 45.9451 -90.2732 472.000 396.0 395.733 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 32 55 45.9451 -90.2732 472.000 396.0 395.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 33 25 45.9451 -90.2732 472.000 396.0 395.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 33 55 45.9451 -90.2732 472.000 396.0 395.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 34 25 45.9451 -90.2732 472.000 396.0 395.724 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 34 55 45.9451 -90.2732 472.000 396.0 395.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 39 55 45.9451 -90.2732 472.000 30.0 396.174 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 44 55 45.9451 -90.2732 472.000 122.0 396.063 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 49 55 45.9451 -90.2732 472.000 396.0 395.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 54 55 45.9451 -90.2732 472.000 30.0 396.151 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 14 59 55 45.9451 -90.2732 472.000 122.0 396.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 04 55 45.9451 -90.2732 472.000 396.0 395.783 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 05 25 45.9451 -90.2732 472.000 396.0 395.802 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 05 55 45.9451 -90.2732 472.000 396.0 395.783 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 06 25 45.9451 -90.2732 472.000 396.0 395.777 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 06 55 45.9451 -90.2732 472.000 396.0 395.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 07 25 45.9451 -90.2732 472.000 396.0 395.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 07 55 45.9451 -90.2732 472.000 396.0 395.800 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 08 25 45.9451 -90.2732 472.000 396.0 395.833 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 08 55 45.9451 -90.2732 472.000 396.0 395.763 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 09 25 45.9451 -90.2732 472.000 396.0 395.767 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 09 55 45.9451 -90.2732 472.000 396.0 395.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 14 55 45.9451 -90.2732 472.000 30.0 396.123 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 19 55 45.9451 -90.2732 472.000 122.0 395.974 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 24 55 45.9451 -90.2732 472.000 396.0 395.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 29 55 45.9451 -90.2732 472.000 30.0 396.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 34 55 45.9451 -90.2732 472.000 122.0 396.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 39 55 45.9451 -90.2732 472.000 396.0 395.704 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 40 25 45.9451 -90.2732 472.000 396.0 395.683 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 40 55 45.9451 -90.2732 472.000 396.0 395.692 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 41 25 45.9451 -90.2732 472.000 396.0 395.751 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 41 55 45.9451 -90.2732 472.000 396.0 395.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 42 25 45.9451 -90.2732 472.000 396.0 395.740 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 42 55 45.9451 -90.2732 472.000 396.0 395.737 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 43 25 45.9451 -90.2732 472.000 396.0 395.764 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 43 55 45.9451 -90.2732 472.000 396.0 395.742 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 44 25 45.9451 -90.2732 472.000 396.0 395.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 44 55 45.9451 -90.2732 472.000 396.0 395.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 49 55 45.9451 -90.2732 472.000 30.0 396.084 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 54 55 45.9451 -90.2732 472.000 122.0 395.980 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 15 59 55 45.9451 -90.2732 472.000 396.0 395.747 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 04 55 45.9451 -90.2732 472.000 30.0 395.971 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 09 55 45.9451 -90.2732 472.000 122.0 395.932 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 14 55 45.9451 -90.2732 472.000 396.0 395.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 24 55 45.9451 -90.2732 472.000 30.0 395.885 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 29 55 45.9451 -90.2732 472.000 122.0 395.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 34 55 45.9451 -90.2732 472.000 396.0 395.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 39 55 45.9451 -90.2732 472.000 30.0 395.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 44 55 45.9451 -90.2732 472.000 122.0 395.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 49 55 45.9451 -90.2732 472.000 396.0 395.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 50 25 45.9451 -90.2732 472.000 396.0 395.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 50 55 45.9451 -90.2732 472.000 396.0 395.935 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 51 25 45.9451 -90.2732 472.000 396.0 395.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 51 55 45.9451 -90.2732 472.000 396.0 395.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 52 25 45.9451 -90.2732 472.000 396.0 395.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 52 55 45.9451 -90.2732 472.000 396.0 395.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 53 25 45.9451 -90.2732 472.000 396.0 395.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 53 55 45.9451 -90.2732 472.000 396.0 395.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 54 25 45.9451 -90.2732 472.000 396.0 395.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 16 54 55 45.9451 -90.2732 472.000 396.0 395.969 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 04 55 45.9451 -90.2732 472.000 30.0 396.085 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 09 55 45.9451 -90.2732 472.000 122.0 396.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 14 55 45.9451 -90.2732 472.000 396.0 396.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 19 55 45.9451 -90.2732 472.000 30.0 396.012 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 24 55 45.9451 -90.2732 472.000 122.0 395.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 29 55 45.9451 -90.2732 472.000 396.0 395.741 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 30 25 45.9451 -90.2732 472.000 396.0 395.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 30 55 45.9451 -90.2732 472.000 396.0 395.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 31 25 45.9451 -90.2732 472.000 396.0 395.773 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 31 55 45.9451 -90.2732 472.000 396.0 395.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 32 25 45.9451 -90.2732 472.000 396.0 395.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 32 55 45.9451 -90.2732 472.000 396.0 395.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 33 25 45.9451 -90.2732 472.000 396.0 395.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 33 55 45.9451 -90.2732 472.000 396.0 395.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 34 25 45.9451 -90.2732 472.000 396.0 395.828 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 34 55 45.9451 -90.2732 472.000 396.0 395.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 39 55 45.9451 -90.2732 472.000 30.0 395.956 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 44 55 45.9451 -90.2732 472.000 122.0 395.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 49 55 45.9451 -90.2732 472.000 396.0 395.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 54 55 45.9451 -90.2732 472.000 30.0 395.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 17 59 55 45.9451 -90.2732 472.000 122.0 395.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 04 55 45.9451 -90.2732 472.000 396.0 395.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 14 55 45.9451 -90.2732 472.000 30.0 395.901 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 19 55 45.9451 -90.2732 472.000 122.0 395.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 24 55 45.9451 -90.2732 472.000 396.0 395.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 29 55 45.9451 -90.2732 472.000 30.0 395.933 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 34 55 45.9451 -90.2732 472.000 122.0 396.006 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 39 55 45.9451 -90.2732 472.000 396.0 395.985 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 40 25 45.9451 -90.2732 472.000 396.0 395.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 40 55 45.9451 -90.2732 472.000 396.0 396.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 41 25 45.9451 -90.2732 472.000 396.0 396.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 41 55 45.9451 -90.2732 472.000 396.0 395.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 42 25 45.9451 -90.2732 472.000 396.0 395.985 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 42 55 45.9451 -90.2732 472.000 396.0 396.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 43 25 45.9451 -90.2732 472.000 396.0 396.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 43 55 45.9451 -90.2732 472.000 396.0 396.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 44 25 45.9451 -90.2732 472.000 396.0 395.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 44 55 45.9451 -90.2732 472.000 396.0 396.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 49 55 45.9451 -90.2732 472.000 30.0 396.117 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 54 55 45.9451 -90.2732 472.000 122.0 396.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 18 59 55 45.9451 -90.2732 472.000 396.0 396.139 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 04 55 45.9451 -90.2732 472.000 30.0 396.223 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 09 55 45.9451 -90.2732 472.000 122.0 396.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 14 55 45.9451 -90.2732 472.000 396.0 396.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 15 25 45.9451 -90.2732 472.000 396.0 396.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 15 55 45.9451 -90.2732 472.000 396.0 396.262 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 16 25 45.9451 -90.2732 472.000 396.0 396.260 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 16 55 45.9451 -90.2732 472.000 396.0 396.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 17 25 45.9451 -90.2732 472.000 396.0 396.287 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 17 55 45.9451 -90.2732 472.000 396.0 396.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 18 25 45.9451 -90.2732 472.000 396.0 396.320 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 18 55 45.9451 -90.2732 472.000 396.0 396.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 19 25 45.9451 -90.2732 472.000 396.0 396.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 19 55 45.9451 -90.2732 472.000 396.0 396.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 24 55 45.9451 -90.2732 472.000 30.0 396.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 29 55 45.9451 -90.2732 472.000 122.0 396.473 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 34 55 45.9451 -90.2732 472.000 396.0 396.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 39 55 45.9451 -90.2732 472.000 30.0 396.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 44 55 45.9451 -90.2732 472.000 122.0 396.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 49 55 45.9451 -90.2732 472.000 396.0 396.386 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 19 59 55 45.9451 -90.2732 472.000 30.0 396.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 04 55 45.9451 -90.2732 472.000 122.0 396.548 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 09 55 45.9451 -90.2732 472.000 396.0 396.482 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 14 55 45.9451 -90.2732 472.000 30.0 396.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 19 55 45.9451 -90.2732 472.000 122.0 396.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 24 55 45.9451 -90.2732 472.000 396.0 396.361 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 25 25 45.9451 -90.2732 472.000 396.0 396.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 25 55 45.9451 -90.2732 472.000 396.0 396.446 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 26 25 45.9451 -90.2732 472.000 396.0 396.392 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 26 55 45.9451 -90.2732 472.000 396.0 396.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 27 25 45.9451 -90.2732 472.000 396.0 396.342 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 27 55 45.9451 -90.2732 472.000 396.0 396.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 28 25 45.9451 -90.2732 472.000 396.0 396.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 28 55 45.9451 -90.2732 472.000 396.0 396.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 29 25 45.9451 -90.2732 472.000 396.0 396.430 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 29 55 45.9451 -90.2732 472.000 396.0 396.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 34 55 45.9451 -90.2732 472.000 30.0 396.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 39 55 45.9451 -90.2732 472.000 122.0 396.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 44 55 45.9451 -90.2732 472.000 396.0 396.541 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 49 55 45.9451 -90.2732 472.000 30.0 396.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 54 55 45.9451 -90.2732 472.000 122.0 396.522 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 20 59 55 45.9451 -90.2732 472.000 396.0 396.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 00 25 45.9451 -90.2732 472.000 396.0 396.449 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 00 55 45.9451 -90.2732 472.000 396.0 396.450 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 01 25 45.9451 -90.2732 472.000 396.0 396.455 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 01 55 45.9451 -90.2732 472.000 396.0 396.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 02 25 45.9451 -90.2732 472.000 396.0 396.419 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 02 55 45.9451 -90.2732 472.000 396.0 396.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 03 25 45.9451 -90.2732 472.000 396.0 396.453 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 03 55 45.9451 -90.2732 472.000 396.0 396.441 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 04 25 45.9451 -90.2732 472.000 396.0 396.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 04 55 45.9451 -90.2732 472.000 396.0 396.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 09 55 45.9451 -90.2732 472.000 30.0 396.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 14 55 45.9451 -90.2732 472.000 122.0 396.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 19 55 45.9451 -90.2732 472.000 396.0 396.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 24 55 45.9451 -90.2732 472.000 30.0 396.664 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 29 55 45.9451 -90.2732 472.000 122.0 396.646 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 34 55 45.9451 -90.2732 472.000 396.0 396.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 35 25 45.9451 -90.2732 472.000 396.0 396.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 35 55 45.9451 -90.2732 472.000 396.0 396.526 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 36 25 45.9451 -90.2732 472.000 396.0 396.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 36 55 45.9451 -90.2732 472.000 396.0 396.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 37 25 45.9451 -90.2732 472.000 396.0 396.513 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 37 55 45.9451 -90.2732 472.000 396.0 396.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 38 25 45.9451 -90.2732 472.000 396.0 396.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 38 55 45.9451 -90.2732 472.000 396.0 396.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 39 25 45.9451 -90.2732 472.000 396.0 396.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 39 55 45.9451 -90.2732 472.000 396.0 396.547 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 44 55 45.9451 -90.2732 472.000 30.0 396.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 49 55 45.9451 -90.2732 472.000 122.0 396.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 54 55 45.9451 -90.2732 472.000 396.0 396.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 21 59 55 45.9451 -90.2732 472.000 30.0 396.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 04 55 45.9451 -90.2732 472.000 122.0 396.623 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 09 55 45.9451 -90.2732 472.000 396.0 396.604 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 19 55 45.9451 -90.2732 472.000 30.0 396.745 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 24 55 45.9451 -90.2732 472.000 122.0 396.693 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 29 55 45.9451 -90.2732 472.000 396.0 396.726 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 34 55 45.9451 -90.2732 472.000 30.0 396.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 39 55 45.9451 -90.2732 472.000 122.0 396.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 44 55 45.9451 -90.2732 472.000 396.0 397.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 54 55 45.9451 -90.2732 472.000 30.0 397.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 22 59 55 45.9451 -90.2732 472.000 122.0 397.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 04 55 45.9451 -90.2732 472.000 396.0 397.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 09 55 45.9451 -90.2732 472.000 30.0 397.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 14 55 45.9451 -90.2732 472.000 122.0 397.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 19 55 45.9451 -90.2732 472.000 396.0 397.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 20 25 45.9451 -90.2732 472.000 396.0 397.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 20 55 45.9451 -90.2732 472.000 396.0 397.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 21 25 45.9451 -90.2732 472.000 396.0 397.645 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 21 55 45.9451 -90.2732 472.000 396.0 397.652 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 22 25 45.9451 -90.2732 472.000 396.0 397.642 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 22 55 45.9451 -90.2732 472.000 396.0 397.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 23 25 45.9451 -90.2732 472.000 396.0 397.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 23 55 45.9451 -90.2732 472.000 396.0 397.663 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 24 25 45.9451 -90.2732 472.000 396.0 397.683 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 24 55 45.9451 -90.2732 472.000 396.0 397.674 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 29 55 45.9451 -90.2732 472.000 30.0 397.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 34 55 45.9451 -90.2732 472.000 122.0 397.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 39 55 45.9451 -90.2732 472.000 396.0 397.812 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 44 55 45.9451 -90.2732 472.000 30.0 397.959 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 24 23 49 55 45.9451 -90.2732 472.000 122.0 397.900 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 14 55 45.9451 -90.2732 472.000 396.0 397.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 19 55 45.9451 -90.2732 472.000 30.0 397.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 24 55 45.9451 -90.2732 472.000 122.0 397.829 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 29 55 45.9451 -90.2732 472.000 396.0 397.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 34 55 45.9451 -90.2732 472.000 30.0 397.908 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 39 55 45.9451 -90.2732 472.000 122.0 397.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 44 55 45.9451 -90.2732 472.000 396.0 397.607 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 45 25 45.9451 -90.2732 472.000 396.0 397.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 45 55 45.9451 -90.2732 472.000 396.0 397.607 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 46 25 45.9451 -90.2732 472.000 396.0 397.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 46 55 45.9451 -90.2732 472.000 396.0 397.576 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 47 25 45.9451 -90.2732 472.000 396.0 397.596 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 47 55 45.9451 -90.2732 472.000 396.0 397.643 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 48 25 45.9451 -90.2732 472.000 396.0 397.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 48 55 45.9451 -90.2732 472.000 396.0 397.683 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 49 25 45.9451 -90.2732 472.000 396.0 397.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 49 55 45.9451 -90.2732 472.000 396.0 397.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 54 55 45.9451 -90.2732 472.000 30.0 397.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 00 59 55 45.9451 -90.2732 472.000 122.0 397.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 04 55 45.9451 -90.2732 472.000 396.0 397.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 09 55 45.9451 -90.2732 472.000 30.0 397.899 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 14 55 45.9451 -90.2732 472.000 122.0 397.762 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 19 55 45.9451 -90.2732 472.000 396.0 397.439 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 20 25 45.9451 -90.2732 472.000 396.0 397.454 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 20 55 45.9451 -90.2732 472.000 396.0 397.520 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 21 25 45.9451 -90.2732 472.000 396.0 397.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 21 55 45.9451 -90.2732 472.000 396.0 397.342 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 22 25 45.9451 -90.2732 472.000 396.0 397.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 22 55 45.9451 -90.2732 472.000 396.0 397.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 23 25 45.9451 -90.2732 472.000 396.0 397.278 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 23 55 45.9451 -90.2732 472.000 396.0 397.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 24 25 45.9451 -90.2732 472.000 396.0 397.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 24 55 45.9451 -90.2732 472.000 396.0 397.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 29 55 45.9451 -90.2732 472.000 30.0 397.789 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 34 55 45.9451 -90.2732 472.000 122.0 397.711 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 39 55 45.9451 -90.2732 472.000 396.0 397.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 44 55 45.9451 -90.2732 472.000 30.0 397.726 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 49 55 45.9451 -90.2732 472.000 122.0 397.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 01 54 55 45.9451 -90.2732 472.000 396.0 397.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 04 55 45.9451 -90.2732 472.000 30.0 397.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 09 55 45.9451 -90.2732 472.000 122.0 397.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 14 55 45.9451 -90.2732 472.000 396.0 397.527 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 19 55 45.9451 -90.2732 472.000 30.0 397.745 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 24 55 45.9451 -90.2732 472.000 122.0 397.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 29 55 45.9451 -90.2732 472.000 396.0 397.839 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 30 25 45.9451 -90.2732 472.000 396.0 397.818 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 30 55 45.9451 -90.2732 472.000 396.0 397.827 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 31 25 45.9451 -90.2732 472.000 396.0 397.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 31 55 45.9451 -90.2732 472.000 396.0 397.818 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 32 25 45.9451 -90.2732 472.000 396.0 397.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 32 55 45.9451 -90.2732 472.000 396.0 397.850 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 33 25 45.9451 -90.2732 472.000 396.0 397.805 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 33 55 45.9451 -90.2732 472.000 396.0 397.831 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 34 25 45.9451 -90.2732 472.000 396.0 397.832 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 34 55 45.9451 -90.2732 472.000 396.0 397.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 39 55 45.9451 -90.2732 472.000 30.0 397.982 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 44 55 45.9451 -90.2732 472.000 122.0 398.001 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 49 55 45.9451 -90.2732 472.000 396.0 398.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 54 55 45.9451 -90.2732 472.000 30.0 398.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 02 59 55 45.9451 -90.2732 472.000 122.0 398.213 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 04 55 45.9451 -90.2732 472.000 396.0 398.233 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 05 25 45.9451 -90.2732 472.000 396.0 398.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 05 55 45.9451 -90.2732 472.000 396.0 398.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 06 25 45.9451 -90.2732 472.000 396.0 398.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 06 55 45.9451 -90.2732 472.000 396.0 398.276 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 07 25 45.9451 -90.2732 472.000 396.0 398.303 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 07 55 45.9451 -90.2732 472.000 396.0 398.308 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 08 25 45.9451 -90.2732 472.000 396.0 398.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 08 55 45.9451 -90.2732 472.000 396.0 398.351 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 09 25 45.9451 -90.2732 472.000 396.0 398.361 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 09 55 45.9451 -90.2732 472.000 396.0 398.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 14 55 45.9451 -90.2732 472.000 30.0 398.430 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 19 55 45.9451 -90.2732 472.000 122.0 398.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 24 55 45.9451 -90.2732 472.000 396.0 398.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 29 55 45.9451 -90.2732 472.000 30.0 398.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 34 55 45.9451 -90.2732 472.000 122.0 398.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 39 55 45.9451 -90.2732 472.000 396.0 398.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 40 25 45.9451 -90.2732 472.000 396.0 398.551 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 40 55 45.9451 -90.2732 472.000 396.0 398.620 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 41 25 45.9451 -90.2732 472.000 396.0 398.592 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 41 55 45.9451 -90.2732 472.000 396.0 398.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 42 25 45.9451 -90.2732 472.000 396.0 398.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 42 55 45.9451 -90.2732 472.000 396.0 398.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 43 25 45.9451 -90.2732 472.000 396.0 398.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 43 55 45.9451 -90.2732 472.000 396.0 398.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 44 25 45.9451 -90.2732 472.000 396.0 398.644 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 44 55 45.9451 -90.2732 472.000 396.0 398.651 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 49 55 45.9451 -90.2732 472.000 30.0 398.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 54 55 45.9451 -90.2732 472.000 122.0 398.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 03 59 55 45.9451 -90.2732 472.000 396.0 398.780 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 04 55 45.9451 -90.2732 472.000 30.0 398.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 09 55 45.9451 -90.2732 472.000 122.0 398.891 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 14 55 45.9451 -90.2732 472.000 396.0 398.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 24 55 45.9451 -90.2732 472.000 30.0 399.098 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 29 55 45.9451 -90.2732 472.000 122.0 399.024 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 34 55 45.9451 -90.2732 472.000 396.0 399.017 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 39 55 45.9451 -90.2732 472.000 30.0 399.195 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 44 55 45.9451 -90.2732 472.000 122.0 399.171 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 49 55 45.9451 -90.2732 472.000 396.0 399.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 50 25 45.9451 -90.2732 472.000 396.0 399.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 50 55 45.9451 -90.2732 472.000 396.0 399.218 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 51 25 45.9451 -90.2732 472.000 396.0 399.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 51 55 45.9451 -90.2732 472.000 396.0 399.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 52 25 45.9451 -90.2732 472.000 396.0 399.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 52 55 45.9451 -90.2732 472.000 396.0 399.369 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 53 25 45.9451 -90.2732 472.000 396.0 399.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 53 55 45.9451 -90.2732 472.000 396.0 399.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 54 25 45.9451 -90.2732 472.000 396.0 399.263 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 04 54 55 45.9451 -90.2732 472.000 396.0 399.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 04 55 45.9451 -90.2732 472.000 30.0 399.474 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 09 55 45.9451 -90.2732 472.000 122.0 399.282 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 14 55 45.9451 -90.2732 472.000 396.0 399.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 19 55 45.9451 -90.2732 472.000 30.0 399.544 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 24 55 45.9451 -90.2732 472.000 122.0 399.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 29 55 45.9451 -90.2732 472.000 396.0 399.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 30 25 45.9451 -90.2732 472.000 396.0 399.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 30 55 45.9451 -90.2732 472.000 396.0 399.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 31 25 45.9451 -90.2732 472.000 396.0 399.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 31 55 45.9451 -90.2732 472.000 396.0 399.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 32 25 45.9451 -90.2732 472.000 396.0 399.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 32 55 45.9451 -90.2732 472.000 396.0 399.938 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 33 25 45.9451 -90.2732 472.000 396.0 400.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 33 55 45.9451 -90.2732 472.000 396.0 399.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 34 25 45.9451 -90.2732 472.000 396.0 399.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 34 55 45.9451 -90.2732 472.000 396.0 399.793 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 39 55 45.9451 -90.2732 472.000 30.0 399.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 44 55 45.9451 -90.2732 472.000 122.0 399.669 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 49 55 45.9451 -90.2732 472.000 396.0 400.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 54 55 45.9451 -90.2732 472.000 30.0 399.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 05 59 55 45.9451 -90.2732 472.000 122.0 399.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 04 55 45.9451 -90.2732 472.000 396.0 400.260 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 14 55 45.9451 -90.2732 472.000 30.0 400.223 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 19 55 45.9451 -90.2732 472.000 122.0 400.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 24 55 45.9451 -90.2732 472.000 396.0 400.588 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 29 55 45.9451 -90.2732 472.000 30.0 400.336 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 34 55 45.9451 -90.2732 472.000 122.0 400.310 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 39 55 45.9451 -90.2732 472.000 396.0 400.638 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 40 25 45.9451 -90.2732 472.000 396.0 400.579 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 40 55 45.9451 -90.2732 472.000 396.0 400.692 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 41 25 45.9451 -90.2732 472.000 396.0 400.654 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 41 55 45.9451 -90.2732 472.000 396.0 400.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 42 25 45.9451 -90.2732 472.000 396.0 400.801 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 42 55 45.9451 -90.2732 472.000 396.0 400.789 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 43 25 45.9451 -90.2732 472.000 396.0 400.871 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 43 55 45.9451 -90.2732 472.000 396.0 400.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 44 25 45.9451 -90.2732 472.000 396.0 400.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 44 55 45.9451 -90.2732 472.000 396.0 400.868 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 49 55 45.9451 -90.2732 472.000 30.0 400.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 54 55 45.9451 -90.2732 472.000 122.0 400.587 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 06 59 55 45.9451 -90.2732 472.000 396.0 401.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 04 55 45.9451 -90.2732 472.000 30.0 400.842 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 09 55 45.9451 -90.2732 472.000 122.0 400.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 14 55 45.9451 -90.2732 472.000 396.0 401.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 15 25 45.9451 -90.2732 472.000 396.0 401.458 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 15 55 45.9451 -90.2732 472.000 396.0 401.304 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 16 25 45.9451 -90.2732 472.000 396.0 401.422 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 16 55 45.9451 -90.2732 472.000 396.0 401.543 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 17 25 45.9451 -90.2732 472.000 396.0 401.526 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 17 55 45.9451 -90.2732 472.000 396.0 401.490 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 18 25 45.9451 -90.2732 472.000 396.0 401.397 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 18 55 45.9451 -90.2732 472.000 396.0 401.311 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 19 25 45.9451 -90.2732 472.000 396.0 401.316 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 19 55 45.9451 -90.2732 472.000 396.0 401.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 24 55 45.9451 -90.2732 472.000 30.0 401.241 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 29 55 45.9451 -90.2732 472.000 122.0 401.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 34 55 45.9451 -90.2732 472.000 396.0 401.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 39 55 45.9451 -90.2732 472.000 30.0 401.380 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 44 55 45.9451 -90.2732 472.000 122.0 401.245 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 49 55 45.9451 -90.2732 472.000 396.0 401.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 07 59 55 45.9451 -90.2732 472.000 30.0 401.585 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 04 55 45.9451 -90.2732 472.000 122.0 401.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 09 55 45.9451 -90.2732 472.000 396.0 402.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 14 55 45.9451 -90.2732 472.000 30.0 401.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 19 55 45.9451 -90.2732 472.000 122.0 401.594 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 24 55 45.9451 -90.2732 472.000 396.0 402.254 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 25 25 45.9451 -90.2732 472.000 396.0 402.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 25 55 45.9451 -90.2732 472.000 396.0 402.320 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 26 25 45.9451 -90.2732 472.000 396.0 402.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 26 55 45.9451 -90.2732 472.000 396.0 402.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 27 25 45.9451 -90.2732 472.000 396.0 402.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 27 55 45.9451 -90.2732 472.000 396.0 402.355 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 28 25 45.9451 -90.2732 472.000 396.0 402.388 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 28 55 45.9451 -90.2732 472.000 396.0 402.418 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 29 25 45.9451 -90.2732 472.000 396.0 402.397 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 29 55 45.9451 -90.2732 472.000 396.0 402.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 34 55 45.9451 -90.2732 472.000 30.0 402.063 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 39 55 45.9451 -90.2732 472.000 122.0 401.917 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 44 55 45.9451 -90.2732 472.000 396.0 402.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 49 55 45.9451 -90.2732 472.000 30.0 402.435 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 54 55 45.9451 -90.2732 472.000 122.0 402.102 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 08 59 55 45.9451 -90.2732 472.000 396.0 402.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 00 25 45.9451 -90.2732 472.000 396.0 402.648 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 00 55 45.9451 -90.2732 472.000 396.0 402.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 01 25 45.9451 -90.2732 472.000 396.0 402.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 01 55 45.9451 -90.2732 472.000 396.0 402.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 02 25 45.9451 -90.2732 472.000 396.0 402.727 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 02 55 45.9451 -90.2732 472.000 396.0 402.749 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 03 25 45.9451 -90.2732 472.000 396.0 402.753 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 03 55 45.9451 -90.2732 472.000 396.0 402.750 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 04 25 45.9451 -90.2732 472.000 396.0 402.757 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 04 55 45.9451 -90.2732 472.000 396.0 402.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 09 55 45.9451 -90.2732 472.000 30.0 402.748 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 14 55 45.9451 -90.2732 472.000 122.0 402.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 19 55 45.9451 -90.2732 472.000 396.0 402.854 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 24 55 45.9451 -90.2732 472.000 30.0 402.888 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 29 55 45.9451 -90.2732 472.000 122.0 402.469 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 34 55 45.9451 -90.2732 472.000 396.0 402.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 35 25 45.9451 -90.2732 472.000 396.0 402.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 35 55 45.9451 -90.2732 472.000 396.0 402.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 36 25 45.9451 -90.2732 472.000 396.0 402.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 36 55 45.9451 -90.2732 472.000 396.0 402.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 37 25 45.9451 -90.2732 472.000 396.0 402.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 37 55 45.9451 -90.2732 472.000 396.0 402.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 38 25 45.9451 -90.2732 472.000 396.0 402.832 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 38 55 45.9451 -90.2732 472.000 396.0 402.744 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 39 25 45.9451 -90.2732 472.000 396.0 402.727 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 39 55 45.9451 -90.2732 472.000 396.0 402.810 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 44 55 45.9451 -90.2732 472.000 30.0 403.053 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 49 55 45.9451 -90.2732 472.000 122.0 402.954 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 54 55 45.9451 -90.2732 472.000 396.0 403.206 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 09 59 55 45.9451 -90.2732 472.000 30.0 403.531 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 04 55 45.9451 -90.2732 472.000 122.0 403.305 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 09 55 45.9451 -90.2732 472.000 396.0 403.372 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 19 55 45.9451 -90.2732 472.000 30.0 403.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 24 55 45.9451 -90.2732 472.000 122.0 403.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 29 55 45.9451 -90.2732 472.000 396.0 403.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 34 55 45.9451 -90.2732 472.000 30.0 404.034 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 39 55 45.9451 -90.2732 472.000 122.0 403.931 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 44 55 45.9451 -90.2732 472.000 396.0 403.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 54 55 45.9451 -90.2732 472.000 30.0 404.360 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 10 59 55 45.9451 -90.2732 472.000 122.0 404.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 04 55 45.9451 -90.2732 472.000 396.0 403.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 09 55 45.9451 -90.2732 472.000 30.0 404.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 14 55 45.9451 -90.2732 472.000 122.0 404.362 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 19 55 45.9451 -90.2732 472.000 396.0 403.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 20 25 45.9451 -90.2732 472.000 396.0 403.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 20 55 45.9451 -90.2732 472.000 396.0 403.945 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 21 25 45.9451 -90.2732 472.000 396.0 403.976 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 21 55 45.9451 -90.2732 472.000 396.0 403.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 22 25 45.9451 -90.2732 472.000 396.0 403.961 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 22 55 45.9451 -90.2732 472.000 396.0 403.977 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 23 25 45.9451 -90.2732 472.000 396.0 404.001 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 23 55 45.9451 -90.2732 472.000 396.0 403.970 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 24 25 45.9451 -90.2732 472.000 396.0 403.981 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 24 55 45.9451 -90.2732 472.000 396.0 404.026 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 29 55 45.9451 -90.2732 472.000 30.0 404.951 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 34 55 45.9451 -90.2732 472.000 122.0 404.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 39 55 45.9451 -90.2732 472.000 396.0 404.266 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 44 55 45.9451 -90.2732 472.000 30.0 405.092 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 11 49 55 45.9451 -90.2732 472.000 122.0 404.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 14 55 45.9451 -90.2732 472.000 396.0 405.058 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 19 55 45.9451 -90.2732 472.000 30.0 405.539 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 24 55 45.9451 -90.2732 472.000 122.0 405.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 29 55 45.9451 -90.2732 472.000 396.0 405.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 34 55 45.9451 -90.2732 472.000 30.0 405.706 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 39 55 45.9451 -90.2732 472.000 122.0 405.734 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 44 55 45.9451 -90.2732 472.000 396.0 405.759 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 45 25 45.9451 -90.2732 472.000 396.0 405.722 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 45 55 45.9451 -90.2732 472.000 396.0 405.784 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 46 25 45.9451 -90.2732 472.000 396.0 405.693 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 46 55 45.9451 -90.2732 472.000 396.0 405.786 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 47 25 45.9451 -90.2732 472.000 396.0 405.685 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 47 55 45.9451 -90.2732 472.000 396.0 405.566 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 48 25 45.9451 -90.2732 472.000 396.0 405.505 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 48 55 45.9451 -90.2732 472.000 396.0 405.536 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 49 25 45.9451 -90.2732 472.000 396.0 405.710 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 49 55 45.9451 -90.2732 472.000 396.0 405.757 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 54 55 45.9451 -90.2732 472.000 30.0 406.240 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 12 59 55 45.9451 -90.2732 472.000 122.0 406.292 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 04 55 45.9451 -90.2732 472.000 396.0 405.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 09 55 45.9451 -90.2732 472.000 30.0 406.128 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 14 55 45.9451 -90.2732 472.000 122.0 406.074 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 19 55 45.9451 -90.2732 472.000 396.0 406.122 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 20 25 45.9451 -90.2732 472.000 396.0 406.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 20 55 45.9451 -90.2732 472.000 396.0 406.170 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 21 25 45.9451 -90.2732 472.000 396.0 406.168 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 21 55 45.9451 -90.2732 472.000 396.0 406.185 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 22 25 45.9451 -90.2732 472.000 396.0 406.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 22 55 45.9451 -90.2732 472.000 396.0 406.352 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 23 25 45.9451 -90.2732 472.000 396.0 406.299 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 23 55 45.9451 -90.2732 472.000 396.0 406.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 24 25 45.9451 -90.2732 472.000 396.0 406.338 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 24 55 45.9451 -90.2732 472.000 396.0 406.353 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 29 55 45.9451 -90.2732 472.000 30.0 406.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 34 55 45.9451 -90.2732 472.000 122.0 406.821 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 39 55 45.9451 -90.2732 472.000 396.0 406.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 44 55 45.9451 -90.2732 472.000 30.0 405.779 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 49 55 45.9451 -90.2732 472.000 122.0 404.504 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 25 13 54 55 45.9451 -90.2732 472.000 396.0 403.998 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 04 55 45.9451 -90.2732 472.000 30.0 403.162 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 09 55 45.9451 -90.2732 472.000 122.0 402.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 14 55 45.9451 -90.2732 472.000 396.0 402.477 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 19 55 45.9451 -90.2732 472.000 30.0 402.942 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 24 55 45.9451 -90.2732 472.000 122.0 402.739 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 29 55 45.9451 -90.2732 472.000 396.0 402.725 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 30 25 45.9451 -90.2732 472.000 396.0 402.680 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 30 55 45.9451 -90.2732 472.000 396.0 402.590 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 31 25 45.9451 -90.2732 472.000 396.0 402.635 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 31 55 45.9451 -90.2732 472.000 396.0 402.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 32 25 45.9451 -90.2732 472.000 396.0 402.758 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 32 55 45.9451 -90.2732 472.000 396.0 402.810 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 33 25 45.9451 -90.2732 472.000 396.0 402.775 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 33 55 45.9451 -90.2732 472.000 396.0 402.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 34 25 45.9451 -90.2732 472.000 396.0 402.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 34 55 45.9451 -90.2732 472.000 396.0 402.714 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 39 55 45.9451 -90.2732 472.000 30.0 402.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 44 55 45.9451 -90.2732 472.000 122.0 402.166 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 49 55 45.9451 -90.2732 472.000 396.0 401.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 54 55 45.9451 -90.2732 472.000 30.0 402.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 14 59 55 45.9451 -90.2732 472.000 122.0 402.272 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 04 55 45.9451 -90.2732 472.000 396.0 401.020 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 05 25 45.9451 -90.2732 472.000 396.0 401.993 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 05 55 45.9451 -90.2732 472.000 396.0 401.993 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 06 25 45.9451 -90.2732 472.000 396.0 401.730 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 06 55 45.9451 -90.2732 472.000 396.0 401.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 07 25 45.9451 -90.2732 472.000 396.0 401.602 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 07 55 45.9451 -90.2732 472.000 396.0 401.608 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 08 25 45.9451 -90.2732 472.000 396.0 401.720 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 08 55 45.9451 -90.2732 472.000 396.0 401.391 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 09 25 45.9451 -90.2732 472.000 396.0 400.866 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 09 55 45.9451 -90.2732 472.000 396.0 400.886 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 14 55 45.9451 -90.2732 472.000 30.0 401.408 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 19 55 45.9451 -90.2732 472.000 122.0 401.505 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 24 55 45.9451 -90.2732 472.000 396.0 400.102 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 29 55 45.9451 -90.2732 472.000 30.0 401.129 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 34 55 45.9451 -90.2732 472.000 122.0 401.696 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 39 55 45.9451 -90.2732 472.000 396.0 401.739 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 40 25 45.9451 -90.2732 472.000 396.0 401.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 40 55 45.9451 -90.2732 472.000 396.0 401.901 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 41 25 45.9451 -90.2732 472.000 396.0 401.763 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 41 55 45.9451 -90.2732 472.000 396.0 401.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 42 25 45.9451 -90.2732 472.000 396.0 401.450 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 42 55 45.9451 -90.2732 472.000 396.0 401.531 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 43 25 45.9451 -90.2732 472.000 396.0 401.676 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 43 55 45.9451 -90.2732 472.000 396.0 401.624 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 44 25 45.9451 -90.2732 472.000 396.0 401.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 44 55 45.9451 -90.2732 472.000 396.0 401.536 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 49 55 45.9451 -90.2732 472.000 30.0 400.936 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 54 55 45.9451 -90.2732 472.000 122.0 399.940 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 15 59 55 45.9451 -90.2732 472.000 396.0 398.606 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 04 55 45.9451 -90.2732 472.000 30.0 400.797 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 09 55 45.9451 -90.2732 472.000 122.0 401.023 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 14 55 45.9451 -90.2732 472.000 396.0 399.371 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 24 55 45.9451 -90.2732 472.000 30.0 400.884 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 29 55 45.9451 -90.2732 472.000 122.0 400.277 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 34 55 45.9451 -90.2732 472.000 396.0 400.314 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 39 55 45.9451 -90.2732 472.000 30.0 399.480 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 44 55 45.9451 -90.2732 472.000 122.0 399.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 49 55 45.9451 -90.2732 472.000 396.0 399.123 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 50 25 45.9451 -90.2732 472.000 396.0 399.186 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 50 55 45.9451 -90.2732 472.000 396.0 399.317 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 51 25 45.9451 -90.2732 472.000 396.0 398.975 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 51 55 45.9451 -90.2732 472.000 396.0 398.622 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 52 25 45.9451 -90.2732 472.000 396.0 399.152 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 52 55 45.9451 -90.2732 472.000 396.0 399.186 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 53 25 45.9451 -90.2732 472.000 396.0 398.800 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 53 55 45.9451 -90.2732 472.000 396.0 398.829 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 54 25 45.9451 -90.2732 472.000 396.0 398.867 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 25 16 54 55 45.9451 -90.2732 472.000 396.0 398.409 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 04 55 45.9451 -90.2732 472.000 30.0 398.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 09 55 45.9451 -90.2732 472.000 122.0 398.316 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 14 55 45.9451 -90.2732 472.000 396.0 397.638 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 19 55 45.9451 -90.2732 472.000 30.0 397.745 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 24 55 45.9451 -90.2732 472.000 122.0 397.211 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 29 55 45.9451 -90.2732 472.000 396.0 397.042 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 30 25 45.9451 -90.2732 472.000 396.0 396.944 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 30 55 45.9451 -90.2732 472.000 396.0 397.191 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 31 25 45.9451 -90.2732 472.000 396.0 397.428 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 31 55 45.9451 -90.2732 472.000 396.0 397.256 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 32 25 45.9451 -90.2732 472.000 396.0 396.959 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 32 55 45.9451 -90.2732 472.000 396.0 397.073 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 33 25 45.9451 -90.2732 472.000 396.0 397.262 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 33 55 45.9451 -90.2732 472.000 396.0 397.157 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 34 25 45.9451 -90.2732 472.000 396.0 396.695 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 34 55 45.9451 -90.2732 472.000 396.0 396.753 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 39 55 45.9451 -90.2732 472.000 30.0 396.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 44 55 45.9451 -90.2732 472.000 122.0 397.127 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 49 55 45.9451 -90.2732 472.000 396.0 396.997 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 54 55 45.9451 -90.2732 472.000 30.0 397.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 17 59 55 45.9451 -90.2732 472.000 122.0 396.991 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 04 55 45.9451 -90.2732 472.000 396.0 396.956 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 14 55 45.9451 -90.2732 472.000 30.0 397.347 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 19 55 45.9451 -90.2732 472.000 122.0 397.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 24 55 45.9451 -90.2732 472.000 396.0 397.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 29 55 45.9451 -90.2732 472.000 30.0 397.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 34 55 45.9451 -90.2732 472.000 122.0 397.560 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 39 55 45.9451 -90.2732 472.000 396.0 397.849 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 40 25 45.9451 -90.2732 472.000 396.0 397.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 40 55 45.9451 -90.2732 472.000 396.0 397.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 41 25 45.9451 -90.2732 472.000 396.0 397.975 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 41 55 45.9451 -90.2732 472.000 396.0 397.965 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 42 25 45.9451 -90.2732 472.000 396.0 397.946 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 42 55 45.9451 -90.2732 472.000 396.0 397.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 43 25 45.9451 -90.2732 472.000 396.0 397.909 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 43 55 45.9451 -90.2732 472.000 396.0 397.916 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 44 25 45.9451 -90.2732 472.000 396.0 397.753 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 44 55 45.9451 -90.2732 472.000 396.0 397.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 49 55 45.9451 -90.2732 472.000 30.0 397.911 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 54 55 45.9451 -90.2732 472.000 122.0 398.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 18 59 55 45.9451 -90.2732 472.000 396.0 398.395 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 04 55 45.9451 -90.2732 472.000 30.0 398.459 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 09 55 45.9451 -90.2732 472.000 122.0 398.454 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 14 55 45.9451 -90.2732 472.000 396.0 398.243 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 15 25 45.9451 -90.2732 472.000 396.0 398.349 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 15 55 45.9451 -90.2732 472.000 396.0 398.185 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 16 25 45.9451 -90.2732 472.000 396.0 398.448 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 16 55 45.9451 -90.2732 472.000 396.0 398.597 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 17 25 45.9451 -90.2732 472.000 396.0 398.319 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 17 55 45.9451 -90.2732 472.000 396.0 398.575 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 18 25 45.9451 -90.2732 472.000 396.0 398.507 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 18 55 45.9451 -90.2732 472.000 396.0 398.532 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 19 25 45.9451 -90.2732 472.000 396.0 398.331 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 19 55 45.9451 -90.2732 472.000 396.0 398.397 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 24 55 45.9451 -90.2732 472.000 30.0 398.769 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 29 55 45.9451 -90.2732 472.000 122.0 398.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 34 55 45.9451 -90.2732 472.000 396.0 398.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 39 55 45.9451 -90.2732 472.000 30.0 398.868 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 44 55 45.9451 -90.2732 472.000 122.0 398.970 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 49 55 45.9451 -90.2732 472.000 396.0 398.572 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 19 59 55 45.9451 -90.2732 472.000 30.0 398.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 04 55 45.9451 -90.2732 472.000 122.0 398.454 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 09 55 45.9451 -90.2732 472.000 396.0 398.437 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 14 55 45.9451 -90.2732 472.000 30.0 398.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 19 55 45.9451 -90.2732 472.000 122.0 398.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 24 55 45.9451 -90.2732 472.000 396.0 398.350 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 25 25 45.9451 -90.2732 472.000 396.0 398.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 25 55 45.9451 -90.2732 472.000 396.0 398.405 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 26 25 45.9451 -90.2732 472.000 396.0 398.457 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 26 55 45.9451 -90.2732 472.000 396.0 398.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 27 25 45.9451 -90.2732 472.000 396.0 398.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 27 55 45.9451 -90.2732 472.000 396.0 398.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 28 25 45.9451 -90.2732 472.000 396.0 398.443 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 28 55 45.9451 -90.2732 472.000 396.0 398.480 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 29 25 45.9451 -90.2732 472.000 396.0 398.426 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 29 55 45.9451 -90.2732 472.000 396.0 398.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 34 55 45.9451 -90.2732 472.000 30.0 398.510 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 39 55 45.9451 -90.2732 472.000 122.0 398.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 44 55 45.9451 -90.2732 472.000 396.0 398.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 49 55 45.9451 -90.2732 472.000 30.0 398.826 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 54 55 45.9451 -90.2732 472.000 122.0 398.561 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 20 59 55 45.9451 -90.2732 472.000 396.0 398.565 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 00 25 45.9451 -90.2732 472.000 396.0 398.498 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 00 55 45.9451 -90.2732 472.000 396.0 398.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 01 25 45.9451 -90.2732 472.000 396.0 398.560 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 01 55 45.9451 -90.2732 472.000 396.0 398.501 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 02 25 45.9451 -90.2732 472.000 396.0 398.624 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 02 55 45.9451 -90.2732 472.000 396.0 398.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 03 25 45.9451 -90.2732 472.000 396.0 398.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 03 55 45.9451 -90.2732 472.000 396.0 398.695 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 04 25 45.9451 -90.2732 472.000 396.0 398.721 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 04 55 45.9451 -90.2732 472.000 396.0 398.728 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 09 55 45.9451 -90.2732 472.000 30.0 398.903 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 14 55 45.9451 -90.2732 472.000 122.0 398.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 19 55 45.9451 -90.2732 472.000 396.0 398.461 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 24 55 45.9451 -90.2732 472.000 30.0 399.172 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 29 55 45.9451 -90.2732 472.000 122.0 399.181 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 34 55 45.9451 -90.2732 472.000 396.0 399.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 35 25 45.9451 -90.2732 472.000 396.0 399.120 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 35 55 45.9451 -90.2732 472.000 396.0 398.698 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 36 25 45.9451 -90.2732 472.000 396.0 398.962 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 36 55 45.9451 -90.2732 472.000 396.0 399.097 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 37 25 45.9451 -90.2732 472.000 396.0 399.061 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 37 55 45.9451 -90.2732 472.000 396.0 399.014 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 38 25 45.9451 -90.2732 472.000 396.0 399.256 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 38 55 45.9451 -90.2732 472.000 396.0 399.312 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 39 25 45.9451 -90.2732 472.000 396.0 399.317 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 39 55 45.9451 -90.2732 472.000 396.0 399.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 44 55 45.9451 -90.2732 472.000 30.0 399.594 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 49 55 45.9451 -90.2732 472.000 122.0 399.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 54 55 45.9451 -90.2732 472.000 396.0 399.420 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 25 21 59 55 45.9451 -90.2732 472.000 30.0 399.709 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 04 55 45.9451 -90.2732 472.000 122.0 399.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 09 55 45.9451 -90.2732 472.000 396.0 399.363 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 19 55 45.9451 -90.2732 472.000 30.0 399.021 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 24 55 45.9451 -90.2732 472.000 122.0 397.813 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 29 55 45.9451 -90.2732 472.000 396.0 397.905 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 34 55 45.9451 -90.2732 472.000 30.0 397.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 39 55 45.9451 -90.2732 472.000 122.0 397.700 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 44 55 45.9451 -90.2732 472.000 396.0 397.505 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 54 55 45.9451 -90.2732 472.000 30.0 397.579 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 22 59 55 45.9451 -90.2732 472.000 122.0 397.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 04 55 45.9451 -90.2732 472.000 396.0 397.502 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 09 55 45.9451 -90.2732 472.000 30.0 397.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 14 55 45.9451 -90.2732 472.000 122.0 397.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 19 55 45.9451 -90.2732 472.000 396.0 397.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 20 25 45.9451 -90.2732 472.000 396.0 397.681 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 20 55 45.9451 -90.2732 472.000 396.0 397.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 21 25 45.9451 -90.2732 472.000 396.0 397.683 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 21 55 45.9451 -90.2732 472.000 396.0 397.489 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 22 25 45.9451 -90.2732 472.000 396.0 397.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 22 55 45.9451 -90.2732 472.000 396.0 397.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 23 25 45.9451 -90.2732 472.000 396.0 397.450 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 23 55 45.9451 -90.2732 472.000 396.0 397.566 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 24 25 45.9451 -90.2732 472.000 396.0 397.633 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 24 55 45.9451 -90.2732 472.000 396.0 397.587 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 29 55 45.9451 -90.2732 472.000 30.0 397.703 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 34 55 45.9451 -90.2732 472.000 122.0 397.679 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 39 55 45.9451 -90.2732 472.000 396.0 397.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 44 55 45.9451 -90.2732 472.000 30.0 397.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 25 23 49 55 45.9451 -90.2732 472.000 122.0 397.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 14 55 45.9451 -90.2732 472.000 396.0 397.980 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 19 55 45.9451 -90.2732 472.000 30.0 398.065 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 24 55 45.9451 -90.2732 472.000 122.0 397.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 29 55 45.9451 -90.2732 472.000 396.0 397.872 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 34 55 45.9451 -90.2732 472.000 30.0 398.117 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 39 55 45.9451 -90.2732 472.000 122.0 398.115 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 44 55 45.9451 -90.2732 472.000 396.0 397.915 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 45 25 45.9451 -90.2732 472.000 396.0 397.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 45 55 45.9451 -90.2732 472.000 396.0 397.922 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 46 25 45.9451 -90.2732 472.000 396.0 397.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 46 55 45.9451 -90.2732 472.000 396.0 397.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 47 25 45.9451 -90.2732 472.000 396.0 397.971 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 47 55 45.9451 -90.2732 472.000 396.0 397.862 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 48 25 45.9451 -90.2732 472.000 396.0 397.883 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 48 55 45.9451 -90.2732 472.000 396.0 397.914 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 49 25 45.9451 -90.2732 472.000 396.0 397.947 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 49 55 45.9451 -90.2732 472.000 396.0 397.923 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 54 55 45.9451 -90.2732 472.000 30.0 398.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 00 59 55 45.9451 -90.2732 472.000 122.0 398.094 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 04 55 45.9451 -90.2732 472.000 396.0 397.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 09 55 45.9451 -90.2732 472.000 30.0 398.169 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 14 55 45.9451 -90.2732 472.000 122.0 398.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 19 55 45.9451 -90.2732 472.000 396.0 398.115 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 20 25 45.9451 -90.2732 472.000 396.0 398.124 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 20 55 45.9451 -90.2732 472.000 396.0 398.150 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 21 25 45.9451 -90.2732 472.000 396.0 398.003 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 21 55 45.9451 -90.2732 472.000 396.0 398.009 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 22 25 45.9451 -90.2732 472.000 396.0 397.910 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 22 55 45.9451 -90.2732 472.000 396.0 398.017 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 23 25 45.9451 -90.2732 472.000 396.0 398.011 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 23 55 45.9451 -90.2732 472.000 396.0 398.020 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 24 25 45.9451 -90.2732 472.000 396.0 397.985 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 24 55 45.9451 -90.2732 472.000 396.0 397.978 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 29 55 45.9451 -90.2732 472.000 30.0 398.327 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 34 55 45.9451 -90.2732 472.000 122.0 398.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 39 55 45.9451 -90.2732 472.000 396.0 397.903 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 44 55 45.9451 -90.2732 472.000 30.0 398.385 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 49 55 45.9451 -90.2732 472.000 122.0 398.268 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 01 54 55 45.9451 -90.2732 472.000 396.0 398.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 04 55 45.9451 -90.2732 472.000 30.0 398.405 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 09 55 45.9451 -90.2732 472.000 122.0 398.377 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 14 55 45.9451 -90.2732 472.000 396.0 397.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 19 55 45.9451 -90.2732 472.000 30.0 398.343 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 24 55 45.9451 -90.2732 472.000 122.0 398.182 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 29 55 45.9451 -90.2732 472.000 396.0 398.015 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 30 25 45.9451 -90.2732 472.000 396.0 397.871 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 30 55 45.9451 -90.2732 472.000 396.0 397.595 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 31 25 45.9451 -90.2732 472.000 396.0 397.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 31 55 45.9451 -90.2732 472.000 396.0 397.601 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 32 25 45.9451 -90.2732 472.000 396.0 397.746 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 32 55 45.9451 -90.2732 472.000 396.0 397.729 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 33 25 45.9451 -90.2732 472.000 396.0 397.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 33 55 45.9451 -90.2732 472.000 396.0 397.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 34 25 45.9451 -90.2732 472.000 396.0 397.712 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 34 55 45.9451 -90.2732 472.000 396.0 397.797 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 39 55 45.9451 -90.2732 472.000 30.0 398.180 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 44 55 45.9451 -90.2732 472.000 122.0 397.908 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 49 55 45.9451 -90.2732 472.000 396.0 397.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 54 55 45.9451 -90.2732 472.000 30.0 397.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 02 59 55 45.9451 -90.2732 472.000 122.0 397.725 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 04 55 45.9451 -90.2732 472.000 396.0 397.336 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 05 25 45.9451 -90.2732 472.000 396.0 397.384 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 05 55 45.9451 -90.2732 472.000 396.0 397.268 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 06 25 45.9451 -90.2732 472.000 396.0 397.249 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 06 55 45.9451 -90.2732 472.000 396.0 397.279 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 07 25 45.9451 -90.2732 472.000 396.0 397.224 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 07 55 45.9451 -90.2732 472.000 396.0 397.270 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 08 25 45.9451 -90.2732 472.000 396.0 397.312 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 08 55 45.9451 -90.2732 472.000 396.0 397.379 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 09 25 45.9451 -90.2732 472.000 396.0 397.344 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 09 55 45.9451 -90.2732 472.000 396.0 397.306 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 14 55 45.9451 -90.2732 472.000 30.0 397.575 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 19 55 45.9451 -90.2732 472.000 122.0 397.315 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 24 55 45.9451 -90.2732 472.000 396.0 397.208 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 29 55 45.9451 -90.2732 472.000 30.0 397.326 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 34 55 45.9451 -90.2732 472.000 122.0 397.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 39 55 45.9451 -90.2732 472.000 396.0 397.177 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 40 25 45.9451 -90.2732 472.000 396.0 397.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 40 55 45.9451 -90.2732 472.000 396.0 397.166 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 41 25 45.9451 -90.2732 472.000 396.0 397.193 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 41 55 45.9451 -90.2732 472.000 396.0 397.172 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 42 25 45.9451 -90.2732 472.000 396.0 397.157 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 42 55 45.9451 -90.2732 472.000 396.0 397.177 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 43 25 45.9451 -90.2732 472.000 396.0 397.170 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 43 55 45.9451 -90.2732 472.000 396.0 397.158 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 44 25 45.9451 -90.2732 472.000 396.0 397.185 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 44 55 45.9451 -90.2732 472.000 396.0 397.209 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 49 55 45.9451 -90.2732 472.000 30.0 397.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 54 55 45.9451 -90.2732 472.000 122.0 397.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 03 59 55 45.9451 -90.2732 472.000 396.0 397.365 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 04 55 45.9451 -90.2732 472.000 30.0 397.432 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 09 55 45.9451 -90.2732 472.000 122.0 397.447 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 14 55 45.9451 -90.2732 472.000 396.0 397.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 24 55 45.9451 -90.2732 472.000 30.0 397.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 29 55 45.9451 -90.2732 472.000 122.0 397.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 34 55 45.9451 -90.2732 472.000 396.0 397.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 39 55 45.9451 -90.2732 472.000 30.0 397.771 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 44 55 45.9451 -90.2732 472.000 122.0 397.738 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 49 55 45.9451 -90.2732 472.000 396.0 397.695 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 50 25 45.9451 -90.2732 472.000 396.0 397.680 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 50 55 45.9451 -90.2732 472.000 396.0 397.731 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 51 25 45.9451 -90.2732 472.000 396.0 397.704 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 51 55 45.9451 -90.2732 472.000 396.0 397.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 52 25 45.9451 -90.2732 472.000 396.0 397.722 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 52 55 45.9451 -90.2732 472.000 396.0 397.749 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 53 25 45.9451 -90.2732 472.000 396.0 397.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 53 55 45.9451 -90.2732 472.000 396.0 397.774 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 54 25 45.9451 -90.2732 472.000 396.0 397.761 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 04 54 55 45.9451 -90.2732 472.000 396.0 397.760 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 04 55 45.9451 -90.2732 472.000 30.0 397.816 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 09 55 45.9451 -90.2732 472.000 122.0 397.875 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 14 55 45.9451 -90.2732 472.000 396.0 397.708 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 19 55 45.9451 -90.2732 472.000 30.0 397.805 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 24 55 45.9451 -90.2732 472.000 122.0 397.772 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 29 55 45.9451 -90.2732 472.000 396.0 397.705 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 30 25 45.9451 -90.2732 472.000 396.0 397.677 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 30 55 45.9451 -90.2732 472.000 396.0 397.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 31 25 45.9451 -90.2732 472.000 396.0 397.669 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 31 55 45.9451 -90.2732 472.000 396.0 397.673 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 32 25 45.9451 -90.2732 472.000 396.0 397.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 32 55 45.9451 -90.2732 472.000 396.0 397.740 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 33 25 45.9451 -90.2732 472.000 396.0 397.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 33 55 45.9451 -90.2732 472.000 396.0 397.658 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 34 25 45.9451 -90.2732 472.000 396.0 397.683 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 34 55 45.9451 -90.2732 472.000 396.0 397.656 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 39 55 45.9451 -90.2732 472.000 30.0 397.881 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 44 55 45.9451 -90.2732 472.000 122.0 397.815 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 49 55 45.9451 -90.2732 472.000 396.0 397.631 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 54 55 45.9451 -90.2732 472.000 30.0 397.795 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 05 59 55 45.9451 -90.2732 472.000 122.0 397.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 04 55 45.9451 -90.2732 472.000 396.0 397.582 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 14 55 45.9451 -90.2732 472.000 30.0 397.648 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 19 55 45.9451 -90.2732 472.000 122.0 397.642 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 24 55 45.9451 -90.2732 472.000 396.0 397.474 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 29 55 45.9451 -90.2732 472.000 30.0 397.662 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 34 55 45.9451 -90.2732 472.000 122.0 397.596 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 39 55 45.9451 -90.2732 472.000 396.0 397.471 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 40 25 45.9451 -90.2732 472.000 396.0 397.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 40 55 45.9451 -90.2732 472.000 396.0 397.462 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 41 25 45.9451 -90.2732 472.000 396.0 397.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 41 55 45.9451 -90.2732 472.000 396.0 397.453 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 42 25 45.9451 -90.2732 472.000 396.0 397.474 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 42 55 45.9451 -90.2732 472.000 396.0 397.482 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 43 25 45.9451 -90.2732 472.000 396.0 397.534 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 43 55 45.9451 -90.2732 472.000 396.0 397.508 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 44 25 45.9451 -90.2732 472.000 396.0 397.507 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 44 55 45.9451 -90.2732 472.000 396.0 397.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 49 55 45.9451 -90.2732 472.000 30.0 397.709 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 54 55 45.9451 -90.2732 472.000 122.0 397.607 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 06 59 55 45.9451 -90.2732 472.000 396.0 397.496 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 04 55 45.9451 -90.2732 472.000 30.0 397.677 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 09 55 45.9451 -90.2732 472.000 122.0 397.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 14 55 45.9451 -90.2732 472.000 396.0 397.628 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 15 25 45.9451 -90.2732 472.000 396.0 397.629 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 15 55 45.9451 -90.2732 472.000 396.0 397.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 16 25 45.9451 -90.2732 472.000 396.0 397.617 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 16 55 45.9451 -90.2732 472.000 396.0 397.596 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 17 25 45.9451 -90.2732 472.000 396.0 397.478 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 17 55 45.9451 -90.2732 472.000 396.0 397.571 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 18 25 45.9451 -90.2732 472.000 396.0 397.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 18 55 45.9451 -90.2732 472.000 396.0 397.630 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 19 25 45.9451 -90.2732 472.000 396.0 397.595 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 19 55 45.9451 -90.2732 472.000 396.0 397.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 24 55 45.9451 -90.2732 472.000 30.0 397.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 29 55 45.9451 -90.2732 472.000 122.0 397.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 34 55 45.9451 -90.2732 472.000 396.0 397.483 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 39 55 45.9451 -90.2732 472.000 30.0 397.879 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 44 55 45.9451 -90.2732 472.000 122.0 397.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 49 55 45.9451 -90.2732 472.000 396.0 397.427 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 07 59 55 45.9451 -90.2732 472.000 30.0 397.774 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 04 55 45.9451 -90.2732 472.000 122.0 397.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 09 55 45.9451 -90.2732 472.000 396.0 397.362 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 14 55 45.9451 -90.2732 472.000 30.0 397.701 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 19 55 45.9451 -90.2732 472.000 122.0 397.530 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 24 55 45.9451 -90.2732 472.000 396.0 397.238 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 25 25 45.9451 -90.2732 472.000 396.0 397.165 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 25 55 45.9451 -90.2732 472.000 396.0 397.189 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 26 25 45.9451 -90.2732 472.000 396.0 397.220 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 26 55 45.9451 -90.2732 472.000 396.0 397.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 27 25 45.9451 -90.2732 472.000 396.0 397.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 27 55 45.9451 -90.2732 472.000 396.0 397.214 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 28 25 45.9451 -90.2732 472.000 396.0 397.195 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 28 55 45.9451 -90.2732 472.000 396.0 397.107 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 29 25 45.9451 -90.2732 472.000 396.0 397.096 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 29 55 45.9451 -90.2732 472.000 396.0 397.198 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 34 55 45.9451 -90.2732 472.000 30.0 397.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 39 55 45.9451 -90.2732 472.000 122.0 397.364 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 44 55 45.9451 -90.2732 472.000 396.0 397.039 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 49 55 45.9451 -90.2732 472.000 30.0 397.364 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 54 55 45.9451 -90.2732 472.000 122.0 397.230 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 08 59 55 45.9451 -90.2732 472.000 396.0 396.923 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 00 25 45.9451 -90.2732 472.000 396.0 396.826 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 00 55 45.9451 -90.2732 472.000 396.0 396.838 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 01 25 45.9451 -90.2732 472.000 396.0 396.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 01 55 45.9451 -90.2732 472.000 396.0 396.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 02 25 45.9451 -90.2732 472.000 396.0 396.872 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 02 55 45.9451 -90.2732 472.000 396.0 396.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 03 25 45.9451 -90.2732 472.000 396.0 396.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 03 55 45.9451 -90.2732 472.000 396.0 396.921 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 04 25 45.9451 -90.2732 472.000 396.0 396.919 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 04 55 45.9451 -90.2732 472.000 396.0 396.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 09 55 45.9451 -90.2732 472.000 30.0 397.089 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 14 55 45.9451 -90.2732 472.000 122.0 397.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 19 55 45.9451 -90.2732 472.000 396.0 396.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 24 55 45.9451 -90.2732 472.000 30.0 397.021 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 29 55 45.9451 -90.2732 472.000 122.0 396.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 34 55 45.9451 -90.2732 472.000 396.0 396.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 35 25 45.9451 -90.2732 472.000 396.0 396.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 35 55 45.9451 -90.2732 472.000 396.0 396.581 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 36 25 45.9451 -90.2732 472.000 396.0 396.616 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 36 55 45.9451 -90.2732 472.000 396.0 396.583 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 37 25 45.9451 -90.2732 472.000 396.0 396.615 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 37 55 45.9451 -90.2732 472.000 396.0 396.555 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 38 25 45.9451 -90.2732 472.000 396.0 396.539 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 38 55 45.9451 -90.2732 472.000 396.0 396.570 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 39 25 45.9451 -90.2732 472.000 396.0 396.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 39 55 45.9451 -90.2732 472.000 396.0 396.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 44 55 45.9451 -90.2732 472.000 30.0 396.817 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 49 55 45.9451 -90.2732 472.000 122.0 396.614 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 54 55 45.9451 -90.2732 472.000 396.0 396.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 09 59 55 45.9451 -90.2732 472.000 30.0 396.642 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 04 55 45.9451 -90.2732 472.000 122.0 396.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 09 55 45.9451 -90.2732 472.000 396.0 396.348 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 19 55 45.9451 -90.2732 472.000 30.0 396.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 24 55 45.9451 -90.2732 472.000 122.0 396.556 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 29 55 45.9451 -90.2732 472.000 396.0 396.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 34 55 45.9451 -90.2732 472.000 30.0 396.608 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 39 55 45.9451 -90.2732 472.000 122.0 396.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 44 55 45.9451 -90.2732 472.000 396.0 396.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 54 55 45.9451 -90.2732 472.000 30.0 396.532 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 10 59 55 45.9451 -90.2732 472.000 122.0 396.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 04 55 45.9451 -90.2732 472.000 396.0 396.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 09 55 45.9451 -90.2732 472.000 30.0 396.538 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 14 55 45.9451 -90.2732 472.000 122.0 396.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 19 55 45.9451 -90.2732 472.000 396.0 396.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 20 25 45.9451 -90.2732 472.000 396.0 396.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 20 55 45.9451 -90.2732 472.000 396.0 396.354 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 21 25 45.9451 -90.2732 472.000 396.0 396.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 21 55 45.9451 -90.2732 472.000 396.0 396.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 22 25 45.9451 -90.2732 472.000 396.0 396.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 22 55 45.9451 -90.2732 472.000 396.0 396.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 23 25 45.9451 -90.2732 472.000 396.0 396.343 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 23 55 45.9451 -90.2732 472.000 396.0 396.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 24 25 45.9451 -90.2732 472.000 396.0 396.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 24 55 45.9451 -90.2732 472.000 396.0 396.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 29 55 45.9451 -90.2732 472.000 30.0 396.571 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 34 55 45.9451 -90.2732 472.000 122.0 396.557 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 39 55 45.9451 -90.2732 472.000 396.0 396.411 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 44 55 45.9451 -90.2732 472.000 30.0 396.612 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 11 49 55 45.9451 -90.2732 472.000 122.0 396.483 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 14 55 45.9451 -90.2732 472.000 396.0 396.486 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 19 55 45.9451 -90.2732 472.000 30.0 396.714 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 24 55 45.9451 -90.2732 472.000 122.0 396.600 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 29 55 45.9451 -90.2732 472.000 396.0 396.578 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 34 55 45.9451 -90.2732 472.000 30.0 396.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 39 55 45.9451 -90.2732 472.000 122.0 396.524 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 44 55 45.9451 -90.2732 472.000 396.0 396.562 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 45 25 45.9451 -90.2732 472.000 396.0 396.506 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 45 55 45.9451 -90.2732 472.000 396.0 396.546 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 46 25 45.9451 -90.2732 472.000 396.0 396.546 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 46 55 45.9451 -90.2732 472.000 396.0 396.634 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 47 25 45.9451 -90.2732 472.000 396.0 396.774 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 47 55 45.9451 -90.2732 472.000 396.0 396.720 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 48 25 45.9451 -90.2732 472.000 396.0 396.492 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 48 55 45.9451 -90.2732 472.000 396.0 396.471 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 49 25 45.9451 -90.2732 472.000 396.0 396.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 49 55 45.9451 -90.2732 472.000 396.0 396.613 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 54 55 45.9451 -90.2732 472.000 30.0 396.666 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 12 59 55 45.9451 -90.2732 472.000 122.0 396.470 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 04 55 45.9451 -90.2732 472.000 396.0 396.484 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 09 55 45.9451 -90.2732 472.000 30.0 396.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 14 55 45.9451 -90.2732 472.000 122.0 396.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 19 55 45.9451 -90.2732 472.000 396.0 396.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 20 25 45.9451 -90.2732 472.000 396.0 396.384 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 20 55 45.9451 -90.2732 472.000 396.0 396.420 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 21 25 45.9451 -90.2732 472.000 396.0 396.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 21 55 45.9451 -90.2732 472.000 396.0 396.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 22 25 45.9451 -90.2732 472.000 396.0 396.323 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 22 55 45.9451 -90.2732 472.000 396.0 396.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 23 25 45.9451 -90.2732 472.000 396.0 396.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 23 55 45.9451 -90.2732 472.000 396.0 396.318 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 24 25 45.9451 -90.2732 472.000 396.0 396.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 24 55 45.9451 -90.2732 472.000 396.0 396.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 29 55 45.9451 -90.2732 472.000 30.0 396.618 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 34 55 45.9451 -90.2732 472.000 122.0 396.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 39 55 45.9451 -90.2732 472.000 396.0 396.271 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 44 55 45.9451 -90.2732 472.000 30.0 396.568 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 49 55 45.9451 -90.2732 472.000 122.0 396.507 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 13 54 55 45.9451 -90.2732 472.000 396.0 396.467 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 04 55 45.9451 -90.2732 472.000 30.0 396.575 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 09 55 45.9451 -90.2732 472.000 122.0 396.592 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 14 55 45.9451 -90.2732 472.000 396.0 396.825 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 19 55 45.9451 -90.2732 472.000 30.0 396.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 24 55 45.9451 -90.2732 472.000 122.0 397.228 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 29 55 45.9451 -90.2732 472.000 396.0 396.783 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 30 25 45.9451 -90.2732 472.000 396.0 396.857 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 30 55 45.9451 -90.2732 472.000 396.0 396.729 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 31 25 45.9451 -90.2732 472.000 396.0 396.975 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 31 55 45.9451 -90.2732 472.000 396.0 396.316 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 32 25 45.9451 -90.2732 472.000 396.0 396.338 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 32 55 45.9451 -90.2732 472.000 396.0 396.523 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 33 25 45.9451 -90.2732 472.000 396.0 396.747 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 33 55 45.9451 -90.2732 472.000 396.0 396.602 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 34 25 45.9451 -90.2732 472.000 396.0 396.780 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 34 55 45.9451 -90.2732 472.000 396.0 396.391 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 39 55 45.9451 -90.2732 472.000 30.0 397.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 44 55 45.9451 -90.2732 472.000 122.0 397.239 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 49 55 45.9451 -90.2732 472.000 396.0 396.589 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 54 55 45.9451 -90.2732 472.000 30.0 397.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 14 59 55 45.9451 -90.2732 472.000 122.0 397.154 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 04 55 45.9451 -90.2732 472.000 396.0 396.186 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 05 25 45.9451 -90.2732 472.000 396.0 396.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 05 55 45.9451 -90.2732 472.000 396.0 396.215 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 06 25 45.9451 -90.2732 472.000 396.0 396.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 06 55 45.9451 -90.2732 472.000 396.0 396.295 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 07 25 45.9451 -90.2732 472.000 396.0 396.285 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 07 55 45.9451 -90.2732 472.000 396.0 396.295 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 08 25 45.9451 -90.2732 472.000 396.0 396.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 08 55 45.9451 -90.2732 472.000 396.0 396.402 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 09 25 45.9451 -90.2732 472.000 396.0 396.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 09 55 45.9451 -90.2732 472.000 396.0 396.384 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 14 55 45.9451 -90.2732 472.000 30.0 397.239 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 19 55 45.9451 -90.2732 472.000 122.0 397.218 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 24 55 45.9451 -90.2732 472.000 396.0 396.221 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 29 55 45.9451 -90.2732 472.000 30.0 397.028 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 34 55 45.9451 -90.2732 472.000 122.0 396.741 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 39 55 45.9451 -90.2732 472.000 396.0 396.333 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 40 25 45.9451 -90.2732 472.000 396.0 396.289 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 40 55 45.9451 -90.2732 472.000 396.0 396.284 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 41 25 45.9451 -90.2732 472.000 396.0 396.292 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 41 55 45.9451 -90.2732 472.000 396.0 396.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 42 25 45.9451 -90.2732 472.000 396.0 396.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 42 55 45.9451 -90.2732 472.000 396.0 396.406 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 43 25 45.9451 -90.2732 472.000 396.0 396.399 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 43 55 45.9451 -90.2732 472.000 396.0 396.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 44 25 45.9451 -90.2732 472.000 396.0 396.305 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 44 55 45.9451 -90.2732 472.000 396.0 396.267 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 49 55 45.9451 -90.2732 472.000 30.0 396.436 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 54 55 45.9451 -90.2732 472.000 122.0 396.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 15 59 55 45.9451 -90.2732 472.000 396.0 396.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 04 55 45.9451 -90.2732 472.000 30.0 396.460 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 09 55 45.9451 -90.2732 472.000 122.0 396.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 14 55 45.9451 -90.2732 472.000 396.0 396.217 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 24 55 45.9451 -90.2732 472.000 30.0 396.881 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 29 55 45.9451 -90.2732 472.000 122.0 397.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 34 55 45.9451 -90.2732 472.000 396.0 396.435 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 39 55 45.9451 -90.2732 472.000 30.0 397.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 44 55 45.9451 -90.2732 472.000 122.0 397.073 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 49 55 45.9451 -90.2732 472.000 396.0 396.221 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 50 25 45.9451 -90.2732 472.000 396.0 396.047 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 50 55 45.9451 -90.2732 472.000 396.0 396.180 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 51 25 45.9451 -90.2732 472.000 396.0 396.170 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 51 55 45.9451 -90.2732 472.000 396.0 396.585 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 52 25 45.9451 -90.2732 472.000 396.0 396.608 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 52 55 45.9451 -90.2732 472.000 396.0 396.706 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 53 25 45.9451 -90.2732 472.000 396.0 396.814 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 53 55 45.9451 -90.2732 472.000 396.0 396.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 54 25 45.9451 -90.2732 472.000 396.0 396.569 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 16 54 55 45.9451 -90.2732 472.000 396.0 396.524 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 04 55 45.9451 -90.2732 472.000 30.0 396.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 09 55 45.9451 -90.2732 472.000 122.0 396.730 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 14 55 45.9451 -90.2732 472.000 396.0 396.398 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 19 55 45.9451 -90.2732 472.000 30.0 396.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 24 55 45.9451 -90.2732 472.000 122.0 397.188 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 29 55 45.9451 -90.2732 472.000 396.0 396.431 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 30 25 45.9451 -90.2732 472.000 396.0 396.411 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 30 55 45.9451 -90.2732 472.000 396.0 396.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 31 25 45.9451 -90.2732 472.000 396.0 396.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 31 55 45.9451 -90.2732 472.000 396.0 396.446 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 32 25 45.9451 -90.2732 472.000 396.0 396.401 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 32 55 45.9451 -90.2732 472.000 396.0 396.275 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 33 25 45.9451 -90.2732 472.000 396.0 396.253 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 33 55 45.9451 -90.2732 472.000 396.0 396.362 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 34 25 45.9451 -90.2732 472.000 396.0 396.195 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 34 55 45.9451 -90.2732 472.000 396.0 396.444 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 39 55 45.9451 -90.2732 472.000 30.0 396.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 44 55 45.9451 -90.2732 472.000 122.0 396.615 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 49 55 45.9451 -90.2732 472.000 396.0 396.349 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 54 55 45.9451 -90.2732 472.000 30.0 396.702 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 17 59 55 45.9451 -90.2732 472.000 122.0 396.956 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 04 55 45.9451 -90.2732 472.000 396.0 396.503 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 14 55 45.9451 -90.2732 472.000 30.0 397.547 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 19 55 45.9451 -90.2732 472.000 122.0 397.292 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 24 55 45.9451 -90.2732 472.000 396.0 396.605 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 29 55 45.9451 -90.2732 472.000 30.0 397.125 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 34 55 45.9451 -90.2732 472.000 122.0 397.223 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 39 55 45.9451 -90.2732 472.000 396.0 396.625 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 40 25 45.9451 -90.2732 472.000 396.0 396.974 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 40 55 45.9451 -90.2732 472.000 396.0 396.457 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 41 25 45.9451 -90.2732 472.000 396.0 396.528 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 41 55 45.9451 -90.2732 472.000 396.0 396.606 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 42 25 45.9451 -90.2732 472.000 396.0 396.413 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 42 55 45.9451 -90.2732 472.000 396.0 396.472 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 43 25 45.9451 -90.2732 472.000 396.0 396.496 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 43 55 45.9451 -90.2732 472.000 396.0 396.446 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 44 25 45.9451 -90.2732 472.000 396.0 396.496 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 44 55 45.9451 -90.2732 472.000 396.0 396.539 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 49 55 45.9451 -90.2732 472.000 30.0 397.527 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 54 55 45.9451 -90.2732 472.000 122.0 397.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 18 59 55 45.9451 -90.2732 472.000 396.0 396.807 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 04 55 45.9451 -90.2732 472.000 30.0 397.374 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 09 55 45.9451 -90.2732 472.000 122.0 397.238 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 14 55 45.9451 -90.2732 472.000 396.0 396.381 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 15 25 45.9451 -90.2732 472.000 396.0 396.206 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 15 55 45.9451 -90.2732 472.000 396.0 396.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 16 25 45.9451 -90.2732 472.000 396.0 396.443 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 16 55 45.9451 -90.2732 472.000 396.0 396.609 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 17 25 45.9451 -90.2732 472.000 396.0 396.888 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 17 55 45.9451 -90.2732 472.000 396.0 396.974 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 18 25 45.9451 -90.2732 472.000 396.0 397.014 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 18 55 45.9451 -90.2732 472.000 396.0 396.715 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 19 25 45.9451 -90.2732 472.000 396.0 396.707 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 19 55 45.9451 -90.2732 472.000 396.0 396.531 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 24 55 45.9451 -90.2732 472.000 30.0 397.164 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 29 55 45.9451 -90.2732 472.000 122.0 397.008 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 34 55 45.9451 -90.2732 472.000 396.0 396.586 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 39 55 45.9451 -90.2732 472.000 30.0 396.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 44 55 45.9451 -90.2732 472.000 122.0 397.107 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 49 55 45.9451 -90.2732 472.000 396.0 397.074 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 19 59 55 45.9451 -90.2732 472.000 30.0 397.276 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 04 55 45.9451 -90.2732 472.000 122.0 397.723 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 09 55 45.9451 -90.2732 472.000 396.0 396.691 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 14 55 45.9451 -90.2732 472.000 30.0 397.746 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 19 55 45.9451 -90.2732 472.000 122.0 397.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 24 55 45.9451 -90.2732 472.000 396.0 396.598 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 25 25 45.9451 -90.2732 472.000 396.0 396.414 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 25 55 45.9451 -90.2732 472.000 396.0 396.676 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 26 25 45.9451 -90.2732 472.000 396.0 396.746 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 26 55 45.9451 -90.2732 472.000 396.0 396.908 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 27 25 45.9451 -90.2732 472.000 396.0 396.938 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 27 55 45.9451 -90.2732 472.000 396.0 396.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 28 25 45.9451 -90.2732 472.000 396.0 396.743 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 28 55 45.9451 -90.2732 472.000 396.0 397.067 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 29 25 45.9451 -90.2732 472.000 396.0 397.230 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 29 55 45.9451 -90.2732 472.000 396.0 397.327 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 34 55 45.9451 -90.2732 472.000 30.0 397.195 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 39 55 45.9451 -90.2732 472.000 122.0 397.464 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 44 55 45.9451 -90.2732 472.000 396.0 397.086 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 49 55 45.9451 -90.2732 472.000 30.0 397.519 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 54 55 45.9451 -90.2732 472.000 122.0 397.216 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 20 59 55 45.9451 -90.2732 472.000 396.0 397.168 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 00 25 45.9451 -90.2732 472.000 396.0 397.118 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 00 55 45.9451 -90.2732 472.000 396.0 397.106 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 01 25 45.9451 -90.2732 472.000 396.0 396.927 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 01 55 45.9451 -90.2732 472.000 396.0 396.946 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 02 25 45.9451 -90.2732 472.000 396.0 396.906 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 02 55 45.9451 -90.2732 472.000 396.0 396.834 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 03 25 45.9451 -90.2732 472.000 396.0 396.979 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 03 55 45.9451 -90.2732 472.000 396.0 397.104 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 04 25 45.9451 -90.2732 472.000 396.0 396.921 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 04 55 45.9451 -90.2732 472.000 396.0 396.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 09 55 45.9451 -90.2732 472.000 30.0 397.637 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 14 55 45.9451 -90.2732 472.000 122.0 397.648 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 19 55 45.9451 -90.2732 472.000 396.0 396.948 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 24 55 45.9451 -90.2732 472.000 30.0 398.037 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 29 55 45.9451 -90.2732 472.000 122.0 397.979 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 34 55 45.9451 -90.2732 472.000 396.0 396.859 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 35 25 45.9451 -90.2732 472.000 396.0 396.819 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 35 55 45.9451 -90.2732 472.000 396.0 396.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 36 25 45.9451 -90.2732 472.000 396.0 396.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 36 55 45.9451 -90.2732 472.000 396.0 396.884 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 37 25 45.9451 -90.2732 472.000 396.0 397.426 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 37 55 45.9451 -90.2732 472.000 396.0 397.065 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 38 25 45.9451 -90.2732 472.000 396.0 396.849 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 38 55 45.9451 -90.2732 472.000 396.0 396.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 39 25 45.9451 -90.2732 472.000 396.0 396.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 39 55 45.9451 -90.2732 472.000 396.0 396.896 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 44 55 45.9451 -90.2732 472.000 30.0 398.279 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 49 55 45.9451 -90.2732 472.000 122.0 398.166 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 54 55 45.9451 -90.2732 472.000 396.0 396.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 21 59 55 45.9451 -90.2732 472.000 30.0 398.427 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 04 55 45.9451 -90.2732 472.000 122.0 398.026 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 09 55 45.9451 -90.2732 472.000 396.0 396.753 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 19 55 45.9451 -90.2732 472.000 30.0 397.862 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 24 55 45.9451 -90.2732 472.000 122.0 397.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 29 55 45.9451 -90.2732 472.000 396.0 396.654 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 34 55 45.9451 -90.2732 472.000 30.0 397.293 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 39 55 45.9451 -90.2732 472.000 122.0 396.964 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 44 55 45.9451 -90.2732 472.000 396.0 396.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 54 55 45.9451 -90.2732 472.000 30.0 397.419 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 22 59 55 45.9451 -90.2732 472.000 122.0 397.077 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 04 55 45.9451 -90.2732 472.000 396.0 396.542 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 09 55 45.9451 -90.2732 472.000 30.0 396.926 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 14 55 45.9451 -90.2732 472.000 122.0 396.766 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 19 55 45.9451 -90.2732 472.000 396.0 396.568 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 20 25 45.9451 -90.2732 472.000 396.0 396.581 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 20 55 45.9451 -90.2732 472.000 396.0 396.566 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 21 25 45.9451 -90.2732 472.000 396.0 396.568 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 21 55 45.9451 -90.2732 472.000 396.0 396.569 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 22 25 45.9451 -90.2732 472.000 396.0 396.559 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 22 55 45.9451 -90.2732 472.000 396.0 396.575 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 23 25 45.9451 -90.2732 472.000 396.0 396.587 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 23 55 45.9451 -90.2732 472.000 396.0 396.606 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 24 25 45.9451 -90.2732 472.000 396.0 396.613 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 24 55 45.9451 -90.2732 472.000 396.0 396.589 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 29 55 45.9451 -90.2732 472.000 30.0 396.824 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 34 55 45.9451 -90.2732 472.000 122.0 396.693 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 39 55 45.9451 -90.2732 472.000 396.0 396.576 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 44 55 45.9451 -90.2732 472.000 30.0 396.773 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 26 23 49 55 45.9451 -90.2732 472.000 122.0 396.677 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 14 55 45.9451 -90.2732 472.000 396.0 396.638 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 19 55 45.9451 -90.2732 472.000 30.0 396.742 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 24 55 45.9451 -90.2732 472.000 122.0 396.649 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 29 55 45.9451 -90.2732 472.000 396.0 396.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 34 55 45.9451 -90.2732 472.000 30.0 396.750 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 39 55 45.9451 -90.2732 472.000 122.0 396.789 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 44 55 45.9451 -90.2732 472.000 396.0 396.724 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 45 25 45.9451 -90.2732 472.000 396.0 396.744 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 45 55 45.9451 -90.2732 472.000 396.0 396.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 46 25 45.9451 -90.2732 472.000 396.0 396.752 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 46 55 45.9451 -90.2732 472.000 396.0 396.776 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 47 25 45.9451 -90.2732 472.000 396.0 396.762 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 47 55 45.9451 -90.2732 472.000 396.0 396.776 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 48 25 45.9451 -90.2732 472.000 396.0 396.765 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 48 55 45.9451 -90.2732 472.000 396.0 396.765 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 49 25 45.9451 -90.2732 472.000 396.0 396.769 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 49 55 45.9451 -90.2732 472.000 396.0 396.728 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 54 55 45.9451 -90.2732 472.000 30.0 396.903 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 00 59 55 45.9451 -90.2732 472.000 122.0 396.834 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 04 55 45.9451 -90.2732 472.000 396.0 396.759 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 09 55 45.9451 -90.2732 472.000 30.0 396.927 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 14 55 45.9451 -90.2732 472.000 122.0 396.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 19 55 45.9451 -90.2732 472.000 396.0 396.821 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 20 25 45.9451 -90.2732 472.000 396.0 396.743 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 20 55 45.9451 -90.2732 472.000 396.0 396.704 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 21 25 45.9451 -90.2732 472.000 396.0 396.777 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 21 55 45.9451 -90.2732 472.000 396.0 396.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 22 25 45.9451 -90.2732 472.000 396.0 396.826 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 22 55 45.9451 -90.2732 472.000 396.0 396.822 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 23 25 45.9451 -90.2732 472.000 396.0 396.722 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 23 55 45.9451 -90.2732 472.000 396.0 396.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 24 25 45.9451 -90.2732 472.000 396.0 396.744 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 24 55 45.9451 -90.2732 472.000 396.0 396.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 29 55 45.9451 -90.2732 472.000 30.0 396.870 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 34 55 45.9451 -90.2732 472.000 122.0 396.938 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 39 55 45.9451 -90.2732 472.000 396.0 396.774 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 44 55 45.9451 -90.2732 472.000 30.0 396.950 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 49 55 45.9451 -90.2732 472.000 122.0 396.860 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 01 54 55 45.9451 -90.2732 472.000 396.0 396.738 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 04 55 45.9451 -90.2732 472.000 30.0 397.073 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 09 55 45.9451 -90.2732 472.000 122.0 396.978 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 14 55 45.9451 -90.2732 472.000 396.0 396.775 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 19 55 45.9451 -90.2732 472.000 30.0 396.998 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 24 55 45.9451 -90.2732 472.000 122.0 396.972 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 29 55 45.9451 -90.2732 472.000 396.0 396.748 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 30 25 45.9451 -90.2732 472.000 396.0 396.783 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 30 55 45.9451 -90.2732 472.000 396.0 396.753 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 31 25 45.9451 -90.2732 472.000 396.0 396.743 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 31 55 45.9451 -90.2732 472.000 396.0 396.815 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 32 25 45.9451 -90.2732 472.000 396.0 396.808 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 32 55 45.9451 -90.2732 472.000 396.0 396.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 33 25 45.9451 -90.2732 472.000 396.0 396.778 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 33 55 45.9451 -90.2732 472.000 396.0 396.702 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 34 25 45.9451 -90.2732 472.000 396.0 396.808 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 34 55 45.9451 -90.2732 472.000 396.0 396.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 39 55 45.9451 -90.2732 472.000 30.0 397.119 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 44 55 45.9451 -90.2732 472.000 122.0 397.042 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 49 55 45.9451 -90.2732 472.000 396.0 396.714 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 54 55 45.9451 -90.2732 472.000 30.0 397.034 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 02 59 55 45.9451 -90.2732 472.000 122.0 396.784 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 04 55 45.9451 -90.2732 472.000 396.0 396.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 05 25 45.9451 -90.2732 472.000 396.0 396.741 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 05 55 45.9451 -90.2732 472.000 396.0 396.684 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 06 25 45.9451 -90.2732 472.000 396.0 396.768 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 06 55 45.9451 -90.2732 472.000 396.0 396.777 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 07 25 45.9451 -90.2732 472.000 396.0 396.685 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 07 55 45.9451 -90.2732 472.000 396.0 396.771 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 08 25 45.9451 -90.2732 472.000 396.0 396.773 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 08 55 45.9451 -90.2732 472.000 396.0 396.683 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 09 25 45.9451 -90.2732 472.000 396.0 396.780 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 09 55 45.9451 -90.2732 472.000 396.0 396.785 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 14 55 45.9451 -90.2732 472.000 30.0 396.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 19 55 45.9451 -90.2732 472.000 122.0 396.831 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 24 55 45.9451 -90.2732 472.000 396.0 396.684 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 29 55 45.9451 -90.2732 472.000 30.0 396.842 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 34 55 45.9451 -90.2732 472.000 122.0 396.898 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 39 55 45.9451 -90.2732 472.000 396.0 396.556 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 40 25 45.9451 -90.2732 472.000 396.0 396.547 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 40 55 45.9451 -90.2732 472.000 396.0 396.557 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 41 25 45.9451 -90.2732 472.000 396.0 396.575 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 41 55 45.9451 -90.2732 472.000 396.0 396.633 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 42 25 45.9451 -90.2732 472.000 396.0 396.580 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 42 55 45.9451 -90.2732 472.000 396.0 396.536 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 43 25 45.9451 -90.2732 472.000 396.0 396.507 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 43 55 45.9451 -90.2732 472.000 396.0 396.572 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 44 25 45.9451 -90.2732 472.000 396.0 396.565 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 44 55 45.9451 -90.2732 472.000 396.0 396.593 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 49 55 45.9451 -90.2732 472.000 30.0 396.854 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 54 55 45.9451 -90.2732 472.000 122.0 396.668 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 03 59 55 45.9451 -90.2732 472.000 396.0 396.421 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 04 55 45.9451 -90.2732 472.000 30.0 396.826 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 09 55 45.9451 -90.2732 472.000 122.0 396.687 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 14 55 45.9451 -90.2732 472.000 396.0 396.521 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 24 55 45.9451 -90.2732 472.000 30.0 396.814 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 29 55 45.9451 -90.2732 472.000 122.0 396.795 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 34 55 45.9451 -90.2732 472.000 396.0 396.695 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 39 55 45.9451 -90.2732 472.000 30.0 396.932 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 44 55 45.9451 -90.2732 472.000 122.0 396.908 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 49 55 45.9451 -90.2732 472.000 396.0 396.710 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 50 25 45.9451 -90.2732 472.000 396.0 396.619 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 50 55 45.9451 -90.2732 472.000 396.0 396.591 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 51 25 45.9451 -90.2732 472.000 396.0 396.761 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 51 55 45.9451 -90.2732 472.000 396.0 396.716 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 52 25 45.9451 -90.2732 472.000 396.0 396.819 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 52 55 45.9451 -90.2732 472.000 396.0 396.792 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 53 25 45.9451 -90.2732 472.000 396.0 396.794 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 53 55 45.9451 -90.2732 472.000 396.0 396.784 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 54 25 45.9451 -90.2732 472.000 396.0 396.768 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 04 54 55 45.9451 -90.2732 472.000 396.0 396.731 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 04 55 45.9451 -90.2732 472.000 30.0 397.034 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 09 55 45.9451 -90.2732 472.000 122.0 397.029 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 14 55 45.9451 -90.2732 472.000 396.0 396.837 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 19 55 45.9451 -90.2732 472.000 30.0 397.060 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 24 55 45.9451 -90.2732 472.000 122.0 396.955 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 29 55 45.9451 -90.2732 472.000 396.0 396.771 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 30 25 45.9451 -90.2732 472.000 396.0 396.717 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 30 55 45.9451 -90.2732 472.000 396.0 396.803 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 31 25 45.9451 -90.2732 472.000 396.0 396.758 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 31 55 45.9451 -90.2732 472.000 396.0 396.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 32 25 45.9451 -90.2732 472.000 396.0 396.878 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 32 55 45.9451 -90.2732 472.000 396.0 396.909 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 33 25 45.9451 -90.2732 472.000 396.0 396.835 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 33 55 45.9451 -90.2732 472.000 396.0 396.838 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 34 25 45.9451 -90.2732 472.000 396.0 396.902 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 34 55 45.9451 -90.2732 472.000 396.0 396.904 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 39 55 45.9451 -90.2732 472.000 30.0 397.134 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 44 55 45.9451 -90.2732 472.000 122.0 397.100 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 49 55 45.9451 -90.2732 472.000 396.0 396.851 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 54 55 45.9451 -90.2732 472.000 30.0 397.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 05 59 55 45.9451 -90.2732 472.000 122.0 397.187 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 04 55 45.9451 -90.2732 472.000 396.0 396.994 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 14 55 45.9451 -90.2732 472.000 30.0 397.363 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 19 55 45.9451 -90.2732 472.000 122.0 397.193 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 24 55 45.9451 -90.2732 472.000 396.0 396.986 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 29 55 45.9451 -90.2732 472.000 30.0 397.438 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 34 55 45.9451 -90.2732 472.000 122.0 397.294 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 39 55 45.9451 -90.2732 472.000 396.0 396.894 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 40 25 45.9451 -90.2732 472.000 396.0 396.923 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 40 55 45.9451 -90.2732 472.000 396.0 397.023 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 41 25 45.9451 -90.2732 472.000 396.0 397.032 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 41 55 45.9451 -90.2732 472.000 396.0 397.062 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 42 25 45.9451 -90.2732 472.000 396.0 396.747 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 42 55 45.9451 -90.2732 472.000 396.0 396.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 43 25 45.9451 -90.2732 472.000 396.0 396.803 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 43 55 45.9451 -90.2732 472.000 396.0 396.844 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 44 25 45.9451 -90.2732 472.000 396.0 396.824 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 44 55 45.9451 -90.2732 472.000 396.0 396.805 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 49 55 45.9451 -90.2732 472.000 30.0 397.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 54 55 45.9451 -90.2732 472.000 122.0 397.133 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 06 59 55 45.9451 -90.2732 472.000 396.0 396.901 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 04 55 45.9451 -90.2732 472.000 30.0 397.320 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 09 55 45.9451 -90.2732 472.000 122.0 397.151 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 14 55 45.9451 -90.2732 472.000 396.0 396.972 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 15 25 45.9451 -90.2732 472.000 396.0 397.031 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 15 55 45.9451 -90.2732 472.000 396.0 396.898 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 16 25 45.9451 -90.2732 472.000 396.0 396.865 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 16 55 45.9451 -90.2732 472.000 396.0 396.988 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 17 25 45.9451 -90.2732 472.000 396.0 397.021 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 17 55 45.9451 -90.2732 472.000 396.0 397.052 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 18 25 45.9451 -90.2732 472.000 396.0 397.038 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 18 55 45.9451 -90.2732 472.000 396.0 396.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 19 25 45.9451 -90.2732 472.000 396.0 396.989 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 19 55 45.9451 -90.2732 472.000 396.0 397.032 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 24 55 45.9451 -90.2732 472.000 30.0 397.285 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 29 55 45.9451 -90.2732 472.000 122.0 397.104 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 34 55 45.9451 -90.2732 472.000 396.0 396.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 39 55 45.9451 -90.2732 472.000 30.0 397.322 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 44 55 45.9451 -90.2732 472.000 122.0 397.178 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 49 55 45.9451 -90.2732 472.000 396.0 397.046 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 07 59 55 45.9451 -90.2732 472.000 30.0 397.357 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 04 55 45.9451 -90.2732 472.000 122.0 397.330 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 09 55 45.9451 -90.2732 472.000 396.0 397.004 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 14 55 45.9451 -90.2732 472.000 30.0 397.423 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 19 55 45.9451 -90.2732 472.000 122.0 397.287 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 24 55 45.9451 -90.2732 472.000 396.0 397.034 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 25 25 45.9451 -90.2732 472.000 396.0 397.124 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 25 55 45.9451 -90.2732 472.000 396.0 397.043 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 26 25 45.9451 -90.2732 472.000 396.0 397.022 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 26 55 45.9451 -90.2732 472.000 396.0 397.060 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 27 25 45.9451 -90.2732 472.000 396.0 397.024 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 27 55 45.9451 -90.2732 472.000 396.0 397.036 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 28 25 45.9451 -90.2732 472.000 396.0 397.067 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 28 55 45.9451 -90.2732 472.000 396.0 397.090 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 29 25 45.9451 -90.2732 472.000 396.0 397.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 29 55 45.9451 -90.2732 472.000 396.0 397.062 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 34 55 45.9451 -90.2732 472.000 30.0 397.262 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 39 55 45.9451 -90.2732 472.000 122.0 397.228 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 44 55 45.9451 -90.2732 472.000 396.0 397.108 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 49 55 45.9451 -90.2732 472.000 30.0 397.352 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 54 55 45.9451 -90.2732 472.000 122.0 397.291 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 08 59 55 45.9451 -90.2732 472.000 396.0 397.096 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 00 25 45.9451 -90.2732 472.000 396.0 397.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 00 55 45.9451 -90.2732 472.000 396.0 397.152 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 01 25 45.9451 -90.2732 472.000 396.0 397.204 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 01 55 45.9451 -90.2732 472.000 396.0 397.219 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 02 25 45.9451 -90.2732 472.000 396.0 397.204 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 02 55 45.9451 -90.2732 472.000 396.0 397.240 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 03 25 45.9451 -90.2732 472.000 396.0 397.194 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 03 55 45.9451 -90.2732 472.000 396.0 397.192 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 04 25 45.9451 -90.2732 472.000 396.0 397.192 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 04 55 45.9451 -90.2732 472.000 396.0 397.182 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 09 55 45.9451 -90.2732 472.000 30.0 397.343 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 14 55 45.9451 -90.2732 472.000 122.0 397.368 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 19 55 45.9451 -90.2732 472.000 396.0 397.303 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 24 55 45.9451 -90.2732 472.000 30.0 397.520 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 29 55 45.9451 -90.2732 472.000 122.0 397.488 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 34 55 45.9451 -90.2732 472.000 396.0 397.404 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 35 25 45.9451 -90.2732 472.000 396.0 397.371 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 35 55 45.9451 -90.2732 472.000 396.0 397.377 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 36 25 45.9451 -90.2732 472.000 396.0 397.403 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 36 55 45.9451 -90.2732 472.000 396.0 397.415 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 37 25 45.9451 -90.2732 472.000 396.0 397.347 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 37 55 45.9451 -90.2732 472.000 396.0 397.404 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 38 25 45.9451 -90.2732 472.000 396.0 397.363 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 38 55 45.9451 -90.2732 472.000 396.0 397.308 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 39 25 45.9451 -90.2732 472.000 396.0 397.277 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 39 55 45.9451 -90.2732 472.000 396.0 397.394 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 44 55 45.9451 -90.2732 472.000 30.0 397.549 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 49 55 45.9451 -90.2732 472.000 122.0 397.494 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 54 55 45.9451 -90.2732 472.000 396.0 397.184 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 09 59 55 45.9451 -90.2732 472.000 30.0 397.544 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 04 55 45.9451 -90.2732 472.000 122.0 397.497 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 09 55 45.9451 -90.2732 472.000 396.0 397.249 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 19 55 45.9451 -90.2732 472.000 30.0 397.646 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 24 55 45.9451 -90.2732 472.000 122.0 397.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 29 55 45.9451 -90.2732 472.000 396.0 397.172 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 34 55 45.9451 -90.2732 472.000 30.0 397.785 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 39 55 45.9451 -90.2732 472.000 122.0 397.696 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 44 55 45.9451 -90.2732 472.000 396.0 397.210 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 54 55 45.9451 -90.2732 472.000 30.0 397.844 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 10 59 55 45.9451 -90.2732 472.000 122.0 397.717 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 04 55 45.9451 -90.2732 472.000 396.0 397.130 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 09 55 45.9451 -90.2732 472.000 30.0 397.898 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 14 55 45.9451 -90.2732 472.000 122.0 397.752 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 19 55 45.9451 -90.2732 472.000 396.0 397.392 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 20 25 45.9451 -90.2732 472.000 396.0 397.476 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 20 55 45.9451 -90.2732 472.000 396.0 397.473 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 21 25 45.9451 -90.2732 472.000 396.0 397.531 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 21 55 45.9451 -90.2732 472.000 396.0 397.453 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 22 25 45.9451 -90.2732 472.000 396.0 397.506 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 22 55 45.9451 -90.2732 472.000 396.0 397.458 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 23 25 45.9451 -90.2732 472.000 396.0 397.295 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 23 55 45.9451 -90.2732 472.000 396.0 397.128 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 24 25 45.9451 -90.2732 472.000 396.0 397.062 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 24 55 45.9451 -90.2732 472.000 396.0 397.140 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 29 55 45.9451 -90.2732 472.000 30.0 397.817 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 34 55 45.9451 -90.2732 472.000 122.0 397.673 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 39 55 45.9451 -90.2732 472.000 396.0 397.034 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 44 55 45.9451 -90.2732 472.000 30.0 397.910 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 11 49 55 45.9451 -90.2732 472.000 122.0 397.929 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 14 55 45.9451 -90.2732 472.000 396.0 397.246 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 19 55 45.9451 -90.2732 472.000 30.0 398.085 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 24 55 45.9451 -90.2732 472.000 122.0 397.935 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 29 55 45.9451 -90.2732 472.000 396.0 396.860 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 34 55 45.9451 -90.2732 472.000 30.0 398.043 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 39 55 45.9451 -90.2732 472.000 122.0 397.990 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 44 55 45.9451 -90.2732 472.000 396.0 396.965 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 45 25 45.9451 -90.2732 472.000 396.0 397.076 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 45 55 45.9451 -90.2732 472.000 396.0 396.885 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 46 25 45.9451 -90.2732 472.000 396.0 396.780 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 46 55 45.9451 -90.2732 472.000 396.0 396.856 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 47 25 45.9451 -90.2732 472.000 396.0 396.722 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 47 55 45.9451 -90.2732 472.000 396.0 396.708 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 48 25 45.9451 -90.2732 472.000 396.0 396.771 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 48 55 45.9451 -90.2732 472.000 396.0 396.977 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 49 25 45.9451 -90.2732 472.000 396.0 396.735 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 49 55 45.9451 -90.2732 472.000 396.0 396.680 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 54 55 45.9451 -90.2732 472.000 30.0 398.047 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 12 59 55 45.9451 -90.2732 472.000 122.0 397.961 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 04 55 45.9451 -90.2732 472.000 396.0 396.894 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 09 55 45.9451 -90.2732 472.000 30.0 397.949 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 14 55 45.9451 -90.2732 472.000 122.0 398.048 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 19 55 45.9451 -90.2732 472.000 396.0 396.882 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 20 25 45.9451 -90.2732 472.000 396.0 396.936 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 20 55 45.9451 -90.2732 472.000 396.0 396.841 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 21 25 45.9451 -90.2732 472.000 396.0 396.893 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 21 55 45.9451 -90.2732 472.000 396.0 397.010 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 22 25 45.9451 -90.2732 472.000 396.0 396.986 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 22 55 45.9451 -90.2732 472.000 396.0 396.959 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 23 25 45.9451 -90.2732 472.000 396.0 396.949 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 23 55 45.9451 -90.2732 472.000 396.0 396.901 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 24 25 45.9451 -90.2732 472.000 396.0 396.923 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 24 55 45.9451 -90.2732 472.000 396.0 396.988 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 29 55 45.9451 -90.2732 472.000 30.0 398.195 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 34 55 45.9451 -90.2732 472.000 122.0 398.045 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 39 55 45.9451 -90.2732 472.000 396.0 396.846 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 44 55 45.9451 -90.2732 472.000 30.0 398.174 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 49 55 45.9451 -90.2732 472.000 122.0 398.038 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 13 54 55 45.9451 -90.2732 472.000 396.0 396.904 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 04 55 45.9451 -90.2732 472.000 30.0 398.242 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 09 55 45.9451 -90.2732 472.000 122.0 398.014 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 14 55 45.9451 -90.2732 472.000 396.0 396.807 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 19 55 45.9451 -90.2732 472.000 30.0 398.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 24 55 45.9451 -90.2732 472.000 122.0 397.621 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 29 55 45.9451 -90.2732 472.000 396.0 397.109 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 30 25 45.9451 -90.2732 472.000 396.0 397.050 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 30 55 45.9451 -90.2732 472.000 396.0 397.077 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 31 25 45.9451 -90.2732 472.000 396.0 397.234 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 31 55 45.9451 -90.2732 472.000 396.0 397.132 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 32 25 45.9451 -90.2732 472.000 396.0 397.298 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 32 55 45.9451 -90.2732 472.000 396.0 397.149 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 33 25 45.9451 -90.2732 472.000 396.0 397.317 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 33 55 45.9451 -90.2732 472.000 396.0 397.330 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 34 25 45.9451 -90.2732 472.000 396.0 397.180 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 34 55 45.9451 -90.2732 472.000 396.0 397.259 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 39 55 45.9451 -90.2732 472.000 30.0 398.033 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 44 55 45.9451 -90.2732 472.000 122.0 397.993 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 49 55 45.9451 -90.2732 472.000 396.0 396.798 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 54 55 45.9451 -90.2732 472.000 30.0 398.095 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 14 59 55 45.9451 -90.2732 472.000 122.0 397.766 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 04 55 45.9451 -90.2732 472.000 396.0 397.059 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 05 25 45.9451 -90.2732 472.000 396.0 397.202 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 05 55 45.9451 -90.2732 472.000 396.0 397.293 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 06 25 45.9451 -90.2732 472.000 396.0 397.049 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 06 55 45.9451 -90.2732 472.000 396.0 397.055 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 07 25 45.9451 -90.2732 472.000 396.0 397.288 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 07 55 45.9451 -90.2732 472.000 396.0 397.298 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 08 25 45.9451 -90.2732 472.000 396.0 397.377 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 08 55 45.9451 -90.2732 472.000 396.0 397.055 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 09 25 45.9451 -90.2732 472.000 396.0 397.100 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 09 55 45.9451 -90.2732 472.000 396.0 397.148 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 14 55 45.9451 -90.2732 472.000 30.0 397.771 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 19 55 45.9451 -90.2732 472.000 122.0 397.620 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 24 55 45.9451 -90.2732 472.000 396.0 397.168 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 29 55 45.9451 -90.2732 472.000 30.0 397.740 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 34 55 45.9451 -90.2732 472.000 122.0 397.477 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 39 55 45.9451 -90.2732 472.000 396.0 397.138 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 40 25 45.9451 -90.2732 472.000 396.0 397.116 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 40 55 45.9451 -90.2732 472.000 396.0 397.122 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 41 25 45.9451 -90.2732 472.000 396.0 397.126 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 41 55 45.9451 -90.2732 472.000 396.0 396.987 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 42 25 45.9451 -90.2732 472.000 396.0 396.914 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 42 55 45.9451 -90.2732 472.000 396.0 397.059 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 43 25 45.9451 -90.2732 472.000 396.0 397.305 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 43 55 45.9451 -90.2732 472.000 396.0 397.362 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 44 25 45.9451 -90.2732 472.000 396.0 397.214 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 44 55 45.9451 -90.2732 472.000 396.0 397.116 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 49 55 45.9451 -90.2732 472.000 30.0 397.223 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 54 55 45.9451 -90.2732 472.000 122.0 397.330 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 15 59 55 45.9451 -90.2732 472.000 396.0 397.297 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 04 55 45.9451 -90.2732 472.000 30.0 397.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 09 55 45.9451 -90.2732 472.000 122.0 397.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 14 55 45.9451 -90.2732 472.000 396.0 397.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 24 55 45.9451 -90.2732 472.000 30.0 397.371 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 29 55 45.9451 -90.2732 472.000 122.0 397.351 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 34 55 45.9451 -90.2732 472.000 396.0 397.353 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 39 55 45.9451 -90.2732 472.000 30.0 397.406 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 44 55 45.9451 -90.2732 472.000 122.0 397.452 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 49 55 45.9451 -90.2732 472.000 396.0 397.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 50 25 45.9451 -90.2732 472.000 396.0 397.387 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 50 55 45.9451 -90.2732 472.000 396.0 397.375 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 51 25 45.9451 -90.2732 472.000 396.0 397.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 51 55 45.9451 -90.2732 472.000 396.0 397.358 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 52 25 45.9451 -90.2732 472.000 396.0 397.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 52 55 45.9451 -90.2732 472.000 396.0 397.403 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 53 25 45.9451 -90.2732 472.000 396.0 397.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 53 55 45.9451 -90.2732 472.000 396.0 397.415 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 54 25 45.9451 -90.2732 472.000 396.0 397.381 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 16 54 55 45.9451 -90.2732 472.000 396.0 397.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 04 55 45.9451 -90.2732 472.000 30.0 397.502 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 09 55 45.9451 -90.2732 472.000 122.0 397.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 14 55 45.9451 -90.2732 472.000 396.0 397.474 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 19 55 45.9451 -90.2732 472.000 30.0 397.535 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 24 55 45.9451 -90.2732 472.000 122.0 397.292 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 29 55 45.9451 -90.2732 472.000 396.0 397.293 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 30 25 45.9451 -90.2732 472.000 396.0 397.549 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 30 55 45.9451 -90.2732 472.000 396.0 397.540 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 31 25 45.9451 -90.2732 472.000 396.0 397.513 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 31 55 45.9451 -90.2732 472.000 396.0 397.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 32 25 45.9451 -90.2732 472.000 396.0 397.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 32 55 45.9451 -90.2732 472.000 396.0 397.511 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 33 25 45.9451 -90.2732 472.000 396.0 397.508 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 33 55 45.9451 -90.2732 472.000 396.0 397.465 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 34 25 45.9451 -90.2732 472.000 396.0 397.579 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 34 55 45.9451 -90.2732 472.000 396.0 397.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 39 55 45.9451 -90.2732 472.000 30.0 397.953 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 44 55 45.9451 -90.2732 472.000 122.0 398.004 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 49 55 45.9451 -90.2732 472.000 396.0 397.331 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 54 55 45.9451 -90.2732 472.000 30.0 398.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 17 59 55 45.9451 -90.2732 472.000 122.0 398.271 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 04 55 45.9451 -90.2732 472.000 396.0 397.537 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 14 55 45.9451 -90.2732 472.000 30.0 398.208 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 19 55 45.9451 -90.2732 472.000 122.0 398.481 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 24 55 45.9451 -90.2732 472.000 396.0 393.312 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 29 55 45.9451 -90.2732 472.000 30.0 398.719 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 34 55 45.9451 -90.2732 472.000 122.0 398.577 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 39 55 45.9451 -90.2732 472.000 396.0 397.547 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 40 25 45.9451 -90.2732 472.000 396.0 397.726 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 40 55 45.9451 -90.2732 472.000 396.0 397.666 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 41 25 45.9451 -90.2732 472.000 396.0 397.748 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 41 55 45.9451 -90.2732 472.000 396.0 397.827 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 42 25 45.9451 -90.2732 472.000 396.0 397.889 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 42 55 45.9451 -90.2732 472.000 396.0 397.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 43 25 45.9451 -90.2732 472.000 396.0 397.514 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 43 55 45.9451 -90.2732 472.000 396.0 397.784 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 44 25 45.9451 -90.2732 472.000 396.0 397.605 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 44 55 45.9451 -90.2732 472.000 396.0 397.495 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 49 55 45.9451 -90.2732 472.000 30.0 398.394 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 54 55 45.9451 -90.2732 472.000 122.0 398.298 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 18 59 55 45.9451 -90.2732 472.000 396.0 396.875 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 04 55 45.9451 -90.2732 472.000 30.0 398.265 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 09 55 45.9451 -90.2732 472.000 122.0 397.619 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 14 55 45.9451 -90.2732 472.000 396.0 397.816 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 15 25 45.9451 -90.2732 472.000 396.0 397.744 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 15 55 45.9451 -90.2732 472.000 396.0 397.771 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 16 25 45.9451 -90.2732 472.000 396.0 397.768 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 16 55 45.9451 -90.2732 472.000 396.0 397.774 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 17 25 45.9451 -90.2732 472.000 396.0 397.785 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 17 55 45.9451 -90.2732 472.000 396.0 397.744 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 18 25 45.9451 -90.2732 472.000 396.0 397.763 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 18 55 45.9451 -90.2732 472.000 396.0 397.797 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 19 25 45.9451 -90.2732 472.000 396.0 397.583 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 19 55 45.9451 -90.2732 472.000 396.0 397.603 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 24 55 45.9451 -90.2732 472.000 30.0 397.884 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 29 55 45.9451 -90.2732 472.000 122.0 397.797 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 34 55 45.9451 -90.2732 472.000 396.0 397.774 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 39 55 45.9451 -90.2732 472.000 30.0 397.924 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 44 55 45.9451 -90.2732 472.000 122.0 397.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 49 55 45.9451 -90.2732 472.000 396.0 397.687 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 19 59 55 45.9451 -90.2732 472.000 30.0 397.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 04 55 45.9451 -90.2732 472.000 122.0 397.842 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 09 55 45.9451 -90.2732 472.000 396.0 397.457 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 14 55 45.9451 -90.2732 472.000 30.0 397.786 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 19 55 45.9451 -90.2732 472.000 122.0 397.852 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 24 55 45.9451 -90.2732 472.000 396.0 397.797 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 25 25 45.9451 -90.2732 472.000 396.0 397.781 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 25 55 45.9451 -90.2732 472.000 396.0 397.734 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 26 25 45.9451 -90.2732 472.000 396.0 397.780 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 26 55 45.9451 -90.2732 472.000 396.0 397.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 27 25 45.9451 -90.2732 472.000 396.0 397.819 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 27 55 45.9451 -90.2732 472.000 396.0 397.812 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 28 25 45.9451 -90.2732 472.000 396.0 397.796 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 28 55 45.9451 -90.2732 472.000 396.0 397.704 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 29 25 45.9451 -90.2732 472.000 396.0 397.626 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 29 55 45.9451 -90.2732 472.000 396.0 397.618 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 34 55 45.9451 -90.2732 472.000 30.0 397.807 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 39 55 45.9451 -90.2732 472.000 122.0 397.590 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 44 55 45.9451 -90.2732 472.000 396.0 397.485 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 49 55 45.9451 -90.2732 472.000 30.0 397.702 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 54 55 45.9451 -90.2732 472.000 122.0 397.734 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 20 59 55 45.9451 -90.2732 472.000 396.0 397.478 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 00 25 45.9451 -90.2732 472.000 396.0 397.670 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 00 55 45.9451 -90.2732 472.000 396.0 397.692 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 01 25 45.9451 -90.2732 472.000 396.0 397.738 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 01 55 45.9451 -90.2732 472.000 396.0 397.698 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 02 25 45.9451 -90.2732 472.000 396.0 397.736 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 02 55 45.9451 -90.2732 472.000 396.0 397.692 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 03 25 45.9451 -90.2732 472.000 396.0 397.783 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 03 55 45.9451 -90.2732 472.000 396.0 397.712 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 04 25 45.9451 -90.2732 472.000 396.0 397.780 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 04 55 45.9451 -90.2732 472.000 396.0 397.690 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 09 55 45.9451 -90.2732 472.000 30.0 397.935 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 14 55 45.9451 -90.2732 472.000 122.0 397.823 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 19 55 45.9451 -90.2732 472.000 396.0 397.749 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 24 55 45.9451 -90.2732 472.000 30.0 397.812 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 29 55 45.9451 -90.2732 472.000 122.0 397.636 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 34 55 45.9451 -90.2732 472.000 396.0 397.625 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 35 25 45.9451 -90.2732 472.000 396.0 397.595 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 35 55 45.9451 -90.2732 472.000 396.0 397.638 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 36 25 45.9451 -90.2732 472.000 396.0 397.632 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 36 55 45.9451 -90.2732 472.000 396.0 397.626 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 37 25 45.9451 -90.2732 472.000 396.0 397.491 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 37 55 45.9451 -90.2732 472.000 396.0 397.558 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 38 25 45.9451 -90.2732 472.000 396.0 397.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 38 55 45.9451 -90.2732 472.000 396.0 397.500 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 39 25 45.9451 -90.2732 472.000 396.0 397.176 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 39 55 45.9451 -90.2732 472.000 396.0 396.946 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 44 55 45.9451 -90.2732 472.000 30.0 397.706 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 49 55 45.9451 -90.2732 472.000 122.0 397.590 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 54 55 45.9451 -90.2732 472.000 396.0 396.273 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 21 59 55 45.9451 -90.2732 472.000 30.0 397.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 04 55 45.9451 -90.2732 472.000 122.0 397.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 09 55 45.9451 -90.2732 472.000 396.0 394.838 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 19 55 45.9451 -90.2732 472.000 30.0 397.759 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 24 55 45.9451 -90.2732 472.000 122.0 397.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 29 55 45.9451 -90.2732 472.000 396.0 395.625 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 34 55 45.9451 -90.2732 472.000 30.0 397.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 39 55 45.9451 -90.2732 472.000 122.0 397.536 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 44 55 45.9451 -90.2732 472.000 396.0 395.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 54 55 45.9451 -90.2732 472.000 30.0 397.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 22 59 55 45.9451 -90.2732 472.000 122.0 397.613 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 04 55 45.9451 -90.2732 472.000 396.0 396.162 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 09 55 45.9451 -90.2732 472.000 30.0 398.076 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 14 55 45.9451 -90.2732 472.000 122.0 397.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 19 55 45.9451 -90.2732 472.000 396.0 396.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 20 25 45.9451 -90.2732 472.000 396.0 396.826 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 20 55 45.9451 -90.2732 472.000 396.0 396.649 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 21 25 45.9451 -90.2732 472.000 396.0 396.707 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 21 55 45.9451 -90.2732 472.000 396.0 396.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 22 25 45.9451 -90.2732 472.000 396.0 396.744 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 22 55 45.9451 -90.2732 472.000 396.0 396.464 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 23 25 45.9451 -90.2732 472.000 396.0 396.466 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 23 55 45.9451 -90.2732 472.000 396.0 396.579 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 24 25 45.9451 -90.2732 472.000 396.0 396.757 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 24 55 45.9451 -90.2732 472.000 396.0 396.740 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 29 55 45.9451 -90.2732 472.000 30.0 398.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 34 55 45.9451 -90.2732 472.000 122.0 398.343 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 39 55 45.9451 -90.2732 472.000 396.0 395.740 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 44 55 45.9451 -90.2732 472.000 30.0 398.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 27 23 49 55 45.9451 -90.2732 472.000 122.0 398.346 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 14 55 45.9451 -90.2732 472.000 396.0 394.413 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 19 55 45.9451 -90.2732 472.000 30.0 398.689 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 24 55 45.9451 -90.2732 472.000 122.0 398.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 29 55 45.9451 -90.2732 472.000 396.0 394.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 34 55 45.9451 -90.2732 472.000 30.0 398.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 39 55 45.9451 -90.2732 472.000 122.0 398.027 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 44 55 45.9451 -90.2732 472.000 396.0 394.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 45 25 45.9451 -90.2732 472.000 396.0 393.919 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 45 55 45.9451 -90.2732 472.000 396.0 393.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 46 25 45.9451 -90.2732 472.000 396.0 393.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 46 55 45.9451 -90.2732 472.000 396.0 393.800 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 47 25 45.9451 -90.2732 472.000 396.0 393.741 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 47 55 45.9451 -90.2732 472.000 396.0 393.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 48 25 45.9451 -90.2732 472.000 396.0 393.756 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 48 55 45.9451 -90.2732 472.000 396.0 393.839 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 49 25 45.9451 -90.2732 472.000 396.0 393.910 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 49 55 45.9451 -90.2732 472.000 396.0 393.891 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 54 55 45.9451 -90.2732 472.000 30.0 398.869 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 00 59 55 45.9451 -90.2732 472.000 122.0 398.161 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 04 55 45.9451 -90.2732 472.000 396.0 393.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 09 55 45.9451 -90.2732 472.000 30.0 398.997 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 14 55 45.9451 -90.2732 472.000 122.0 398.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 19 55 45.9451 -90.2732 472.000 396.0 393.866 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 20 25 45.9451 -90.2732 472.000 396.0 393.880 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 20 55 45.9451 -90.2732 472.000 396.0 393.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 21 25 45.9451 -90.2732 472.000 396.0 393.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 21 55 45.9451 -90.2732 472.000 396.0 393.873 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 22 25 45.9451 -90.2732 472.000 396.0 393.911 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 22 55 45.9451 -90.2732 472.000 396.0 393.893 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 23 25 45.9451 -90.2732 472.000 396.0 393.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 23 55 45.9451 -90.2732 472.000 396.0 393.924 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 24 25 45.9451 -90.2732 472.000 396.0 393.929 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 24 55 45.9451 -90.2732 472.000 396.0 393.927 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 29 55 45.9451 -90.2732 472.000 30.0 399.096 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 34 55 45.9451 -90.2732 472.000 122.0 398.692 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 39 55 45.9451 -90.2732 472.000 396.0 393.844 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 44 55 45.9451 -90.2732 472.000 30.0 399.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 49 55 45.9451 -90.2732 472.000 122.0 398.176 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 01 54 55 45.9451 -90.2732 472.000 396.0 394.134 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 04 55 45.9451 -90.2732 472.000 30.0 399.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 09 55 45.9451 -90.2732 472.000 122.0 397.936 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 14 55 45.9451 -90.2732 472.000 396.0 394.636 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 19 55 45.9451 -90.2732 472.000 30.0 398.947 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 24 55 45.9451 -90.2732 472.000 122.0 397.914 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 29 55 45.9451 -90.2732 472.000 396.0 395.392 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 30 25 45.9451 -90.2732 472.000 396.0 395.342 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 30 55 45.9451 -90.2732 472.000 396.0 395.339 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 31 25 45.9451 -90.2732 472.000 396.0 395.381 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 31 55 45.9451 -90.2732 472.000 396.0 395.414 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 32 25 45.9451 -90.2732 472.000 396.0 395.487 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 32 55 45.9451 -90.2732 472.000 396.0 395.293 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 33 25 45.9451 -90.2732 472.000 396.0 395.345 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 33 55 45.9451 -90.2732 472.000 396.0 395.223 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 34 25 45.9451 -90.2732 472.000 396.0 394.855 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 34 55 45.9451 -90.2732 472.000 396.0 394.570 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 39 55 45.9451 -90.2732 472.000 30.0 398.999 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 44 55 45.9451 -90.2732 472.000 122.0 397.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 49 55 45.9451 -90.2732 472.000 396.0 394.866 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 54 55 45.9451 -90.2732 472.000 30.0 399.262 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 02 59 55 45.9451 -90.2732 472.000 122.0 397.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 04 55 45.9451 -90.2732 472.000 396.0 395.403 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 05 25 45.9451 -90.2732 472.000 396.0 396.089 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 05 55 45.9451 -90.2732 472.000 396.0 396.833 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 06 25 45.9451 -90.2732 472.000 396.0 396.185 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 06 55 45.9451 -90.2732 472.000 396.0 395.684 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 07 25 45.9451 -90.2732 472.000 396.0 395.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 07 55 45.9451 -90.2732 472.000 396.0 395.166 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 08 25 45.9451 -90.2732 472.000 396.0 394.967 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 08 55 45.9451 -90.2732 472.000 396.0 395.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 09 25 45.9451 -90.2732 472.000 396.0 395.360 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 09 55 45.9451 -90.2732 472.000 396.0 395.609 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 14 55 45.9451 -90.2732 472.000 30.0 399.392 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 19 55 45.9451 -90.2732 472.000 122.0 398.179 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 24 55 45.9451 -90.2732 472.000 396.0 398.435 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 29 55 45.9451 -90.2732 472.000 30.0 399.926 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 34 55 45.9451 -90.2732 472.000 122.0 397.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 39 55 45.9451 -90.2732 472.000 396.0 395.827 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 40 25 45.9451 -90.2732 472.000 396.0 395.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 40 55 45.9451 -90.2732 472.000 396.0 395.724 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 41 25 45.9451 -90.2732 472.000 396.0 395.983 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 41 55 45.9451 -90.2732 472.000 396.0 395.892 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 42 25 45.9451 -90.2732 472.000 396.0 395.963 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 42 55 45.9451 -90.2732 472.000 396.0 395.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 43 25 45.9451 -90.2732 472.000 396.0 395.893 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 43 55 45.9451 -90.2732 472.000 396.0 396.228 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 44 25 45.9451 -90.2732 472.000 396.0 396.268 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 44 55 45.9451 -90.2732 472.000 396.0 396.070 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 49 55 45.9451 -90.2732 472.000 30.0 400.054 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 54 55 45.9451 -90.2732 472.000 122.0 398.512 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 03 59 55 45.9451 -90.2732 472.000 396.0 398.705 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 04 55 45.9451 -90.2732 472.000 30.0 400.227 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 09 55 45.9451 -90.2732 472.000 122.0 397.946 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 14 55 45.9451 -90.2732 472.000 396.0 396.406 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 24 55 45.9451 -90.2732 472.000 30.0 400.729 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 29 55 45.9451 -90.2732 472.000 122.0 397.766 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 34 55 45.9451 -90.2732 472.000 396.0 392.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 39 55 45.9451 -90.2732 472.000 30.0 400.822 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 44 55 45.9451 -90.2732 472.000 122.0 397.918 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 49 55 45.9451 -90.2732 472.000 396.0 393.594 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 50 25 45.9451 -90.2732 472.000 396.0 393.794 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 50 55 45.9451 -90.2732 472.000 396.0 393.770 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 51 25 45.9451 -90.2732 472.000 396.0 393.776 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 51 55 45.9451 -90.2732 472.000 396.0 393.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 52 25 45.9451 -90.2732 472.000 396.0 393.820 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 52 55 45.9451 -90.2732 472.000 396.0 393.817 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 53 25 45.9451 -90.2732 472.000 396.0 393.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 53 55 45.9451 -90.2732 472.000 396.0 393.830 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 54 25 45.9451 -90.2732 472.000 396.0 393.815 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 04 54 55 45.9451 -90.2732 472.000 396.0 393.846 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 04 55 45.9451 -90.2732 472.000 30.0 401.193 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 09 55 45.9451 -90.2732 472.000 122.0 398.277 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 14 55 45.9451 -90.2732 472.000 396.0 396.029 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 19 55 45.9451 -90.2732 472.000 30.0 400.982 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 24 55 45.9451 -90.2732 472.000 122.0 400.316 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 29 55 45.9451 -90.2732 472.000 396.0 395.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 30 25 45.9451 -90.2732 472.000 396.0 395.358 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 30 55 45.9451 -90.2732 472.000 396.0 395.316 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 31 25 45.9451 -90.2732 472.000 396.0 395.304 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 31 55 45.9451 -90.2732 472.000 396.0 395.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 32 25 45.9451 -90.2732 472.000 396.0 395.263 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 32 55 45.9451 -90.2732 472.000 396.0 395.294 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 33 25 45.9451 -90.2732 472.000 396.0 395.178 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 33 55 45.9451 -90.2732 472.000 396.0 395.167 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 34 25 45.9451 -90.2732 472.000 396.0 395.148 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 34 55 45.9451 -90.2732 472.000 396.0 395.299 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 39 55 45.9451 -90.2732 472.000 30.0 401.007 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 44 55 45.9451 -90.2732 472.000 122.0 399.809 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 49 55 45.9451 -90.2732 472.000 396.0 394.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 54 55 45.9451 -90.2732 472.000 30.0 401.009 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 05 59 55 45.9451 -90.2732 472.000 122.0 400.132 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 04 55 45.9451 -90.2732 472.000 396.0 394.732 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 14 55 45.9451 -90.2732 472.000 30.0 400.938 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 19 55 45.9451 -90.2732 472.000 122.0 399.582 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 24 55 45.9451 -90.2732 472.000 396.0 394.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 29 55 45.9451 -90.2732 472.000 30.0 401.251 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 34 55 45.9451 -90.2732 472.000 122.0 399.602 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 39 55 45.9451 -90.2732 472.000 396.0 394.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 40 25 45.9451 -90.2732 472.000 396.0 394.459 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 40 55 45.9451 -90.2732 472.000 396.0 394.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 41 25 45.9451 -90.2732 472.000 396.0 394.442 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 41 55 45.9451 -90.2732 472.000 396.0 394.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 42 25 45.9451 -90.2732 472.000 396.0 394.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 42 55 45.9451 -90.2732 472.000 396.0 394.425 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 43 25 45.9451 -90.2732 472.000 396.0 394.446 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 43 55 45.9451 -90.2732 472.000 396.0 394.434 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 44 25 45.9451 -90.2732 472.000 396.0 394.396 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 44 55 45.9451 -90.2732 472.000 396.0 394.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 49 55 45.9451 -90.2732 472.000 30.0 401.074 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 54 55 45.9451 -90.2732 472.000 122.0 398.190 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 06 59 55 45.9451 -90.2732 472.000 396.0 394.285 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 04 55 45.9451 -90.2732 472.000 30.0 401.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 09 55 45.9451 -90.2732 472.000 122.0 399.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 14 55 45.9451 -90.2732 472.000 396.0 393.259 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 15 25 45.9451 -90.2732 472.000 396.0 393.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 15 55 45.9451 -90.2732 472.000 396.0 393.200 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 16 25 45.9451 -90.2732 472.000 396.0 393.205 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 16 55 45.9451 -90.2732 472.000 396.0 393.178 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 17 25 45.9451 -90.2732 472.000 396.0 393.155 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 17 55 45.9451 -90.2732 472.000 396.0 393.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 18 25 45.9451 -90.2732 472.000 396.0 393.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 18 55 45.9451 -90.2732 472.000 396.0 393.350 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 19 25 45.9451 -90.2732 472.000 396.0 393.285 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 19 55 45.9451 -90.2732 472.000 396.0 393.188 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 24 55 45.9451 -90.2732 472.000 30.0 401.420 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 29 55 45.9451 -90.2732 472.000 122.0 398.719 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 34 55 45.9451 -90.2732 472.000 396.0 393.254 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 39 55 45.9451 -90.2732 472.000 30.0 401.460 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 44 55 45.9451 -90.2732 472.000 122.0 399.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 49 55 45.9451 -90.2732 472.000 396.0 393.469 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 07 59 55 45.9451 -90.2732 472.000 30.0 401.420 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 04 55 45.9451 -90.2732 472.000 122.0 398.719 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 09 55 45.9451 -90.2732 472.000 396.0 393.199 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 14 55 45.9451 -90.2732 472.000 30.0 401.491 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 19 55 45.9451 -90.2732 472.000 122.0 397.880 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 24 55 45.9451 -90.2732 472.000 396.0 393.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 25 25 45.9451 -90.2732 472.000 396.0 393.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 25 55 45.9451 -90.2732 472.000 396.0 393.224 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 26 25 45.9451 -90.2732 472.000 396.0 393.249 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 26 55 45.9451 -90.2732 472.000 396.0 393.237 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 27 25 45.9451 -90.2732 472.000 396.0 393.235 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 27 55 45.9451 -90.2732 472.000 396.0 393.242 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 28 25 45.9451 -90.2732 472.000 396.0 393.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 28 55 45.9451 -90.2732 472.000 396.0 393.252 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 29 25 45.9451 -90.2732 472.000 396.0 393.269 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 29 55 45.9451 -90.2732 472.000 396.0 393.274 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 34 55 45.9451 -90.2732 472.000 30.0 401.436 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 39 55 45.9451 -90.2732 472.000 122.0 397.452 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 44 55 45.9451 -90.2732 472.000 396.0 393.239 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 49 55 45.9451 -90.2732 472.000 30.0 401.282 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 54 55 45.9451 -90.2732 472.000 122.0 396.919 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 28 08 59 55 45.9451 -90.2732 472.000 396.0 393.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 00 25 45.9451 -90.2732 472.000 396.0 393.240 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 00 55 45.9451 -90.2732 472.000 396.0 393.248 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 01 25 45.9451 -90.2732 472.000 396.0 393.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 01 55 45.9451 -90.2732 472.000 396.0 393.274 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 02 25 45.9451 -90.2732 472.000 396.0 393.296 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 02 55 45.9451 -90.2732 472.000 396.0 393.272 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 03 25 45.9451 -90.2732 472.000 396.0 393.246 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 03 55 45.9451 -90.2732 472.000 396.0 393.249 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 04 25 45.9451 -90.2732 472.000 396.0 393.263 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 04 55 45.9451 -90.2732 472.000 396.0 393.250 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 09 55 45.9451 -90.2732 472.000 30.0 401.058 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 14 55 45.9451 -90.2732 472.000 122.0 397.086 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 19 55 45.9451 -90.2732 472.000 396.0 393.362 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 24 55 45.9451 -90.2732 472.000 30.0 401.311 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 29 55 45.9451 -90.2732 472.000 122.0 396.531 1.410 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 34 55 45.9451 -90.2732 472.000 396.0 393.194 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 35 25 45.9451 -90.2732 472.000 396.0 393.168 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 35 55 45.9451 -90.2732 472.000 396.0 393.185 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 36 25 45.9451 -90.2732 472.000 396.0 393.183 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 36 55 45.9451 -90.2732 472.000 396.0 393.186 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 37 25 45.9451 -90.2732 472.000 396.0 393.190 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 37 55 45.9451 -90.2732 472.000 396.0 393.177 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 38 25 45.9451 -90.2732 472.000 396.0 393.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 38 55 45.9451 -90.2732 472.000 396.0 393.141 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 39 25 45.9451 -90.2732 472.000 396.0 393.215 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 39 55 45.9451 -90.2732 472.000 396.0 393.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 44 55 45.9451 -90.2732 472.000 30.0 400.593 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 49 55 45.9451 -90.2732 472.000 122.0 396.288 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 54 55 45.9451 -90.2732 472.000 396.0 394.151 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 09 59 55 45.9451 -90.2732 472.000 30.0 400.402 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 04 55 45.9451 -90.2732 472.000 122.0 395.548 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 09 55 45.9451 -90.2732 472.000 396.0 395.232 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 19 55 45.9451 -90.2732 472.000 30.0 399.917 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 24 55 45.9451 -90.2732 472.000 122.0 396.752 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 29 55 45.9451 -90.2732 472.000 396.0 394.884 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 34 55 45.9451 -90.2732 472.000 30.0 400.207 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 39 55 45.9451 -90.2732 472.000 122.0 397.571 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 44 55 45.9451 -90.2732 472.000 396.0 394.389 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 54 55 45.9451 -90.2732 472.000 30.0 400.742 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 10 59 55 45.9451 -90.2732 472.000 122.0 397.383 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 04 55 45.9451 -90.2732 472.000 396.0 394.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 09 55 45.9451 -90.2732 472.000 30.0 400.256 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 14 55 45.9451 -90.2732 472.000 122.0 397.009 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 19 55 45.9451 -90.2732 472.000 396.0 394.677 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 20 25 45.9451 -90.2732 472.000 396.0 394.675 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 20 55 45.9451 -90.2732 472.000 396.0 394.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 21 25 45.9451 -90.2732 472.000 396.0 394.679 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 21 55 45.9451 -90.2732 472.000 396.0 394.694 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 22 25 45.9451 -90.2732 472.000 396.0 394.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 22 55 45.9451 -90.2732 472.000 396.0 394.708 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 23 25 45.9451 -90.2732 472.000 396.0 394.670 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 23 55 45.9451 -90.2732 472.000 396.0 394.632 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 24 25 45.9451 -90.2732 472.000 396.0 394.627 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 24 55 45.9451 -90.2732 472.000 396.0 394.634 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 29 55 45.9451 -90.2732 472.000 30.0 399.965 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 34 55 45.9451 -90.2732 472.000 122.0 397.248 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 39 55 45.9451 -90.2732 472.000 396.0 394.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 44 55 45.9451 -90.2732 472.000 30.0 399.900 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 11 49 55 45.9451 -90.2732 472.000 122.0 397.720 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 14 55 45.9451 -90.2732 472.000 396.0 394.611 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 19 55 45.9451 -90.2732 472.000 30.0 399.582 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 24 55 45.9451 -90.2732 472.000 122.0 397.734 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 29 55 45.9451 -90.2732 472.000 396.0 394.531 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 34 55 45.9451 -90.2732 472.000 30.0 399.217 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 39 55 45.9451 -90.2732 472.000 122.0 397.742 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 44 55 45.9451 -90.2732 472.000 396.0 395.564 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 45 25 45.9451 -90.2732 472.000 396.0 395.635 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 45 55 45.9451 -90.2732 472.000 396.0 395.790 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 46 25 45.9451 -90.2732 472.000 396.0 395.821 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 46 55 45.9451 -90.2732 472.000 396.0 395.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 47 25 45.9451 -90.2732 472.000 396.0 395.908 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 47 55 45.9451 -90.2732 472.000 396.0 395.851 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 48 25 45.9451 -90.2732 472.000 396.0 395.804 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 48 55 45.9451 -90.2732 472.000 396.0 395.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 49 25 45.9451 -90.2732 472.000 396.0 396.195 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 49 55 45.9451 -90.2732 472.000 396.0 396.560 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 54 55 45.9451 -90.2732 472.000 30.0 398.946 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 12 59 55 45.9451 -90.2732 472.000 122.0 397.775 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 04 55 45.9451 -90.2732 472.000 396.0 397.062 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 09 55 45.9451 -90.2732 472.000 30.0 399.240 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 14 55 45.9451 -90.2732 472.000 122.0 397.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 19 55 45.9451 -90.2732 472.000 396.0 395.464 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 20 25 45.9451 -90.2732 472.000 396.0 395.383 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 20 55 45.9451 -90.2732 472.000 396.0 395.305 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 21 25 45.9451 -90.2732 472.000 396.0 395.072 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 21 55 45.9451 -90.2732 472.000 396.0 395.139 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 22 25 45.9451 -90.2732 472.000 396.0 395.010 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 22 55 45.9451 -90.2732 472.000 396.0 395.419 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 23 25 45.9451 -90.2732 472.000 396.0 395.310 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 23 55 45.9451 -90.2732 472.000 396.0 395.255 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 24 25 45.9451 -90.2732 472.000 396.0 395.081 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 24 55 45.9451 -90.2732 472.000 396.0 395.015 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 29 55 45.9451 -90.2732 472.000 30.0 399.544 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 34 55 45.9451 -90.2732 472.000 122.0 398.102 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 39 55 45.9451 -90.2732 472.000 396.0 396.577 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 44 55 45.9451 -90.2732 472.000 30.0 400.530 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 49 55 45.9451 -90.2732 472.000 122.0 398.302 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 13 54 55 45.9451 -90.2732 472.000 396.0 395.293 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 04 55 45.9451 -90.2732 472.000 30.0 401.336 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 09 55 45.9451 -90.2732 472.000 122.0 398.434 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 14 55 45.9451 -90.2732 472.000 396.0 394.853 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 19 55 45.9451 -90.2732 472.000 30.0 401.591 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 24 55 45.9451 -90.2732 472.000 122.0 398.409 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 29 55 45.9451 -90.2732 472.000 396.0 395.026 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 30 25 45.9451 -90.2732 472.000 396.0 394.755 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 30 55 45.9451 -90.2732 472.000 396.0 394.677 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 31 25 45.9451 -90.2732 472.000 396.0 394.434 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 31 55 45.9451 -90.2732 472.000 396.0 394.841 0.380 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 32 25 45.9451 -90.2732 472.000 396.0 394.126 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 32 55 45.9451 -90.2732 472.000 396.0 394.416 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 33 25 45.9451 -90.2732 472.000 396.0 394.558 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 33 55 45.9451 -90.2732 472.000 396.0 394.012 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 34 25 45.9451 -90.2732 472.000 396.0 393.738 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 34 55 45.9451 -90.2732 472.000 396.0 393.779 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 39 55 45.9451 -90.2732 472.000 30.0 401.502 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 44 55 45.9451 -90.2732 472.000 122.0 398.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 49 55 45.9451 -90.2732 472.000 396.0 395.941 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 54 55 45.9451 -90.2732 472.000 30.0 401.364 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 14 59 55 45.9451 -90.2732 472.000 122.0 398.655 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 04 55 45.9451 -90.2732 472.000 396.0 395.344 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 05 25 45.9451 -90.2732 472.000 396.0 395.083 0.400 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 05 55 45.9451 -90.2732 472.000 396.0 395.295 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 06 25 45.9451 -90.2732 472.000 396.0 394.957 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 06 55 45.9451 -90.2732 472.000 396.0 395.349 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 07 25 45.9451 -90.2732 472.000 396.0 395.249 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 07 55 45.9451 -90.2732 472.000 396.0 395.164 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 08 25 45.9451 -90.2732 472.000 396.0 395.244 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 08 55 45.9451 -90.2732 472.000 396.0 395.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 09 25 45.9451 -90.2732 472.000 396.0 395.121 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 09 55 45.9451 -90.2732 472.000 396.0 395.066 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 14 55 45.9451 -90.2732 472.000 30.0 400.720 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 19 55 45.9451 -90.2732 472.000 122.0 398.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 24 55 45.9451 -90.2732 472.000 396.0 395.146 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 29 55 45.9451 -90.2732 472.000 30.0 399.833 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 34 55 45.9451 -90.2732 472.000 122.0 399.303 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 39 55 45.9451 -90.2732 472.000 396.0 395.480 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 40 25 45.9451 -90.2732 472.000 396.0 395.633 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 40 55 45.9451 -90.2732 472.000 396.0 395.773 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 41 25 45.9451 -90.2732 472.000 396.0 395.945 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 41 55 45.9451 -90.2732 472.000 396.0 395.708 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 42 25 45.9451 -90.2732 472.000 396.0 395.609 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 42 55 45.9451 -90.2732 472.000 396.0 395.896 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 43 25 45.9451 -90.2732 472.000 396.0 396.100 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 43 55 45.9451 -90.2732 472.000 396.0 396.479 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 44 25 45.9451 -90.2732 472.000 396.0 396.012 0.310 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 44 55 45.9451 -90.2732 472.000 396.0 396.049 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 49 55 45.9451 -90.2732 472.000 30.0 399.787 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 54 55 45.9451 -90.2732 472.000 122.0 399.580 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 15 59 55 45.9451 -90.2732 472.000 396.0 395.890 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 04 55 45.9451 -90.2732 472.000 30.0 399.825 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 09 55 45.9451 -90.2732 472.000 122.0 399.686 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 14 55 45.9451 -90.2732 472.000 396.0 395.880 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 24 55 45.9451 -90.2732 472.000 30.0 400.078 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 29 55 45.9451 -90.2732 472.000 122.0 399.737 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 34 55 45.9451 -90.2732 472.000 396.0 395.945 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 39 55 45.9451 -90.2732 472.000 30.0 400.014 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 44 55 45.9451 -90.2732 472.000 122.0 399.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 49 55 45.9451 -90.2732 472.000 396.0 397.416 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 50 25 45.9451 -90.2732 472.000 396.0 397.058 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 50 55 45.9451 -90.2732 472.000 396.0 396.764 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 51 25 45.9451 -90.2732 472.000 396.0 397.048 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 51 55 45.9451 -90.2732 472.000 396.0 396.204 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 52 25 45.9451 -90.2732 472.000 396.0 396.123 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 52 55 45.9451 -90.2732 472.000 396.0 396.688 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 53 25 45.9451 -90.2732 472.000 396.0 396.481 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 53 55 45.9451 -90.2732 472.000 396.0 396.449 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 54 25 45.9451 -90.2732 472.000 396.0 396.887 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 16 54 55 45.9451 -90.2732 472.000 396.0 396.615 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 04 55 45.9451 -90.2732 472.000 30.0 399.689 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 09 55 45.9451 -90.2732 472.000 122.0 399.633 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 14 55 45.9451 -90.2732 472.000 396.0 397.248 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 19 55 45.9451 -90.2732 472.000 30.0 399.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 24 55 45.9451 -90.2732 472.000 122.0 399.488 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 29 55 45.9451 -90.2732 472.000 396.0 397.386 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 30 25 45.9451 -90.2732 472.000 396.0 396.780 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 30 55 45.9451 -90.2732 472.000 396.0 396.183 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 31 25 45.9451 -90.2732 472.000 396.0 395.494 0.480 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 31 55 45.9451 -90.2732 472.000 396.0 396.565 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 32 25 45.9451 -90.2732 472.000 396.0 396.596 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 32 55 45.9451 -90.2732 472.000 396.0 396.738 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 33 25 45.9451 -90.2732 472.000 396.0 396.525 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 33 55 45.9451 -90.2732 472.000 396.0 396.708 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 34 25 45.9451 -90.2732 472.000 396.0 395.385 0.710 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 34 55 45.9451 -90.2732 472.000 396.0 396.943 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 39 55 45.9451 -90.2732 472.000 30.0 399.234 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 44 55 45.9451 -90.2732 472.000 122.0 399.047 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 49 55 45.9451 -90.2732 472.000 396.0 397.398 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 54 55 45.9451 -90.2732 472.000 30.0 399.041 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 17 59 55 45.9451 -90.2732 472.000 122.0 398.956 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 04 55 45.9451 -90.2732 472.000 396.0 396.116 1.040 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 14 55 45.9451 -90.2732 472.000 30.0 398.992 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 19 55 45.9451 -90.2732 472.000 122.0 398.892 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 24 55 45.9451 -90.2732 472.000 396.0 396.860 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 29 55 45.9451 -90.2732 472.000 30.0 398.851 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 34 55 45.9451 -90.2732 472.000 122.0 398.619 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 39 55 45.9451 -90.2732 472.000 396.0 397.946 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 40 25 45.9451 -90.2732 472.000 396.0 397.666 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 40 55 45.9451 -90.2732 472.000 396.0 397.512 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 41 25 45.9451 -90.2732 472.000 396.0 397.646 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 41 55 45.9451 -90.2732 472.000 396.0 397.946 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 42 25 45.9451 -90.2732 472.000 396.0 397.691 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 42 55 45.9451 -90.2732 472.000 396.0 397.760 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 43 25 45.9451 -90.2732 472.000 396.0 397.914 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 43 55 45.9451 -90.2732 472.000 396.0 397.818 0.360 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 44 25 45.9451 -90.2732 472.000 396.0 397.564 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 44 55 45.9451 -90.2732 472.000 396.0 397.580 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 49 55 45.9451 -90.2732 472.000 30.0 398.935 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 54 55 45.9451 -90.2732 472.000 122.0 398.629 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 18 59 55 45.9451 -90.2732 472.000 396.0 397.560 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 04 55 45.9451 -90.2732 472.000 30.0 398.669 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 09 55 45.9451 -90.2732 472.000 122.0 398.606 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 14 55 45.9451 -90.2732 472.000 396.0 396.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 15 25 45.9451 -90.2732 472.000 396.0 397.296 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 15 55 45.9451 -90.2732 472.000 396.0 397.203 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 16 25 45.9451 -90.2732 472.000 396.0 397.269 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 16 55 45.9451 -90.2732 472.000 396.0 397.006 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 17 25 45.9451 -90.2732 472.000 396.0 396.873 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 17 55 45.9451 -90.2732 472.000 396.0 397.403 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 18 25 45.9451 -90.2732 472.000 396.0 396.869 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 18 55 45.9451 -90.2732 472.000 396.0 396.990 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 19 25 45.9451 -90.2732 472.000 396.0 397.040 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 19 55 45.9451 -90.2732 472.000 396.0 396.947 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 24 55 45.9451 -90.2732 472.000 30.0 398.784 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 29 55 45.9451 -90.2732 472.000 122.0 398.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 34 55 45.9451 -90.2732 472.000 396.0 397.057 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 39 55 45.9451 -90.2732 472.000 30.0 398.778 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 44 55 45.9451 -90.2732 472.000 122.0 398.680 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 49 55 45.9451 -90.2732 472.000 396.0 396.824 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 28 19 59 55 45.9451 -90.2732 472.000 30.0 398.682 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 04 55 45.9451 -90.2732 472.000 122.0 398.660 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 09 55 45.9451 -90.2732 472.000 396.0 396.700 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 14 55 45.9451 -90.2732 472.000 30.0 398.567 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 19 55 45.9451 -90.2732 472.000 122.0 398.423 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 24 55 45.9451 -90.2732 472.000 396.0 396.794 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 25 25 45.9451 -90.2732 472.000 396.0 396.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 25 55 45.9451 -90.2732 472.000 396.0 396.760 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 26 25 45.9451 -90.2732 472.000 396.0 396.699 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 26 55 45.9451 -90.2732 472.000 396.0 396.685 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 27 25 45.9451 -90.2732 472.000 396.0 396.402 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 27 55 45.9451 -90.2732 472.000 396.0 396.595 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 28 25 45.9451 -90.2732 472.000 396.0 396.491 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 28 55 45.9451 -90.2732 472.000 396.0 396.289 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 29 25 45.9451 -90.2732 472.000 396.0 396.550 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 29 55 45.9451 -90.2732 472.000 396.0 396.932 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 34 55 45.9451 -90.2732 472.000 30.0 398.665 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 39 55 45.9451 -90.2732 472.000 122.0 398.657 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 44 55 45.9451 -90.2732 472.000 396.0 396.852 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 49 55 45.9451 -90.2732 472.000 30.0 398.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 54 55 45.9451 -90.2732 472.000 122.0 398.493 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 20 59 55 45.9451 -90.2732 472.000 396.0 396.394 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 00 25 45.9451 -90.2732 472.000 396.0 396.356 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 00 55 45.9451 -90.2732 472.000 396.0 396.399 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 01 25 45.9451 -90.2732 472.000 396.0 396.669 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 01 55 45.9451 -90.2732 472.000 396.0 396.610 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 02 25 45.9451 -90.2732 472.000 396.0 396.088 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 02 55 45.9451 -90.2732 472.000 396.0 396.495 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 03 25 45.9451 -90.2732 472.000 396.0 396.658 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 03 55 45.9451 -90.2732 472.000 396.0 396.701 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 04 25 45.9451 -90.2732 472.000 396.0 396.601 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 04 55 45.9451 -90.2732 472.000 396.0 396.671 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 09 55 45.9451 -90.2732 472.000 30.0 398.461 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 14 55 45.9451 -90.2732 472.000 122.0 398.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 19 55 45.9451 -90.2732 472.000 396.0 396.789 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 24 55 45.9451 -90.2732 472.000 30.0 398.499 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 29 55 45.9451 -90.2732 472.000 122.0 398.206 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 34 55 45.9451 -90.2732 472.000 396.0 396.603 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 35 25 45.9451 -90.2732 472.000 396.0 396.693 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 35 55 45.9451 -90.2732 472.000 396.0 396.690 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 36 25 45.9451 -90.2732 472.000 396.0 396.657 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 36 55 45.9451 -90.2732 472.000 396.0 396.524 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 37 25 45.9451 -90.2732 472.000 396.0 396.605 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 37 55 45.9451 -90.2732 472.000 396.0 396.824 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 38 25 45.9451 -90.2732 472.000 396.0 396.928 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 38 55 45.9451 -90.2732 472.000 396.0 396.978 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 39 25 45.9451 -90.2732 472.000 396.0 396.995 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 39 55 45.9451 -90.2732 472.000 396.0 396.855 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 44 55 45.9451 -90.2732 472.000 30.0 398.158 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 49 55 45.9451 -90.2732 472.000 122.0 397.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 54 55 45.9451 -90.2732 472.000 396.0 397.188 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 28 21 59 55 45.9451 -90.2732 472.000 30.0 398.450 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 04 55 45.9451 -90.2732 472.000 122.0 398.698 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 09 55 45.9451 -90.2732 472.000 396.0 397.926 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 19 55 45.9451 -90.2732 472.000 30.0 399.364 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 24 55 45.9451 -90.2732 472.000 122.0 399.383 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 29 55 45.9451 -90.2732 472.000 396.0 397.799 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 34 55 45.9451 -90.2732 472.000 30.0 399.785 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 39 55 45.9451 -90.2732 472.000 122.0 399.761 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 44 55 45.9451 -90.2732 472.000 396.0 397.941 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 54 55 45.9451 -90.2732 472.000 30.0 400.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 22 59 55 45.9451 -90.2732 472.000 122.0 399.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 04 55 45.9451 -90.2732 472.000 396.0 398.812 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 09 55 45.9451 -90.2732 472.000 30.0 400.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 14 55 45.9451 -90.2732 472.000 122.0 399.722 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 19 55 45.9451 -90.2732 472.000 396.0 398.276 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 20 25 45.9451 -90.2732 472.000 396.0 398.372 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 20 55 45.9451 -90.2732 472.000 396.0 398.332 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 21 25 45.9451 -90.2732 472.000 396.0 398.344 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 21 55 45.9451 -90.2732 472.000 396.0 398.341 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 22 25 45.9451 -90.2732 472.000 396.0 398.297 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 22 55 45.9451 -90.2732 472.000 396.0 398.441 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 23 25 45.9451 -90.2732 472.000 396.0 398.463 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 23 55 45.9451 -90.2732 472.000 396.0 398.179 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 24 25 45.9451 -90.2732 472.000 396.0 398.191 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 24 55 45.9451 -90.2732 472.000 396.0 398.253 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 29 55 45.9451 -90.2732 472.000 30.0 399.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 34 55 45.9451 -90.2732 472.000 122.0 399.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 39 55 45.9451 -90.2732 472.000 396.0 399.015 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 44 55 45.9451 -90.2732 472.000 30.0 399.748 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 28 23 49 55 45.9451 -90.2732 472.000 122.0 399.593 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 14 55 45.9451 -90.2732 472.000 396.0 399.348 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 19 55 45.9451 -90.2732 472.000 30.0 400.020 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 24 55 45.9451 -90.2732 472.000 122.0 399.940 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 29 55 45.9451 -90.2732 472.000 396.0 399.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 34 55 45.9451 -90.2732 472.000 30.0 400.125 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 39 55 45.9451 -90.2732 472.000 122.0 399.988 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 44 55 45.9451 -90.2732 472.000 396.0 399.772 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 45 25 45.9451 -90.2732 472.000 396.0 399.791 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 45 55 45.9451 -90.2732 472.000 396.0 399.860 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 46 25 45.9451 -90.2732 472.000 396.0 399.861 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 46 55 45.9451 -90.2732 472.000 396.0 399.865 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 47 25 45.9451 -90.2732 472.000 396.0 399.887 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 47 55 45.9451 -90.2732 472.000 396.0 399.909 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 48 25 45.9451 -90.2732 472.000 396.0 399.935 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 48 55 45.9451 -90.2732 472.000 396.0 399.950 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 49 25 45.9451 -90.2732 472.000 396.0 399.922 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 49 55 45.9451 -90.2732 472.000 396.0 399.915 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 54 55 45.9451 -90.2732 472.000 30.0 400.245 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 00 59 55 45.9451 -90.2732 472.000 122.0 400.139 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 04 55 45.9451 -90.2732 472.000 396.0 399.845 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 09 55 45.9451 -90.2732 472.000 30.0 400.239 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 14 55 45.9451 -90.2732 472.000 122.0 400.120 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 19 55 45.9451 -90.2732 472.000 396.0 399.930 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 20 25 45.9451 -90.2732 472.000 396.0 399.902 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 20 55 45.9451 -90.2732 472.000 396.0 399.957 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 21 25 45.9451 -90.2732 472.000 396.0 400.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 21 55 45.9451 -90.2732 472.000 396.0 399.991 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 22 25 45.9451 -90.2732 472.000 396.0 400.003 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 22 55 45.9451 -90.2732 472.000 396.0 400.037 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 23 25 45.9451 -90.2732 472.000 396.0 400.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 23 55 45.9451 -90.2732 472.000 396.0 400.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 24 25 45.9451 -90.2732 472.000 396.0 400.071 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 24 55 45.9451 -90.2732 472.000 396.0 400.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 29 55 45.9451 -90.2732 472.000 30.0 400.463 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 34 55 45.9451 -90.2732 472.000 122.0 400.326 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 39 55 45.9451 -90.2732 472.000 396.0 400.127 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 44 55 45.9451 -90.2732 472.000 30.0 400.546 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 49 55 45.9451 -90.2732 472.000 122.0 400.468 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 01 54 55 45.9451 -90.2732 472.000 396.0 400.357 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 04 55 45.9451 -90.2732 472.000 30.0 400.778 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 09 55 45.9451 -90.2732 472.000 122.0 400.713 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 14 55 45.9451 -90.2732 472.000 396.0 400.396 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 19 55 45.9451 -90.2732 472.000 30.0 400.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 24 55 45.9451 -90.2732 472.000 122.0 400.894 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 29 55 45.9451 -90.2732 472.000 396.0 400.659 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 30 25 45.9451 -90.2732 472.000 396.0 400.697 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 30 55 45.9451 -90.2732 472.000 396.0 400.656 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 31 25 45.9451 -90.2732 472.000 396.0 400.538 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 31 55 45.9451 -90.2732 472.000 396.0 400.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 32 25 45.9451 -90.2732 472.000 396.0 400.678 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 32 55 45.9451 -90.2732 472.000 396.0 400.671 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 33 25 45.9451 -90.2732 472.000 396.0 400.651 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 33 55 45.9451 -90.2732 472.000 396.0 400.697 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 34 25 45.9451 -90.2732 472.000 396.0 400.725 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 34 55 45.9451 -90.2732 472.000 396.0 400.583 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 39 55 45.9451 -90.2732 472.000 30.0 401.136 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 44 55 45.9451 -90.2732 472.000 122.0 401.119 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 49 55 45.9451 -90.2732 472.000 396.0 400.959 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 54 55 45.9451 -90.2732 472.000 30.0 401.344 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 02 59 55 45.9451 -90.2732 472.000 122.0 401.399 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 04 55 45.9451 -90.2732 472.000 396.0 400.288 0.460 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 05 25 45.9451 -90.2732 472.000 396.0 400.855 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 05 55 45.9451 -90.2732 472.000 396.0 400.725 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 06 25 45.9451 -90.2732 472.000 396.0 400.871 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 06 55 45.9451 -90.2732 472.000 396.0 400.914 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 07 25 45.9451 -90.2732 472.000 396.0 401.113 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 07 55 45.9451 -90.2732 472.000 396.0 401.024 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 08 25 45.9451 -90.2732 472.000 396.0 400.781 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 08 55 45.9451 -90.2732 472.000 396.0 400.877 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 09 25 45.9451 -90.2732 472.000 396.0 400.898 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 09 55 45.9451 -90.2732 472.000 396.0 401.090 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 14 55 45.9451 -90.2732 472.000 30.0 401.766 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 19 55 45.9451 -90.2732 472.000 122.0 401.711 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 24 55 45.9451 -90.2732 472.000 396.0 401.424 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 29 55 45.9451 -90.2732 472.000 30.0 402.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 34 55 45.9451 -90.2732 472.000 122.0 401.989 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 39 55 45.9451 -90.2732 472.000 396.0 401.229 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 40 25 45.9451 -90.2732 472.000 396.0 401.522 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 40 55 45.9451 -90.2732 472.000 396.0 401.550 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 41 25 45.9451 -90.2732 472.000 396.0 401.479 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 41 55 45.9451 -90.2732 472.000 396.0 401.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 42 25 45.9451 -90.2732 472.000 396.0 401.663 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 42 55 45.9451 -90.2732 472.000 396.0 401.784 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 43 25 45.9451 -90.2732 472.000 396.0 401.426 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 43 55 45.9451 -90.2732 472.000 396.0 401.531 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 44 25 45.9451 -90.2732 472.000 396.0 401.580 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 44 55 45.9451 -90.2732 472.000 396.0 401.481 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 49 55 45.9451 -90.2732 472.000 30.0 402.262 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 54 55 45.9451 -90.2732 472.000 122.0 402.160 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 03 59 55 45.9451 -90.2732 472.000 396.0 401.721 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 04 55 45.9451 -90.2732 472.000 30.0 402.389 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 09 55 45.9451 -90.2732 472.000 122.0 402.404 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 14 55 45.9451 -90.2732 472.000 396.0 401.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 24 55 45.9451 -90.2732 472.000 30.0 402.762 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 29 55 45.9451 -90.2732 472.000 122.0 402.723 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 34 55 45.9451 -90.2732 472.000 396.0 402.155 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 39 55 45.9451 -90.2732 472.000 30.0 403.054 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 44 55 45.9451 -90.2732 472.000 122.0 403.072 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 49 55 45.9451 -90.2732 472.000 396.0 400.809 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 50 25 45.9451 -90.2732 472.000 396.0 400.992 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 50 55 45.9451 -90.2732 472.000 396.0 401.300 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 51 25 45.9451 -90.2732 472.000 396.0 401.251 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 51 55 45.9451 -90.2732 472.000 396.0 401.135 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 52 25 45.9451 -90.2732 472.000 396.0 401.400 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 52 55 45.9451 -90.2732 472.000 396.0 401.078 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 53 25 45.9451 -90.2732 472.000 396.0 401.100 0.500 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 53 55 45.9451 -90.2732 472.000 396.0 400.909 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 54 25 45.9451 -90.2732 472.000 396.0 400.762 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 04 54 55 45.9451 -90.2732 472.000 396.0 401.079 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 04 55 45.9451 -90.2732 472.000 30.0 403.462 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 09 55 45.9451 -90.2732 472.000 122.0 403.271 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 14 55 45.9451 -90.2732 472.000 396.0 401.414 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 19 55 45.9451 -90.2732 472.000 30.0 403.521 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 24 55 45.9451 -90.2732 472.000 122.0 403.242 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 29 55 45.9451 -90.2732 472.000 396.0 401.167 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 30 25 45.9451 -90.2732 472.000 396.0 401.490 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 30 55 45.9451 -90.2732 472.000 396.0 401.862 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 31 25 45.9451 -90.2732 472.000 396.0 401.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 31 55 45.9451 -90.2732 472.000 396.0 401.889 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 32 25 45.9451 -90.2732 472.000 396.0 401.799 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 32 55 45.9451 -90.2732 472.000 396.0 401.796 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 33 25 45.9451 -90.2732 472.000 396.0 401.578 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 33 55 45.9451 -90.2732 472.000 396.0 401.640 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 34 25 45.9451 -90.2732 472.000 396.0 401.533 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 34 55 45.9451 -90.2732 472.000 396.0 401.678 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 39 55 45.9451 -90.2732 472.000 30.0 403.771 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 44 55 45.9451 -90.2732 472.000 122.0 403.388 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 49 55 45.9451 -90.2732 472.000 396.0 401.873 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 54 55 45.9451 -90.2732 472.000 30.0 403.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 05 59 55 45.9451 -90.2732 472.000 122.0 403.358 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 04 55 45.9451 -90.2732 472.000 396.0 401.296 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 14 55 45.9451 -90.2732 472.000 30.0 403.746 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 19 55 45.9451 -90.2732 472.000 122.0 403.350 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 24 55 45.9451 -90.2732 472.000 396.0 401.770 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 29 55 45.9451 -90.2732 472.000 30.0 403.767 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 34 55 45.9451 -90.2732 472.000 122.0 403.563 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 39 55 45.9451 -90.2732 472.000 396.0 401.998 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 40 25 45.9451 -90.2732 472.000 396.0 401.729 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 40 55 45.9451 -90.2732 472.000 396.0 401.395 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 41 25 45.9451 -90.2732 472.000 396.0 401.824 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 41 55 45.9451 -90.2732 472.000 396.0 402.098 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 42 25 45.9451 -90.2732 472.000 396.0 402.152 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 42 55 45.9451 -90.2732 472.000 396.0 402.344 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 43 25 45.9451 -90.2732 472.000 396.0 401.735 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 43 55 45.9451 -90.2732 472.000 396.0 400.959 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 44 25 45.9451 -90.2732 472.000 396.0 401.995 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 44 55 45.9451 -90.2732 472.000 396.0 401.950 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 49 55 45.9451 -90.2732 472.000 30.0 404.007 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 54 55 45.9451 -90.2732 472.000 122.0 403.569 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 06 59 55 45.9451 -90.2732 472.000 396.0 401.998 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 04 55 45.9451 -90.2732 472.000 30.0 404.366 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 09 55 45.9451 -90.2732 472.000 122.0 404.003 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 14 55 45.9451 -90.2732 472.000 396.0 401.497 0.490 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 15 25 45.9451 -90.2732 472.000 396.0 401.087 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 15 55 45.9451 -90.2732 472.000 396.0 401.465 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 16 25 45.9451 -90.2732 472.000 396.0 402.069 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 16 55 45.9451 -90.2732 472.000 396.0 402.658 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 17 25 45.9451 -90.2732 472.000 396.0 402.800 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 17 55 45.9451 -90.2732 472.000 396.0 402.634 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 18 25 45.9451 -90.2732 472.000 396.0 402.449 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 18 55 45.9451 -90.2732 472.000 396.0 401.955 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 19 25 45.9451 -90.2732 472.000 396.0 401.517 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 19 55 45.9451 -90.2732 472.000 396.0 401.770 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 24 55 45.9451 -90.2732 472.000 30.0 404.653 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 29 55 45.9451 -90.2732 472.000 122.0 404.082 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 34 55 45.9451 -90.2732 472.000 396.0 401.985 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 39 55 45.9451 -90.2732 472.000 30.0 404.487 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 44 55 45.9451 -90.2732 472.000 122.0 404.030 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 49 55 45.9451 -90.2732 472.000 396.0 401.804 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 07 59 55 45.9451 -90.2732 472.000 30.0 404.472 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 04 55 45.9451 -90.2732 472.000 122.0 404.221 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 09 55 45.9451 -90.2732 472.000 396.0 402.389 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 14 55 45.9451 -90.2732 472.000 30.0 404.658 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 19 55 45.9451 -90.2732 472.000 122.0 404.422 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 24 55 45.9451 -90.2732 472.000 396.0 402.313 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 25 25 45.9451 -90.2732 472.000 396.0 402.670 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 25 55 45.9451 -90.2732 472.000 396.0 402.305 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 26 25 45.9451 -90.2732 472.000 396.0 402.250 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 26 55 45.9451 -90.2732 472.000 396.0 402.101 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 27 25 45.9451 -90.2732 472.000 396.0 402.475 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 27 55 45.9451 -90.2732 472.000 396.0 402.593 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 28 25 45.9451 -90.2732 472.000 396.0 402.605 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 28 55 45.9451 -90.2732 472.000 396.0 402.296 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 29 25 45.9451 -90.2732 472.000 396.0 401.962 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 29 55 45.9451 -90.2732 472.000 396.0 401.817 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 34 55 45.9451 -90.2732 472.000 30.0 404.515 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 39 55 45.9451 -90.2732 472.000 122.0 404.146 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 44 55 45.9451 -90.2732 472.000 396.0 402.812 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 49 55 45.9451 -90.2732 472.000 30.0 404.306 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 54 55 45.9451 -90.2732 472.000 122.0 404.016 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 08 59 55 45.9451 -90.2732 472.000 396.0 402.852 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 00 25 45.9451 -90.2732 472.000 396.0 402.800 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 00 55 45.9451 -90.2732 472.000 396.0 402.785 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 01 25 45.9451 -90.2732 472.000 396.0 402.725 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 01 55 45.9451 -90.2732 472.000 396.0 402.924 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 02 25 45.9451 -90.2732 472.000 396.0 402.837 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 02 55 45.9451 -90.2732 472.000 396.0 402.763 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 03 25 45.9451 -90.2732 472.000 396.0 403.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 03 55 45.9451 -90.2732 472.000 396.0 402.971 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 04 25 45.9451 -90.2732 472.000 396.0 402.824 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 04 55 45.9451 -90.2732 472.000 396.0 402.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 09 55 45.9451 -90.2732 472.000 30.0 404.295 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 14 55 45.9451 -90.2732 472.000 122.0 404.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 19 55 45.9451 -90.2732 472.000 396.0 402.787 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 24 55 45.9451 -90.2732 472.000 30.0 404.244 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 29 55 45.9451 -90.2732 472.000 122.0 404.152 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 34 55 45.9451 -90.2732 472.000 396.0 402.959 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 35 25 45.9451 -90.2732 472.000 396.0 403.089 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 35 55 45.9451 -90.2732 472.000 396.0 403.030 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 36 25 45.9451 -90.2732 472.000 396.0 402.880 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 36 55 45.9451 -90.2732 472.000 396.0 402.776 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 37 25 45.9451 -90.2732 472.000 396.0 402.896 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 37 55 45.9451 -90.2732 472.000 396.0 402.871 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 38 25 45.9451 -90.2732 472.000 396.0 402.728 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 38 55 45.9451 -90.2732 472.000 396.0 402.811 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 39 25 45.9451 -90.2732 472.000 396.0 402.974 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 39 55 45.9451 -90.2732 472.000 396.0 403.014 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 44 55 45.9451 -90.2732 472.000 30.0 404.306 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 49 55 45.9451 -90.2732 472.000 122.0 404.109 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 54 55 45.9451 -90.2732 472.000 396.0 402.702 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 09 59 55 45.9451 -90.2732 472.000 30.0 404.319 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 04 55 45.9451 -90.2732 472.000 122.0 404.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 09 55 45.9451 -90.2732 472.000 396.0 402.440 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 19 55 45.9451 -90.2732 472.000 30.0 404.541 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 24 55 45.9451 -90.2732 472.000 122.0 404.315 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 29 55 45.9451 -90.2732 472.000 396.0 402.139 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 34 55 45.9451 -90.2732 472.000 30.0 404.523 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 39 55 45.9451 -90.2732 472.000 122.0 404.143 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 44 55 45.9451 -90.2732 472.000 396.0 401.965 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 54 55 45.9451 -90.2732 472.000 30.0 404.449 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 10 59 55 45.9451 -90.2732 472.000 122.0 404.067 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 04 55 45.9451 -90.2732 472.000 396.0 402.142 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 09 55 45.9451 -90.2732 472.000 30.0 404.431 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 14 55 45.9451 -90.2732 472.000 122.0 404.016 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 19 55 45.9451 -90.2732 472.000 396.0 401.871 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 20 25 45.9451 -90.2732 472.000 396.0 401.885 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 20 55 45.9451 -90.2732 472.000 396.0 401.866 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 21 25 45.9451 -90.2732 472.000 396.0 401.918 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 21 55 45.9451 -90.2732 472.000 396.0 401.891 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 22 25 45.9451 -90.2732 472.000 396.0 401.659 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 22 55 45.9451 -90.2732 472.000 396.0 401.763 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 23 25 45.9451 -90.2732 472.000 396.0 401.770 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 23 55 45.9451 -90.2732 472.000 396.0 401.713 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 24 25 45.9451 -90.2732 472.000 396.0 401.773 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 24 55 45.9451 -90.2732 472.000 396.0 401.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 29 55 45.9451 -90.2732 472.000 30.0 404.314 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 34 55 45.9451 -90.2732 472.000 122.0 403.956 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 39 55 45.9451 -90.2732 472.000 396.0 401.672 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 44 55 45.9451 -90.2732 472.000 30.0 404.337 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 11 49 55 45.9451 -90.2732 472.000 122.0 403.955 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 14 55 45.9451 -90.2732 472.000 396.0 402.058 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 19 55 45.9451 -90.2732 472.000 30.0 404.424 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 24 55 45.9451 -90.2732 472.000 122.0 404.077 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 29 55 45.9451 -90.2732 472.000 396.0 401.877 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 34 55 45.9451 -90.2732 472.000 30.0 404.376 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 39 55 45.9451 -90.2732 472.000 122.0 404.152 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 44 55 45.9451 -90.2732 472.000 396.0 401.739 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 45 25 45.9451 -90.2732 472.000 396.0 401.754 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 45 55 45.9451 -90.2732 472.000 396.0 401.707 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 46 25 45.9451 -90.2732 472.000 396.0 401.736 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 46 55 45.9451 -90.2732 472.000 396.0 401.714 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 47 25 45.9451 -90.2732 472.000 396.0 401.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 47 55 45.9451 -90.2732 472.000 396.0 401.621 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 48 25 45.9451 -90.2732 472.000 396.0 401.640 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 48 55 45.9451 -90.2732 472.000 396.0 401.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 49 25 45.9451 -90.2732 472.000 396.0 401.648 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 49 55 45.9451 -90.2732 472.000 396.0 401.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 54 55 45.9451 -90.2732 472.000 30.0 404.659 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 12 59 55 45.9451 -90.2732 472.000 122.0 404.158 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 04 55 45.9451 -90.2732 472.000 396.0 401.458 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 09 55 45.9451 -90.2732 472.000 30.0 404.608 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 14 55 45.9451 -90.2732 472.000 122.0 404.240 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 19 55 45.9451 -90.2732 472.000 396.0 400.976 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 20 25 45.9451 -90.2732 472.000 396.0 400.896 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 20 55 45.9451 -90.2732 472.000 396.0 400.827 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 21 25 45.9451 -90.2732 472.000 396.0 400.897 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 21 55 45.9451 -90.2732 472.000 396.0 401.260 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 22 25 45.9451 -90.2732 472.000 396.0 401.154 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 22 55 45.9451 -90.2732 472.000 396.0 401.159 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 23 25 45.9451 -90.2732 472.000 396.0 401.124 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 23 55 45.9451 -90.2732 472.000 396.0 401.210 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 24 25 45.9451 -90.2732 472.000 396.0 401.158 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 24 55 45.9451 -90.2732 472.000 396.0 401.286 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 29 55 45.9451 -90.2732 472.000 30.0 404.671 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 34 55 45.9451 -90.2732 472.000 122.0 404.534 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 39 55 45.9451 -90.2732 472.000 396.0 401.943 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 44 55 45.9451 -90.2732 472.000 30.0 404.806 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 49 55 45.9451 -90.2732 472.000 122.0 404.604 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 13 54 55 45.9451 -90.2732 472.000 396.0 402.117 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 04 55 45.9451 -90.2732 472.000 30.0 404.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 09 55 45.9451 -90.2732 472.000 122.0 404.776 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 14 55 45.9451 -90.2732 472.000 396.0 402.132 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 19 55 45.9451 -90.2732 472.000 30.0 404.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 24 55 45.9451 -90.2732 472.000 122.0 404.856 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 29 55 45.9451 -90.2732 472.000 396.0 402.871 0.240 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 30 25 45.9451 -90.2732 472.000 396.0 402.205 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 30 55 45.9451 -90.2732 472.000 396.0 402.025 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 31 25 45.9451 -90.2732 472.000 396.0 402.203 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 31 55 45.9451 -90.2732 472.000 396.0 402.156 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 32 25 45.9451 -90.2732 472.000 396.0 402.252 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 32 55 45.9451 -90.2732 472.000 396.0 402.478 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 33 25 45.9451 -90.2732 472.000 396.0 402.250 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 33 55 45.9451 -90.2732 472.000 396.0 402.198 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 34 25 45.9451 -90.2732 472.000 396.0 402.236 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 34 55 45.9451 -90.2732 472.000 396.0 402.355 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 39 55 45.9451 -90.2732 472.000 30.0 405.195 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 44 55 45.9451 -90.2732 472.000 122.0 405.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 49 55 45.9451 -90.2732 472.000 396.0 401.886 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 54 55 45.9451 -90.2732 472.000 30.0 405.259 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 14 59 55 45.9451 -90.2732 472.000 122.0 405.196 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 04 55 45.9451 -90.2732 472.000 396.0 402.870 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 05 25 45.9451 -90.2732 472.000 396.0 402.939 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 05 55 45.9451 -90.2732 472.000 396.0 402.641 0.340 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 06 25 45.9451 -90.2732 472.000 396.0 402.932 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 06 55 45.9451 -90.2732 472.000 396.0 403.293 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 07 25 45.9451 -90.2732 472.000 396.0 403.234 0.370 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 07 55 45.9451 -90.2732 472.000 396.0 402.953 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 08 25 45.9451 -90.2732 472.000 396.0 403.942 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 08 55 45.9451 -90.2732 472.000 396.0 403.300 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 09 25 45.9451 -90.2732 472.000 396.0 402.878 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 09 55 45.9451 -90.2732 472.000 396.0 402.736 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 14 55 45.9451 -90.2732 472.000 30.0 405.338 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 19 55 45.9451 -90.2732 472.000 122.0 405.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 24 55 45.9451 -90.2732 472.000 396.0 402.679 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 29 55 45.9451 -90.2732 472.000 30.0 405.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 34 55 45.9451 -90.2732 472.000 122.0 405.356 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 39 55 45.9451 -90.2732 472.000 396.0 402.226 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 40 25 45.9451 -90.2732 472.000 396.0 402.883 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 40 55 45.9451 -90.2732 472.000 396.0 403.473 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 41 25 45.9451 -90.2732 472.000 396.0 403.108 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 41 55 45.9451 -90.2732 472.000 396.0 402.466 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 42 25 45.9451 -90.2732 472.000 396.0 402.310 0.650 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 42 55 45.9451 -90.2732 472.000 396.0 402.260 0.540 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 43 25 45.9451 -90.2732 472.000 396.0 402.897 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 43 55 45.9451 -90.2732 472.000 396.0 402.978 0.420 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 44 25 45.9451 -90.2732 472.000 396.0 401.991 0.700 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 44 55 45.9451 -90.2732 472.000 396.0 401.474 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 49 55 45.9451 -90.2732 472.000 30.0 405.324 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 54 55 45.9451 -90.2732 472.000 122.0 405.257 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 15 59 55 45.9451 -90.2732 472.000 396.0 399.349 0.440 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 04 55 45.9451 -90.2732 472.000 30.0 405.322 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 09 55 45.9451 -90.2732 472.000 122.0 405.301 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 14 55 45.9451 -90.2732 472.000 396.0 398.638 0.570 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 24 55 45.9451 -90.2732 472.000 30.0 405.313 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 29 55 45.9451 -90.2732 472.000 122.0 405.289 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 34 55 45.9451 -90.2732 472.000 396.0 404.344 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 39 55 45.9451 -90.2732 472.000 30.0 405.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 44 55 45.9451 -90.2732 472.000 122.0 405.302 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 49 55 45.9451 -90.2732 472.000 396.0 404.335 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 50 25 45.9451 -90.2732 472.000 396.0 404.596 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 50 55 45.9451 -90.2732 472.000 396.0 404.637 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 51 25 45.9451 -90.2732 472.000 396.0 404.639 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 51 55 45.9451 -90.2732 472.000 396.0 403.874 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 52 25 45.9451 -90.2732 472.000 396.0 403.532 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 52 55 45.9451 -90.2732 472.000 396.0 404.626 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 53 25 45.9451 -90.2732 472.000 396.0 404.643 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 53 55 45.9451 -90.2732 472.000 396.0 404.698 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 54 25 45.9451 -90.2732 472.000 396.0 404.693 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 29 16 54 55 45.9451 -90.2732 472.000 396.0 404.388 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 04 55 45.9451 -90.2732 472.000 30.0 405.475 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 09 55 45.9451 -90.2732 472.000 122.0 405.435 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 14 55 45.9451 -90.2732 472.000 396.0 404.676 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 19 55 45.9451 -90.2732 472.000 30.0 405.333 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 24 55 45.9451 -90.2732 472.000 122.0 405.345 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 29 55 45.9451 -90.2732 472.000 396.0 404.042 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 30 25 45.9451 -90.2732 472.000 396.0 403.981 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 30 55 45.9451 -90.2732 472.000 396.0 404.892 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 31 25 45.9451 -90.2732 472.000 396.0 404.493 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 31 55 45.9451 -90.2732 472.000 396.0 403.811 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 32 25 45.9451 -90.2732 472.000 396.0 403.130 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 32 55 45.9451 -90.2732 472.000 396.0 403.384 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 33 25 45.9451 -90.2732 472.000 396.0 404.482 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 33 55 45.9451 -90.2732 472.000 396.0 404.222 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 34 25 45.9451 -90.2732 472.000 396.0 404.690 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 34 55 45.9451 -90.2732 472.000 396.0 405.126 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 39 55 45.9451 -90.2732 472.000 30.0 405.323 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 44 55 45.9451 -90.2732 472.000 122.0 405.253 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 49 55 45.9451 -90.2732 472.000 396.0 404.947 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 54 55 45.9451 -90.2732 472.000 30.0 405.255 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 17 59 55 45.9451 -90.2732 472.000 122.0 405.242 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 04 55 45.9451 -90.2732 472.000 396.0 404.988 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 14 55 45.9451 -90.2732 472.000 30.0 405.328 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 19 55 45.9451 -90.2732 472.000 122.0 405.327 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 24 55 45.9451 -90.2732 472.000 396.0 404.474 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 29 55 45.9451 -90.2732 472.000 30.0 405.242 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 34 55 45.9451 -90.2732 472.000 122.0 405.284 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 39 55 45.9451 -90.2732 472.000 396.0 404.578 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 40 25 45.9451 -90.2732 472.000 396.0 404.723 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 40 55 45.9451 -90.2732 472.000 396.0 404.688 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 41 25 45.9451 -90.2732 472.000 396.0 404.886 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 41 55 45.9451 -90.2732 472.000 396.0 404.842 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 42 25 45.9451 -90.2732 472.000 396.0 404.905 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 42 55 45.9451 -90.2732 472.000 396.0 404.607 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 43 25 45.9451 -90.2732 472.000 396.0 404.186 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 43 55 45.9451 -90.2732 472.000 396.0 404.342 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 44 25 45.9451 -90.2732 472.000 396.0 404.743 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 44 55 45.9451 -90.2732 472.000 396.0 404.580 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 49 55 45.9451 -90.2732 472.000 30.0 405.293 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 54 55 45.9451 -90.2732 472.000 122.0 405.203 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 18 59 55 45.9451 -90.2732 472.000 396.0 405.007 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 04 55 45.9451 -90.2732 472.000 30.0 405.252 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 09 55 45.9451 -90.2732 472.000 122.0 405.222 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 14 55 45.9451 -90.2732 472.000 396.0 404.729 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 15 25 45.9451 -90.2732 472.000 396.0 404.877 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 15 55 45.9451 -90.2732 472.000 396.0 405.015 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 16 25 45.9451 -90.2732 472.000 396.0 404.933 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 16 55 45.9451 -90.2732 472.000 396.0 404.814 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 17 25 45.9451 -90.2732 472.000 396.0 404.803 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 17 55 45.9451 -90.2732 472.000 396.0 405.096 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 18 25 45.9451 -90.2732 472.000 396.0 405.052 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 18 55 45.9451 -90.2732 472.000 396.0 405.078 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 19 25 45.9451 -90.2732 472.000 396.0 405.118 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 19 55 45.9451 -90.2732 472.000 396.0 405.066 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 24 55 45.9451 -90.2732 472.000 30.0 405.216 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 29 55 45.9451 -90.2732 472.000 122.0 405.267 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 34 55 45.9451 -90.2732 472.000 396.0 404.656 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 39 55 45.9451 -90.2732 472.000 30.0 405.251 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 44 55 45.9451 -90.2732 472.000 122.0 405.236 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 49 55 45.9451 -90.2732 472.000 396.0 404.627 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 19 59 55 45.9451 -90.2732 472.000 30.0 405.232 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 04 55 45.9451 -90.2732 472.000 122.0 405.256 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 09 55 45.9451 -90.2732 472.000 396.0 404.960 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 14 55 45.9451 -90.2732 472.000 30.0 405.257 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 19 55 45.9451 -90.2732 472.000 122.0 405.068 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 24 55 45.9451 -90.2732 472.000 396.0 404.705 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 25 25 45.9451 -90.2732 472.000 396.0 404.336 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 25 55 45.9451 -90.2732 472.000 396.0 404.399 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 26 25 45.9451 -90.2732 472.000 396.0 404.373 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 26 55 45.9451 -90.2732 472.000 396.0 404.578 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 27 25 45.9451 -90.2732 472.000 396.0 404.751 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 27 55 45.9451 -90.2732 472.000 396.0 404.667 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 28 25 45.9451 -90.2732 472.000 396.0 404.661 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 28 55 45.9451 -90.2732 472.000 396.0 404.795 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 29 25 45.9451 -90.2732 472.000 396.0 404.959 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 29 55 45.9451 -90.2732 472.000 396.0 404.895 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 34 55 45.9451 -90.2732 472.000 30.0 405.344 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 39 55 45.9451 -90.2732 472.000 122.0 405.292 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 44 55 45.9451 -90.2732 472.000 396.0 404.600 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 49 55 45.9451 -90.2732 472.000 30.0 405.487 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 54 55 45.9451 -90.2732 472.000 122.0 405.672 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 20 59 55 45.9451 -90.2732 472.000 396.0 404.373 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 00 25 45.9451 -90.2732 472.000 396.0 403.826 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 00 55 45.9451 -90.2732 472.000 396.0 404.048 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 01 25 45.9451 -90.2732 472.000 396.0 404.471 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 01 55 45.9451 -90.2732 472.000 396.0 404.554 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 02 25 45.9451 -90.2732 472.000 396.0 404.589 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 02 55 45.9451 -90.2732 472.000 396.0 404.987 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 03 25 45.9451 -90.2732 472.000 396.0 405.052 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 03 55 45.9451 -90.2732 472.000 396.0 405.047 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 04 25 45.9451 -90.2732 472.000 396.0 405.303 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 04 55 45.9451 -90.2732 472.000 396.0 405.106 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 09 55 45.9451 -90.2732 472.000 30.0 405.824 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 14 55 45.9451 -90.2732 472.000 122.0 405.611 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 19 55 45.9451 -90.2732 472.000 396.0 404.650 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 24 55 45.9451 -90.2732 472.000 30.0 405.607 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 29 55 45.9451 -90.2732 472.000 122.0 405.537 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 34 55 45.9451 -90.2732 472.000 396.0 404.835 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 35 25 45.9451 -90.2732 472.000 396.0 404.819 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 35 55 45.9451 -90.2732 472.000 396.0 404.912 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 36 25 45.9451 -90.2732 472.000 396.0 405.065 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 36 55 45.9451 -90.2732 472.000 396.0 404.989 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 37 25 45.9451 -90.2732 472.000 396.0 404.741 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 37 55 45.9451 -90.2732 472.000 396.0 404.672 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 38 25 45.9451 -90.2732 472.000 396.0 404.812 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 38 55 45.9451 -90.2732 472.000 396.0 404.935 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 39 25 45.9451 -90.2732 472.000 396.0 404.809 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 39 55 45.9451 -90.2732 472.000 396.0 404.720 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 44 55 45.9451 -90.2732 472.000 30.0 405.685 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 49 55 45.9451 -90.2732 472.000 122.0 405.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 54 55 45.9451 -90.2732 472.000 396.0 405.360 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 21 59 55 45.9451 -90.2732 472.000 30.0 406.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 04 55 45.9451 -90.2732 472.000 122.0 406.388 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 09 55 45.9451 -90.2732 472.000 396.0 406.025 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 19 55 45.9451 -90.2732 472.000 30.0 406.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 24 55 45.9451 -90.2732 472.000 122.0 406.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 29 55 45.9451 -90.2732 472.000 396.0 405.991 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 34 55 45.9451 -90.2732 472.000 30.0 406.792 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 39 55 45.9451 -90.2732 472.000 122.0 406.748 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 44 55 45.9451 -90.2732 472.000 396.0 405.920 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 54 55 45.9451 -90.2732 472.000 30.0 406.984 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 22 59 55 45.9451 -90.2732 472.000 122.0 406.806 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 04 55 45.9451 -90.2732 472.000 396.0 406.212 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 09 55 45.9451 -90.2732 472.000 30.0 406.863 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 14 55 45.9451 -90.2732 472.000 122.0 406.737 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 19 55 45.9451 -90.2732 472.000 396.0 406.046 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 20 25 45.9451 -90.2732 472.000 396.0 406.029 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 20 55 45.9451 -90.2732 472.000 396.0 406.169 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 21 25 45.9451 -90.2732 472.000 396.0 406.189 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 21 55 45.9451 -90.2732 472.000 396.0 406.175 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 22 25 45.9451 -90.2732 472.000 396.0 406.018 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 22 55 45.9451 -90.2732 472.000 396.0 406.014 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 23 25 45.9451 -90.2732 472.000 396.0 405.922 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 23 55 45.9451 -90.2732 472.000 396.0 406.073 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 24 25 45.9451 -90.2732 472.000 396.0 406.176 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 24 55 45.9451 -90.2732 472.000 396.0 406.190 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 29 55 45.9451 -90.2732 472.000 30.0 406.824 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 34 55 45.9451 -90.2732 472.000 122.0 406.671 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 39 55 45.9451 -90.2732 472.000 396.0 406.170 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 44 55 45.9451 -90.2732 472.000 30.0 406.845 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 29 23 49 55 45.9451 -90.2732 472.000 122.0 406.775 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 14 55 45.9451 -90.2732 472.000 396.0 406.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 19 55 45.9451 -90.2732 472.000 30.0 407.207 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 24 55 45.9451 -90.2732 472.000 122.0 407.104 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 29 55 45.9451 -90.2732 472.000 396.0 407.005 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 34 55 45.9451 -90.2732 472.000 30.0 407.381 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 39 55 45.9451 -90.2732 472.000 122.0 407.301 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 44 55 45.9451 -90.2732 472.000 396.0 407.258 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 45 25 45.9451 -90.2732 472.000 396.0 407.241 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 45 55 45.9451 -90.2732 472.000 396.0 407.243 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 46 25 45.9451 -90.2732 472.000 396.0 407.295 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 46 55 45.9451 -90.2732 472.000 396.0 407.294 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 47 25 45.9451 -90.2732 472.000 396.0 407.326 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 47 55 45.9451 -90.2732 472.000 396.0 407.306 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 48 25 45.9451 -90.2732 472.000 396.0 407.376 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 48 55 45.9451 -90.2732 472.000 396.0 407.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 49 25 45.9451 -90.2732 472.000 396.0 407.417 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 49 55 45.9451 -90.2732 472.000 396.0 407.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 54 55 45.9451 -90.2732 472.000 30.0 407.828 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 00 59 55 45.9451 -90.2732 472.000 122.0 407.661 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 04 55 45.9451 -90.2732 472.000 396.0 407.761 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 09 55 45.9451 -90.2732 472.000 30.0 408.030 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 14 55 45.9451 -90.2732 472.000 122.0 408.110 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 19 55 45.9451 -90.2732 472.000 396.0 408.400 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 20 25 45.9451 -90.2732 472.000 396.0 408.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 20 55 45.9451 -90.2732 472.000 396.0 408.431 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 21 25 45.9451 -90.2732 472.000 396.0 408.438 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 21 55 45.9451 -90.2732 472.000 396.0 408.423 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 22 25 45.9451 -90.2732 472.000 396.0 408.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 22 55 45.9451 -90.2732 472.000 396.0 408.518 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 23 25 45.9451 -90.2732 472.000 396.0 408.419 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 23 55 45.9451 -90.2732 472.000 396.0 408.500 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 24 25 45.9451 -90.2732 472.000 396.0 408.478 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 24 55 45.9451 -90.2732 472.000 396.0 408.479 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 29 55 45.9451 -90.2732 472.000 30.0 408.626 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 34 55 45.9451 -90.2732 472.000 122.0 408.597 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 39 55 45.9451 -90.2732 472.000 396.0 408.840 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 44 55 45.9451 -90.2732 472.000 30.0 408.947 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 49 55 45.9451 -90.2732 472.000 122.0 409.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 01 54 55 45.9451 -90.2732 472.000 396.0 409.492 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 04 55 45.9451 -90.2732 472.000 30.0 409.505 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 09 55 45.9451 -90.2732 472.000 122.0 409.741 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 14 55 45.9451 -90.2732 472.000 396.0 410.026 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 19 55 45.9451 -90.2732 472.000 30.0 410.159 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 24 55 45.9451 -90.2732 472.000 122.0 410.309 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 29 55 45.9451 -90.2732 472.000 396.0 409.883 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 30 25 45.9451 -90.2732 472.000 396.0 409.972 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 30 55 45.9451 -90.2732 472.000 396.0 409.944 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 31 25 45.9451 -90.2732 472.000 396.0 409.585 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 31 55 45.9451 -90.2732 472.000 396.0 409.615 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 32 25 45.9451 -90.2732 472.000 396.0 410.034 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 32 55 45.9451 -90.2732 472.000 396.0 410.013 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 33 25 45.9451 -90.2732 472.000 396.0 409.638 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 33 55 45.9451 -90.2732 472.000 396.0 409.938 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 34 25 45.9451 -90.2732 472.000 396.0 409.976 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 34 55 45.9451 -90.2732 472.000 396.0 409.729 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 39 55 45.9451 -90.2732 472.000 30.0 410.839 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 44 55 45.9451 -90.2732 472.000 122.0 410.603 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 49 55 45.9451 -90.2732 472.000 396.0 409.138 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 54 55 45.9451 -90.2732 472.000 30.0 410.952 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 02 59 55 45.9451 -90.2732 472.000 122.0 410.545 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 04 55 45.9451 -90.2732 472.000 396.0 409.150 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 05 25 45.9451 -90.2732 472.000 396.0 409.273 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 05 55 45.9451 -90.2732 472.000 396.0 409.049 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 06 25 45.9451 -90.2732 472.000 396.0 409.141 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 06 55 45.9451 -90.2732 472.000 396.0 408.933 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 07 25 45.9451 -90.2732 472.000 396.0 408.979 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 07 55 45.9451 -90.2732 472.000 396.0 409.057 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 08 25 45.9451 -90.2732 472.000 396.0 409.287 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 08 55 45.9451 -90.2732 472.000 396.0 409.405 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 09 25 45.9451 -90.2732 472.000 396.0 409.187 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 09 55 45.9451 -90.2732 472.000 396.0 409.016 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 14 55 45.9451 -90.2732 472.000 30.0 410.990 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 19 55 45.9451 -90.2732 472.000 122.0 410.415 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 24 55 45.9451 -90.2732 472.000 396.0 408.929 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 29 55 45.9451 -90.2732 472.000 30.0 410.913 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 34 55 45.9451 -90.2732 472.000 122.0 410.383 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 39 55 45.9451 -90.2732 472.000 396.0 408.609 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 40 25 45.9451 -90.2732 472.000 396.0 408.287 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 40 55 45.9451 -90.2732 472.000 396.0 408.312 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 41 25 45.9451 -90.2732 472.000 396.0 408.317 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 41 55 45.9451 -90.2732 472.000 396.0 408.371 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 42 25 45.9451 -90.2732 472.000 396.0 408.204 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 42 55 45.9451 -90.2732 472.000 396.0 408.005 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 43 25 45.9451 -90.2732 472.000 396.0 408.028 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 43 55 45.9451 -90.2732 472.000 396.0 408.383 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 44 25 45.9451 -90.2732 472.000 396.0 408.075 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 44 55 45.9451 -90.2732 472.000 396.0 408.169 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 49 55 45.9451 -90.2732 472.000 30.0 410.392 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 54 55 45.9451 -90.2732 472.000 122.0 410.018 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 03 59 55 45.9451 -90.2732 472.000 396.0 408.550 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 04 55 45.9451 -90.2732 472.000 30.0 410.512 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 09 55 45.9451 -90.2732 472.000 122.0 409.973 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 14 55 45.9451 -90.2732 472.000 396.0 407.853 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 24 55 45.9451 -90.2732 472.000 30.0 410.445 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 29 55 45.9451 -90.2732 472.000 122.0 409.900 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 34 55 45.9451 -90.2732 472.000 396.0 408.506 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 39 55 45.9451 -90.2732 472.000 30.0 410.367 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 44 55 45.9451 -90.2732 472.000 122.0 409.814 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 49 55 45.9451 -90.2732 472.000 396.0 407.369 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 50 25 45.9451 -90.2732 472.000 396.0 407.313 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 50 55 45.9451 -90.2732 472.000 396.0 407.746 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 51 25 45.9451 -90.2732 472.000 396.0 408.107 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 51 55 45.9451 -90.2732 472.000 396.0 408.078 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 52 25 45.9451 -90.2732 472.000 396.0 407.855 0.250 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 52 55 45.9451 -90.2732 472.000 396.0 408.422 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 53 25 45.9451 -90.2732 472.000 396.0 408.110 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 53 55 45.9451 -90.2732 472.000 396.0 408.131 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 54 25 45.9451 -90.2732 472.000 396.0 407.994 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 04 54 55 45.9451 -90.2732 472.000 396.0 408.079 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 04 55 45.9451 -90.2732 472.000 30.0 410.359 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 09 55 45.9451 -90.2732 472.000 122.0 409.775 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 14 55 45.9451 -90.2732 472.000 396.0 407.370 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 19 55 45.9451 -90.2732 472.000 30.0 410.558 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 24 55 45.9451 -90.2732 472.000 122.0 409.951 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 29 55 45.9451 -90.2732 472.000 396.0 406.688 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 30 25 45.9451 -90.2732 472.000 396.0 406.691 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 30 55 45.9451 -90.2732 472.000 396.0 406.594 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 31 25 45.9451 -90.2732 472.000 396.0 406.988 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 31 55 45.9451 -90.2732 472.000 396.0 406.917 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 32 25 45.9451 -90.2732 472.000 396.0 406.980 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 32 55 45.9451 -90.2732 472.000 396.0 407.076 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 33 25 45.9451 -90.2732 472.000 396.0 407.433 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 33 55 45.9451 -90.2732 472.000 396.0 407.132 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 34 25 45.9451 -90.2732 472.000 396.0 406.969 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 34 55 45.9451 -90.2732 472.000 396.0 407.657 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 39 55 45.9451 -90.2732 472.000 30.0 410.578 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 44 55 45.9451 -90.2732 472.000 122.0 409.825 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 49 55 45.9451 -90.2732 472.000 396.0 407.387 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 54 55 45.9451 -90.2732 472.000 30.0 410.609 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 05 59 55 45.9451 -90.2732 472.000 122.0 410.274 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 04 55 45.9451 -90.2732 472.000 396.0 406.718 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 14 55 45.9451 -90.2732 472.000 30.0 410.914 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 19 55 45.9451 -90.2732 472.000 122.0 410.414 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 24 55 45.9451 -90.2732 472.000 396.0 407.967 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 29 55 45.9451 -90.2732 472.000 30.0 410.906 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 34 55 45.9451 -90.2732 472.000 122.0 410.352 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 39 55 45.9451 -90.2732 472.000 396.0 408.151 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 40 25 45.9451 -90.2732 472.000 396.0 408.178 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 40 55 45.9451 -90.2732 472.000 396.0 408.408 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 41 25 45.9451 -90.2732 472.000 396.0 408.528 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 41 55 45.9451 -90.2732 472.000 396.0 408.758 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 42 25 45.9451 -90.2732 472.000 396.0 408.770 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 42 55 45.9451 -90.2732 472.000 396.0 408.846 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 43 25 45.9451 -90.2732 472.000 396.0 408.773 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 43 55 45.9451 -90.2732 472.000 396.0 408.743 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 44 25 45.9451 -90.2732 472.000 396.0 408.934 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 44 55 45.9451 -90.2732 472.000 396.0 408.816 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 49 55 45.9451 -90.2732 472.000 30.0 411.070 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 54 55 45.9451 -90.2732 472.000 122.0 410.147 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 06 59 55 45.9451 -90.2732 472.000 396.0 408.889 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 04 55 45.9451 -90.2732 472.000 30.0 410.544 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 09 55 45.9451 -90.2732 472.000 122.0 409.747 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 14 55 45.9451 -90.2732 472.000 396.0 408.978 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 15 25 45.9451 -90.2732 472.000 396.0 408.497 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 15 55 45.9451 -90.2732 472.000 396.0 408.637 0.210 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 16 25 45.9451 -90.2732 472.000 396.0 408.403 0.390 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 16 55 45.9451 -90.2732 472.000 396.0 408.037 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 17 25 45.9451 -90.2732 472.000 396.0 408.080 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 17 55 45.9451 -90.2732 472.000 396.0 408.235 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 18 25 45.9451 -90.2732 472.000 396.0 408.482 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 18 55 45.9451 -90.2732 472.000 396.0 408.850 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 19 25 45.9451 -90.2732 472.000 396.0 408.819 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 19 55 45.9451 -90.2732 472.000 396.0 408.729 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 24 55 45.9451 -90.2732 472.000 30.0 410.541 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 29 55 45.9451 -90.2732 472.000 122.0 409.691 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 34 55 45.9451 -90.2732 472.000 396.0 407.814 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 39 55 45.9451 -90.2732 472.000 30.0 410.111 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 44 55 45.9451 -90.2732 472.000 122.0 409.372 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 49 55 45.9451 -90.2732 472.000 396.0 407.909 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 30 07 59 55 45.9451 -90.2732 472.000 30.0 409.875 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 04 55 45.9451 -90.2732 472.000 122.0 409.157 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 09 55 45.9451 -90.2732 472.000 396.0 405.776 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 14 55 45.9451 -90.2732 472.000 30.0 409.700 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 19 55 45.9451 -90.2732 472.000 122.0 408.954 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 24 55 45.9451 -90.2732 472.000 396.0 406.505 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 25 25 45.9451 -90.2732 472.000 396.0 406.710 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 25 55 45.9451 -90.2732 472.000 396.0 406.891 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 26 25 45.9451 -90.2732 472.000 396.0 407.129 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 26 55 45.9451 -90.2732 472.000 396.0 407.225 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 27 25 45.9451 -90.2732 472.000 396.0 407.312 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 27 55 45.9451 -90.2732 472.000 396.0 407.400 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 28 25 45.9451 -90.2732 472.000 396.0 407.755 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 28 55 45.9451 -90.2732 472.000 396.0 407.767 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 29 25 45.9451 -90.2732 472.000 396.0 407.406 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 29 55 45.9451 -90.2732 472.000 396.0 406.314 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 34 55 45.9451 -90.2732 472.000 30.0 409.495 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 39 55 45.9451 -90.2732 472.000 122.0 408.619 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 44 55 45.9451 -90.2732 472.000 396.0 407.101 0.410 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 49 55 45.9451 -90.2732 472.000 30.0 409.578 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 54 55 45.9451 -90.2732 472.000 122.0 408.921 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 08 59 55 45.9451 -90.2732 472.000 396.0 407.788 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 00 25 45.9451 -90.2732 472.000 396.0 407.738 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 00 55 45.9451 -90.2732 472.000 396.0 407.658 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 01 25 45.9451 -90.2732 472.000 396.0 407.577 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 01 55 45.9451 -90.2732 472.000 396.0 407.338 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 02 25 45.9451 -90.2732 472.000 396.0 407.212 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 02 55 45.9451 -90.2732 472.000 396.0 407.186 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 03 25 45.9451 -90.2732 472.000 396.0 407.013 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 03 55 45.9451 -90.2732 472.000 396.0 407.038 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 04 25 45.9451 -90.2732 472.000 396.0 407.223 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 04 55 45.9451 -90.2732 472.000 396.0 407.346 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 09 55 45.9451 -90.2732 472.000 30.0 409.302 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 14 55 45.9451 -90.2732 472.000 122.0 408.723 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 19 55 45.9451 -90.2732 472.000 396.0 406.033 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 24 55 45.9451 -90.2732 472.000 30.0 409.509 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 29 55 45.9451 -90.2732 472.000 122.0 408.897 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 34 55 45.9451 -90.2732 472.000 396.0 407.373 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 35 25 45.9451 -90.2732 472.000 396.0 407.356 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 35 55 45.9451 -90.2732 472.000 396.0 407.702 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 36 25 45.9451 -90.2732 472.000 396.0 407.839 0.280 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 36 55 45.9451 -90.2732 472.000 396.0 408.058 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 37 25 45.9451 -90.2732 472.000 396.0 407.975 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 37 55 45.9451 -90.2732 472.000 396.0 407.740 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 38 25 45.9451 -90.2732 472.000 396.0 407.555 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 38 55 45.9451 -90.2732 472.000 396.0 407.879 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 39 25 45.9451 -90.2732 472.000 396.0 407.734 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 39 55 45.9451 -90.2732 472.000 396.0 407.159 0.220 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 44 55 45.9451 -90.2732 472.000 30.0 409.504 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 49 55 45.9451 -90.2732 472.000 122.0 408.966 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 54 55 45.9451 -90.2732 472.000 396.0 406.090 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 30 09 59 55 45.9451 -90.2732 472.000 30.0 409.718 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 04 55 45.9451 -90.2732 472.000 122.0 408.647 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 09 55 45.9451 -90.2732 472.000 396.0 402.982 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 19 55 45.9451 -90.2732 472.000 30.0 410.056 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 24 55 45.9451 -90.2732 472.000 122.0 408.400 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 29 55 45.9451 -90.2732 472.000 396.0 404.116 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 34 55 45.9451 -90.2732 472.000 30.0 409.712 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 39 55 45.9451 -90.2732 472.000 122.0 406.933 0.300 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 44 55 45.9451 -90.2732 472.000 396.0 403.947 0.260 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 54 55 45.9451 -90.2732 472.000 30.0 409.229 0.230 -999.990 -999.990 0.070 ..P LEF 2010 11 30 10 59 55 45.9451 -90.2732 472.000 122.0 406.942 0.190 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 04 55 45.9451 -90.2732 472.000 396.0 402.772 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 09 55 45.9451 -90.2732 472.000 30.0 408.415 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 14 55 45.9451 -90.2732 472.000 122.0 407.073 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 19 55 45.9451 -90.2732 472.000 396.0 403.096 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 20 25 45.9451 -90.2732 472.000 396.0 403.186 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 20 55 45.9451 -90.2732 472.000 396.0 403.229 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 21 25 45.9451 -90.2732 472.000 396.0 403.350 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 21 55 45.9451 -90.2732 472.000 396.0 403.529 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 22 25 45.9451 -90.2732 472.000 396.0 403.394 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 22 55 45.9451 -90.2732 472.000 396.0 403.339 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 23 25 45.9451 -90.2732 472.000 396.0 403.183 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 23 55 45.9451 -90.2732 472.000 396.0 403.062 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 24 25 45.9451 -90.2732 472.000 396.0 403.370 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 24 55 45.9451 -90.2732 472.000 396.0 403.213 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 29 55 45.9451 -90.2732 472.000 30.0 408.196 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 34 55 45.9451 -90.2732 472.000 122.0 406.516 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 39 55 45.9451 -90.2732 472.000 396.0 401.994 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 44 55 45.9451 -90.2732 472.000 30.0 407.745 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 11 49 55 45.9451 -90.2732 472.000 122.0 406.217 0.290 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 14 55 45.9451 -90.2732 472.000 396.0 404.051 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 19 55 45.9451 -90.2732 472.000 30.0 407.180 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 24 55 45.9451 -90.2732 472.000 122.0 405.644 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 29 55 45.9451 -90.2732 472.000 396.0 404.357 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 34 55 45.9451 -90.2732 472.000 30.0 406.600 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 39 55 45.9451 -90.2732 472.000 122.0 405.272 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 44 55 45.9451 -90.2732 472.000 396.0 405.151 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 45 25 45.9451 -90.2732 472.000 396.0 405.143 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 45 55 45.9451 -90.2732 472.000 396.0 405.162 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 46 25 45.9451 -90.2732 472.000 396.0 405.188 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 46 55 45.9451 -90.2732 472.000 396.0 405.227 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 47 25 45.9451 -90.2732 472.000 396.0 405.436 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 47 55 45.9451 -90.2732 472.000 396.0 405.619 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 48 25 45.9451 -90.2732 472.000 396.0 405.830 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 48 55 45.9451 -90.2732 472.000 396.0 405.700 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 49 25 45.9451 -90.2732 472.000 396.0 405.755 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 49 55 45.9451 -90.2732 472.000 396.0 405.803 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 54 55 45.9451 -90.2732 472.000 30.0 406.427 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 12 59 55 45.9451 -90.2732 472.000 122.0 405.553 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 04 55 45.9451 -90.2732 472.000 396.0 405.484 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 09 55 45.9451 -90.2732 472.000 30.0 406.340 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 14 55 45.9451 -90.2732 472.000 122.0 405.880 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 19 55 45.9451 -90.2732 472.000 396.0 405.331 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 20 25 45.9451 -90.2732 472.000 396.0 405.300 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 20 55 45.9451 -90.2732 472.000 396.0 405.334 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 21 25 45.9451 -90.2732 472.000 396.0 405.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 21 55 45.9451 -90.2732 472.000 396.0 405.363 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 22 25 45.9451 -90.2732 472.000 396.0 405.390 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 22 55 45.9451 -90.2732 472.000 396.0 405.350 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 23 25 45.9451 -90.2732 472.000 396.0 405.382 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 23 55 45.9451 -90.2732 472.000 396.0 405.384 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 24 25 45.9451 -90.2732 472.000 396.0 405.368 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 24 55 45.9451 -90.2732 472.000 396.0 405.393 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 29 55 45.9451 -90.2732 472.000 30.0 406.379 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 34 55 45.9451 -90.2732 472.000 122.0 406.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 39 55 45.9451 -90.2732 472.000 396.0 405.810 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 44 55 45.9451 -90.2732 472.000 30.0 406.406 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 49 55 45.9451 -90.2732 472.000 122.0 406.029 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 13 54 55 45.9451 -90.2732 472.000 396.0 405.528 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 04 55 45.9451 -90.2732 472.000 30.0 406.360 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 09 55 45.9451 -90.2732 472.000 122.0 405.655 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 14 55 45.9451 -90.2732 472.000 396.0 405.216 0.150 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 19 55 45.9451 -90.2732 472.000 30.0 406.403 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 24 55 45.9451 -90.2732 472.000 122.0 406.639 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 29 55 45.9451 -90.2732 472.000 396.0 406.373 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 30 25 45.9451 -90.2732 472.000 396.0 406.159 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 30 55 45.9451 -90.2732 472.000 396.0 406.322 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 31 25 45.9451 -90.2732 472.000 396.0 406.591 0.330 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 31 55 45.9451 -90.2732 472.000 396.0 406.655 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 32 25 45.9451 -90.2732 472.000 396.0 406.630 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 32 55 45.9451 -90.2732 472.000 396.0 406.789 0.320 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 33 25 45.9451 -90.2732 472.000 396.0 406.874 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 33 55 45.9451 -90.2732 472.000 396.0 406.685 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 34 25 45.9451 -90.2732 472.000 396.0 406.573 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 34 55 45.9451 -90.2732 472.000 396.0 406.561 0.200 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 39 55 45.9451 -90.2732 472.000 30.0 407.220 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 44 55 45.9451 -90.2732 472.000 122.0 407.433 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 49 55 45.9451 -90.2732 472.000 396.0 408.515 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 54 55 45.9451 -90.2732 472.000 30.0 407.948 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 14 59 55 45.9451 -90.2732 472.000 122.0 408.238 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 04 55 45.9451 -90.2732 472.000 396.0 409.226 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 05 25 45.9451 -90.2732 472.000 396.0 409.362 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 05 55 45.9451 -90.2732 472.000 396.0 409.196 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 06 25 45.9451 -90.2732 472.000 396.0 409.321 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 06 55 45.9451 -90.2732 472.000 396.0 409.473 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 07 25 45.9451 -90.2732 472.000 396.0 409.416 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 07 55 45.9451 -90.2732 472.000 396.0 409.309 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 08 25 45.9451 -90.2732 472.000 396.0 409.192 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 08 55 45.9451 -90.2732 472.000 396.0 409.373 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 09 25 45.9451 -90.2732 472.000 396.0 409.444 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 09 55 45.9451 -90.2732 472.000 396.0 409.309 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 14 55 45.9451 -90.2732 472.000 30.0 409.004 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 19 55 45.9451 -90.2732 472.000 122.0 408.949 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 24 55 45.9451 -90.2732 472.000 396.0 409.335 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 29 55 45.9451 -90.2732 472.000 30.0 409.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 34 55 45.9451 -90.2732 472.000 122.0 409.622 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 39 55 45.9451 -90.2732 472.000 396.0 409.785 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 40 25 45.9451 -90.2732 472.000 396.0 409.794 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 40 55 45.9451 -90.2732 472.000 396.0 409.823 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 41 25 45.9451 -90.2732 472.000 396.0 409.856 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 41 55 45.9451 -90.2732 472.000 396.0 409.963 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 42 25 45.9451 -90.2732 472.000 396.0 410.088 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 42 55 45.9451 -90.2732 472.000 396.0 410.128 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 43 25 45.9451 -90.2732 472.000 396.0 410.143 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 43 55 45.9451 -90.2732 472.000 396.0 410.024 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 44 25 45.9451 -90.2732 472.000 396.0 410.214 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 44 55 45.9451 -90.2732 472.000 396.0 410.208 0.070 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 49 55 45.9451 -90.2732 472.000 30.0 410.340 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 54 55 45.9451 -90.2732 472.000 122.0 410.475 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 15 59 55 45.9451 -90.2732 472.000 396.0 411.252 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 04 55 45.9451 -90.2732 472.000 30.0 412.652 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 09 55 45.9451 -90.2732 472.000 122.0 413.133 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 14 55 45.9451 -90.2732 472.000 396.0 414.263 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 24 55 45.9451 -90.2732 472.000 30.0 413.550 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 29 55 45.9451 -90.2732 472.000 122.0 413.967 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 34 55 45.9451 -90.2732 472.000 396.0 413.231 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 39 55 45.9451 -90.2732 472.000 30.0 413.384 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 44 55 45.9451 -90.2732 472.000 122.0 413.286 0.130 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 49 55 45.9451 -90.2732 472.000 396.0 411.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 50 25 45.9451 -90.2732 472.000 396.0 411.824 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 50 55 45.9451 -90.2732 472.000 396.0 411.922 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 51 25 45.9451 -90.2732 472.000 396.0 411.874 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 51 55 45.9451 -90.2732 472.000 396.0 411.799 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 52 25 45.9451 -90.2732 472.000 396.0 412.062 0.270 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 52 55 45.9451 -90.2732 472.000 396.0 411.716 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 53 25 45.9451 -90.2732 472.000 396.0 411.832 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 53 55 45.9451 -90.2732 472.000 396.0 411.654 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 54 25 45.9451 -90.2732 472.000 396.0 411.449 0.180 -999.990 -999.990 0.070 ..P LEF 2010 11 30 16 54 55 45.9451 -90.2732 472.000 396.0 411.301 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 04 55 45.9451 -90.2732 472.000 30.0 413.223 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 09 55 45.9451 -90.2732 472.000 122.0 411.894 0.170 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 14 55 45.9451 -90.2732 472.000 396.0 410.029 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 19 55 45.9451 -90.2732 472.000 30.0 412.236 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 24 55 45.9451 -90.2732 472.000 122.0 411.367 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 29 55 45.9451 -90.2732 472.000 396.0 410.558 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 30 25 45.9451 -90.2732 472.000 396.0 410.451 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 30 55 45.9451 -90.2732 472.000 396.0 410.421 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 31 25 45.9451 -90.2732 472.000 396.0 410.420 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 31 55 45.9451 -90.2732 472.000 396.0 410.480 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 32 25 45.9451 -90.2732 472.000 396.0 410.210 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 32 55 45.9451 -90.2732 472.000 396.0 410.219 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 33 25 45.9451 -90.2732 472.000 396.0 410.225 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 33 55 45.9451 -90.2732 472.000 396.0 410.288 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 34 25 45.9451 -90.2732 472.000 396.0 410.277 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 34 55 45.9451 -90.2732 472.000 396.0 410.308 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 39 55 45.9451 -90.2732 472.000 30.0 411.075 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 44 55 45.9451 -90.2732 472.000 122.0 411.020 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 49 55 45.9451 -90.2732 472.000 396.0 409.307 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 54 55 45.9451 -90.2732 472.000 30.0 409.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 17 59 55 45.9451 -90.2732 472.000 122.0 408.633 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 04 55 45.9451 -90.2732 472.000 396.0 408.101 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 14 55 45.9451 -90.2732 472.000 30.0 406.201 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 19 55 45.9451 -90.2732 472.000 122.0 405.886 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 24 55 45.9451 -90.2732 472.000 396.0 405.867 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 29 55 45.9451 -90.2732 472.000 30.0 405.788 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 34 55 45.9451 -90.2732 472.000 122.0 405.277 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 39 55 45.9451 -90.2732 472.000 396.0 405.239 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 40 25 45.9451 -90.2732 472.000 396.0 405.255 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 40 55 45.9451 -90.2732 472.000 396.0 405.115 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 41 25 45.9451 -90.2732 472.000 396.0 405.108 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 41 55 45.9451 -90.2732 472.000 396.0 405.247 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 42 25 45.9451 -90.2732 472.000 396.0 405.091 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 42 55 45.9451 -90.2732 472.000 396.0 404.846 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 43 25 45.9451 -90.2732 472.000 396.0 404.943 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 43 55 45.9451 -90.2732 472.000 396.0 404.722 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 44 25 45.9451 -90.2732 472.000 396.0 404.731 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 44 55 45.9451 -90.2732 472.000 396.0 404.688 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 49 55 45.9451 -90.2732 472.000 30.0 404.269 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 54 55 45.9451 -90.2732 472.000 122.0 403.958 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 18 59 55 45.9451 -90.2732 472.000 396.0 404.082 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 04 55 45.9451 -90.2732 472.000 30.0 403.638 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 09 55 45.9451 -90.2732 472.000 122.0 403.472 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 14 55 45.9451 -90.2732 472.000 396.0 403.100 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 15 25 45.9451 -90.2732 472.000 396.0 403.323 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 15 55 45.9451 -90.2732 472.000 396.0 403.365 0.160 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 16 25 45.9451 -90.2732 472.000 396.0 403.151 0.140 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 16 55 45.9451 -90.2732 472.000 396.0 402.967 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 17 25 45.9451 -90.2732 472.000 396.0 402.899 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 17 55 45.9451 -90.2732 472.000 396.0 402.906 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 18 25 45.9451 -90.2732 472.000 396.0 402.990 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 18 55 45.9451 -90.2732 472.000 396.0 402.960 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 19 25 45.9451 -90.2732 472.000 396.0 402.946 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 19 55 45.9451 -90.2732 472.000 396.0 402.951 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 24 55 45.9451 -90.2732 472.000 30.0 402.623 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 29 55 45.9451 -90.2732 472.000 122.0 402.363 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 34 55 45.9451 -90.2732 472.000 396.0 402.273 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 39 55 45.9451 -90.2732 472.000 30.0 402.107 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 44 55 45.9451 -90.2732 472.000 122.0 401.855 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 49 55 45.9451 -90.2732 472.000 396.0 401.697 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 19 59 55 45.9451 -90.2732 472.000 30.0 401.161 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 04 55 45.9451 -90.2732 472.000 122.0 400.996 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 09 55 45.9451 -90.2732 472.000 396.0 401.083 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 14 55 45.9451 -90.2732 472.000 30.0 400.976 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 19 55 45.9451 -90.2732 472.000 122.0 401.013 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 24 55 45.9451 -90.2732 472.000 396.0 400.814 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 25 25 45.9451 -90.2732 472.000 396.0 400.743 0.120 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 25 55 45.9451 -90.2732 472.000 396.0 400.528 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 26 25 45.9451 -90.2732 472.000 396.0 400.559 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 26 55 45.9451 -90.2732 472.000 396.0 400.554 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 27 25 45.9451 -90.2732 472.000 396.0 400.585 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 27 55 45.9451 -90.2732 472.000 396.0 400.599 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 28 25 45.9451 -90.2732 472.000 396.0 400.602 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 28 55 45.9451 -90.2732 472.000 396.0 400.545 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 29 25 45.9451 -90.2732 472.000 396.0 400.535 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 29 55 45.9451 -90.2732 472.000 396.0 400.542 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 34 55 45.9451 -90.2732 472.000 30.0 400.183 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 39 55 45.9451 -90.2732 472.000 122.0 399.985 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 44 55 45.9451 -90.2732 472.000 396.0 400.035 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 49 55 45.9451 -90.2732 472.000 30.0 400.140 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 54 55 45.9451 -90.2732 472.000 122.0 400.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 20 59 55 45.9451 -90.2732 472.000 396.0 400.075 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 00 25 45.9451 -90.2732 472.000 396.0 400.038 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 00 55 45.9451 -90.2732 472.000 396.0 400.049 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 01 25 45.9451 -90.2732 472.000 396.0 399.969 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 01 55 45.9451 -90.2732 472.000 396.0 399.922 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 02 25 45.9451 -90.2732 472.000 396.0 399.964 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 02 55 45.9451 -90.2732 472.000 396.0 400.002 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 03 25 45.9451 -90.2732 472.000 396.0 399.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 03 55 45.9451 -90.2732 472.000 396.0 399.936 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 04 25 45.9451 -90.2732 472.000 396.0 399.673 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 04 55 45.9451 -90.2732 472.000 396.0 399.647 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 09 55 45.9451 -90.2732 472.000 30.0 399.515 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 14 55 45.9451 -90.2732 472.000 122.0 399.222 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 19 55 45.9451 -90.2732 472.000 396.0 399.163 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 24 55 45.9451 -90.2732 472.000 30.0 399.091 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 29 55 45.9451 -90.2732 472.000 122.0 399.037 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 34 55 45.9451 -90.2732 472.000 396.0 398.919 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 35 25 45.9451 -90.2732 472.000 396.0 398.912 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 35 55 45.9451 -90.2732 472.000 396.0 398.921 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 36 25 45.9451 -90.2732 472.000 396.0 398.962 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 36 55 45.9451 -90.2732 472.000 396.0 398.979 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 37 25 45.9451 -90.2732 472.000 396.0 399.033 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 37 55 45.9451 -90.2732 472.000 396.0 399.034 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 38 25 45.9451 -90.2732 472.000 396.0 399.086 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 38 55 45.9451 -90.2732 472.000 396.0 399.040 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 39 25 45.9451 -90.2732 472.000 396.0 399.046 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 39 55 45.9451 -90.2732 472.000 396.0 399.086 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 44 55 45.9451 -90.2732 472.000 30.0 399.009 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 49 55 45.9451 -90.2732 472.000 122.0 399.021 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 54 55 45.9451 -90.2732 472.000 396.0 399.108 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 21 59 55 45.9451 -90.2732 472.000 30.0 399.132 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 04 55 45.9451 -90.2732 472.000 122.0 399.173 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 09 55 45.9451 -90.2732 472.000 396.0 399.207 0.100 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 19 55 45.9451 -90.2732 472.000 30.0 398.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 24 55 45.9451 -90.2732 472.000 122.0 398.698 0.080 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 29 55 45.9451 -90.2732 472.000 396.0 398.642 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 34 55 45.9451 -90.2732 472.000 30.0 398.894 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 39 55 45.9451 -90.2732 472.000 122.0 398.723 0.110 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 44 55 45.9451 -90.2732 472.000 396.0 398.670 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 54 55 45.9451 -90.2732 472.000 30.0 398.150 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 22 59 55 45.9451 -90.2732 472.000 122.0 398.003 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 04 55 45.9451 -90.2732 472.000 396.0 398.019 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 09 55 45.9451 -90.2732 472.000 30.0 398.061 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 14 55 45.9451 -90.2732 472.000 122.0 398.051 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 19 55 45.9451 -90.2732 472.000 396.0 398.104 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 20 25 45.9451 -90.2732 472.000 396.0 398.177 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 20 55 45.9451 -90.2732 472.000 396.0 398.156 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 21 25 45.9451 -90.2732 472.000 396.0 398.165 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 21 55 45.9451 -90.2732 472.000 396.0 398.139 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 22 25 45.9451 -90.2732 472.000 396.0 398.146 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 22 55 45.9451 -90.2732 472.000 396.0 398.241 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 23 25 45.9451 -90.2732 472.000 396.0 398.210 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 23 55 45.9451 -90.2732 472.000 396.0 398.139 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 24 25 45.9451 -90.2732 472.000 396.0 398.167 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 24 55 45.9451 -90.2732 472.000 396.0 398.229 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 29 55 45.9451 -90.2732 472.000 30.0 398.075 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 34 55 45.9451 -90.2732 472.000 122.0 397.937 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 39 55 45.9451 -90.2732 472.000 396.0 397.766 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 44 55 45.9451 -90.2732 472.000 30.0 397.974 0.090 -999.990 -999.990 0.070 ..P LEF 2010 11 30 23 49 55 45.9451 -90.2732 472.000 122.0 397.775 0.090 -999.990 -999.990 0.070 ..P